Requirement Metrics for Risk Identification

The Software Assurance Technology Center (SATC) is part of the Office of Mission Assurance of the Goddard Space Flight Center (GSFC). The SATC's mission is to assist National Aeronautics and Space Administration (NASA) projects to improve the quality of software which they acquire or develop. The SATC's efforts are currently focused on the development and use of metric methodologies and tools that identify and assess risks associated with software performance and scheduled delivery. This starts at the requirements phase, where the SATC, in conjunction with software projects at GSFC and other NASA centers is working to identify tools and metric methodologies to assist project managers in identifying and mitigating risks. This paper discusses requirement metrics currently being used at NASA in a collaborative effort between the SATC and the Quality Assurance Office at GSFC to utilize the information available through the application of requirements management tools.

Hammer, Theodore↗

Case Study of Risk Mitigation Based on Hardware/Software Integration (HSI) Testing for the International Space Station (ISS) Node 2 Module

Within the pressurized elements of the International Space Station (ISS), requirements exist to ensure a safe, habitable environment for the crew. In order to provide this environment, thermal control components work in conjunction with software controls to provide heat rejection for subsystem avionics equipment, for the environmental control system and for experiment payloads. It is essential to ISS operations, mission success and crew safety that necessary testing incorporates the extreme conditions to ensure proper performance. This paper provides a general description and methodology applied to thermal related Hardware/Software Integration (HSI) tests for the ISS Node 2 module. A detailed test plan was developed and implemented with two objectives: the first was for risk mitigation of the thermal control algorithms and software qualification, and the second was for data collection which will substantiate thermalhydraulic models of the Internal Active Thermal Control System (IATCS). Analytical models are utilized to determine on-orbit performance for conditions and scenarios where the simulation of actual on-orbit system performance is limited by test configuration constraints. Node 2 IATCS HSI activities were performed at the Alenia Spazio facility in Torino, Italy with participation from the National Aeronautics and Space Administration (NASA), Alenia Spazio, Jacobs Engineering Sverdrup (JE Sverdrup) and Boeing.

Holt, James Mike↗

Wald Sequential Probability Ratio Test for Space Object Conjunction Assessment

This paper shows how satellite owner/operators may use sequential estimates of collision probability, along with a prior assessment of the base risk of collision, in a compound hypothesis ratio test to inform decisions concerning collision risk mitigation maneuvers. The compound hypothesis test reduces to a simple probability ratio test, which appears to be a novel result. The test satisfies tolerances related to targeted false alarm and missed detection rates. This result is independent of the method one uses to compute the probability density that one integrates to compute collision probability. A well-established test case from the literature shows that this test yields acceptable results within the constraints of a typical operational conjunction assessment decision timeline. Another example illustrates the use of the test in a practical conjunction assessment scenario based on operations of the International Space Station.

Navigation↗

Sequential Wald Test Employing a Constrained Filter Bank: Application to Spacecraft Conjunctions

A binary Wald sequential probability ratio test that uses the residuals of norm-inequality-constrained Kalman filters for its likelihood ratio may be employed for a class of compound hypothesis tests on non-stationary systems. The hypotheses concern an inequality constraint on the norm of some elements of the system state. Each of two filters minimizes the summed-squares of its estimation errors subject to one or the other direction of the inequality constraint. This solution is motivated by the problem of satellite conjunction assessment, wherein the constraint concerns the close approach distance between two space objects. The outcome of the test can inform decisions concerning risk mitigation maneuvers.

J. Russell Carpenter↗

Managing Research in a Risk World

The Office of Chief Medical Officer (OCHMO) owns all human health and performance risks managed by the Human System Risk Board (HSRB). While the HSRB manages the risks, the Human Research Program (HRP) manages the research portion of the overall risk mitigation strategy for these risks. The HSRB manages risks according to a process that identifies and analyzes risks, plans risk mitigation and tracks and reviews the implementation of these strategies according to its decisions pertaining to the OCHMO risk posture. HRP manages risk research work using an architecture that describes evidence-based risks, gaps in our knowledge about characterizing or mitigating the risk, and the tasks needed to produce deliverables to fill the gaps and reduce the risk. A planning schedule reflecting expected research milestones is developed, and as deliverables and new evidence are generated, research progress is tracked via the Path to Risk Reduction (PRR) that reflects a risk's research plan for a design reference mission. HRP's risk research process closely interfaces with the HSRB risk management process. As research progresses, new deliverables and evidence are used by the HSRB in conjunction with other operational and non-research evidence to inform decisions pertaining to the likelihood and consequence of the risk and risk posture. Those decisions in turn guide forward work for research as it contributes to overall risk mitigation strategies. As HRP tracks its research work, it aligns its priorities by assessing the effectiveness of its contributions and maintaining specific core competencies that would be invaluable for future work for exploration missions.

