Testing relativity with solar system dynamics

A major breakthrough is described in the accuracy of Solar System dynamical tests of relativistic gravity. The breakthrough was achieved by factoring in ranging data from Viking Landers 1 and 2 from the surface of Mars. Other key data sources included optical transit circle observations, lunar laser ranging, planetary radar, and spacecraft (Mariner 9 to Mars and Mariner 10 to Mercury). The Solar System model which is used to fit the data and the process by which such fits are performed are explained and results are discussed. The results are fully consistent with the predictions of General Relativity.

Hellings, R. W.↗

Transformational Sorbent-Based Process for a Substantial Reduction in the Cost of CO2 Capture

Adsorption processes have the potential to significantly reduce the CO2 capture cost from power plants and industrial flue gases. InnoSepra has developed several sorbent-based technologies to obtain very high CO2 recovery and high purity CO2 while meeting the EOR/sequestration product specifications. A first-generation process was shown to achieve CO2 recoveries greater than 94% at CO2 purities in the range of 98.5-99.5%. The absolute heat energy required for the process was not only 40% lower than MEA but also was needed at a much lower temperature. This work will present the performance of the second-generation InnoSepra process which is based on a breakthrough sorbent regeneration method. This process has a projected 45% lower capital cost compared to MEA, less than 16% loss in plant output for CO2 capture and compression, and a CO2 capture cost at least 55% lower than MEA. Lab scale testing and the process simulations indicate a CO2 capture performance similar to or better than the first-generation process. Pilot scale drying and breakthrough tests were carried out at the Technology Centre Mongstad (TCM), Norway, and lab-scale cyclic tests were carried out at InnoSepra to confirm the process improvement. During these tests, InnoSepra’s flue gas purification technology was also tested at TCM. It can provide a low-cost option for the removal of NO2 and SOX to sub-ppm levels as well as a significant reduction in aerosol emissions.

08 HYDROGEN↗

Chemical Challenge Tests on ISS Fire Cartridges

Following a confirmed combustion event onboard the International Space Station (ISS), crewmembers will don Emergency Masks, each fitted with 2 ISS fire cartridge filters. As the crewmember breathes through the filters, combustion products in the cabin air are either filtered or catalyzed by the fire cartridge media to minimize crew exposure to harmful levels of contaminants. Rigorous certification, acceptance, and surveillance programs for the fire cartridges ensure that each lot meets stringent performance requirements during the beginning of and throughout the service life of the cartridges. In accordance with the Quality/Acceptance Test Plan, multiple fire cartridges from each lot undergo chemical challenge tests, with each test lasting 2.5 hours and involving one or more chemicals at specified concentrations. These tests are conducted at specific temperatures, humidity levels, and gas flow rates intended to mimic the worst-case conditions for fire cartridge performance. These challenge tests are conducted by the Environmental Chemistry Laboratory at the NASA Lyndon B. Johnson Space Center. The majority of the challenge tests focus on carbon monoxide (CO), but other gases include hydrogen cyanide (HCN), hydrogen chloride (HCl), cyclohexane, acrolein, and acetaldehyde. A fire cartridge is exposed to the test gas in a test chamber at the specified conditions and the outlet is monitored for breakthrough during the 2.5-hour test. This paper will briefly introduce fire cartridges and how they work, then discuss details of the challenge gas delivery and exposure system, breakthrough monitoring methods, and discussion of issues that have arisen during the course of the test program. Although the focus of this paper will be on the conduction of the challenge tests, a general summary of the performance of the fire cartridges will be provided.

Fire Cartridge↗

Harnessing Uncertainty through Functional Data Analysis in Gas Breakthrough Data

Detecting subsurface explosions from radionuclide gas migration through rock fractures is an effective way to identify nuclear activity. Los Alamos National Laboratory (LANL) has developed simulation methods, based on data from the 1962 Hardhat underground nuclear test, to predict gas breakthrough times at the surface. However, these methods rely on an imperfect understanding of the relationship between rock damage and fracture permeability. Our clinic project studies methods for predicting breakthrough curves that characterize total mass produced as a function of time, as well as quantifying the uncertainty associated with these predictions. The model that is currently employed to relate damage to permeability uses an empirically motivated power-law expression, with a range of parameter values that are compatible with the experimental Hardhat data. We develop emulators, built from functional data analysis techniques and trained on simulation data, that rapidly predict the gas breakthrough curve given a damage field and given the parameter values of the power-law equation. Using Bayesian regression, we address the problem of uncertainty quantification in our emulators. Finally, in order to test the robustness of the model, we further validate it on a damage field representing different physical conditions.

