Search NASA⌕ Search

SEARCH · Search NASA

Results for “change notification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

DataComm in Flight Deck Surface Trajectory-Based Operations

The purpose of this pilot-in-the-loop aircraft taxi simulation was to evaluate a NextGen concept for surface trajectory-based operations (STBO) in which air traffic control (ATC) issued taxi clearances with a required time of arrival (RTA) by Data Communications (DataComm). Flight deck avionics, driven by an error-nulling algorithm, displayed the speed needed to meet the RTA. To ensure robustness of the algorithm, the ability of 10 two-pilot crews to meet the RTA was tested in nine experimental trials representing a range of realistic conditions including a taxi route change, an RTA change, a departure clearance change, and a crossing traffic hold scenario. In some trials, these DataComm taxi clearances or clearance modifications were accompanied by preview information, in which the airport map display showed a preview of the proposed route changes, including the necessary speed to meet the RTA. Overall, the results of this study show that with the aid of the RTA speed algorithm, pilots were able to meet their RTAs with very little time error in all of the robustness-testing scenarios. Results indicated that when taxi clearance changes were issued by DataComm only, pilots required longer notification distances than with voice communication. However, when the DataComm was accompanied by graphical preview, the notification distance required by pilots was equivalent to that for voice.

Bakowski, Deborah L.↗

DataComm in Flight Deck Surface Trajectory-Based Operations

The purpose of this pilot-in-the-loop aircraft taxi simulation was to evaluate a NextGen concept for surface trajectory-based operations (STBO) in which air traffic control (ATC) issued taxi clearances with a required time of arrival (RTA) by Data Communications (DataComm). Flight deck avionics, driven by an error-nulling algorithm, displayed the speed needed to meet the RTA. To ensure robustness of the algorithm, the ability of 10 two-pilot crews to meet the RTA was tested in nine experimental trials representing a range of realistic conditions including a taxi route change, an RTA change, a departure clearance change, and a crossing traffic hold scenario. In some trials, these DataComm taxi clearances or clearance modifications were accompanied by 'preview' information, in which the airport map display showed a preview of the proposed route changes, including the necessary speed to meet the RTA. Overall, the results of this study show that with the aid of the RTA speed algorithm, pilots were able to meet their RTAs with very little time error in all of the robustness-testing scenarios. Results indicated that when taxi clearance changes were issued by DataComm only, pilots required longer notification distances than with voice communication. However, when the DataComm was accompanied by graphical preview, the notification distance required by pilots was equivalent to that for voice.

NextGen↗

APPLICATIONS OF CURRENT TECHNOLOGY FOR CONTINUOUS MONITORING OF SPENT FUEL

Advancements in technology have opened many opportunities to improve upon the current infrastructure surrounding the nuclear fuel cycle. Embedded devices, very small sensors, and wireless technology can be applied to Security, Safety, and Nonproliferation of Spent Nuclear Fuel. Security, separate of current video monitoring systems, can be improved by integrating current wireless technology with a variety of sensors including motion detection, altimeter, accelerometer, and a tagging system. By continually monitoring these sensors, thresholds can be set to sense deviations from nominal values. Then alarms or notifications can be activated as needed. Safety can be improved in several ways. First, human exposure to ionizing radiation can be reduced by using a wireless sensor package on each spent fuel cask to monitor radiation, temperature, humidity, etc. Since the sensor data is monitored remotely operator stay-time is decreased and distance from the spent fuel increased, so the overall radiation exposure is reduced as compared to visual inspections. The second improvement is the ability to monitor continuously rather than periodically. If changes occur to the material, alarm thresholds could be set and notifications made to provide advanced notice of negative data trends. These sensor packages could also record data to be used for scientific evaluation and studies to improve transportation and storage safety. Nonproliferation can be improved for spent fuel transportation and storage by designing an integrated tag that uses current infrastructure for reporting and in an event; tracking can be accomplished using the Iridium satellite system. This technology is similar to GPS but with higher signal strength and penetration power, but lower accuracy. A sensor package can integrate all or some of the above depending on the transportation and storage requirements and regulations. A sensor package can be developed using off the shelf technology and applying it to each specific need. There are products on the market for smart meters, industrial lighting control and home automation that can be applied to the Back End Fuel Cycle. With a little integration and innovation a cost effective solution is achievable.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Avoiding thermal runaway in lithium-ion batteries using ultrasound detection of early failure mechanisms

