Search NASA⌕ Search

SEARCH · Search NASA

Results for “conjunction risk mitigation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Setting the Bar for the Replacement of the Probability of Collision Metric

To date, satellite conjunction assessment (CA) risk analysis has largely embraced the probability of collision (Pc) as the omnibus metric to evaluate collision likelihood, and its use in such assessments has mostly been straightforward: at the point at which a conjunction mitigation decision is required, the calculated Pc is compared to a threshold; and if the calculated Pc exceeds that threshold, then a mitigation action is warranted. With only minor variation, this approach is employed by major CA risk assessment centers (e.g., NASA, EUSST, CNES, JAXA) and is advanced as the preferred method in the published CA best practices handbooks. Despite this near unanimity of operational practice, there is a major strain of secondary literature critical of the Pc and willing to propose alternatives. Alfano (2005) pointed out the ability of the Pc to underrepresent the risk in certain situations and counselled a maximum Pc construct. Carpenter (2017, 2019) reiterated this criticism and proposed using instead a confidence interval on the miss distance. Balch et al. (2019) identified what they argued was a defect in the entire Bayesian Pc construct and believed that the use of a more conservative methodology based on covariance ellipsoid overlap was necessary. Delande (2022) introduced the framework of collision “plausibility” to the risk assessment process and sketched out how this might be used operationally. Elkantassi (2022) published a full development of the miss distance confidence interval approach and applied it to several worked examples. While these different approaches to collision risk assessment do differ in their details, they all converge on two central points: first, the Pc’s failure to give an adequate expression of the risk in dilution region situations is a fatal flaw; and second, a conjunction should be presumed risky and in need of mitigation until the evidence of the situation can establish otherwise. These criticisms, if correct, would counsel a number of modifications to current CA operational practice; as such, they force a re-examination of fundamental aspects of the CA problem, including the following: 1. Is the CA risk assessment a probability problem, a statistics problem, or something else? 2. If it is a statistics problem, does it lend itself naturally to a hypothesis test construction? 3. If it can be construed as a hypothesis test, what form should the null hypothesis take, to wit: what constraints exist on the choice of the null hypothesis, what selections are in best alignment with all of the attendant parameters of the problem, and what is implied philosophically by different choices? 4. What are the implications of using the different proposed risk assessment parameters for CA? This question should be answered both in determining how frequently the dilution region situation cited by the critics of the Pc actually appears in an operationally significant manner and the missed detection and false alarm rates of all of the proposed risk assessment metrics, compared both to the Pc and to each other. This paper explores and offers preliminary answers to the above questions, presenting a researched treatment of the philosophical nature of the CA problem and the null hypothesis choice that achieves the greatest consistency with all of the different aspects of operational CA conduct. It then profiles all of the different proposed risk assessment metrics enumerated in the earlier paragraph against an extremely large database of conjunction events at both the 550km and 700km altitudes. The combination of the philosophical exploration of the CA problem and the results of the profiling activity articulates what a risk assessment metric will need to demonstrate, in terms of both innate construction and performance, in order to be a true competitor to the Pc.

conjunction assessment↗

Current Best Practices on Wildfire Risk Reduction for Electric Transmission and Distribution Systems

This report provides a set of best practices in response to Section 4(d) of Executive Order 14308, Empowering Commonsense Wildfire Prevention and Response. The information contained herein is expected to be used in conjunction with other materials at the Federal Energy Regulatory Commission Wildfire Risk Mitigation Technical Conference (Docket No. AD25-16-000), with possible direction to the North American Electric Reliability Corporation to take action. The objective of this report is to provide an overview of existing and emerging best practices currently employed or planned by utilities for wildfire mitigation, demonstrating how these efforts align with the executive order’s emphasis on reducing electric utility–caused wildfires while also balancing cost-effectiveness. Additionally, while most practices in utility-developed wildfire mitigation plans focus on risk reduction through robustness and operational reliability, this report also discusses best practices for resilience. The best practices are adopted from publicly available utility wildfire mitigation plans from the United States and Canada, recent findings from wildfire risk reduction research, and industry engagement.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Advancing Geophysical Techniques to Image a Stratigraphic Hydrothermal Resource

