Microwave-Assisted Syngas Cleanup: Catalytic Reforming of Gasifier Tar Using a Low-Cost Iron Catalyst

The microwave-assisted gasification of plastic wastes to produce hydrogen-rich syngas is an attractive energy-saving plastic upcycling route, and the addition of biomass could improve the quality of the syngas produced; however, it could also increase the tar yield, which is an undesired, secondary product in this process. The presence of tars could result in downstream lines blockage, reactor down time and costly maintenance. Therefore, reducing or removing tar is desired. Due to its chemical complexity, toluene, which is one of the main tar constituents, could be used as a model tar compound. In this work, the microwave-assisted catalytic dry reforming of toluene was studied using Fe/Al2O3 as a catalyst, under CO2 at different reaction temperatures. The toluene reforming reaction was conducted using microwave and conventional thermal reactors. The results showed that under microwave irradiation, higher CO2 and toluene conversions, as well as better hydrogen yield can be observed compared to conventional toluene reforming at the same reaction temperature. The catalyst stability test was also investigated. Three reaction pathways were observed during microwave reaction.

Bai, Xinwei↗

Pilot-Scale Modular Research Facility for Acidic Water Pollution Cleanup and Domestic Production of Critical Minerals for National Security

A recent study by Penn State researchers revealed that Pennsylvania AMD streams originate from abandoned mines, with coal refuse piles of the lower Kittanning coal seam containing the most valuable heavy rare earth elements. Penn State has developed a three-stage process to recover these critical minerals, tested it for proof of concept, and secured a patent. Funded by the US DOE, a modular pilot-scale research and development unit has been designed and built to process 1,000 gallons per day of AMD from a site managed by the Pennsylvania Department of Environmental Protection (PA DEP). The system will selectively recover iron, aluminum, rare earth elements, and cobalt-nickel-manganese concentrates from AMD, followed by a proprietary downstream purification process. These operations aim to produce concentrates of critical minerals while treating acid mine drainage to meet environmental standards and evaluate different feedstocks. This presentation will describe the design, operation, and innovations of the proposed process and pilot facility, emphasizing its role in promoting sustainable recovery of critical minerals from legacy waste streams.

Pisupati, Sarma V [Center for Critical Minerals, T↗

Adaptive Site Management Strategies for the Hanford Central Plateau Groundwater

Adaptive site management (ASM) is a systematic and iterative management approach that can be used to expedite the remediation of large and/or complex sites. ASM is defined as a formal and systematic project or site management approach centered on rigorous site planning and a firm understanding of site conditions and uncertainties, using science and technology to routinely re-evaluate and prioritize site remedial actions and characterization activities. The goal of the approach is to create a framework of structured and continuous planning, implementation, and assessment processes that accommodates new information and changing site conditions to develop effective and efficient cleanup approaches that achieves the required outcome(s) while optimizing costs, cleanup timeframe, and performance. Central to ASM is an evolving conceptual site model (CSM). Over time, incremental reductions in uncertainty associated with the CSM will occur, while supporting continued progress toward site cleanup and closure through remedy optimization and evaluation. ASM has the potential to expedite cleanup for the Central Plateau area at Hanford through a planned and systematic approach for reducing uncertainty with targeted characterization activities, while continuing remediation activities that advance cleanup for key risk-driving contaminants. A core component of cleanup within the Central Plateau is the 200 West Pump-and-Treat (P&T) system. Even with an active P&T remedy, uncertainty exists with respect to plume distributions, total mass in the aquifer, and currently known continuing sources. Additional uncertainty is associated with multiple contaminant source locations in the vadose zone, which have the potential to create new groundwater plumes in the absence of any source control measures, although not all contaminant fluxes to groundwater will result in contaminant concentrations above cleanup levels. Collectively, these uncertainties need to be addressed in the CSM to support effective and efficient site progress toward cleanup goal(s). Other nontechnical factors that may warrant an ASM approach at the Hanford Central Plateau are associated with the formation of operable units (OUs) used to manage cleanup. With the exception of the 200-ZP-1 OU, the three remaining groundwater OUs only have interim action records of decision. Nine vadose zone source area OUs are also in the early stages of the remedial investigation and feasibility study process, with pending characterization and technology identification activities. A set of proposed site objectives for the Central Plateau are provided in this document as an initial consideration/example and basis for discussion for ASM implementation. These example site objectives were selected with the goal of maintaining protectiveness at the Columbia River through confinement of contaminant plumes within an administratively controlled area below existing surface waste sites and waste disposal facilities. Although site decision makers and regulators need to provide concurrence, these site objectives are used in this document to describe the elements of an ASM approach, including selection of interim objectives and a long-term adaptive management plan. Interim objectives are also defined to yield measurable incremental progress toward the overall site goals. This document identifies initial technical considerations for developing an ASM framework for the Central Plateau cleanup decisions. These considerations are intended to facilitate more specific decisions, such as objectives, near- and long-term actions, and performance metrics, to develop an overall approach that maintains protectiveness but recognizes the uncertainty, long timeframe, and technical challenges that need to be considered in selecting, implementing, and managing remediation at the Hanford Central Plateau.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pilot Testing of a Highly Efficient Pre-combustion Sorbent-based Carbon Capture System

