Search NASA⌕ Search

SEARCH · Search NASA

Results for “building loads”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Techno-economic feasibility of borehole thermal energy storage system connected to geothermal heat pumps for seasonal heating load of two buildings in Fairbanks, Alaska

Borehole thermal energy storage (BTES) is an effective solution for managing imbalanced heating and cooling loads in cold regions. This study evaluated the long-term feasibility of a BTES system in the Fairbanks area, Alaska, through building energy modeling, resource characterization, and numerical modeling. The system was designed to store waste heat from a nearby coal power plant during summer and provide thermal energy during winter to geothermal heat pumps supplying heating loads in two buildings. Heating load profiles were modeled for the buildings using EnergyPlus, and the results indicated the annual heating load was 5.6 times greater than the cooling load. 40 borehole heat exchangers were pre-designed approximately 100 m away from the two buildings in terms of land availability and regulatorily optimized depth. The 20-year performance of the designed BTES system under two operational scenarios—one with a 5-year preheating period and one without—was numerically modeled using subsurface temperature and properties characterized through the literature review and thermal response tests. Both scenarios demonstrated that the BTES has the capacity to fully cover the heating loads in the two buildings throughout the 20-year lifetime. Production temperatures at central wells were 33 % higher on average than at outer wells in both scenarios. The 5-year preheating period increased subsurface and extraction temperatures, and correspondingly annual average and total thermal energy production was higher for 8 years than in the scenario without the preheating period. These results highlight the long-term reliability and sustainability of the BTES system in meeting heating demands over its lifetime, with the preheating period offering potential performance improvements. Implementing the BTES system in cold regions with high heating demand, such as Fairbanks, Alaska, could provide a long-term, sustainable energy solution for managing imbalanced heating and cooling loads.

15 GEOTHERMAL ENERGY↗

Optimizing Hydronic Heating for Comfort and Performance in Multifamily Housing

Inefficient control settings in multifamily boilers often lead to substantial energy and cost penalties. To address this, a Fault Detection and Diagnostic (FDD) tool was developed to automate data analysis and identify operational faults such as suboptimal outdoor temperature sensor placement, misconfigured outdoor air reset (OAR) curves, excess boiler cycling, and domestic hot water (DHW) setpoint errors. By comparing pre- and post-implementation periods and applying engineering models, the tool quantifies energy savings and reduces manual analysis time by over 90%. Testing on over 100 monitored sites and a targeted subset of 12 buildings showed an average 11% energy savings from remote optimization; further validation across 19 OAR curve changes confirmed the tool’s accuracy, predicting actual savings within ±5% for most cases. Simple payback can be under three years for many multifamily buildings, though rising hardware, labor, and fuel costs create uncertainties, and decarbonization goals increasingly shift focus to electrification. The FDD tool remains invaluable for optimizing existing boilers, enhancing future electrification measures, and adapting to new technologies by refining building load estimates. In doing so, it supports both near-term efficiency and long-term transitions to low-carbon alternatives, ensuring buildings achieve substantial cost and energy benefits throughout their system lifecycles.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Optimizing Control for Efficient Load Shifting with Thermal Energy Storage in Existing HVAC Systems

This project developed the integration of a direct-contact heat exchanger (DCHX) based thermal energy storage (TES) system with a chiller–air handling unit (AHU) plant to evaluate its potential for reducing building energy costs. Detailed physical models of the TES unit, building envelope, and HVAC components were developed alongside simplified control-oriented models to support both high-fidelity simulation and real-time optimization. Two control strategies were implemented and compared: a rule-based control (RBC) aligned with utility time-of-use (ToU) rates, and a model predictive control (MPC) framework leveraging forecasts of building load, weather, and internal gains.Simulation results show that the RBC strategy reduced daily electricity costs by around 30% by shifting cooling production from on-peak to off-peak hours. In contrast, the MPC strategy achieved significantly greater performance, reducing daily operating costs by up to 44% and peak-hour costs by more than 60%. Both strategies maintained indoor thermal comfort within acceptable limits, with MPC further improving load distribution and reducing equipment cycling.The outcomes confirm that TES integration, particularly when coordinated with advanced predictive control, can provide substantial cost savings and on-peak demand reduction. . These findings directly support the U.S. Department of Energy’s goals for grid-interactive efficient buildings and demonstrate the potential of TES-enabled HVAC systems for scalable deployment across the commercial building.