Thermal runaway leading to catastrophic failure has slowed the adoption of lithium-ion batteries, highlighting the need for early warning systems. In this work, ultrasound is used to detect physical changes in 0.950 Ah Li-ion battery cells by inducing conditions associated with thermal runaway. Ultrasound signal features are extracted as the batteries are cycled under baseline conditions and subsequently subjected to constant current and voltage overcharges. Two conditions identifying failure are defined: a warning to detect the start of overcharge and an emergency stop (E-stop), to immediately take the battery out of service. Using changes in ultrasound signal features, consistent warning and stopping classifications are applied to all failure experiments. On average, a warning notification was issued after 15% of the overcharge time and an E-stop was triggered after 35% of total overcharge duration before failure. Further testing suggests that it is possible to avoid thermal runaway by reacting to intermediate, warning notifications prior to an immediate E-stop. In other words, not only can detection derived by ultrasound identify battery failure before a catastrophic event, but can also provide early, actionable warnings so that overcharges can be detected and corrected quickly enough so the battery does not need to be decommissioned.

25 ENERGY STORAGE↗

Foresee: A user-centric home energy management system for energy efficiency and demand response

This paper presents foresee, a user-centric home energy management system that can help optimize how a home operates to concurrently meet users' needs, achieve energy efficiency and commensurate utility cost savings, and reliably deliver grid services based on utility signals. Foresee is built on a multiobjective model predictive control framework, wherein the objectives consist of energy cost, thermal comfort, user convenience, and carbon emission. Foresee learns user preferences on different objectives and acts on their behalf to operate building equipment, such as home appliances, photovoltaic systems, and battery storage. In this work, machine-learning algorithms were used to derive data-driven appliance models and usage patterns to predict the home's future energy consumption. This approach enables highly accurate predictions of comfort needs, energy costs, environmental impacts, and grid service availability. Simulation studies were performed on field data from a residential building stock data set collected in the Pacific Northwest. Results indicated that foresee generated up to 7.6% whole-home energy savings without requiring substantial behavioral changes. When responding to demand response events, foresee was able to provide load forecasts upon receipt of event notifications and delivered the committed demand response services with 10% or fewer errors. Foresee fully utilized the potential of the battery storage and controllable building loads and delivered up to 7.0-kW load reduction and 13.5-kW load increase. As a result, these benefits are provided while maintaining the occupants' thermal comfort or convenience in using their appliances.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Real-Time Multimission Event Notification System for Mars Relay

As the Mars Relay Network is in constant flux (missions and teams going through their daily workflow), it is imperative that users are aware of such state changes. For example, a change by an orbiter team can affect operations on a lander team. This software provides an ambient view of the real-time status of the Mars network. The Mars Relay Operations Service (MaROS) comprises a number of tools to coordinate, plan, and visualize various aspects of the Mars Relay Network. As part of MaROS, a feature set was developed that operates on several levels of the software architecture. These levels include a Web-based user interface, a back-end "ReSTlet" built in Java, and databases that store the data as it is received from the network. The result is a real-time event notification and management system, so mission teams can track and act upon events on a moment-by-moment basis. This software retrieves events from MaROS and displays them to the end user. Updates happen in real time, i.e., messages are pushed to the user while logged into the system, and queued when the user is not online for later viewing. The software does not do away with the email notifications, but augments them with in-line notifications. Further, this software expands the events that can generate a notification, and allows user-generated notifications. Existing software sends a smaller subset of mission-generated notifications via email. A common complaint of users was that the system-generated e-mails often "get lost" with other e-mail that comes in. This software allows for an expanded set (including user-generated) of notifications displayed in-line of the program. By separating notifications, this can improve a user's workflow.

Wallick, Michael N.↗

Startup Notification Report 3rd Quarter FY17.

This activity is being revised based on the November 2016 Project Plan and Installation Plan. These documents were developed and issued due to a change in the design responsibilities, assigned project personnel and the change in the installation of the RCS subsystems.