TDA developed and demonstrated a highly efficient pre-combustion carbon capture system. The overall objective of this work was to develop a new sorbent-based pre-combustion carbon capture technology for Integrated Gasification Combined Cycle (IGCC) power plants. In this project our goal was to demonstrate the techno-economic viability of the new technology by 1) demonstrating it in large-scale slipstream tests, and 2) carrying out a high fidelity engineering and cost analysis. TDA’s process used an advanced physical adsorbent that selectively removes CO 2 from coal-derived synthesis gas above the dew point of the gas at temperatures as high as 300°C. The sorbent consists of a mesoporous carbon whose surface was grafted with functional groups that remove CO 2 via a well-known acid-base interaction. As documented in bench-scale experiments and field tests with actual coal gas, the sorbent achieved a very high capacity for CO 2 at temperatures as high as 300°C. The sorbent bound CO 2 more strongly than common physical adsorbents, providing the chemical potential needed for the high temperature operation. However, because CO 2 does not form a true covalent bond with the surface sites (as is the case with chemical absorbents), the sorbent regeneration could be carried out with only a very small energy input. The heat input to regenerate our sorbent was only 4.9 kcal per mol of CO 2 , which is much lower than that for chemical absorbents (e.g., 29.9 kcal/mol CO 2 for sodium carbonate) and was similar to the requirements of physical solvents (e.g., 4 kcal/mol CO 2 for Selexol TM ). Because the sorbent operates above the dew point of the synthesis gas (unlike the Selexol TM process), a higher power cycle efficiency can be achieved. With previous DOE/NETL funding (Contract No. DE-FE-0000469), we demonstrated the techno-economic viability of the technology in bench-scale tests and slipstream demonstrations at the National Carbon Capture Center (NCCC), Wilsonville, Alabama and Wabash River IGCC plant in Terra Haute, Indiana. We demonstrated a stable working CO 2 capacity for over 11,650 cycles with simulated synthesis gas. We also evaluated its performance with actual synthesis gas in two test campaigns at the Wabash River IGCC Plant, Terre Haute, IN and the National Carbon Capture Center (NCCC), Wilsonville, AL. The slipstream tests clearly showed that the actual coal gas constituents and potential contaminants (e.g. trace metals, halides, tars) had no effect on the sorbent’s ability to remove CO 2 (the same sorbent beds were used in both field tests with no sign of deactivation for 2,000 cycles with over 26,750 SCF of gas treated). As expected, due to the high temperature CO 2 removal capability and low energy needed to regenerate the sorbent, the power cycle efficiency with our process was greater than 34% on a higher heating value (HHV) basis; in comparison, the same IGCC plant equipped with the Selexol TM solvent for carbon capture can only achieve 31.4% HHV efficiency. The capital cost for an IGCC system with TDA’s process is estimated as $2,417/kW e , which is 12% lower than that of the IGCC/ Selexol TM process. The levelized cost for electricity including the transport, storage and monitoring (TS&M) cost for CO 2 was calculated as $\$ $92.9/MWh (lowest reported to our knowledge), which is much better than the $105.2/MWh estimated for the IGCC/ Selexol TM process. In this project (DE-FE0013105), TDA Research, in collaboration with our partners Gas Technology Institute (GTI), Illinois Clean Coal Institute (ICCI), University of California, Irvine (UCI), University of Alberta (UOA), Siemens, NCCC and Sinopec advanced the technical maturity of the technology; scaling it up by a factor of 100. We optimized the reactor design using computational fluid dynamics (CFD); using adsorption modeling we improved the pressure swing adsorption (PSA) cycle sequence. We carried out two field test campaigns with a fully-equipped 0.1 MW e prototype unit (for a total of 844 hours) using actual synthesis gas to prove the viability of the new technology. A successful 30 day (707 hrs) evaluation was completed at NCCC under air blown gasification conditions. We demonstrated 97.3% carbon capture at 1,500 SLPM, 93% carbon capture at 1,800 SLPM, and 90% carbon capture at 2,100 SLPM in the NCCC tests. We also demonstrated the system for 137 hours at a Sinopec petrochemical plant under oxygen blown gasification, demonstrating 86% carbon capture at 2,660 SLPM. In collaboration with University of California, Irvine (UCI), we completed a techno-economic analysis (TEA) for TDA’s warm gas cleanup technology integrated to IGCC power plant. The net plant efficiencies (on a coal HHV basis) for the warm gas cleanup cases were estimated to be 34.0% for E-GasTM gasifier, 34.4% for GE gasifier, 33.4 for the Shell gasifier and 34.2 for the TRIG TM gasifier (Cases 2, 4, 6 and 8 in this study) with a catalytic combustor for CO 2 purification, which are significantly higher than those for the Cold Gas Case, or an increase of as much as 12% in the heat rate for Case 2, 6% for Case 4, 9% for Case 6, and 9% for Case 8. The 1st year cost of electricity with the transport, storage and monitoring (TS&M) costs for the CO 2 included was $\$ $129.2/MWh for the E-GasTM gasifier Warm Gas Cleanup Case, $\$ $131.9/MWh for the GE gasifier Warm Gas Cleanup Case, $\$ $146.8/MWh for the Shell Gasifier Warm Gas Cleanup Case, and $\$ $129.9/MWh for the TRIG TM gasifier Warm Gas Cleanup Case. For comparison, the costs for the baseline Cold Gas CO 2 removal with Selexol for the different gasifiers were: $\$ $146.6/MWh for the E-Gas TM gasifier, $\$ $142.2/MWh for the GE gasifier, $\$ $159.0/MWh for the Shell gasifier and $\$ $144.3/MWh for the TRIG TM gasifier. In summary, the costs for our system were 7 to 12% lower than the corresponding Cold Gas Cleanup cases. The results of this techno-economic analysis suggested that TDA’s high temperature PSA-based Warm Gas Clean-up Technology can make a substantial improvement in the IGCC plant thermal performance for achieving near zero CO 2 emissions for E-Gas TM , GE, Shell and TRIG TM gasifier based IGCC power plants. The capital expenses were estimated to be lower than that of Selexol’s™. Taken together, the higher net plant efficiency and lower capital and operating costs resulted in substantial reduction in the cost of carbon capture for the IGCC plant equipped with TDA’s high temperature PSA-based carbon capture system. Finally, in collaboration with Gas Technology Institute (GTI) we completed the environmental health and safety assessment for TDA’s warm gas carbon capture technology.