58 GEOSCIENCES↗

Chemical Challenge Tests on ISS Fire Cartridges

Following a confirmed combustion event onboard the International Space Station (ISS), crew members will don Emergency Masks, each fitted with 2 ISS fire cartridge filters. As the crew member breathes through the filters, combustion products in the cabin air are either filtered or catalyzed by the fire cartridge media to minimize crew exposure to harmful levels of contaminants. Rigorous certification, acceptance, and surveillance programs for the fire cartridges ensure that each lot meets stringent performance requirements throughout the service life of the cartridges. In accordance with the Quality/Acceptance Test Plan, multiple fire cartridges from each lot undergo chemical challenge tests involving one or more chemicals at specified concentrations. These tests are conducted at specific temperatures, humidity levels, and gas flow rates intended to mimic the worst-case conditions for fire cartridge performance. These challenge tests are conducted by the Environmental Chemistry- Laboratory at the NASA Lyndon B. Johnson Space Center. Many of the challenge tests focus on carbon monoxide (CO), but other gases include hydrogen cyanide (HCN), hydrogen chloride (HCl), cyclohexane, acrolein, ammonia (NH3), and acetaldehyde. A fire cartridge is exposed to the test gas in a chamber at the specified conditions, and the outlet is monitored for breakthrough during the 2.5-hour test. This paper will briefly introduce fire cartridges and how they work and will then discuss details of the challenge gas delivery and exposure system, breakthrough monitoring methods, and discussion of issues that have arisen during the course of the test program. Although the focus of this paper will be on the challenge tests, a general summary of the performance of the fire cartridges will also be provided.

Cristina M. Muko↗

Ion Exchange Processing of AN-107 Hanford Tank Waste through Crystalline Silicotitanate in a Staged 2- then 3-Column System

The Hanford Site stores an estimated 56 million gallons of mixed radioactive and chemically hazardous waste in large underground tanks. In support of the Direct Feed Low-Activity Waste (DFLAW) Program for expediting Hanford tank waste supernate treatment, laboratory-scale ion exchange processing using prototypic unit operations was conducted on AN-107 tank waste at the Pacific Northwest National Laboratory Radiochemical Processing Laboratory. This report describes the small-scale ion exchange testing with 13.7 L of diluted and filtered supernate from Tank 241-AN-107 (hereafter referred to as AN-107) at 16 °C (62 °F). One of the waste acceptance criteria (WAC) for the Waste Treatment Plant (WTP) Low-Activity Waste Facility is that the waste must contain less than 3.18×10 -5 Ci 137 Cs per mole of Na. For the AN-107 tank waste to meet this criterion, only 0.147% of the influent 137 Cs concentration may be delivered to the WTP; this requires a Cs decontamination factor of 678. Testing with AN-107 matched current Tank Side Cesium Removal (TSCR) facility prototypic operations where a lead-lag configuration was used until the lag column reached the WAC limit, then a polish column was brought online for continued processing in a lead-lag-polish column configuration. Feed was processed at 1.9 bed volumes (BVs) per hour; the flowrate, in terms of contact time with the crystalline silicotitanate (CST) bed, matched the expected flowrate at TSCR. The Cs-decontaminated product was retained for vitrification testing (to be reported separately). The lead column reached 40% Cs breakthrough after processing ~1700 BVs of feed; the 50% Cs breakthrough was extrapolated from the breakthrough data to occur at 1873 BVs. Testing compared to previous AP-101 and AP-107 testing at 16 °C showed ~300 BV increases in volume processed to reach the WAC limit for both lead and lag columns. The increase in capacity was determined to be due to the significantly lower K concentration in the AN-107 compared to the other tank waste matrices. A comparison in breakthrough curves for the three tests indicated slightly slower kinetic behavior in the AN-107, with variations in feed matrices (high organic complexants) likely responsible for the deviation. The Cs effluent from the lag column reached the WAC limit after processing 1097 BVs. Anticipating this breakthrough point, the polish column was preemptively installed around 900 BVs. Cs breakthrough from the lag column began at 500 BVs, reaching 3.06×10 0 µCi/mL, or 2.6 % Cs breakthrough, after processing all 1700 BVs of feed. Table S.1 and Figure S.1 summarize the observed column performance and relevant Cs loading characteristics.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FY25 Ion Exchange Processing for the West Area Risk Management (WARM) Project