Anton, W.↗

Time Dependence of Collision Probabilities During Satellite Conjunctions

The NASA Conjunction Assessment Risk Analysis (CARA) team has recently implemented updated software to calculate the probability of collision (P (sub c)) for Earth-orbiting satellites. The algorithm can employ complex dynamical models for orbital motion, and account for the effects of non-linear trajectories as well as both position and velocity uncertainties. This “3D P (sub c)” method entails computing a 3-dimensional numerical integral for each estimated probability. Our analysis indicates that the 3D method provides several new insights over the traditional “2D P (sub c)” method, even when approximating the orbital motion using the relatively simple Keplerian two-body dynamical model. First, the formulation provides the means to estimate variations in the time derivative of the collision probability, or the probability rate, R (sub c). For close-proximity satellites, such as those orbiting in formations or clusters, R (sub c) variations can show multiple peaks that repeat or blend with one another, providing insight into the ongoing temporal distribution of risk. For single, isolated conjunctions, R (sub c) analysis provides the means to identify and bound the times of peak collision risk. Additionally, analysis of multiple actual archived conjunctions demonstrates that the commonly used “2D P (sub c)” approximation can occasionally provide inaccurate estimates. These include cases in which the 2D method yields negligibly small probabilities (e.g., P (sub c)) is greater than 10 (sup -10)), but the 3D estimates are sufficiently large to prompt increased monitoring or collision mitigation (e.g., P (sub c) is greater than or equal to 10 (sup -5)). Finally, the archive analysis indicates that a relatively efficient calculation can be used to identify which conjunctions will have negligibly small probabilities. This small-P (sub c) screening test can significantly speed the overall risk analysis computation for large numbers of conjunctions.

Hall, Doyle T.↗

Structural Qualification Testing of the WindSat Payload Using Sine Bursts Near Structural Resonance

Sine burst tests are often used for structural qualification of space flight hardware. In most instances, the driving frequency of the shaker is specified far below the structure's first resonant mode, such that the entire test article sees uniform acceleration. For large structures, this limits qualification testing to lower parts of the structure, or else it over-tests the lower structure to achieve qualification of the upper structure. The WindSat payload, a 10.5 foot tall graphite/epoxy, titanium, and aluminum radiometer, experiences accelerations at the six foot diameter reflector nearly four times that at the spacecraft interface. Due to size of the payload, the number of bonded joints, and the lightweight reflector support structure design and construction, using static pull testing to qualify all of the bonded joints in the upper structure would result in large, expensive, and extensive test fixturing. Sine burst testing near the first two structural resonant modes was performed on the WindSat payload to achieve the correct load factor distribution up the stack for structural qualification. In this presentation, how finite element method (FEM) sine burst predictions were used in conjunction with low level random and sine burst tests to achieve correct qualification test load factor distribution on the WindSat payload is discussed. Also presented is the risk mitigation approach for using the uncorrelated FEM in this procedure.

Pontius, Jim↗

Risk Assessment and Integration Team (RAIT) Portfolio Risk Analysis Strategy

Impact at management level: Qualitative assessment of risk criticality in conjunction with risk consequence, likelihood, and severity enable development of an "investment policy" towards managing a portfolio of risks. Impact at research level: Quantitative risk assessments enable researchers to develop risk mitigation strategies with meaningful risk reduction results. Quantitative assessment approach provides useful risk mitigation information.