01 COAL, LIGNITE, AND PEAT↗

Life-Cycle Baseline Customization for the Formerly Utilized Sites Remedial Action Program - 20304

One of the responsibilities of the federal government is to estimate sound and defensible life-cycle baseline costs for use in federal budget estimates and to meet federal financial reporting requirements. To accomplish this, the US Department of Energy (DOE) Office of Legacy Management (LM) and the US Army Corps of Engineers (USACE) have partnered together to ensure that the liabilities documented in each Formerly Utilized Sites Remedial Action Program (FUSRAP) site's life-cycle baseline are specifically tailored. FUSRAP was created in the mid-1970's to clean up radiological contamination resulting from the early development of nuclear weapons. DOE was responsible for FUSRAP until October 1997, when Congress transferred the administration and execution of FUSRAP site cleanups to USACE. By 1997, DOE had completed the cleanup of 25 of the 46 sites that were active within the program and had begun cleanup at 13 additional sites. USACE was assigned responsibility for the cleanup of the 21 remaining FUSRAP sites, and at 8 additional sites that had since been referred for cleanup. The LM mission for the FUSRAP sites is to perform long-term surveillance and maintenance (LTS and M). Currently, LM provides long-term stewardship for 34 completed FUSRAP sites. Another 20 sites are under active remediation by USACE. Within the last 5 years, USACE has completed the cleanup at five FUSRAP sites and the LTS and M responsibility has been transferred to LM. By 2029, USACE will compete remediation at eight additional sites and LTS and M for those sites will transfer to LM. Because responsibilities for the FUSRAP sites transfer between USACE and LM upon completion of remedial actions, both agencies maintain life-cycle baselines for different stages of the project and both must have a strong understanding of the needs and requirements for each site. This understanding ensures that the life-cycle baselines form a complete and accurate picture of what is required for the site and for the FUSRAP program. LM focuses on several things when customizing the life-cycle baseline estimates for the FUSRAP sites, including (1) Understanding the unique requirements for each site. By reviewing site-specific documents prepared by USACE, such as Feasibility Studies and Records of Decision, and partnering with USACE to gain additional insight about site conditions and requirements for stewardship, as well as potential risks, LM can better develop the life-cycle baselines. (2) Developing site-specific labor breakdowns. This ensures the required labor mix is baselined for specific activities by comparing the labor mix required to perform activities at (a) other LM-managed FUSRAP sites and (b) non-FUSRAP LM sites and (c) by USACE at active FUSRAP sites. (3) Taking a tiered approach to life-cycle baseline planning. Estimates for sites transferring to LM in the near term (5 years) are more definitive than for sites transferring in the out-year period. Remedial actions at the near-term sites are at or near completion, providing LM a strong understanding of the LTS and M requirements and remaining liabilities. This in turn allows for site-specific customization of the baseline. (4) Using a robust risk management approach to ensure that liabilities specific to each site are identified, evaluated by probability and severity, and documented in relation to the impact to cost or schedule. To ensure the most accuracy within all the baselines, the FUSRAP life-cycle baselines are updated as needed to support program, project, and contract management needs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Risk to ecological resources following remediation can be due mainly to increased resource value of successful restoration: A case study from the Department of Energy's Hanford Site

