Full-scale FEED Study for Retrofitting the Prairie State Generating Station with an 816 MWe Capture Plant using Mitsubishi Heavy Industries Post-Combustion CO 2 Capture Technology
A full front-end engineering design (FEED) study to for a carbon capture system for Unit #2 (816 MWe) at the Prairie State Generating Company’s (PSGC) Energy Campus in Marissa, IL based on the KM CDR Process CO 2 capture technology from Mitsubishi Heavy Industries (MHI) using their proprietary solvent KS-21TM. If built this carbon capture plant would be the world's largest to date. The cost of capture of 100 percent of the plant emissions was calculated to be $43.42 per metric tonne of CO 2 based on levelized costs for 30 years of operation (85% capacity factor), and includes Interest on Debt and Return on Equity During Operation.