99 GENERAL AND MISCELLANEOUS↗

Dynamic virtualized field-programmable gate array resource control for performance and reliability

A method for allocating field-programmable gate array (FPGA) resources includes monitoring a first operating metric for one or more computing devices, identifying a first portion of plurality of macro components of a set of one or more FPGA devices in the one or more computing devices, where the first portion is allocated for implementing one or more user defined functions. The method also includes, in response to a first change in the first operating metric, reallocating the first portion of the macro components for implementing a system function associated with the first operating metric, and generating a first notification indicating the reallocation of the first portion.

97 MATHEMATICS AND COMPUTING↗

Response to “how robust are reductions in modeled estimates from GTAP-BIO of the indirect land use change induced by conventional biofuels?”

Malins et al. (2020) recently published "How robust are reductions in modeled estimates from GTAP-BIO of the indirect land use change induced by conventional biofuels?", provided their narrative from the model improvements in GTAP-BIO over time, made several critical points regarding this model, and argued that the implemented improvements in this model tended to decrease Induce Land Use Changes (ILUC) emissions. Furthermore, they also provided several critical points regarding the Carbon Calculator for Land Use Change from Biofuels Production (CCLUB) emissions model. In this response to Malins et al. we address these critiques point-by-point by providing our detailed responses to key issues: 1) the GTAP-BIO model and its improvements over time; 2) the inclusion of cropland pasture in the model; 3) the observed land use changes in the US that have been the bases for improvements in GTAP-BIO model, 4) the time trends in corn price and yield to challenge the concept of the yield to price response; 5) some sources of land intensification in crop production; 6) the FAO notifications with respect to the comparison between harvested area and arable land; and 7) the GTAP-BIO results for multiple cropping. We also provided responses to Malins et al. critical points regarding the CCLUB emissions model. We hope that this response letter will open more constructive discussion among the LUC modeling community to remain focused on the big picture regarding agriculture's role as a very effective GHG mitigation tool that can shape the new policies to govern the production and consumption of biofuels.

09 BIOMASS FUELS↗

Installation and Commissioning Automated Demand Response Systems

Demand Response (DR) can be defined as actions taken to reduce electric loads when contingencies, such as emergencies and congestion, occur that threaten supply-demand balance, or market conditions raise supply costs. California utilities have offered price and reliability DR based programs to customers to help reduce electric peak demand. The lack of knowledge about the DR programs and how to develop and implement DR control strategies is a barrier to participation in DR programs, as is the lack of automation of DR systems. Most DR activities are manual and require people to first receive notifications, and then act on the information to execute DR strategies. Levels of automation in DR can be defined as follows. Manual Demand Response involves a labor-intensive approach such as manually turning off or changing comfort set points at each equipment switch or controller. Semi-Automated Demand Response involves a pre-programmed demand response strategy initiated by a person via centralized control system. Fully-Automated Demand Response does not involve human intervention, but is initiated at a home, building, or facility through receipt of an external communications signal. The receipt of the external signal initiates pre-programmed demand response strategies. We refer to this as Auto-DR (Piette et. al. 2005). Auto-DR for commercial and industrial facilities can be defined as fully automated DR initiated by a signal from a utility or other appropriate entity and that provides fully-automated connectivity to customer end-use control strategies. One important concept in Auto-DR is that a homeowner or facility manager should be able to 'opt out' or 'override' a DR event if the event comes at time when the reduction in end-use services is not desirable. Therefore, Auto-DR is not handing over total control of the equipment or the facility to the utility but simply allowing the utility to pass on grid related information which then triggers facility defined and programmed strategies if convenient to the facility. From 2003 through 2006 Lawrence Berkeley National Laboratory (LBNL) and the Demand Response Research Center (DRRC) developed and tested a series of demand response automation communications technologies known as Automated Demand Response (Auto-DR). In 2007, LBNL worked with three investor-owned utilities to commercialize and implement Auto-DR programs in their territories. This paper summarizes the history of technology development for Auto-DR, and describes the DR technologies and control strategies utilized at many of the facilities. It outlines early experience in commercializing Auto-DR systems within PG&E DR programs, including the steps to configure the automation technology. The paper also describes the DR sheds derived using three different baseline methodologies. Emphasis is given to the lessons learned from installation and commissioning of Auto-DR systems, with a detailed description of the technical coordination roles and responsibilities, and costs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Notification of Class 1 Permit Modification to Attachment B, Part A Application for the Los Alamos National Laboratory Hazardous Waste Facility Permit, EPA ID # NM0890010515