Edwards, Michelle↗

Current-State Constrained Filter Bank for Wald Testing of Spacecraft Conjunctions

We propose a filter bank consisting of an ordinary current-state extended Kalman filter, and two similar but constrained filters: one is constrained by a null hypothesis that the miss distance between two conjuncting spacecraft is inside their combined hard body radius at the predicted time of closest approach, and one is constrained by an alternative complementary hypothesis. The unconstrained filter is the basis of an initial screening for close approaches of interest. Once the initial screening detects a possibly risky conjunction, the unconstrained filter also governs measurement editing for all three filters, and predicts the time of closest approach. The constrained filters operate only when conjunctions of interest occur. The computed likelihoods of the innovations of the two constrained filters form a ratio for a Wald sequential probability ratio test. The Wald test guides risk mitigation maneuver decisions based on explicit false alarm and missed detection criteria. Since only current-state Kalman filtering is required to compute the innovations for the likelihood ratio, the present approach does not require the mapping of probability density forward to the time of closest approach. Instead, the hard-body constraint manifold is mapped to the filter update time by applying a sigma-point transformation to a projection function. Although many projectors are available, we choose one based on Lambert-style differential correction of the current-state velocity. We have tested our method using a scenario based on the Magnetospheric Multi-Scale mission, scheduled for launch in late 2014. This mission involves formation flight in highly elliptical orbits of four spinning spacecraft equipped with antennas extending 120 meters tip-to-tip. Eccentricities range from 0.82 to 0.91, and close approaches generally occur in the vicinity of perigee, where rapid changes in geometry may occur. Testing the method using two 12,000-case Monte Carlo simulations, we found the method achieved a missed detection rate of 0.1%, and a false alarm rate of 2%.

Carpenter, J. Russell↗

The 7 Year Evolution of EOS CA Support for Planning & Executing Risk Mitigation Maneuvers

This presentation will discuss the evolution of Collision Avoidance (CA) support for planning and executing Risk Mitigation Maneuvers (RMMs) for the Earth Observing System (EOS) Aqua, Aura, and Terra satellites within the seven-year period of January 2015 through December 2021. Several enhancements were implemented by the EOS team to expedite and improve the RMM planning and execution process, including updates to High Interest Event (HIE) analysis, maneuver preparation, maneuver ephemeris generation, conjunction event data screening, and maneuver commanding. As of 2022, these advancements allow the EOS team to plan and execute an RMM within 5 hours of identification with an accurate and low-risk solution. This represents a vast improvement from the 30 hours required to turn around an RMM back in 2015. In addition, the current process is substantially less error prone. Details of this progression and the specific aspects of each supporting component are explicated in the content of the presentation.

Syed Hasan↗

Decision Support Tool for Risk Assessment & Maneuver Planning in Collision Avoidance

As the quantity of orbital debris continues to grow, so too does the rate of conjunction messages that suggest possible collisions between high value payloads and debris. The abundance of these conjunction messages, and eventual misses, has led to a culture of ignored alerts, and an increase in satellite operation costs as a result of the frequent need to plan resources for maneuver planning and execution. The loss of “trust” in conjunction alerts is due to the poorly characterized evolution in probability of collision (Pc) as time approaches the time of closest approach (TCA) between two objects, as well as the interpretation of Pc in the context of maneuver planning. To address these problems, and in collaboration with the NASA Conjunction Assessment Risk Analysis (CARA) program, the Industrial Sciences Group has developed a novel Maneuver Decision Support System (MDSS) to assist satellite operations in conjunction assessment and Maneuver planning. It provides a meaningful and intuitive Urgency metric for actionable maneuver decisions, based on the physical dynamics of conjunctions. It is based on a forecast of the evolution of Pc over time and represents an advance over current methods that are in use for satellite conjunction monitoring and planning. The result is to give satellite operators a validated decision support systems to plan for maneuver execution or mitigation or monitoring up to 3 days before TCA.

Decision Support Tool↗

Mars Design Reference Architecture 5.0 Study: Executive Summary

The NASA Mars Design Reference Architecture 5.0 Study seeks to update its long term goals and objective for human exploration missions; flight and surface systems for human missions and supporting infrastructure; operational concept for human and robotic exploration of Mars; key challenges including risk and cost drivers; and, its development schedule options. It additionally seeks to assess strategic linkages between lunar and Mars strategies and develop and understanding of methods for reducing the cost/risk of human Mars missions through investment in research, technology development, and synergy with other exploration plans. Recommendations are made regarding conjunction class (long-stay) missions which are seen as providing the best balance of cost, risk, and performance. Additionally, this study reviews entry, descent, and landing challenges; in-space transportation systems; launch vehicle and Orion assessments; risk and risk mitigation; key driving requirements and challenges; and, lunar linkages.