The West Area Risk Management (WARM) Project was established to enable near-term retrieval and pretreatment of tank waste from Hanford’s 200 West Area and to support deployment of an ion exchange (IX) system capable of producing cesium-depleted supernate suitable for offsite treatment and disposal. The WARM experimental campaign was designed to provide key data for design and operational planning of the 200 W IX system, which plans to utilize crystalline silicotitanate (CST) as the active media for cesium removal. This report documents a comprehensive FY25 experimental campaign designed to produce key technical data required for design and operational planning of the WARM IX system. Testing includes assessing Cs and Sr breakthrough performance in a 4-column system, Cs capacity batch contact testing, phosphate precipitation assessments, reduced-hydroxide feed displacement evaluation, and Sr speciation impacts on Sr removal. The experimental results provide detailed trends in Cs and Sr loading behavior, breakthrough performance across a 4-column staged IX system, distribution profiles within CST beds, and projections of operational flowrates relative to Waste Acceptance Criteria (WAC) limits. Batch contact testing established equilibrium partitioning behavior for the S1–S5 simulants and characterized how matrix chemistry influenced Cs sorption onto CST. Additionally, further evaluations on waste matrix as it pertains to precipitation potential were also determined. Collectively, these datasets support engineering design choices for WARM system throughput and pretreatment planning.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Effect of KOH concentration on LEO cycle life of IPV nickel-hydrogen flight cells-update 2

An update of validation test results confirming the breakthrough in low earth orbit (LEO) cycle life of nickel-hydrogen cells containing 26 percent KOH electrolyte is presented. A breakthrough in the LEO cycle life of individual pressure vessel (IPV nickel-hydrogen cells has been previously reported. The cycle life of boiler plate cells containing 26 percent potassium hydroxide (KOH) electrolyte was about 40 000 LEO cycles compared to 3500 cycles for cells containing 31 percent KOH. This test was conducted at Hughes Aircraft Company under a NASA Lewis contract. The purpose was to investigate the effect of KOH concentration on cycle life. The cycle regime was a stressful accelerated LEO, which consisted of a 27.5 min charge followed by a 17.5 min discharge (2x normal rate). The depth of discharge (DOD) was 80 percent. The cell temperature was maintained at 23 C. The boiler plate test results are in the process of being validated using flight hardware and real time LEO test at the Naval Weapons Support Center (NWSC), Crane, Indiana under a NASA Lewis Contract. Six 48 Ah Hughes recirculation design IPV nickel-hydrogen flight battery cells are being evaluated. Three of the cells contain 26 percent KOH (test cells), and three contain 31 percent KOH (control cells). They are undergoing real time LEO cycle life testing. The cycle regime is a 90-min LEO orbit consisting of a 54-min charge followed by a 36-min discharge. The depth-of-discharge is 80 percent. The cell temperature is maintained at 10 C. The three 31 percent KOH cells failed (cycles 3729, 4165, and 11355). One of the 26 percent KOH cells failed at cycle 15314. The other two 26 percent KOH cells were cycled for over 16600 cycles during the continuing test.

Smithrick, John J.↗

Effect of KOH concentration on LEO cycle life of IPV nickel-hydrogen flight cell - Update II

