Transmission Cost Allocation via High-Fidelity Stochastic Capacity Expansion Planning
Explore the source record for details and available documents.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
The growing need for sustainable energy solutions in coastal areas necessitates the development of integrated systems that leverage abundant marine resources. In this study, a standalone Marine Energy Supported Multi-Energy System (MRE-MES) is designed for sustainable coastal community development, utilizing renewable marine resources, including offshore wind, wave, and solar energy, to address the energy needs of electricity, heat, freshwater, and hydrogen. The proposed MRE-MES incorporates a co-optimization model that simultaneously balances capacity planning and operational efficiency to minimize costs and environmental impacts. The system is tested under different renewable energy penetration levels and demand uncertainties, using a two-stage stochastic programming to account for variability in renewable resources and consumption needs. The experimental results indicate that in the optimal system capacity configuration, the percentage of total renewable energy generation is around 80 %, with or without capacity limitation constraints on PV, water tank, and hydrogen storage. Compared to the worst-case scenario in Monte Carlo experiments, two-stage stochastic optimization results in a more robust decision that effectively mitigates the risks posed by future uncertain demand conditions. In conclusion, the findings highlight the viability of marine energy for providing a resilient, comprehensive energy solution to coastal communities.
This data package contains output files associated with Mongird et al. (in prep) organized into four dataset directories. Each dataset is described in more detail below. 1. Marginal Soils Index Analysis Description: This folder contains a csv file with land needs and availability by state, power generating technology type, and scenario in 2050 when suitable siting areas are additionally constrained to areas with increasing levels of soil marginality. Files: msi_constrained_siting_availability_2050.csv Variables: Scenario - Projected 2050 scenario name State - US state abbreviation Technology - Generating technology type solar = solar photovoltaic gas_cc_re = natural gas combined cycle (recirculating cooling) wind = onshore wind gas_cc_ccs_re = natural gas combined cycle with carbon capture sequestration (recirculating cooling) gas_cc_dry = natural gas combined cycle with (dry cooling) gas_cc_pond = natural gas combined cycle with (pond cooling) coal_conv_ccs_re = conventional coal with carbon capture sequestration (recirculating cooling) Req_Capacity_MW - The amount of rated capacity required in 2050 of the given technology type in the given state and under the given scenario from the capacity expansion plan Req_Capacity_Factor - The assumed capacity factor (fraction between 0 and 1) for the given technology type in the given state and under the given scenario by the capacity expansion plan Req_Land_km2 - The amount of land required (in km-squared) to host the required generating capacity that is capable of meeting the specified capacity factor for the given technology type in the given state and under the given scenario Req_Energy_TWh - Product of Req_Capacity_MW, Req_Capacity_Factor, and 8760/1e6 for the given technology type in the given state and under the given scenario MSI_Case - The level of MSI that siting the given technology is additionally constrained to, where >0 means siting is additionally constrained to suitable land areas that have an MSI value greater than 0 >=1 means siting is additionally constrained to suitable land areas that have an MSI value greater than or equal to 1 >=2 means siting is additionally constrained to suitable land areas that have an MSI value greater than or equal to 2 >=3 means siting is additionally constrained to suitable land areas that have an MSI value greater than or equal to 3 Soil Attribute Rasters Description: This folder contains geospatial raster files for individual soil parameters upscaled to the listed grid resolution (30m or 1 km). 1 km resolution files are a spatial average of non-missing 30m resolution values. All raster files use the USA Contiguous Albers Equal Area Conic (ESRI:102003) projection. Files: avg_cond_raster_ .tif - Average conductivity of the saturation extract across all soil horizons within a depth of 40 inches, measured in mmhos/cm max_cond_raster_ .tif - Maximum conductivity of the saturation extract across all soil horizons within a depth of 40 inches, measured in mmhos/cm min_ph_raster_ .tif- Min pH values across all soil horizons within a depth of 40 inches. avg_ph_raster_ .tif - Average pH value across all soil horizons within a depth of 40 inches. max_ph_raster_ .tif- Max pH value across all soil horizons within a depth of 40 inches. erosion_factor_raster_ .tif - Product of k-factor and percent slope flood_freq_raster_ .tif - Number of months of the year during which the area is commonly, frequently, or very frequently flooded. max_sar_raster_ .tif - Maximum sodium adsorption ratio across all horizons within a depth of 40 inches rock_frac_raster_ .tif - Fraction of the upper 6 inches of soil composed of rock fragments larger than 3 inches. temp_regime_raster_ .tif - Soil temperature regime with the following key: 0 = pergelic 1 = gelic 2 = cryic 3 = frigid 4 = isofrigid 5 = mesic 6 = isomesic 7 = thermic 8 = isothermic 9 = hyperthermic 10 =isohyperthermic Marginal Soils Index Rasters Description: This folder contains geospatial raster files of the Marginal Soils Index at the listed grid resolution (30m or 1 km). 