Several nations are faced with the need to remediate large contaminated sites following World War II, the Cold War, and abandoned industrial sites, and to return them to productive land uses. In the United States, the Department of Energy (DOE) has the largest cleanup challenge, and its Hanford Site in the state of Washington has the most extensive and most expensive cleanup task. Ideally, the risk to ecological resources on remediation sites is evaluated before, during, and after remediation, and the risk from, or damage to, ecological resources from contaminants should be lower following remediation. In this paper, we report the risk to ecological resources before, during, and as a consequence of remediation on contaminated units requiring cleanup, and then examine the causes for changes in risk by evaluating 56 cleanup evaluation units (EUs) at the Hanford Site. In this case, remediation includes a restoration phase. In general, the risk to ecological and eco-cultural resources is currently not discernible or low at most contaminated units, increases during remediation, and decreases thereafter. Remediation often causes physical disruption to ecosystems as it reduces the risk from exposure to contaminants. Most new remediation projects at the Hanford Site include ecological restoration. Ecological restoration results in the potential for the presence of higher quality resources after remediation than currently exists on these contaminated lands and facilities. Although counter-intuitive, our evaluation of the risk to ecological resources following remediation indicated that a significant percentage of units (61%) will be at increased risk in the post-remediation period. This increased risk is due to DOE's successful remediation and restoration that results in a higher percent of native vegetation and higher ecological value on the sites in the post-remediation period than before. These newly-created resources can then be at risk from post-remediation activities. Risks to these new higher quality resources include the potential for spread of invasive species and of noxious grasses used in previous cleanup actions, disruption of ecosystems (including those with state or federally listed species and unique ecosystems), compaction of soil, use of pesticides to control invasive species, and the eventual need for continued monitoring activities. Thus, by greatly improving the existing habitat and health of eco-receptors, and maintaining habitat corridors between high quality habitats, the ecological resources in the post-remediated units are at risk unless care is taken to protect them. Many of the negative effects of both remediation and future monitoring (or other future land uses) can be avoided by planning and management early in the remediation process. We suggest DOE and other agencies convene a panel of managers, remediation scientists, regulators, environmental and ecological scientists, Native Americans, economists, and the public to develop a generic list of performance metrics for the restoration phase of remediation, including evaluation of success, which could be applied across the DOE complex.