99 GENERAL AND MISCELLANEOUS↗

Optimizing Control for Efficient Load Shifting with Thermal Energy Storage in Existing HVAC Systems

This project developed the integration of a direct-contact heat exchanger (DCHX) based thermal energy storage (TES) system with a chiller–air handling unit (AHU) plant to evaluate its potential for reducing building energy costs. Detailed physical models of the TES unit, building envelope, and HVAC components were developed alongside simplified control-oriented models to support both high-fidelity simulation and real-time optimization. Two control strategies were implemented and compared: a rule-based control (RBC) aligned with utility time-of-use (ToU) rates, and a model predictive control (MPC) framework leveraging forecasts of building load, weather, and internal gains. Simulation results show that the RBC strategy reduced daily electricity costs by around 30% by shifting cooling production from on-peak to off-peak hours. In contrast, the MPC strategy achieved significantly greater performance, reducing daily operating costs by up to 44% and peak-hour costs by more than 60%. Both strategies maintained indoor thermal comfort within acceptable limits, with MPC further improving load distribution and reducing equipment cycling. The outcomes confirm that TES integration, particularly when coordinated with advanced predictive control, can provide substantial cost savings and on-peak demand reduction. . These findings directly support the U.S. Department of Energy’s goals for grid-interactive efficient buildings and demonstrate the potential of TES-enabled HVAC systems for scalable deployment across the commercial building.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Latent heat thermal energy storage performance maps enabling fast & accurate building energy simulations

Thermal energy storage (TES) using phase change materials (PCMs) has gained attention as an effective approach to manage energy demand fluctuations and shift peak building loads. PCM embedded heat exchangers (PCM-HXs) offer high energy storage density and low temperature variation during phase change, being suitable for load-shifting applications. However, this component is typically evaluated using computationally expensive methods, which present significant challenges when the ultimate goal is to assess the performance of PCM-HX integrated thermal energy storage systems in the full building context. In this paper, we present a methodology to generate highly accurate and computationally efficient PCM-HX performance maps which can be easily integrated into building energy simulation tools to analyze the feasibility of space conditioning systems with latent heat PCM-based TES. The performance maps are generated using a computationally efficient PCM-HX simulation tool based on a Generalized Resistance-Capacitance Model (GRCM) which can simulate arbitrary PCM-HXs with high accuracy and significantly less computational effort compared to full CFD simulations. The methodology was verified for a case study considering a 5-ton (~17.5 kW) air-to-water heat pump-thermal energy storage system (HP-TES), which was co-simulated in Modelica for a DOE prototype small-office building in Vienna, Austria, using Spawn of EnergyPlus™. The TES performance maps provided accurate predictions of PCM-HX behavior when used as Modelica component, with deviations within 2-4% while also achieving at least 103 computational time reduction. Leveraging this faster prediction capability, four PCMs with different melting temperatures for cooling (12°C, 16°C) and heating (31°C, 36°C) were assessed to investigate their impact on system performance. This work highlights the importance of robust PCM-HX models for efficient and high-fidelity building-level simulations, presenting new opportunities for advanced control strategy development and parametric analysis of TES configurations in a computationally efficient manner

Modelica Building Simulations↗

Optimizing Grid-interactive Efficient Building Designs with Stacked Value Streams

Grid-interactive efficient buildings (GEBs) are those characterized by the combination of energy efficiency and demand flexibility with smart technologies and communications to not only deliver greater affordability and comfort to buildings, but also help utilities manage grid operations and lower system costs. This paper presents an innovative techno-economic assessment framework to effectively examine different GEB design options, explore various use cases, define technically achievable benefits, and thereby assist in informed decision-making. In particular, building load flexibility, thermal storage, and battery energy storage are considered. Advanced optimal dispatch problem is formulated to maximize the stacked value streams from multiple, competing use cases, subject to the physical capabilities and operational flexibility associated with different designs and configurations. Comprehensive case studies were performed for a real-world building to evaluate the cost-effectiveness of different GEB designs and offer in-depth insights. It was found that the proposed assessment method could effectively capture the costs and benefits linked to each GEB design option. Furthermore, the study revealed that outage mitigation and demand response are the two most significant sources of benefits for GEBs.