An update of validation test results confirming the breakthrough in LEO cycle life of nickel-hydrogen cells containing 26 percent KOH electrolyte is presented. A breakthrough in the LEO cycle life of individual pressure vessel (IPV) nickel-hydrogen cells has been previously reported. The cycle life of boiler plate cells containing 26 percent potassium hydroxide (KOH) electrolyte was about 40,000 LEO cycles, compared to 3500 cycles for cells containing 31 percent KOH. The cycle regime was a stressful accelerated LEO, which consisted of a 27.5 min charge followed by a 17.5 min discharge (2X normal rate). The depth-of-discharge was 80 percent. Six 48-Ah Hughes recirculation design IPV nickel-hydrogen flight battery cells are being evaluated. Three of the cells contain 26 percent KOH (test cells), and three contain 31 percent KOH (control cells). They are undergoing real time LEO cycle life testing. The cycle regime is a 90-min LEO orbit consisting of a 54-min charge followed by a 36-min discharge. The depth-of-discharge is 80 percent. The cell temperature is maintained at 10 C. The three 31 percent KOH cells failed (cycles 3729, 4165, and 11355). One of the 26 percent KOH cells failed at cycle 15314. The other two 26 percent KOH cells were cycled for over 16,000 cycles during the continuing test.

Smithrick, John J.↗

Effect of KOH concentration on LEO cycle life of IPV nickel-hydrogen flight cells. An update

An update of validation test results confirming the breakthrough in LEO cycle life of nickel-hydrogen cells containing 26 percent potassium hydroxide (KOH) electrolyte is presented. A breakthrough in the LEO cycle life of individual pressure vessel nickel-hydrogen cells is reported. The cycle life of boiler plate cells containing 26 percent KOH electrolyte was about 40,000 LEO cycles compared to 3500 cycles for cells containing 31 percent KOH.

Smithrick, John J.↗

Effect of KOH concentration on LEO cycle life of IPV nickel-hydrogen flight cells - An update

An update of validation test results confirming the breakthrough in LEO cycle life of nickel-hydrogen cells containing 26 percent potassium hydroxide (KOH) electrolyte is presented. A breakthrough in the LEO cycle life of individual pressure vessel nickel-hydrogen cells is reported. The cycle life of boiler plate cells containing 26 percent KOH electrolyte was about 40,000 LEO cycles compared to 3500 cycles for cells containing 31 percent KOH.

Smithrick, John J.↗

Effect of LEO cycling on 125 Ah advanced design IPV nickel-hydrogen flight cells - An update

An update of validation test results confirming the breakthrough in LEO cycle life of nickel-hydrogen cells containing 26 percent potassium hydroxide (KOH) electrolyte is presented. A breakthrough in the LEO cycle life of individual pressure vessel nickel-hydrogen cells is reported. The cycle life of boiler plate cells containing 26 percent KOH electrolyte was about 40,000 LEO cycles compared to 3500 cycles for cells containing 31 percent KOH.

Smithrick, John J.↗

Small to Full Height Scale Comparisons of Cesium Ion Exchange Performance with Crystalline Silicotitanate

The U.S. Department of Energy’s (DOE) Hanford Site houses 56 million gallons of high-level radioactive waste generated from plutonium production from 1944 to 1988. The supernatant waste, currently stored in underground tanks, is intended to be vitrified following filtration and 137 Cs removal at the Hanford Waste Treatment and Immobilization Plant (WTP) Low-Activity Waste (LAW) Vitrification Facility. The WTP Pretreatment Facility will not be operational for several years. The Tank Side Cesium Removal (TSCR) system is a technology demonstration that will remove cesium from tank waste supernate to support directly feeding LAW to the vitrification facility. The 137 Cs removal is important to meet the WTP LAW contract specification and ultimately for creating a contact-handled waste form. The waste acceptance criteria (WAC) limit for the WTP LAW Facility is <3.18E-5 Ci 137 Cs per mole Na. The TSCR system is skid mounted and employs two key technologies: dead end filtration for solids removal and ion exchange (IX) for cesium removal. Filtration is necessary to protect the functionality of the IX columns. The IX process utilizes sodium form crystalline silicotitanate (CST) IX media produced by UOP Honeywell, LLC (Des Plaines, IL) under the product name IONSIV R9140-B, 18 x 50 mesh, in a lead-lag-polish column configuration. Each column contains a CST bed height of 92 inches and a volume of approximately 157 gallons of CST IX media. The full-scale TSCR operation will run at a residence time of 1.9 bed volumes (BV)/h, which results in a superficial velocity of 7.3 cm/min and a flowrate of ~5 gal/min. Column testing at small (2.5% of the full bed height), medium (12% of the full bed height), and full-height scales has been previously conducted to evaluate process variables and scale up performance of Cs exchange onto the CST. Cesium load performances from various sieve cuts at the small scale indicated that a 30-mesh sieve cut be tested to determine if it better reflects the 12% and full-height column performances at the small scale. Two process flowrates were tested in the small-column configuration with <30-mesh CST and simulant solutions. These tests were compared to full-height column tests at the same residence times to assess CST particle size effect on column scaling. Table S.1 summarizes the observed column performance determined for the two flowrates juxtaposed to the previous work with 5.6 M Na simulant at higher scales (used as benchmarks). The WAC breakthroughs between the small and full-height tests at 1.3 BV/h differed by ~59 BVs. The WAC breakthroughs for small, medium, and full-height tests at 1.8 BV/h were consistent at 240 BVs. The 50% Cs breakthroughs were nominally equivalent for all column tests. The common transition zones and onsets of Cs breakthrough at the 1.8 BV/h tests indicated that the Cs mass transfers were equivalent and thus the <30-mesh CST Cs load performance at the small scale successfully modeled that of the full-height system. It is recommended that the <30-mesh CST be used in subsequent 10-mL CST bed tests.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Experimental and Numerical Investigation of Adsorption/Desorption in Packed Sorption Beds Under Ideal and Non-Ideal Flows