Drake, Bret G.↗

A Geometric Analysis to Protect Manned Assets from Newly Launched Objects - Cola Gap Analysis

A safety risk was identified for the International Space Station (ISS) by The Aerospace Corporation, where the ISS would be unable to react to a conjunction with a newly launched object following the end of the launch Collision Avoidance (COLA) process. Once an object is launched, there is a finite period of time required to track, catalog, and evaluate that new object as part of standard onorbit COLA screening processes. Additionally, should a conjunction be identified, there is an additional period of time required to plan and execute a collision avoidance maneuver. While the computed prelaunch probability of collision with any object is extremely low, NASA/JSC has requested that all US launches take additional steps to protect the ISS during this "COLA gap" period. This paper details a geometric-based COLA gap analysis method developed by the NASA Launch Services Program to determine if launch window cutouts are required to mitigate this risk. Additionally, this paper presents the results of several missions where this process has been used operationally.

Hametz, Mark E.↗

Automating Maneuvers: Considerations for Collision Avoidance

As more space operators implement large constellations of spacecraft, automating orbit maintenance maneuvers becomes a key feature of their operations concept to ensure that the workload is manageable. However the practice of performing a maneuver without sharing the plan with other nearby spacecraft causes a risk that two spacecraft will collide, not only destroying the spacecraft involved, but creating debris that will affect all other spacecraft using that orbit regime. In order to share the maneuver plan, a predicted ephemeris file containing the maneuver must be sent to a central authority to screen against predicted trajectories of all other on-orbit objects to determine where and when close approaches may occur that need to be mitigated. Currently the screening authority used by US operators is the 19th Space Defense Squadron. However the conjunction screening process in use by the 19th was developed over 30 years ago and was not designed with automation in mind, so screenings are performed once every 8 hours, meaning that spacecraft using automated maneuvering need to allow 16 hours to share their maneuver plan via the screening process. Many operators assume that automated maneuver planning must be real-time; however this time between planning and execution to allow for screening is possible if planned for during system design. In an effort to speed up the screening process, NASA has developed a prototype system for performing near-real-time screenings. This prototype system was necessitated to support the NASA Starling mission, a constellation of 4 cubesats that planned to fly at the same altitude as the SpaceX Starlink constellation, both performing automated maneuvering. Without screening of the planned maneuvers, the two constellations risked a collision. Once converted from a prototype to an operational system, this capability will greatly help smallsats, for example those that are planning to test propulsive capabilities, by allowing fast turnaround feedback to ensure safety form collision with other objects. This paper describes the existing CA process, the prototype real-time capability, and results from the experiment that tested the prototype.

Matthew Hejduk↗

Mir Contamination Observations and Implications to the International Space Station

A series of external contamination measurements were made on the Russian Mir Space Station. The Mir external contamination observations summarized in this paper were essential in assessing the system level impact of Russian Segment induced contamination on the International Space Station (ISS). Mir contamination observations include results from a series of flight experiments: CNES Comes-Aragatz, retrieved NASA camera bracket, Euro-Mir '95 ICA, retrieved NASA Trek blanket, Russian Astra-II, Mir Solar Array Return Experiment (SARE), etc. Results from these experiments were studied in detail to characterize Mir induced contamination. In conjunction with Mir contamination observations, Russian materials samples were tested for condensable outgassing rates in the U.S. These test results were essential in the characterization of Mir contamination sources. Once Mir contamination sources were identified and characterized, activities to assess the implications to ISS were implemented. As a result, modifications in Russian materials selection and/or usage were implemented to control contamination and mitigate risk to ISS.