1 km resolution files are a spatial average of 30m resolution. Both raster files use the USA Contiguous Albers Equal Area Conic (ESRI:102003) projection. A value of 0 indicates that there were no soil attributes present that indicate marginal soil. NA values indicate that data was unavailable or bodies of water. Files: marginal_soils_index_30m_raster.tif marginal_soils_index_1km_raster.tif Marginal Soils Index Resource Potential Rasters Description: This folder contains geospatial raster files of the Marginal Soils Index + Resource Potential (MSI+RP) score at 1km resolution for geothermal, solar, and wind technologies. Raster files use the USA Contiguous Albers Equal Area Conic (ESRI:102003) projection. NA values indicate that the location is not suitable for siting the given technology due to policy, environmental, socioeconomic, topological, and other constraints regardless of soil marginality level. Areas with values greater than or equal to zero represent the product of the normalized MSI value and the normalized resource potential value. Files: geothermal_msi_ep_score_raster.tif solar_msi_ep_score_raster.tif wind_msi_ep_score_raster.tif Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program. Disclaimer This material was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor the United States Department of Energy, nor the Contractor, nor any or their employees, nor any jurisdiction or organization that has cooperated in the development of these materials, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness or any information, apparatus, product, software, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or Battelle Memorial Institute. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. PACIFIC NORTHWEST NATIONAL LABORATORYoperated byBATTELLEfor theUNITED STATES DEPARTMENT OF ENERGYunder Contract DE-AC05-76RL01830
This data package contains output files associated with the Mongird et al. paper entitled "Can US power grid expansion avoid prime agricultural lands?" and is organized into four dataset directories. Each dataset is described in more detail below. 1. Marginal Soils Index Analysis Description: This folder contains a csv file with land needs and availability by state, power generating technology type, and scenario in 2050 when suitable siting areas are additionally constrained to areas with increasing levels of soil marginality. Files: msi_constrained_siting_availability_2050.csv Variables: Scenario - Projected 2050 scenario name State - US state abbreviation Technology - Generating technology type solar = solar photovoltaic gas_cc_re = natural gas combined cycle (recirculating cooling) wind = onshore wind gas_cc_ccs_re = natural gas combined cycle with carbon capture sequestration (recirculating cooling) gas_cc_dry = natural gas combined cycle with (dry cooling) gas_cc_pond = natural gas combined cycle with (pond cooling) coal_conv_ccs_re = conventional coal with carbon capture sequestration (recirculating cooling) Req_Capacity_MW - The amount of rated capacity required in 2050 of the given technology type in the given state and under the given scenario from the capacity expansion plan Req_Capacity_Factor - The assumed capacity factor (fraction between 0 and 1) for the given technology type in the given state and under the given scenario by the capacity expansion plan Req_Land_km2 - The amount of land required (in km-squared) to host the required generating capacity that is capable of meeting the specified capacity factor for the given technology type in the given state and under the given scenario Req_Energy_TWh - Product of Req_Capacity_MW, Req_Capacity_Factor, and 8760/1e6 for the given technology type in the given state and under the given scenario MSI_Case - The level of MSI that siting the given technology is additionally constrained to, where >0 means siting is additionally constrained to suitable land areas that have an MSI value greater than 0 >=1 means siting is additionally constrained to suitable land areas that have an MSI value greater than or equal to 1 >=2 means siting is additionally constrained to suitable land areas that have an MSI value greater than or equal to 2 >=3 means siting is additionally constrained to suitable land areas that have an MSI value greater than or equal to 3 Soil Attribute Rasters Description: This folder contains geospatial raster files for individual soil parameters upscaled to the listed grid resolution (30m or 1 km). 