This document contains a notification for a Class 1 Permit Modification to modify the Los Alamos National Laboratory (LANL) Hazardous Waste Facility Permit (Permit) issued to the Department of Energy and the Los Alamos National Security, LLC, collectively known as the Permittees, in November 2010. All changes have been made to Attachment B, Part A Application, and a full, updated form, Revision 10.0, is enclosed. The modification updates the facility contact and address information, and the process codes and design capacity section for Technical Area (TA) 14; TA-16; TA-39; TA-54 West; TA-54, Area G; and TA-55 within the Attachment B, Part A Application. The process codes and design capacity section for TA-14, TA-16, and TA-39 was updated to incorporate a statement that the Permittees have notified of the intent to close units at these locations. The process design capacity for TA-54, Area G has been updated from 3,664,150 gallons to 4,346,590 gallons to account for the TA-54, Area G Pad 11 container storage unit that was added when the Permit was issued in 2010 but at the time did not previously store hazardous waste. The number of units at TA-54, Area G was also updated to 9 units to include this new unit. The process design capacity for TA-55 has also been updated from 178,500 gallons to 207,600 gallons to incorporate the addition of the TA-55-185 container storage unit that was also added when the Permit was issued. The number of storage units at TA-55 was updated to 7 to include the unit. The process design capacity at TA-54 West was changed to 11,660 gallons to correct a typographical error in previous versions of the form.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Safeguard Application Options for the Laser-Based Item Monitoring System (LBIMS)

Researchers at Oak Ridge National Laboratory (ORNL) are developing a Laser-Based Item Monitoring System (LBIMS) for advanced safeguards at nuclear facilities. LBIMS uses a low-power laser transceiver to monitor the presence and position of items with retroreflective tags. The primary advantages of LBIMS are its scalability to continuously monitor a wide range of items, its ability to operate unattended, its low cost of implementation, and its inherent information security due to its line-of-sight and non-broadcasting operation. The primary proposed safeguard application of LBIMS is described in its name: item monitoring. LBIMS could be implemented in a storage area to continuously monitor containers of nuclear material and the area in which they are stored. The system could be configured to provide off-site notification if any of the containers are moved or removed or if the area is accessed. Individual tags would be used to monitor storage containers, and additional tags could be used to record information regarding secondary storage units and room access. The capability to register small changes in tag position opens up the possibility of several other uses. These include continuously monitoring piping arrangements for design information verification or recording equipment positions for other safeguards systems, such as tracking the opening and closing of autoclaves as part of a cylinder tracking system or opening and closing valves on a sample or product take-off line. Combined with attribute tags, which transmit information from any kind of sensor by modulating the laser signal, LBIMS provides the capability to wirelessly and securely collect safeguards data, even in areas where radio-frequency or other wireless communication methods are not practicable. Four application types are described in this report: static item monitoring, in-process item monitoring with trigger tags, multi-layered integration with trigger tags, and line-of-sight data transfer with attribute tags. Field trials for each of these applications are described.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Lessons learned about spaceflight and cell biology experiments

Conducting cell biology experiments in microgravity can be among the most technically challenging events in a biologist's life. Conflicting events of spaceflight include waiting to get manifested, delays in manifest schedules, training astronauts to not shake your cultures and to add reagents slowly, as shaking or quick injection can activate signaling cascades and give you erroneous results. It is important to select good hardware that is reliable. Possible conflicting environments in flight include g-force and vibration of launch, exposure of cells to microgravity for extended periods until hardware is turned on, changes in cabin gases and cosmic radiation. One should have an on-board 1-g control centrifuge in order to eliminate environmental differences. Other obstacles include getting your funding in a timely manner (it is not uncommon for two to three years to pass between notification of grant approval for funding and actually getting funded). That said, it is important to note that microgravity research is worthwhile since all terrestrial life evolved in a gravity field and secrets of biological function may only be answered by removing the constant of gravity. Finally, spaceflight experiments are rewarding and worth your effort and patience.

manned↗

Inspection Report "Personal Property Management at Lawrence Livermore National Laboratory"