Sedimentary-hosted geothermal energy systems are permeable structural, structural-stratigraphic, and/or stratigraphic horizons with sufficient temperature for direct use and/or electricity generation. Sedimentary-hosted (i.e., stratigraphic) geothermal reservoirs may be present in multiple locations across the central and eastern Great Basin of the USA, thereby constituting a potentially large base of untapped, economically accessible energy resources. Sandia National Laboratories has partnered with a multi disciplinary group of collaborators to evaluate a stratigraphic system in Steptoe Valley, Nevada using both established and novel geophysical imaging techniques. The goal of this study is to inform an optimized strategy for subsequent exploration and development of this resource and analogous ones. Building from prior Nevada Play Fairway Analysis (PFA), this team is primarily 1) collecting additional geophysical data, 2) employing novel joint geophysical inversion/modeling techniques to update existing 3D geologic models, and 3) integrating the geophysical results to produce a working, geologically constrained thermo-hydrological reservoir model. Prior PFA work highlights Steptoe Valley as a favorable resource basin that likely has both sedimentary and hydrothermal characteristics. However, there remains significant uncertainty on the nature and architecture of the resource(s) at depth, which increases the risk in exploratory drilling. Newly acquired gravity, magnetic, magnetotelluric, and controlled-source electromagnetic data products, in conjunction with new and preexisting geoscientific measurements and observations, are being integrated and evaluated for efficacy in understanding stratigraphic geothermal resources and mitigating exploration risk. Furthermore, the influence of hydrothermal activity on sedimentary-hosted reservoirs in favorable structural settings, and whether fault-controlled systems may locally enhance temperature and permeability in some deep stratigraphic reservoirs, will also be evaluated.

Geothermal, Sedimentary Heat, Geophysics, Seismic,↗

Requirement Metrics for Risk Identification

The Software Assurance Technology Center (SATC) is part of the Office of Mission Assurance of the Goddard Space Flight Center (GSFC). The SATC's mission is to assist National Aeronautics and Space Administration (NASA) projects to improve the quality of software which they acquire or develop. The SATC's efforts are currently focused on the development and use of metric methodologies and tools that identify and assess risks associated with software performance and scheduled delivery. This starts at the requirements phase, where the SATC, in conjunction with software projects at GSFC and other NASA centers is working to identify tools and metric methodologies to assist project managers in identifying and mitigating risks. This paper discusses requirement metrics currently being used at NASA in a collaborative effort between the SATC and the Quality Assurance Office at GSFC to utilize the information available through the application of requirements management tools.

Hammer, Theodore↗

Case Study of Risk Mitigation Based on Hardware/Software Integration (HSI) Testing for the International Space Station (ISS) Node 2 Module

Within the pressurized elements of the International Space Station (ISS), requirements exist to ensure a safe, habitable environment for the crew. In order to provide this environment, thermal control components work in conjunction with software controls to provide heat rejection for subsystem avionics equipment, for the environmental control system and for experiment payloads. It is essential to ISS operations, mission success and crew safety that necessary testing incorporates the extreme conditions to ensure proper performance. This paper provides a general description and methodology applied to thermal related Hardware/Software Integration (HSI) tests for the ISS Node 2 module. A detailed test plan was developed and implemented with two objectives: the first was for risk mitigation of the thermal control algorithms and software qualification, and the second was for data collection which will substantiate thermalhydraulic models of the Internal Active Thermal Control System (IATCS). Analytical models are utilized to determine on-orbit performance for conditions and scenarios where the simulation of actual on-orbit system performance is limited by test configuration constraints. Node 2 IATCS HSI activities were performed at the Alenia Spazio facility in Torino, Italy with participation from the National Aeronautics and Space Administration (NASA), Alenia Spazio, Jacobs Engineering Sverdrup (JE Sverdrup) and Boeing.

Holt, James Mike↗

Fragility Functions Resource Report: Documented Sources for Electricity and Water Resilience Valuation

Fragility curves provide the vulnerability between hazard intensity and an asset. Federal installations may include many different electricity and water infrastructure types (or assets) such as generators, wind turbines, solar PV, switch yards, substations and power lines as well as water distribution systems that could be affected by different hazards. The vulnerability of each asset is a function of its age, type of materials and maintenance. In addition, the vulnerability changes with the hazards intensity and has a probability distribution function associated with it. The fragility functions are used in conjunction with hazard probability and consequence valuations to determine the values at risk for examination of investment grade analyses of alternative mitigation strategies. This document provides examples of fragility functions and links to their sources for different electricity and water infrastructure assets by hazard type.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Wald Sequential Probability Ratio Test for Space Object Conjunction Assessment