1 km resolution files are a spatial average of non-missing 30m resolution values. All raster files use the USA Contiguous Albers Equal Area Conic (ESRI:102003) projection. Files: avg_cond_raster_ .tif - Average conductivity of the saturation extract across all soil horizons within a depth of 40 inches, measured in mmhos/cm max_cond_raster_ .tif - Maximum conductivity of the saturation extract across all soil horizons within a depth of 40 inches, measured in mmhos/cm min_ph_raster_ .tif- Min pH values across all soil horizons within a depth of 40 inches. avg_ph_raster_ .tif - Average pH value across all soil horizons within a depth of 40 inches. max_ph_raster_ .tif- Max pH value across all soil horizons within a depth of 40 inches. erosion_factor_raster_ .tif - Product of k-factor and percent slope flood_freq_raster_ .tif - Number of months of the year during which the area is commonly, frequently, or very frequently flooded. max_sar_raster_ .tif - Maximum sodium adsorption ratio across all horizons within a depth of 40 inches rock_frac_raster_ .tif - Fraction of the upper 6 inches of soil composed of rock fragments larger than 3 inches. temp_regime_raster_ .tif - Soil temperature regime with the following key: 0 = pergelic 1 = gelic 2 = cryic 3 = frigid 4 = isofrigid 5 = mesic 6 = isomesic 7 = thermic 8 = isothermic 9 = hyperthermic 10 =isohyperthermic Marginal Soils Index Rasters Description: This folder contains geospatial raster files of the Marginal Soils Index at the listed grid resolution (30m or 1 km). 1 km resolution files are a spatial average of 30m resolution. Both raster files use the USA Contiguous Albers Equal Area Conic (ESRI:102003) projection. A value of 0 indicates that there were no soil attributes present that indicate marginal soil. NA values indicate that data was unavailable or bodies of water. Files: marginal_soils_index_30m_raster.tif marginal_soils_index_1km_raster.tif Marginal Soils Index Resource Potential Rasters Description: This folder contains geospatial raster files of the Marginal Soils Index + Resource Potential (MSIxRP) score at 1km resolution for geothermal, solar, and wind technologies. Raster files use the USA Contiguous Albers Equal Area Conic (ESRI:102003) projection. NA values indicate that the location is not suitable for siting the given technology due to policy, environmental, socioeconomic, topological, and other constraints regardless of soil marginality level. Areas with values greater than or equal to zero represent the product of the normalized MSI value and the normalized resource potential value. Files: geothermal_msi_rp_score_raster.tif solar_msi_rp_score_raster.tif wind_msi_rp_score_raster.tif Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program. Disclaimer This material was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor the United States Department of Energy, nor the Contractor, nor any or their employees, nor any jurisdiction or organization that has cooperated in the development of these materials, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness or any information, apparatus, product, software, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or Battelle Memorial Institute. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. PACIFIC NORTHWEST NATIONAL LABORATORYoperated byBATTELLEfor theUNITED STATES DEPARTMENT OF ENERGYunder Contract DE-AC05-76RL01830
Long-term electric power sector planning and capacity expansion is a key area of interest to stakeholders across a wide range of organizations because it helps in making informed decisions about investments in infrastructure within the context of potential future vulnerabilities under various natural and human stressors. Future power plant siting costs will depend on a number of factors including the characteristics of the electricity capacity expansion and electricity demand (e.g., fuel mix of future electric power capacity, and the magnitude and geographic distribution of electricity demand growth) as well as the geographic location of power plants. Electricity technology capacity expansion plans modeled to represent alternate future conditions meeting a set of scenario assumptions are traditionally compared against historical trends which may not be consistent with current and future conditions. We present the `cerf` Python package (a.k.a., the Capacity Expansion Regional Feasibility model) which helps evaluate the feasibility and structure of future, scenario-driven electricity capacity expansion plans by siting power plants in areas that have been deemed the least cost option while considering dynamic future conditions. We can use `cerf` to gain insight to research topics such as: 1) under what conditions future projected electricity expansion plans from models such as GCAM-USA are possible to achieve, 2) where and which on-the-ground barriers to siting (e.g., protected areas, cooling water availability) may influence our ability to achieve certain expansions, and 3) how electricity infrastructure build-outs and value may evolve into the future when considering locational marginal pricing (LMP) based on the supply and demand of electricity from a grid operations model.