Ma, Xu↗

Optimizing Facility Operations by Applying Machine Learning to the Army Reserve Enterprise Building Control System (Final Report)

Thousands of U.S. Department of Defense (DoD) buildings have building automation systems (BASs) and/or advanced meters. Although these systems have a wealth of data, performance optimization requires time and expertise to review and act on that information. Machine learning (ML) can provide automated and actionable insights to controls operators. This demonstration implemented proven ML methods on the Army Reserve Enterprise Building Control System. ML refers to algorithms that “learn” from data and improve their performance on a given task over time. In the buildings domain these tasks range from predicting future energy consumption, to identifying operational issues before faults occur, to optimizing control decisions. To learn, ML requires input data, which – for buildings – typically consists of instrument data such as energy consumption data and subsystem controls information such as set-point temperatures, and context data consisting of information such as the physical location of the building, the area of the building, and the weather. ML models use the relationships learned from the input data to make predictions with new, previously unseen, data. The team was able to investigate and successfully implement the following ML use cases: labeling consumption data as anomalous or non-anomalous; baseline whole-building load prediction (unknown fault status); fault detection (validation not possible); and site prioritization for energy-related projects. Due to the constraints of the project, interventions were not able to be implemented during the demonstration; therefore, assessments of operational cost savings and maintenance avoided could not be performed. The project has been presented at two leading national building conferences and two additional publications to peer-reviewed journals are currently in preparation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Optimized V1G and V2G Electric Vehicle Fleet Management and Grid Transaction at Marine Corps Air Station Miramar in San Diego, CA

The overall technical goal of the project was to demonstrate an all-electric bi-directional non-tactical fleet at Marine Corps Air Station (MCAS) Miramar that was integrated and controlled with other distributed energy resources (DERs) (i.e., PV, stationary battery, and building loads) to provide resilience to critical electric loads in the event of grid outages, to minimize charging costs, and to provide economic energy resources to electricity markets. In this project, the specific, technical objectives were: 1. Demonstrate that bi-directional electric vehicles can provide critical complementary services to fixed storage batteries in microgrid applications while performing function as non-tactical vehicles. 2. Demonstrate participation of bi-directional (V2G) and unidirectional (V1G) PEVs for demand management and minimization of charging costs. 3. Demonstrate integration of multiple DERs for grid service participation. US Marine Corps Air Station (MCAS) Miramar in San Diego was the site of this electric vehicle-to-microgrid-utility grid test and demonstration project. Existing microgrid assets in this study included (1) a public works building; (2) a 30-kW rooftop photovoltaic (PV) system and (3) a separate 250 kW carport PV system. In this project, six bi-directional V2G vans were located at the MCAS Miramar’s showcase building-scale microgrid to develop and test technical capabilities that V2G can provide in microgrid applications (e.g., cost reduction and resiliency). These resources provided aggregated demand management and simulated participation in current retail DR programs. The vehicles used in this demonstration were selected because they provided functionality that MCAS Miramar needed, 15 passenger transport and facilities work cargo carrying capacity, and bi-directional charging capability that the research project required. All vehicles in this study were manufactured and distributed by VIA Motors, Inc. There were six vehicles total and each was VIA’s VTRUX eREV V2G model, a modified General Motors Chevrolet 2500 2WD van. Three of the vans were configured as passenger vans and the other three were configured as cargo vans. Each van had an on-board bi-direcrtional inverter/charger, Bel Power Solutions model 350INVCHGT150-120-240-8G nominally rated at +/-15 kW. The VIA van’s charging connector follows the J1772 charging protocol. The bi-directional EVSEs demonstrated in this study were manufactured by Coritech, Inc. Each VGI-80-AC charging station enabled enhanced V2G charging capability to a Clipper Creek CS-100 charging module. The enhanced capabilities included ethernet communication following the SEP2.0 protocol with a distributed energy resource function set and an operator screen displaying real-time SOC, voltage, and current. The VGI-80-AC charging stations are classified as level 2 with a maximum current output of 80 A or effectively 19 kW. The VIA van’s onboard charger limited the charging and discharging power to 15 kW in each direction. A control computer was installed in the EWOC and connected to an existing monitor. The V2G control communication network was a completely stand-alone closed system that did not have any connection to any other networks on the base. A cybersecure remote communication connection was created with a cellular modem, firewall hardware, and a virtual private network configuration.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A flight-rated liquid-cooled garment for use within a full-pressure suit

A flight rated liquid cooled garment system for use inside a full pressure suit has been designed, fabricated, and tested. High temperature tests with this system have indicated that heat is absorbed at a rate decreasing from 224 kg-cal/hr to 143 kg-cal/hr over a 40-min period. The first 30 min are very comfortable; thereafter a gradual heat load builds that results in mild sweating at the end of the 40-min period. In flight tests during hot weather when this cooling system was worn under a regulation flight suit, the pilot reported that temperatures were comfortable and that the garment prevented sweating.