The importance of the wall effect on packed beds in the adsorption and desorption of carbon dioxide, nitrogen, and water on molecular sieve 5A of 0.127 cm in radius is examined experimentally and with one-dimensional computer simulations. Experimental results are presented for a 22.5-cm long by 4.5-cm diameter cylindrical column with concentration measurements taken at various radial locations. The set of partial differential equations are solved using finite differences and Newman's method. Comparison of test data with the axial-dispersed, non-isothermal, linear driving force model suggests that a two-dimensional model (submitted to Separation Science and Technology) is required for accurate simulation of the average column breakthrough concentration. Additional comparisons of test data with the model provided information on the interactive effects of carrier gas coadsorption with CO2, as well as CO2-H2O interactions.

Mohamadinejad, H.↗

Providing Affordable Access to the Lunar and Martian Gravity Environments for Conducting Scientific Research and Enabling Technology Development

NASA’s Artemis campaign aims to explore the Moon for scientific discovery, technology advancement, and to learn how to live and work on another world as we prepare for human missions to Mars. Like the Moon, Mars is a rich destination for scientific discovery and a driver of technologies that will enable humans to travel and explore far from Earth. Conducting space research and validating gravity-dependent technologies in low-Earth orbit or on the surface of the Moon or Mars is expensive and typically requires long project life cycles. To achieve NASA’s Moon to Mars objectives, it will be necessary to have affordable, ground-based test platforms for carrying out this research and technology development in the relevant gravity environment. A proposed upgrade to NASA Glenn Research Center’s Zero Gravity Research Facility is presented that will provide more than 10 seconds of any prescribed gravity level between microgravity and Earth gravity, allowing users to rapidly conduct dozens of tests per day in a microgravity, Lunar, and Martian gravity environment. The design concept is described along with expected performance characteristics, and technologies and research areas that will benefit. The proposed ground-based variable gravity test capability will enable scientific breakthroughs and Moon to Mars technology and subsystem development while also providing a tool for educating and inspiring future scientists and engineers.

Variable Gravity↗

Ion Exchange Processing of AW-105 Hanford Tank Waste through Crystalline Silicotitanate in a Staged 2- then 3-Column System