Hydrogen and, more recently, ammonia have received worldwide attention as energy storage media. In this work we investigate the economics of using each of these chemicals as well as the two in combination for islanded renewable energy supply systems in 15 American cities representing different climate regions throughout the country. We use an optimal combined capacity planning and scheduling model which minimizes the levelized cost of energy (LCOE) by determining optimal unit selection and size along with unit commitments, production rates, and storage inventories for each period of system operation. These periods are aggregated from full year hourly resolution data via a consecutive temporal clustering algorithm. Ammonia is generally more economical than hydrogen as a single method of energy storage. Additionally, systems which use both hydrogen and ammonia outperform those which use only one storage option and have LCOE between $\$ 0.17$/kWh and $\$ 0.28$/kWh, including full investment in renewable generation infrastructure.
The electricity generation sector is responsible for 25% of the world’s greenhouse gas (GHG) emissions and thus has been the focus of efforts to transition to clean energy and sustainable development in many nations. In the past 20 years, renewable energy sources have been the fastest-growing energy source in the world, comprising almost 29% of the world’s electricity generation in 2020. Renewable energy sources are expected to comprise nearly 95% of the world’s power capacity growth through 2026, with a share of planned capacity expansion of up to 46% in 2026. The rapid development of renewable energy sources and technologies will require an enormous amount of raw materials to replace coal and gas plants and increase in the capacity to handle growing electricity demand because renewable energy sources have a low-power density and intermittent behavior. Accounting for the expected scale of rapidly deploying renewable energy sources that require rare earth elements (REEs), cement, and steel, the mining industry may face a supply problem for the materials critical for clean energy. And, as the exploration and development of new mining sites can be expensive and risky, the mining industry may require economic stimuli to grow supply. The increasing demand for renewable energy resources makes mining a threat to the environment unless proper regulations are established and calls for remining, cleanup, and circular economic development are made. Mining also contributes to environmental injustices related to the exploitation and pollution of lands near communities that are dependent on biodiversity in the area, while not always benefiting from technological advancements provided by the use of renewable energy and technologies. This study explored the opportunity of remining abandoned mining waste to extract metals and minerals essential for the production of renewable energy sources. The authors analyzed materials used in the production of these technologies, materials readily available in the United States, and which materials can be extracted locally in the United States from abandoned mine waste. The authors also studied environmental injustices that populations near mining sites experience and ways to mitigate these injustices, such as providing more control over extraction and cleanup activities, providing more job opportunities in those areas, and offsetting costs associated with cleanup and land restoration projects.
Abstract Previous studies investigating deep decarbonization of bulk electric power systems and wholesale electricity markets have not sufficiently explored how future grid pathways could affect the grid's vulnerability to hydrometeorological uncertainty on multiple timescales. Here, we employ a grid operations model and a large synthetic weather ensemble to “stress test” a range of future grid pathways for the U.S. West Coast developed by ReEDS, a well‐known capacity planning model. Our results show that gradual changes in the underlying capacity mix from 2020 to 2050 can cause significant “re‐ranking” of weather years in terms of annual wholesale electricity prices (with “good” years becoming bad, and vice versa). Nonetheless, we find the highest and lowest ranking price years in terms of average electricity price remain mostly tied to extremes in hydropower availability (streamflow) and load (summer temperatures), with the strongest sensitivities related to drought. Seasonal dynamics seen today involving spring snowmelt and hot, dry summers remain well‐defined out to 2050. In California, future supply shortfalls in our model are concentrated in the evening and occur mostly during periods of high temperature anomalies in late summer months and in late winter; in the Pacific Northwest, supply shortfalls are much more strongly tied to negative streamflow anomalies. Under our more robust sampling of stationary hydrometeorological uncertainty, we also find that the ratio of dis‐patchable thermal (i.e., natural gas) capacity to wind and solar required to ensure grid reliability can differ significantly from values reported by ReEDS.