54 ENVIRONMENTAL SCIENCES↗

Hybrid Sorbents for 129 I Capture from Contaminated Groundwater

Radioiodine ( 129 I) poses a risk to the environment due to its long half-life, toxicity, and mobility. It is found at the U.S. Department of Energy Hanford Site due to legacy releases of nuclear wastes to the subsurface where 129 I is predominantly present as iodate (IO 3 – ). To date, a cost-effective and scalable cleanup technology for 129 I has not been identified, with hydraulic containment implemented as the remedial approach. Here, novel high-performing sorbents for 129 I remediation with the capacity to reduce 129 I concentrations to or below the US Environmental Protection Agency (EPA) drinking water standard and procedures to deploy them in an ex-situ pump and treat (P&T) system are introduced. Furthermore, this includes implementation of hybridized polyacrylonitrile (PAN) beads for ex-situ remediation of IO 3 – -contaminated groundwater for the first time. Iron (Fe) oxyhydroxide and bismuth (Bi) oxyhydroxide sorbents were deployed on silica substrates or encapsulated in porous PAN beads. In addition, Fe–, cerium (Ce)–, and Bi–oxyhydroxides were encapsulated with anion-exchange resins. The PAN–bismuth oxyhydroxide and PAN–ferrihydrite composites along with Fe- and Ce-based hybrid anion-exchange resins performed well in batch sorption experiments with distribution coefficients for IO 3 – of >1000 mL/g and rapid removal kinetics. Of the tested materials, the Ce-based hybrid anion-exchange resin was the most efficient for removal of IO 3 – from Hanford groundwater in a column system, with 50% breakthrough occurring at 324 pore volumes. The functional amine groups on the parent resin and amount of active sorbent in the resin can be customized to improve the iodine loading capacity. These results highlight the potential for IO 3 – remediation by hybrid sorbents and represent a benchmark for the implementation of commercially available materials to meet EPA standards for cleanup of 129 I in a large-scale P&T system.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Spatiotemporal Analyses of Groundwater and Shoreline Cr(VI) Concentrations in the 100 Areas at Hanford

Cleanup efforts have been ongoing since the late 1990s to remediate contaminated waste sites and groundwater in the 100 Areas at the U.S. Department of Energy (DOE) Hanford Site. One of the primary contaminants of concern is hexavalent chromium (Cr(VI)), which was used as a corrosion inhibitor in cooling water for nuclear reactors that formerly operated along the shoreline of the Columbia River. Cleanup efforts have included 1) removal, treatment (as needed), and disposal of contaminated sediments; 2) in situ redox manipulation as a permeable reactive barrier; 3) pump-and-treat; 4) soil flushing; and 5) monitored natural attenuation. DOE’s annual groundwater monitoring reports document the significant reductions in Cr(VI) plume areas that have occurred over the past 10 years or more as a result of these cleanup efforts. The Record of Decision for the 100-HR-3 operable unit specified a cleanup level (CUL) for Cr(VI) in groundwater of 48 µg/L to protect human receptors, and a surface water CUL of 10 µg/L to protect aquatic organisms in the Columbia River. The Record of Decision did not specify point-of-compliance locations for the surface water CUL. Data for 2019 from the six groundwater operable units (OUs) in the 100 Areas indicate that the 48 μg/L groundwater CUL has been achieved in 100% of the wells in the 100-BC and 100-NR OUs, and in 89- 97% of the wells in the other OUs (100-KR, 100-HR-D, 100-HR-H, 100-FR). Data for 2019 indicate that 100% of the aquifer tubes monitored for Cr(VI) in the 100 Areas have concentrations below the 48 μg/L groundwater CUL. However, the 10 μg/L standard has not yet been consistently achieved for both inland groundwater monitoring wells and shoreline aquifer tubes. This report describes a series of data analyses performed to identify consistent relationships, if any, between inland well and shoreline Cr(VI) concentrations within the 100 Areas. To this end, select monitoring data for Cr(VI) measured in groundwater and aquifer tubes at the 100 Areas were analyzed for a 10-year period—2010 to 2019. Relationships between inland groundwater plumes and surface-water points of discharge in and along the Columbia River were examined through several analyses that included inland well and aquifer tube concentrations as a function of distance from the shoreline, evaluation of cumulative probability plots, trend analysis, correlation analysis, cluster analysis, and identification of plume trajectories for each of the 100 Areas. The analyses did not identify consistent relationships between inland groundwater Cr(VI) concentrations and shoreline concentrations within the 100 Areas due to several confounding factors influencing groundwater flow directions and Cr(VI) concentrations. The proximity of groundwater Cr(VI) plumes to the river, and the highly dynamic nature of the river, influence the transport behavior of the plumes and create challenges for quantifying attenuation of Cr(VI) between the inland monitoring wells and shoreline concentrations. Other factors contributing to temporal and spatial Cr(VI) concentrations, as supported by some of the data analyses, include the presence of vadose zone sources, variable sorption behavior, and complexities associated with Cr(VI) mass transfer between the upper and lower aquifers and their interactions with the river. Hence, monitoring to assess compliance with target CULs will need to be determined for each area individually since several factors influence Cr(VI) concentrations in the 100 Areas.