Soares, Carlos↗

Evolution of Spaceflight Renal Stone Risks and Update to the NASA Human Research Program (HRP) Renal Stone Evidence Report and Integrated Concept of Operations

BACKGROUND: The NASA HRP Evidence Report on the Risk of Renal Stone Formation is being updated based on new information obtained from 9 years of data from NASA’s astronaut renal stone surveillance program. In addition, the Concept of Operations for missions beyond Low Earth Orbit (LEO) was created to supplement the Evidence Report, and the NASA clinical practice guideline(CPG)for renal stone surveillance was updated. OVERVIEW: A literature review was performed to evaluate the state of literature regarding renal stone prevention, mitigation, and management both in terrestrial and spaceflight environments. Current renal stone treatment guidelines for the ISS, which were created by the Inflight Clinical Medicine Working Group and approved by the Multilateral Medical Operations Panel (MMOP)were reviewed, as well as recent ultrasound technology demonstrations onboard the ISS. This information was used in conjunction with emerging evidence from the surveillance program to update the Evidence Report and in-flight Concept of Operations. DISCUSSION: There are known and emerging renal stone prevention strategies including astronaut selection, the use of medications and resistive exercise, early diagnosis with regular urine studies and ultrasound imaging. In-flight treatment options include pharmaceuticals, use of lithotripsy and propulsive ultrasound, placement of percutaneous drains and other modalities. This information is useful to gauge future risks and update our strategies for prevention and management of renal stones in astronauts to reduce the risk of in-flight renal stone colic that could cause morbidity and mission impact.

E Stratton↗

LightForce Photon-Pressure Collision Avoidance: Efficiency Assessment on an Entire Catalogue of Space Debris

The potential to perturb debris orbits using photon pressure from ground-based lasers has been confirmed by independent research teams. Two useful applications of this scheme are protecting space assets from impacts with debris and stabilizing the orbital debris environment, both relying on collision avoidance rather than de-orbiting debris. This paper presents the results of a new assessment method to analyze the efficiency of the concept for collision avoidance. Earlier research concluded that one ground based system consisting of a 10 kW class laser, directed by a 1.5 m telescope with adaptive optics, can prevent a significant fraction of debris-debris collisions in low Earth orbit. That research used in-track displacement to measure efficiency and restricted itself to an analysis of a limited number of objects. As orbit prediction error is dependent on debris object properties, a static displacement threshold should be complemented with another measure to assess the efficiency of the scheme. In this paper we present the results of an approach using probability of collision. Using a least-squares fitting method, we improve the quality of the original TLE catalogue in terms of state and co-state accuracy. We then calculate collision probabilities for all the objects in the catalogue. The conjunctions with the highest risk of collision are then engaged by a simulated network of laser ground stations. After those engagements, the perturbed orbits are used to re-assess the collision probability in a 20 minute window around the original conjunction. We then use different criteria to evaluate the utility of the laser-based collision avoidance scheme and assess the number of base-line ground stations needed to mitigate a significant number of high probability conjunctions. Finally, we also give an account how a laser ground station can be used for both orbit deflection and debris tracking.

laser↗

The New NASA Orbital Debris Mitigation Procedural Requirements and Standards

NASA has issued major updates to its principal orbital debris mitigation policy directive and standards. The new NASA Procedural Requirements for Limiting Orbital Debris (NPR 8715.6), with its supporting NASA Standard 8719.14, both refine earlier orbital debris mitigation documents and in some areas expand their applicability. Organizational and individual responsibilities along with general directives are set forth in NPR 8715.6. New requirements include routine conjunction assessments for all maneuverable NASA spacecraft in LEO and GEO, prompt notifications of intended or unintended debris generation, preparation and maintenance of formal end-of-mission plans, and disposal of vehicles in operation around the Moon and Mars and at the Earth-Sun Lagrangian points. NASA Standard 8719.14 replaces the 1995 NASA Safety Standard 1740.14 with no major new requirements but with several refinements and additions, some of which had already been adopted. Compliance with human casualty risk limitations from reentering debris will be calculated explicitly and not be expressed in terms of average debris casualty area. Moreover, the minimum kinetic energy threshold for potentially injurious reentering debris is set at 15 Joules. The overarching requirement for the disposal of GEO spacecraft and launch vehicle orbital stages is to ensure that the vehicles do not come within GEO + 200 km for at least 100 km after end of mission, rather than setting specific requirements for the disposal orbit. Spacecraft operating in or routinely transiting LEO must remain in the region for no more than 25 years after end of mission or 30 years after launch, whichever occurs sooner. A comprehensive new NASA handbook on orbital debris has also been prepared to provide background on the orbital debris environment and the related NASA mitigation requirements and standards.

Johnson, Nicholas L.↗