Carpenter, R.↗

Attitude determination with three-axis accelerometer for emergency atmospheric entry

Two algorithms are disclosed that, with the use of a 3-axis accelerometer, will be able to determine the angles of attack, sideslip and roll of a capsule-type spacecraft prior to entry (at very high altitudes, where the atmospheric density is still very low) and during entry. The invention relates to emergency situations in which no reliable attitude and attitude rate are available. Provided that the spacecraft would not attempt a guided entry without reliable attitude information, the objective of the entry system in such case would be to attempt a safe ballistic entry. A ballistic entry requires three controlled phases to be executed in sequence: First, cancel initial rates in case the spacecraft is tumbling; second, maneuver the capsule to a heat-shield-forward attitude, preferably to the trim attitude, to counteract the heat rate and heat load build up; and third, impart a ballistic bank or roll rate to null the average lift vector in order to prevent prolonged lift down situations. Being able to know the attitude, hence the attitude rate, will allow the control system (nominal or backup, automatic or manual) to cancel any initial angular rates. Also, since a heat-shield forward attitude and the trim attitude can be specified in terms of the angles of attack and sideslip, being able to determine the current attitude in terms of these angles will allow the control system to maneuver the vehicle to the desired attitude. Finally, being able to determine the roll angle will allow for the control of the roll ballistic rate during entry.

Garcia-Llama, Eduardo↗

Integration of Electric Vehicle Charging Loads in Residential Building Stock Energy Modeling

The rapid adoption of electric vehicles (EVs) has resulted in significant new household electric loads that have the potential to change how energy costs are incurred by homeowners and the landscape of utility operations and energy infrastructure. Whereas adoption patterns and magnitudes of residential building and EV charging loads are influenced by distinct factors, the loads themselves are tightly coupled with the behavior of the individual occupants and EV owners.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Simulation Of Probabilistic Wind Loads On A Building

Method of simulating probabilistic windloads on building developed. Numerical results of simulation used to assess reliability of building and risk associated with tendencies of large gusts or high steady winds to cause building to sway, buckle, and/or overturn. Using method to analyze proposed design in iterative design cycle, building designed for specified reliability.

Chamis, Christos C.↗

Calibration of urban building energy model using smart meter data for district peak load prediction

Urban building energy modeling (UBEM) is a powerful approach to assessing baseline building energy performance and retrofits with new technologies across building stocks in cities. However, the accuracy of UBEM is often constrained by the limited availability of reliable data about building characteristics and operations, such as envelope efficiency levels, HVAC system performance, and end-use load patterns. Existing research has performed UBEM calibration using annual or monthly energy consumption data, which falls short when higher-resolution time series applications are needed, such as peak load prediction for utility operation planning. This study presents a new framework for calibrating building energy models at urban scale using smart meter data, targeting the accurate prediction of summer peak electricity loads to support robust grid planning. The framework first integrates various data sources to enhance baseline input assumptions for building models, and then calibrates the baseline models through a pattern-matching approach. A case study using CityBES and two years of AMI data from over 9000 residential customers in Portland, Oregon, demonstrated the workflow and its effectiveness. The calibrated models achieved a daily peak load mean absolute percentage error of 2.6 % during the heatwave in the calibration year, and 2.0 % in the validation year using another year of AMI data. Using the calibrated models, we analyzed the demand flexibility potential of the district building stock as an application of UBEM calibration. The findings affirm the appropriate use of UBEM for peak electric load forecasting and demand side management at the utility distribution system level.