This paper shows how satellite owner/operators may use sequential estimates of collision probability, along with a prior assessment of the base risk of collision, in a compound hypothesis ratio test to inform decisions concerning collision risk mitigation maneuvers. The compound hypothesis test reduces to a simple probability ratio test, which appears to be a novel result. The test satisfies tolerances related to targeted false alarm and missed detection rates. This result is independent of the method one uses to compute the probability density that one integrates to compute collision probability. A well-established test case from the literature shows that this test yields acceptable results within the constraints of a typical operational conjunction assessment decision timeline. Another example illustrates the use of the test in a practical conjunction assessment scenario based on operations of the International Space Station.

Navigation↗

Sequential Wald Test Employing a Constrained Filter Bank: Application to Spacecraft Conjunctions

A binary Wald sequential probability ratio test that uses the residuals of norm-inequality-constrained Kalman filters for its likelihood ratio may be employed for a class of compound hypothesis tests on non-stationary systems. The hypotheses concern an inequality constraint on the norm of some elements of the system state. Each of two filters minimizes the summed-squares of its estimation errors subject to one or the other direction of the inequality constraint. This solution is motivated by the problem of satellite conjunction assessment, wherein the constraint concerns the close approach distance between two space objects. The outcome of the test can inform decisions concerning risk mitigation maneuvers.

J. Russell Carpenter↗

Data Driven Analysis for Modernization Program Management

NNSA is responsible for managing national nuclear security missions: ensuring a safe, secure, and reliable nuclear deterrent; supplying nuclear fuel to the Navy; and supporting the nation’s nuclear nonproliferation efforts. However, over half of NNSA’s facilities are more than 40 years old, and roughly one-third date back to the Manhattan Project. To execute its critical nuclear security missions, NNSA is making large investments to modernize its nuclear production capabilities. This ramp up represents NNSA’s largest modernization effort since the Cold War. Given the scale of these efforts, NNSA’s Office of Secondary Stage Production Modernization has implemented data driven techniques to prioritize investments and inform strategic decision making. NNSA, with support from its site managing contractors, has developed and implemented an integrated schedule and risk management system to address the issues and limitations with the traditional approach. The multi-year integrated schedules are key to identifying program linkages and managing large portfolios comprised of many different projects and efforts. In conjunction with the integrated schedule, a new program risk management system has also been developed and implemented, which manages program risks and opportunities, along with specific mitigation strategies to reduce or eliminate the risks per timelines that are tracked in the integrated schedule. This paper is supplemented with a follow-on presentation on effective management of program material and throughput modeling.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Managing Research in a Risk World

The Office of Chief Medical Officer (OCHMO) owns all human health and performance risks managed by the Human System Risk Board (HSRB). While the HSRB manages the risks, the Human Research Program (HRP) manages the research portion of the overall risk mitigation strategy for these risks. The HSRB manages risks according to a process that identifies and analyzes risks, plans risk mitigation and tracks and reviews the implementation of these strategies according to its decisions pertaining to the OCHMO risk posture. HRP manages risk research work using an architecture that describes evidence-based risks, gaps in our knowledge about characterizing or mitigating the risk, and the tasks needed to produce deliverables to fill the gaps and reduce the risk. A planning schedule reflecting expected research milestones is developed, and as deliverables and new evidence are generated, research progress is tracked via the Path to Risk Reduction (PRR) that reflects a risk's research plan for a design reference mission. HRP's risk research process closely interfaces with the HSRB risk management process. As research progresses, new deliverables and evidence are used by the HSRB in conjunction with other operational and non-research evidence to inform decisions pertaining to the likelihood and consequence of the risk and risk posture. Those decisions in turn guide forward work for research as it contributes to overall risk mitigation strategies. As HRP tracks its research work, it aligns its priorities by assessing the effectiveness of its contributions and maintaining specific core competencies that would be invaluable for future work for exploration missions.