The Department of Energy's (DOE's) Lawrence Livermore National Laboratory (Livermore) is a premier research and development institution for science and technology supporting the core mission of national security. According to Livermore, as of November 2008 the Laboratory managed 64,933 items of Government personal property valued at about $1 billion. At the beginning of Fiscal Year 2008, Livermore reported 249 DOE property items valued at about $1.3 million that were missing, unaccounted for, or stolen during Fiscal Year 2007. Livermore centrally tracks property utilizing the Sunflower Assets system (Sunflower), which reflects the cradle to grave history of each property item. Changes in the custodianship and/or location of a property item must be timely reported by the custodian to the respective property center representative for updating in Sunflower. In Fiscal Year 2008, over 2,000 individuals were terminated as a result of workforce reduction at Livermore, of which about 750 received a final notification of termination on the same day that they were required to depart the facility. All of these terminations potentially necessitated updates to the property database, but the involuntary terminations had the potential to pose particular challenges because of the immediacy of individuals departures. The objective of our inspection was to evaluate the adequacy of Livermore's internal controls over Government property. Based upon the results of our preliminary field work, we particularly focused on personal property assigned to terminated individuals and stolen laptop computers. We concluded that Livermore's internal controls over property could be improved, which could help to reduce the number of missing, unaccounted for, or stolen property items. Specifically, we found that: (1) The location and/or custodian of approximately 18 percent of the property items in our sample, which was drawn from the property assigned to individuals terminated on short notice in 2008, was inaccurately reflected in Sunflower. The data in this system is relied upon for tracking purposes, so inaccurate entries could increase the probability of property not being located during inventories and, thus, being reported as 'lost' or 'missing'. We believe that providing formal training to property custodians, which was not being done at the time of our inspection, could help improve this situation. (2) Some property custodians were not adequately protecting their Government laptop computers when taking them offsite, and they were not held accountable for the subsequent theft of the laptops. We made several recommendations to management intended to improve property controls at Livermore.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Exploring the Early Lightning Notification of an Electric Field Mill at the Savannah River Site

At the Savannah River Site (SRS), employees receive automated broadcast notification about lightning only after three strikes have already occurred near the site boundary. To increase employee safety, it is preferential to give employees lead time before lightning strikes occur. We compared measurements from an on-site electric field mill to lightning detection data from the National Lightning Detection Network and the Geostationary Lightning Mapper. Using a difference threshold, we determined that the electric field mill provided a lead time greater than 6 minutes for 95% of lightning events from 2009-2020, with an average lead time of 56 minutes. Detection of events were limited to a 7-mile radius around the field mill. We also identified that the field mill threshold generated many false detections not clearly identified. False detections and detections from only precipitation can be reduced by using a second threshold without creating too many missed detections (Type II errors). The two thresholds used together provide the best information about rapidly changing electric fields and aid in advanced detection necessary to improve the lightning warning system used at SRS.

42 ENGINEERING↗

Operations Concept for Responding to Urgent Requests for NASA-ISRO Synthetic Aperture Radar (NISAR)

The NASA-ISRO Synthetic Aperture Radar, or NISAR, mission is an Earth-mapping radar observatory to be launched from Sriharikota (India) in 2022. This mission is a collaboration between the National Aeronautics and Space Administration (NASA) and the Indian Space Research Organization (ISRO). This spacecraft will carry two instruments that will operate at radar wavelengths (L and Sband) and will provide data for understanding changes in the Earth’s land surface. The scientific data from this mission will revolutionize our understanding of the causes and consequences of land surface changes on Earth, ranging from Solid Earth Deformation in the form of natural hazards like earthquakes, volcanic eruptions and landslides, to ecosystem disturbances, to changes in the cryosphere (measurements of polar ice caps, ice sheets and sea ice). A nominal Reference Observation Plan, that repeats roughly every 12-24 days, developed prior to launch by the NISAR Mission Planning team, in consultation with the Science Team, will form the basis of science data collection by the payload instruments onboard the NISAR observatory after launch. Scheduling of science observations for the mission requires accounting for limited spacecraft resources like onboard data storage, downlink capacity, energy/power, thermal limits and instrument duty cycles. In addition to nominal science data collection, the project has a Level 1 requirement to respond to requests for urgent data acquisition over disaster sites (natural or anthropogenic) by scheduling new acquisitions within 24 hrs of notification and delivering science data within 5 hours of data acquisition. This capability is to be exercised on a ‘best-efforts basis’. While the definition of what constitutes an ‘urgent request’, and how such requests would be submitted to the project, is within the domain of the Science Team, the Mission System team is responsible for developing the baseline operations concept and implementation approach for responding to such requests. Given the ‘best-efforts’ nature of this requirement, a few highlevel guidelines have been developed to help guide the formulation of the operations concept, and are presented in this paper. Requests for urgent response data will be accommodated following the guiding principle of minimal to no impact on nominal science and planned engineering activities. No change in satellite orbit or attitude will be made for urgent response. Restricting response approaches to only changing the downlink and/or ground processing priority for existing observations, and adding new observations only in areas where NISAR will not be nominally imaging, allows for minimal impact on the Reference science Observation Plan. No instrument mode changes will be allowed for urgent response (except for high-priority requests), and no new observations that impact either planned science or engineering activities will be scheduled. Additionally, data requests must fit within the available project resource margins (both spacecraft and ground resources are to be evaluated). Both JPL and ISRO will be involved at various steps of the implementation, irrespective of whether the urgent request is for L-SAR (NASA instrument) or S-SAR (ISRO instrument) or a joint dataset.