54 ENVIRONMENTAL SCIENCES↗

Panel Session 133: Integrating Economic Redevelopment and Workforce Transition Into DOE Site Closure Planning (R1.18)

This panel focused on post-closure impacts to the long-term site workforce and communities in DoE's approach to accelerated site cleanup and expedited reduction of long-term financial liabilities. At sites where Cold-War workers shifted from weapons production to the cleanup effort, a more holistic approach to the workforce transition Post-EM cleanup is needed. This holistic approach would include incentives for expedited closure, trade re-training, and a vision for future site commercial activities. The panel discussed the importance of the right workforce incentives that includes appropriate training for displaced workers so that they can be integrated into a next job. A key aspect of this discussion was to re-assess the current and future land use opportunities related to land re-use concepts. By re-arranging cleanup sequencing is it possible to divest land sooner than originally projected for productive commercial use hence reducing the DOE long-term liability and consequently increasing an economic soft landing for those Cold-War workers. Panelists with presentations: Integrating Economic Redevelopment and Workforce Transition Into DOE Site Closure Planning (Sean Todd); Sustaining, Growing and Re-Developing DOD/DOD Facilities and Assets (Jonathan Taylor)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 4 and 15: Japan Fukushima Daiichi D and D Update and Technological Challenges at Japan Fukushima Daiichi D and D and Update on Nuclear Overview and Development in Japan - Nuclear Fuel Cycle

Sessions 4 and 15 represent a two-part panel series that discusses progress and challenges associated with cleanup at Fukushima. Severe limitations on availability of original panelists from Japan due to strict restrictions put in place to alleviate the spread of coronavirus necessitated changes to both panels. The result was a significantly modified panel for Session 04 (shown above) and the elimination of all panelists for Session 15. The 4 and 15 Panel Sessions provide an overview of activities related to both the progress and challenges of cleanup and decommissioning of the Fukushima Daiichi Nuclear Power Station (NPS) in Japan. Five panelists discussed perspectives of the cleanup following a Tokyo Electric Power Company (TEPCO) video showing the progress on site since the devastating Great East Earthquake and tsunami that caused the explosions at three of the six reactors on the site. Three of the five panelists discussed on-going work being performed for the effort, while the other two provided expert perspectives of on strategic efforts at the site. The panel was attended by over 80 technologists and policy makers spanning the globe and was opened by Dr. Monica Regalbuto of Idaho National Laboratory and a short video provided by TEPCO. The video described changes at the site that spanned the cleanup efforts from stabilizing water intrusion into the contaminated reactor buildings to construction of new administrative facilities. The video explained the processes underway to retrieve spent fuel rods and challenges in retrieval of the compromised fuel debris. The video highlighted working condition improvements that included establishment of rest housing and a small convenience store on the site, and the rollback of protective equipment around the site due to decreases contamination. Panelists with presentations: Revision of 'the Mid-and-Long-Term Road-map towards the Decommissioning of TEPCO's Fukushima Daiichi Nuclear Power Station' (Paul Dickman); Sharing UK experience at Fukushima Daiichi (Adrian Simper); SRNL Japan (Andrew Fellinger); ABLE's Initiative to Dismantle the Exhaust Stack (Daniel Walter); JAEA R and D in Fukushima (Tokio Fukahori); TEPCO - Overview and Update of the Fukushima Decommissioning Process (Monica Regalbuto); Toshiba's Involvement in the Decommissioning of the Fukushima Daiichi Nuclear Power Plant (Yasuhiro Yuguchi); Remote Dismantling of the Exhaust Stack At Fukushima Dai-ichi NPS (Takashi Okutsu)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 2: Hot Topics in US DOE Environmental Management

The well-attended Panel Session was chaired by Martin Schneider. The four panelists did not provide presentations. Rather the session was a discussion focusing on pressing issues facing US DOE Environmental Management (EM) sites and how the program is moving forward. The session began by momentarily reflecting on a success: the three Tank Waste Treatment Facilities will soon be coming online. These three facilities will treat as much waste in two years as was treated in the past 30 years. That is a significant milestone in progress. Also, safety enhancements at WIPP are a big success. The panelists noted that there will be challenges with the victories of the startup of the Waste Treatment Facilities. Treating tank waste is the last EM mission and will help with the relationships with the stakeholders, regulators and Congress. One of the biggest challenges will be moving back to full operation mode. Although the operation will increase productivity of reducing/managing the tank waste, it will decrease life cycle cost and lessen years of cleanup. The challenge will be having people understand that EM will be operating 24/7 and that maintenance will be key in keeping the operations. EM will be working together with the regulators to show tangible progress that will be effective and efficient. By working together, they can find opportunities/technologies for streamlining and accelerating cleanup. Recent changes to the regulatory framework between DOE-EM Los Alamos Field Office and New Mexico Environmental Department have helped cleanup in Los Alamos. Every year EM and the agencies review progress and come to agreements on the next work priorities. At Savannah River Site, the Federal Facility Agreement among EM, South Carolina Department of Health and Environmental Control, and Environmental Protection Agency (EPA) has developed a small core team that work are shared by together in resolving issues that come up. The discussion moved on to how progress can be made by sharing lessons learned among the contractors. An example of how these learned lessons can be shared is that key representatives from projects across the EM sites participate in various forums to review/contribute to the work planned. Other opportunities can be by temporary assignments of DOE staff to gain experience and by monthly EM Headquarters report that provide the lessons learned across the EM sites. The panelists discussed how skyline changes are the best examples of tangible progress. Decontamination and Demolition (D and D) of structures are the easiest tangible progress that can be seen. Whereas tank waste cleanup is the hardest to see. Disposal of waste onsite versus offsite is another challenge, and timely discussions are necessary to get to the best value to the government.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 88: Waste Management from Remediation of Legacy Sites or Unplanned Releases