Anton, W.↗

Time Dependence of Collision Probabilities During Satellite Conjunctions

The NASA Conjunction Assessment Risk Analysis (CARA) team has recently implemented updated software to calculate the probability of collision (P (sub c)) for Earth-orbiting satellites. The algorithm can employ complex dynamical models for orbital motion, and account for the effects of non-linear trajectories as well as both position and velocity uncertainties. This “3D P (sub c)” method entails computing a 3-dimensional numerical integral for each estimated probability. Our analysis indicates that the 3D method provides several new insights over the traditional “2D P (sub c)” method, even when approximating the orbital motion using the relatively simple Keplerian two-body dynamical model. First, the formulation provides the means to estimate variations in the time derivative of the collision probability, or the probability rate, R (sub c). For close-proximity satellites, such as those orbiting in formations or clusters, R (sub c) variations can show multiple peaks that repeat or blend with one another, providing insight into the ongoing temporal distribution of risk. For single, isolated conjunctions, R (sub c) analysis provides the means to identify and bound the times of peak collision risk. Additionally, analysis of multiple actual archived conjunctions demonstrates that the commonly used “2D P (sub c)” approximation can occasionally provide inaccurate estimates. These include cases in which the 2D method yields negligibly small probabilities (e.g., P (sub c)) is greater than 10 (sup -10)), but the 3D estimates are sufficiently large to prompt increased monitoring or collision mitigation (e.g., P (sub c) is greater than or equal to 10 (sup -5)). Finally, the archive analysis indicates that a relatively efficient calculation can be used to identify which conjunctions will have negligibly small probabilities. This small-P (sub c) screening test can significantly speed the overall risk analysis computation for large numbers of conjunctions.

Hall, Doyle T.↗

Structural Qualification Testing of the WindSat Payload Using Sine Bursts Near Structural Resonance

Sine burst tests are often used for structural qualification of space flight hardware. In most instances, the driving frequency of the shaker is specified far below the structure's first resonant mode, such that the entire test article sees uniform acceleration. For large structures, this limits qualification testing to lower parts of the structure, or else it over-tests the lower structure to achieve qualification of the upper structure. The WindSat payload, a 10.5 foot tall graphite/epoxy, titanium, and aluminum radiometer, experiences accelerations at the six foot diameter reflector nearly four times that at the spacecraft interface. Due to size of the payload, the number of bonded joints, and the lightweight reflector support structure design and construction, using static pull testing to qualify all of the bonded joints in the upper structure would result in large, expensive, and extensive test fixturing. Sine burst testing near the first two structural resonant modes was performed on the WindSat payload to achieve the correct load factor distribution up the stack for structural qualification. In this presentation, how finite element method (FEM) sine burst predictions were used in conjunction with low level random and sine burst tests to achieve correct qualification test load factor distribution on the WindSat payload is discussed. Also presented is the risk mitigation approach for using the uncorrelated FEM in this procedure.

Pontius, Jim↗

Risk Assessment and Integration Team (RAIT) Portfolio Risk Analysis Strategy

Impact at management level: Qualitative assessment of risk criticality in conjunction with risk consequence, likelihood, and severity enable development of an "investment policy" towards managing a portfolio of risks. Impact at research level: Quantitative risk assessments enable researchers to develop risk mitigation strategies with meaningful risk reduction results. Quantitative assessment approach provides useful risk mitigation information.

Edwards, Michelle↗

Current-State Constrained Filter Bank for Wald Testing of Spacecraft Conjunctions

We propose a filter bank consisting of an ordinary current-state extended Kalman filter, and two similar but constrained filters: one is constrained by a null hypothesis that the miss distance between two conjuncting spacecraft is inside their combined hard body radius at the predicted time of closest approach, and one is constrained by an alternative complementary hypothesis. The unconstrained filter is the basis of an initial screening for close approaches of interest. Once the initial screening detects a possibly risky conjunction, the unconstrained filter also governs measurement editing for all three filters, and predicts the time of closest approach. The constrained filters operate only when conjunctions of interest occur. The computed likelihoods of the innovations of the two constrained filters form a ratio for a Wald sequential probability ratio test. The Wald test guides risk mitigation maneuver decisions based on explicit false alarm and missed detection criteria. Since only current-state Kalman filtering is required to compute the innovations for the likelihood ratio, the present approach does not require the mapping of probability density forward to the time of closest approach. Instead, the hard-body constraint manifold is mapped to the filter update time by applying a sigma-point transformation to a projection function. Although many projectors are available, we choose one based on Lambert-style differential correction of the current-state velocity. We have tested our method using a scenario based on the Magnetospheric Multi-Scale mission, scheduled for launch in late 2014. This mission involves formation flight in highly elliptical orbits of four spinning spacecraft equipped with antennas extending 120 meters tip-to-tip. Eccentricities range from 0.82 to 0.91, and close approaches generally occur in the vicinity of perigee, where rapid changes in geometry may occur. Testing the method using two 12,000-case Monte Carlo simulations, we found the method achieved a missed detection rate of 0.1%, and a false alarm rate of 2%.