Sharma, Priyanka↗

Technical Basis Related to the Posture of NASA’s Office of Safety and Mission Assurance for the Launch of Radioactive Material Other than Space Nuclear Systems: Volume 1–Overview of Analysis and Results

NASA has launched and reentered payloads containing radioactive material for over 50 years. The isotopes, their quantity, and their form have varied significantly. The handling of this material prior to its integration into the spacecraft at the launch Center (and after its return to Earth after flight, if applicable) falls under the purview of the Office of the Chief Health and Medical Officer, while after the radioactive material is integrated into the spacecraft at the launch Center, it falls under the purview of the Office of Safety and Mission Assurance’s (OSMA) Nuclear Flight Safety Program. Historically, OSMA concurrence was required for any launch or reentry involving radioactive material. However, OSMA recently revisited this posture due to changes in the Federal policy in this area, and the significant accrued experience. The current report represents the more quantitative study envisioned in the recent change in posture. More specifically, this document addresses the potential risks and other considerations associated with launching small quantities of radioactive material (below the level requiring the Federally-mandated process in National Security Presidential Memorandum- (NSPM-) 20, “Presidential Memorandum on Launch of Spacecraft Containing Space Nuclear Systems” (USG, 2019) to provide the technical basis for when such activities require OSMA concurrence versus notification, as it relates to nuclear flight safety.

Don Helton↗

Class 1 Permit Modification Notification Addition of Structures within Technical Area 54, Area G, Pad 11, Dome 375 Los Alamos National Laboratory Hazardous Waste Facility Permit, July 2012

The purpose of this letter is to notify the New Mexico Environment Department-Hazardous Waste Bureau (NMED-HWB) of a Class 1 Permit Modification to the Los Alamos National Laboratory (LANL) Hazardous Waste Facility Permit issued to the Department of Energy (DOE) and Los Alamos National Security, LLC (LANS) in November 2010. The modification adds structures to the container storage unit at Technical Area (TA) 54 Area G, Pad 11. Permit Section 3.1(3) requires that changes to the location of a structure that does not manage hazardous waste shall be changed within the Permit as a Class 1 modification without prior approval in accordance with Code of Federal Regulations, Title 40 (40 CFR), {section}270.42(a)(1). Structures have been added within Dome 375 located at TA-54, Area G, Pad 11 that will be used in support of waste management operations within Dome 375 and the modular panel containment structure located within Dome 375, but will not be used as waste management structures. The Class 1 Permit Modification revises Figure 36 in Attachment N, Figures; and Figure G.12-1 in Attachment G.12, Technical Area 54, Area G, Pad 11 Outdoor Container Storage Unit Closure Plan. Descriptions of the structures have also been added to Section A.4.2.9 in Attachment A, TA - Unit Descriptions; and Section 2.0 in Attachment G.12, Technical Area 54, Area G, Pad 11 Outdoor Container Storage Unit Closure Plan. Full description of the permit modification and the necessary changes are included in Enclosure 1. The modification has been prepared in accordance with 40 CFR {section}270.42(a)(l). This package includes this letter and an enclosure containing a description of the permit modification, text edits of the Permit sections, and the revised figures (collectively LA-UR-12-22808). Accordingly, a signed certification page is also enclosed. Three hard copies and one electronic copy of this submittal will be delivered to the NMED-HWB.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