Over the next three years, the Public Service Company of New Mexico (PNM) plans to increase utility-scale solar photovoltaic (PV) capacity from today’s roughly 330MW to about 1600MW. This massive increase in variable generation—from about 15% to 75% of peak load—will require changes in how PNM operates their system. We characterize the 5 and 30-minute solar and wind forecast errors that the system is likely to experience in order to determine the level of reserves needed to counteract such events. Our focus in this study is on negative forecast error (in other words, shortfalls relative to forecast) – whereas excess variable generation can be curtailed if needed, a shortfall must be compensated for to avoid loss of load. Calculating forecast error requires the use of the same forecasting methods that PNM uses or a reasonable approximation thereof. For wind, we use a persistence forecast on actual 5-minute 2019 wind output data (scaled up to reflect the amount of wind capacity planned for 2025). For solar, we use a formula incorporating the clear sky index (CSI) for the forecast. As the solar on the grid now is a small fraction of what is planned for 2025, we generated 5-minute solar data using 2019 weather inputs. We find that to handle 99.9% of the 5-minute negative forecast errors, a maximum of 275MW of variable generation reserve during daylight hours, and a maximum of 75MW during non-daylight hours, should be sufficient. Note that this variable generation reserve is an additional reserve category that specifies reserves over and above what are currently carried for contingency reserve. This would require a significant increase in reserve relative to what PNM currently carries or can call upon from other utilities per reserve sharing agreements. This variable generation reserve specification may overestimate the actual level needed to deal with PNM’s planned variable generation in 2025. The forecasting methodologies used in this study likely underperform PNM’s forecasting – and better forecasting allows for less reserve. To obtain more precise estimates, it is necessary to consider load and use the same forecasting inputs and methods used by PNM.
In this work, we propose a Generalized Disjunctive Programming (GDP) model that optimizes both long-term capacity planning (such as the number and size of dispatchable/renewable generators, batteries, and transmission lines) and hourly operation (such as on/off schedules of dispatchable generators, power output from each generator, and power flow) to maximize power system reliability while minimizing total cost and CO2 emissions.
Questions of equity and fairness are often raised by representatives from State, Tribal and local governments and members of the public when resolving conflicts over siting of nuclear facilities. However, the two terms are not synonymous: equity can be quantified while fairness is much more subjective. The Department of Energy's (DOE) December 2021 Request for Information sought input on how to site federal facilities for the temporary, consolidated storage of spent nuclear fuel (SNF) using a consent-based approach. It is anticipated that just such questions about equity and fairness associated with the potential emergence of more than one host site may be raised by the twelve groups of university, nonprofit and private sector partners (Consortia) working to support community engagement, inclusively involve stakeholders, build relationships, and develop innovative forms of mutual learning and public capacity to participate in the consent-based siting process for a federal consolidated interim storage facility during the current Planning & Capacity Building stage of the consent-based siting process. In terms of DOE's Integrated Waste Management System (IWMS), sociopolitical equity concepts are a factor in all aspects of IWMS development and operations and will be particularly applicable should two or more host sites become a possibility, either by the emergence of multiple volunteer hosts or by pursuit as a IWMS program strategy. This paper summarizes recent analyses that explore how four equity metrics - number of states, division of the projected SNF total by the year 2083, current population and land area - might be perceived by host communities, states and regions if two, three or four sites for hosting federal consolidated interim storage facilities were to be contemporaneously realized. Existing institutional arrangements, including Nuclear Regulatory Commission regions, Federal Energy Regulatory Commission regions and Low-Level Radioactive Waste Disposal Compacts, were selected to create hypothetically merged two, three and four-region scenarios to calculate how the four metrics balance out. Projected SNF burden was prioritized with regional contiguity of the consolidated regions a requirement for a functional scenario. The intent was not to promote or suggest any construct as a program objective; the configurations are geopolitical abstractions only to explore potential perceptions of equity. Understanding the possible issues of equity that could arise may benefit program efforts toward achieving a cooperative federalism wherein both the federal and multiple State governments share the goal of manifesting more than one federal consolidated interim storage facility. The main finding is that it is not possible to optimize for all four metrics simultaneously. The analyses demonstrate that trying to create a sense of equity by backfitting a solution to a random population and land distribution will always contain a degree of artificiality.
This fact sheet focuses specifically on one element of the long-term planning process, the capacity expansion model. It highlights the key advances in these models to enable planning for systems with growing shared of renewable energy and storage.