Carpenter, J. Russell↗

The 7 Year Evolution of EOS CA Support for Planning & Executing Risk Mitigation Maneuvers

This presentation will discuss the evolution of Collision Avoidance (CA) support for planning and executing Risk Mitigation Maneuvers (RMMs) for the Earth Observing System (EOS) Aqua, Aura, and Terra satellites within the seven-year period of January 2015 through December 2021. Several enhancements were implemented by the EOS team to expedite and improve the RMM planning and execution process, including updates to High Interest Event (HIE) analysis, maneuver preparation, maneuver ephemeris generation, conjunction event data screening, and maneuver commanding. As of 2022, these advancements allow the EOS team to plan and execute an RMM within 5 hours of identification with an accurate and low-risk solution. This represents a vast improvement from the 30 hours required to turn around an RMM back in 2015. In addition, the current process is substantially less error prone. Details of this progression and the specific aspects of each supporting component are explicated in the content of the presentation.

Syed Hasan↗

Decision Support Tool for Risk Assessment & Maneuver Planning in Collision Avoidance

As the quantity of orbital debris continues to grow, so too does the rate of conjunction messages that suggest possible collisions between high value payloads and debris. The abundance of these conjunction messages, and eventual misses, has led to a culture of ignored alerts, and an increase in satellite operation costs as a result of the frequent need to plan resources for maneuver planning and execution. The loss of “trust” in conjunction alerts is due to the poorly characterized evolution in probability of collision (Pc) as time approaches the time of closest approach (TCA) between two objects, as well as the interpretation of Pc in the context of maneuver planning. To address these problems, and in collaboration with the NASA Conjunction Assessment Risk Analysis (CARA) program, the Industrial Sciences Group has developed a novel Maneuver Decision Support System (MDSS) to assist satellite operations in conjunction assessment and Maneuver planning. It provides a meaningful and intuitive Urgency metric for actionable maneuver decisions, based on the physical dynamics of conjunctions. It is based on a forecast of the evolution of Pc over time and represents an advance over current methods that are in use for satellite conjunction monitoring and planning. The result is to give satellite operators a validated decision support systems to plan for maneuver execution or mitigation or monitoring up to 3 days before TCA.

Decision Support Tool↗

Mars Design Reference Architecture 5.0 Study: Executive Summary

The NASA Mars Design Reference Architecture 5.0 Study seeks to update its long term goals and objective for human exploration missions; flight and surface systems for human missions and supporting infrastructure; operational concept for human and robotic exploration of Mars; key challenges including risk and cost drivers; and, its development schedule options. It additionally seeks to assess strategic linkages between lunar and Mars strategies and develop and understanding of methods for reducing the cost/risk of human Mars missions through investment in research, technology development, and synergy with other exploration plans. Recommendations are made regarding conjunction class (long-stay) missions which are seen as providing the best balance of cost, risk, and performance. Additionally, this study reviews entry, descent, and landing challenges; in-space transportation systems; launch vehicle and Orion assessments; risk and risk mitigation; key driving requirements and challenges; and, lunar linkages.

Drake, Bret G.↗

A Geometric Analysis to Protect Manned Assets from Newly Launched Objects - Cola Gap Analysis

A safety risk was identified for the International Space Station (ISS) by The Aerospace Corporation, where the ISS would be unable to react to a conjunction with a newly launched object following the end of the launch Collision Avoidance (COLA) process. Once an object is launched, there is a finite period of time required to track, catalog, and evaluate that new object as part of standard onorbit COLA screening processes. Additionally, should a conjunction be identified, there is an additional period of time required to plan and execute a collision avoidance maneuver. While the computed prelaunch probability of collision with any object is extremely low, NASA/JSC has requested that all US launches take additional steps to protect the ISS during this "COLA gap" period. This paper details a geometric-based COLA gap analysis method developed by the NASA Launch Services Program to determine if launch window cutouts are required to mitigate this risk. Additionally, this paper presents the results of several missions where this process has been used operationally.

Hametz, Mark E.↗