The Hanford Site stores an estimated 56 million gallons of mixed radioactive and chemically hazardous waste in large underground tanks. In support of the Direct Feed Low-Activity Waste (DFLAW) Program for expediting Hanford tank waste supernate treatment, laboratory-scale ion exchange processing using prototypic unit operations was conducted on AW-105 tank waste at the Pacific Northwest National Laboratory Radiochemical Processing Laboratory. This report describes the small-scale ion exchange testing with 9.2 L of diluted and filtered supernate from Tank 241-AW-105 (hereafter referred to as AW-105) at 16 °C (62 °F). One of the waste acceptance criteria (WAC) for the Waste Treatment Plant (WTP) Low-Activity Waste Facility is that the waste must contain less than 3.18×10 -5 Ci 137 Cs per mole of Na. For the AW-105 tank waste to meet this criterion, only 0.225% of the influent 137 Cs concentration may be delivered to the WTP; this requires a Cs decontamination factor of 445. Testing with AW-105 matched current Tank Side Cesium Removal (TSCR) facility prototypic operations where a lead-lag configuration was used until the lag column reached the WAC limit, then a polish column was brought online for continued processing in a lead-lag-polish column configuration. Feed was processed at 1.9 bed volumes (BVs) per hour; the flowrate, in terms of contact time with the crystalline silicotitanate (CST) bed, matched the expected flowrate at TSCR. The Cs-decontaminated product was retained for vitrification testing (to be reported separately). The lead column reached 83% Cs breakthrough after processing ~1500 BVs of feed; the 50% Cs breakthrough was interpolated from the breakthrough data and occurred at 1041 BVs. Despite the AW-105 having a significantly higher K concentration (0.55 M compared to 0.10 M), testing compared to previous AP-107 ion exchange column testing at 16 °C showed no difference in BVs processed to reach the WAC on the lead column and only an approximate ~20 BV decrease in volume processed to reach the WAC limit on the lag column. The negligible differences in capacity despite the 5x concentration differences in K was determined to be due to the significantly lower NO3 concentration in the AW-105 supernate compared to the AP-107 tank waste matrix. A comparison in breakthrough curves for the two tests also indicated slightly faster kinetic behavior in the AW-105, with the variations in feed matrices (lower NO3 concentration) likely responsible for the deviation. The Cs effluent from the lag column reached the WAC limit after processing 772 BVs. Anticipating this breakthrough point, the polish column was preemptively installed around 675 BVs. Cs breakthrough from the lag column began at 300 BVs, reaching 1.10×10 1 µCi/mL, or 14.13 % Cs breakthrough, after processing all 1500 BVs of feed. The polish column processed nominally 830 BVs and reached 2.10×10 -1 µCi/mL, or 0.27 % Cs breakthrough at the conclusion of the test. Table S.1 and Figure S.1 summarize the observed column performance and relevant Cs loading characteristics.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Simulated Moving Bed Process for CO 2 Capture from Humid Postcombustion Flue Gases Using MUF-16

Simulated moving bed (SMB) designs are increasingly being adapted for the separation of multicomponent gaseous mixtures. In this work, we develop a modified SMB process for capturing CO 2 from humid postcombustion flue gas using MUF-16 (MUF = Massey University Framework). MUF-16 shows excellent selectivity for CO 2 over N 2 , moderate heats of adsorption for CO 2 and H 2 O, and no competitive sorption of CO 2 over water at relative humidities relevant to postcombustion capture. We utilize these characteristics to propose a continuous process that uses N 2 from the feed as the desorbent for the water, eliminating the need for a separate desiccant bed and allowing for localized heating during desorption for H 2 O-saturated MOF beds. Single-component isotherms, single-column breakthrough experiments, and SO 2 stability tests suggest the excellent suitability of MUF-16 to this separation via the proposed SMB design.

CO2 capture from humid flue gas↗

Hanford Tank Waste Matrix Impact on Ion Exchange Performance Using Crystalline Silicotitanate

The removal of radiocesium from Hanford tank waste supernate is a critical step in preparing feed for low-activity waste immobilization. This study evaluated cesium ion exchange performance using crystalline silicotitanate (CST) media in a series of tests designed to evaluate the influence of waste matrix variability on capacity and kinetics. Tank waste supernate subsampled from five Hanford double-shell tanks encompassed a range of sodium, hydroxide, nitrate, and nitrite concentrations in order to assess the impact of feed variability on the performance of the ion exchange system. Both equilibrium and dynamic ion exchange tests were conducted to quantify cesium distribution coefficients and breakthrough behavior under prototypic operating conditions. Results indicated that effective cesium capacity varied by up to a factor of five across the matrices tested, with higher sodium concentrations significantly reducing uptake. Kinetic behavior was similarly matrix-dependent, with solution viscosity contributing to a twofold variation in mass-transfer rates. These results demonstrate the strong dependence of CST ion exchange performance on waste composition and must be incorporated into predictive models for future treatment system design and optimization.