This panel focused on the progression of cleanup on the Hanford Site, Washington, USA, from establishing the regulatory framework necessary for cleanup, to understanding the risks and addressing near-term hazards, to moving to 24/7 operations as cleanup focuses on tank waste treatment and co-located risk reduction efforts as the active cleanup footprint shrinks. Panelists with presentations: Hanford: Past, Present, Future (Brian Vance); Protecting the River (L. Ty Blackford); Hanford Tank Farms (John Eschenberg Jr.); The Hanford Site (Robert Wilkinson); The Hanford Site (Valerie McCain)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Selection of Vadose Zone Flow and Transport Properties with Gravel Fraction Corrections for the Hanford Site Composite Analysis and Cumulative Impact Evaluation

This environmental calculation file (ECF) is a compilation of hydrologic and radiological/chemical properties to be used for the updated Hanford Site Composite Analysis (CA) and Cumulative Impact Evaluation (CIE) vadose zone (VZ) modeling. The CA will provide an all-pathways dose projection to a hypothetical future member of the public from all planned low-level radioactive waste disposal facilities and potential contributions from all other projected end-state sources of radioactive material left at the Hanford Site following site closure. Its primary purpose is to support the decision-making process of the U.S. Department of Energy (DOE) under DOE O 435.1 Chg 1, Radioactive Waste Management, related to managing low-level waste disposal facilities at the Hanford Site. The CIE evaluates the effects of cleanup decisions regarding groundwater quality in the Hanford Site Central Plateau (DOE/RL-2018-69, Cumulative Impact Evaluation Technical Approach Document). Due to the complexity and large number of waste sites in source operable units (OUs), the computational tools used for the CIE must be capable of representing a range of site conditions and source terms in the VZ while also efficiently computing the impact that cleanup decisions have on the underlying aquifer. Waste-site proximity between and within source OUs has resulted in contaminants commingling in the vadose and saturated zones in complex ways. Plume commingling requires cleanup decisions to be evaluated considering the surrounding waste sites and existing groundwater contamination, therefore demonstrating the need to evaluate cumulative impacts from the VZ to groundwater.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remining and Restoring Abandoned US Mining Sites: The Case for Materials Needed for Zero-Carbon Transition

The electricity generation sector is responsible for 25% of the world’s greenhouse gas (GHG) emissions and thus has been the focus of efforts to transition to clean energy and sustainable development in many nations. In the past 20 years, renewable energy sources have been the fastest-growing energy source in the world, comprising almost 29% of the world’s electricity generation in 2020. Renewable energy sources are expected to comprise nearly 95% of the world’s power capacity growth through 2026, with a share of planned capacity expansion of up to 46% in 2026. The rapid development of renewable energy sources and technologies will require an enormous amount of raw materials to replace coal and gas plants and increase in the capacity to handle growing electricity demand because renewable energy sources have a low-power density and intermittent behavior. Accounting for the expected scale of rapidly deploying renewable energy sources that require rare earth elements (REEs), cement, and steel, the mining industry may face a supply problem for the materials critical for clean energy. And, as the exploration and development of new mining sites can be expensive and risky, the mining industry may require economic stimuli to grow supply. The increasing demand for renewable energy resources makes mining a threat to the environment unless proper regulations are established and calls for remining, cleanup, and circular economic development are made. Mining also contributes to environmental injustices related to the exploitation and pollution of lands near communities that are dependent on biodiversity in the area, while not always benefiting from technological advancements provided by the use of renewable energy and technologies. This study explored the opportunity of remining abandoned mining waste to extract metals and minerals essential for the production of renewable energy sources. The authors analyzed materials used in the production of these technologies, materials readily available in the United States, and which materials can be extracted locally in the United States from abandoned mine waste. The authors also studied environmental injustices that populations near mining sites experience and ways to mitigate these injustices, such as providing more control over extraction and cleanup activities, providing more job opportunities in those areas, and offsetting costs associated with cleanup and land restoration projects.