AMI data↗

Pathways to commercial building plug and process load efficiency and control

Abstract To accomplish net-zero carbon emissions in the built environment by 2050, we must equitably decarbonize commercial buildings, including reducing plug and process loads (PPLs). PPLs are plug-in or hardwired electric and gas loads that are not associated with major building end uses like lighting and HVAC. Research shows PPL energy reduction strategies and control technologies have the potential to save energy. But even when implemented, these savings have rarely been achieved and there has not been widespread uptake in U.S. commercial buildings. We investigate why these technologies and strategies have not seen widespread adoption and identify behavior and technology pathways to increase PPL reduction in U.S. commercial buildings. We examined behaviors of commercial building stakeholders through 44 interviews and cross-referenced qualitative analysis findings with in-depth technical knowledge of existing PPL control technologies and reduction strategies. PPL control implementation must be paired with management strategies, such as occupant engagement and training, to achieve optimal savings, and best practices should be disseminated across the industry. We found that increasing access to cost and energy savings data will promote uptake of PPL control technologies and allow designers to better incorporate PPLs into building design. Improving access to funding for PPL energy efficiency projects and addressing the split-incentive problem will increase adoption of PPL efficiency and control. Code bodies should continue to include PPL monitoring and reduction measures in energy codes. Key building stakeholders, including cybersecurity and information technology teams, should be involved in PPL monitoring and reduction strategy processes for successful implementation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Challenges and Opportunities for HVAC + Phase Change Material Thermal Energy Storage in Buildings

Phase-change material (PCM) thermal-energy storage (TES) integrated with HVAC and domestic hot water (DHW) can shift a large share of building thermal loads. By flattening and shifting loads, PCM TES reduces peak electricity use, eases stress on local and grid infrastructure, and lowers costs. It can also defer costly upgrades to service panels, distribution, and transmission. Higher energy density relative to chilled or hot water storage makes PCM TES practical for small, space limited, and retrofit projects, while packaged HVAC-integrated systems expand cost-effective load shifting to commercial buildings that previously lacked options. Despite this promise, deployment faces barriers. This paper presents challenges, opportunities, and lessons learned from lab and field integrations of PCM TES with packaged HVAC systems. Key challenges include misalignment between default heat pump controls tuned for direct-to-load operation and TES charge/discharge objectives, PCM properties that diverge from manufacturer claims and evolve with cycling, and high integration and deployment costs with off-the-shelf products. These studies underscore the need for factory built, integrated systems that arrive as prepackaged modules with proven controls, reducing design and installation effort and delivering predictable performance across projects. The paper outlines steps to enable viable and scalable PCM TES HVAC and DHW systems, including 1) validated methods that can be used to characterize PCM properties and TES system performance, 2) supervisory controls that optimize charge/discharge scheduling, and 3) factory integrated packaging that eliminates bespoke field engineering.

Dutton, Spencer↗

Best Practices for Plug Load Management Using a Building Energy Management System

The University of California San Diego (UCSD) successfully integrated PLCs with their BEMS, which resulted in 66% energy savings over one week across 25 plug loads (K. Chia et al. 2023). UCSD documented each step of this effort, highlighting best practices along the way, in their 10-page brief, "Best Practices for Plug Load Management Using a Building Energy Management System" (also referred to as "brief" in this document). This fact sheet provides highlights and key takeaways from UCSD's brief. The reader is encouraged to read UCSD's full brief if they wish to move forward with implementing PLC integration with their BEMS.

Building Energy Management System Integration↗

Wood template-supported phase change material composites for durable and form-stable thermal energy storage in buildings

Here, to reduce and shift peak energy loads in buildings, phase change materials (PCMs) with high transition enthalpies and transition temperatures near human thermal comfort are desirable for thermal energy storage (TES). Traditional solid/liquid PCMs suffer from leakage during thermal cycling, requiring encapsulation that lowers heat storage capacity. Wood templates (WTs), with porous and hierarchical structures, provide natural encapsulation scaffolds for PCM containment. Polyethylene glycol (PEG) is a compatible PCM with WTs, but when infiltrated alone, ~30 wt% of PEG binds to wood with no detectable phase change, limiting TES efficiency. To address this, we developed a method to (1) improve the form stability of balsa and pine-based composites (BWT + PCMs and PWT + PCMs) and (2) reduce inactive PCM within the composites to ~10 wt%. BWT + PCMs exhibit transition properties upwards of 114.2 J/g at 25.4 degrees C, with no degradation after 1000 thermal cycles, and similar stiffness compared to raw balsa. Meanwhile, PWT + PCMs exhibit 25 % higher storage efficiency with the addition of poly(ethylene glycol) diacrylate compared to solely PEG-infiltrated PWT. PWT + PCM retains 84 % of raw pine's mechanical stiffness, sufficient for light-duty construction. Our shape-stabilized WT + PCM composites enrich the functionality of wood materials as both ideal TES material candidates and light-duty building construction applications.

25 ENERGY STORAGE↗