42 ENGINEERING↗

Web-Based Tools for Data-Informed Remedy Optimization: Software Theory and User Guide

This report documents the development and application of two web-based decision-support tools for pump-and-treat (P&T) groundwater remediation systems: PTOLEMY (Pump-and-Treat Optimized Location Evaluation to Maximize Yields) and OPTIMA (Optimization for Pump-and-Treat Implementation, Management, & Assessment). These tools enhance remedy design and management by leveraging advanced computational methods – specifically deep learning and multi-objective optimization – within a user-friendly platform. By integrating data-driven models with established hydrogeological knowledge, PTOLEMY and OPTIMA enable more efficient evaluation of well placement and operational strategies, helping site managers balance multiple remediation objectives under complex conditions. Both tools are implemented as modules within the SOCRATES (Suite Of Comprehensive Rapid Analysis Tools for Environmental Sites) web platform, which provides data access, visualization, and analytics to support remedy optimization across sites in the U.S. Department of Energy Office of Environmental Management complex. PTOLEMY is a rapid screening module designed to identify promising locations for new extraction wells. It employs a multi-channel three-dimensional convolutional neural network (MC3D-CNN) trained on high-fidelity simulation data to predict the relative performance (in terms of contaminant mass recovery) of potential well sites. Through an interactive web interface, PTOLEMY visualizes the probability of high performance across a site, highlighting areas where an extraction well is likely to yield above-threshold contaminant removal over a multi-year period. PTOLEMY’s map-based displays and exportable results support transparent communication of screening analyses. By focusing attention on the most favorable candidate locations, the tool augments traditional engineering judgment and physics-based modeling, providing a data informed basis for subsequent detailed evaluations. OPTIMA is a multi objective optimization module designed to find wellfield layouts and operating schedules that meet various cleanup goals. It quickly evaluates thousands of candidate setups – combinations of well locations, timing, and rates – and returns a small set of best trade-off options for comparison. At its core, OPTIMA uses a U-Net-based surrogate model – a deep-learning emulator of a groundwater flow and transport simulator – to dramatically accelerate scenario evaluations. Coupling this fast surrogate with the NSGA-II (Non-dominated Sorting Genetic Algorithm II) evolutionary algorithm, OPTIMA explores a wide decision space of well locations and schedules to identify Pareto-optimal solutions that trade off key objectives (e.g., minimizing cleanup time, maximizing contaminant mass removal, and minimizing plume extent). The tool outputs a family of optimal configurations and visualizes their trade-offs (Pareto frontiers of cleanup metrics and maps of optimized well placements). Site managers can use these results to understand the range of viable strategies and to select candidate designs for more detailed verification. OPTIMA is currently under active development and not yet fully released; this guide provides early documentation to support planning and gather user feedback.

54 ENVIRONMENTAL SCIENCES↗

Session 097A - Panel: Accomplishments and Update of the East Tennessee Technology Park in Oak Ridge, TN (1/4) (R1.16a)

This panel was deferred until 2021. The session was designed to highlight and celebrate the accomplishment of Vision 2020 at US DoE's East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee. Vision 2020 is the overarching strategy and guidance that have formed the foundation of success in closing one of the largest cleanup site in the DOE Complex. The session was supposed to feature representatives from the DOE Oak Ridge Office of Environmental Management (OREM) and its contractor, UCOR, in exploring the partnerships and performance excellence that have made the difference in achieving success. OREM's Vision 2020 is a collaboration with entities that have made a difference in its success: economic developers, workforce developers, the University of Tennessee, and community partners. The vigorous Oak Ridge small business contracting community has also been instrumental in helping achieve success. This session plans to celebrate the entire process, its numerous players, and the spirit of accomplishment as the Oak Ridge community comes to realize the promise of 30 years of continuous cleanup excellence. This session integrated with panel sessions 97B, 97C and 97D. Panelists with presentations: Beyond Cleanup: Achieving Risk Reduction through Partnerships and Performance Excellence (Kenneth Rueter); Strategic Approach to Achieve End States at the East Tennessee Technology Park (Jay Mullis)

61 RADIATION PROTECTION AND DOSIMETRY↗