Search NASASearch

SEARCH · Search NASA

Results for “contingency software”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

An Onboard ISS Virtual Reality Trainer

Prior to the retirement of the Space Shuttle, many exterior repairs on the International Space Station (ISS) were carried out by shuttle astronauts, trained on the ground and flown to the station to perform these repairs. After the retirement of the shuttle, this is no longer an available option. As such, the need for the ISS crew members to review scenarios while on flight, either for tasks they already trained or for contingency operations has become a very critical subject. In many situations, the time between the last session of Neutral Buoyancy Laboratory (NBL) training and an Extravehicular Activity (EVA) task might be 6 to 8 months. In order to help with training for contingency repairs and to maintain EVA proficiency while on flight, the Johnson Space Center Virtual Reality Lab (VRLab) designed an onboard immersive ISS Virtual Reality Trainer (VRT), incorporating a unique optical system and making use of the already successful Dynamic Onboard Ubiquitous Graphical (DOUG) graphics software, to assist crew members with current procedures and contingency EVAs while on flight. The VRT provides an immersive environment similar to the one experienced at the VRLab crew training facility at NASA Johnson Space Center. EVA tasks are critical for a mission since as time passes the crew members may lose proficiency on previously trained tasks. In addition, there is an increased need for unplanned contingency repairs to fix problems arising as the ISS ages. The need to train and re-train crew members for EVAs and contingency scenarios is crucial and extremely demanding. ISS crew members are now asked to perform EVA tasks for which they have not been trained and potentially have never seen before.

Miralles, Evelyn

Evaluation criteria for software classification inventories, accuracies, and maps

Statistical criteria are presented for modifying the contingency table used to evaluate tabular classification results obtained from remote sensing and ground truth maps. This classification technique contains information on the spatial complexity of the test site, on the relative location of classification errors, on agreement of the classification maps with ground truth maps, and reduces back to the original information normally found in a contingency table.

Jayroe, R. R., Jr.

Aerospace Safety Advisory Panel

This report covers the activities of the Aerospace Safety Advisory Panel (ASAP) for calendar year 1998-a year of sharp contrasts and significant successes at NASA. The year opened with the announcement of large workforce cutbacks. The slip in the schedule for launching the International Space Station (ISS) created a five-month hiatus in Space Shuttle launches. This slack period ended with the successful and highly publicized launch of the STS-95 mission. As the year closed, ISS assembly began with the successful orbiting and joining of the Functional Cargo Block (FGB), Zarya, from Russia and the Unity Node from the United States. Throughout the year, the Panel maintained its scrutiny of NASA's safety processes. Of particular interest were the potential effects on safety of workforce reductions and the continued transition of functions to the Space Flight Operations Contractor. Attention was also given to the risk management plans of the Aero-Space Technology programs, including the X-33, X-34, and X-38. Overall, the Panel concluded that safety is well served for the present. The picture is not as clear for the future. Cutbacks have limited the depth of talent available. In many cases, technical specialties are 'one deep.' The extended hiring freeze has resulted in an older workforce that will inevitably suffer significant departures from retirements in the near future. The resulting 'brain drain' could represent a future safety risk unless appropriate succession planning is started expeditiously. This and other topics are covered in the section addressing workforce. The major NASA programs are also limited in their ability to plan property for the future. This is of particular concern for the Space Shuttle and ISS because these programs are scheduled to operate well into the next century. In the case of the Space Shuttle, beneficial and mandatory safety and operational upgrades are being delayed because of a lack of sufficient present funding. Likewise, the ISS has little flexibility to begin long lead-time items for upgrades or contingency planning. For example, the section on computer hardware and software contains specific findings related to required longer range safety-related actions. NASA can be proud of its accomplishments this past year, but must remain ever vigilant, particularly as ISS assembly begins to accelerate. The Panel will continue to focus on both the short- and long-term aspects of risk management and safety planning. This task continues to be made manageable and productive by the excellent cooperation the Panel receives from both NASA and its contractors. Particular emphasis will continue to be directed to longer term workforce and program planning issues as well as the immediate risks associated with ISS assembly and the initial flights of the X-33 and X-34. Section 2 of this report presents specific findings and recommendations generated by ASAP activities during 1998. Section 3 contains more detailed information in support of these findings and recommendations. Appendix A is a current roster of Panel members, consultants, and staff. Appendix B contains NASA's response to the findings and recommendations from the 1997 ASAP Annual Report. Appendix C details the fact-finding activities of the Panel in 1998. During the year, Mr. Richard D. Blomberg was elected chair of the Panel and Vice Admiral (VADM) Robert F Dunn was elected deputy chair. VADM Bernard M. Kauderer moved from consultant to member. Mr. Charles J. Donlan retired from the Panel after many years of meritorious service. Ms. Shirley C. McCarty and Mr. Robert L. ('Hoot') Gibson joined the Panel as consultants.

Source record

Visiting Vehicle Ground Trajectory Tool

The International Space Station (ISS) Visiting Vehicle Group needed a targeting tool for vehicles that rendezvous with the ISS. The Visiting Vehicle Ground Trajectory targeting tool provides the ability to perform both realtime and planning operations for the Visiting Vehicle Group. This tool provides a highly reconfigurable base, which allows the Visiting Vehicle Group to perform their work. The application is composed of a telemetry processing function, a relative motion function, a targeting function, a vector view, and 2D/3D world map type graphics. The software tool provides the ability to plan a rendezvous trajectory for vehicles that visit the ISS. It models these relative trajectories using planned and realtime data from the vehicle. The tool monitors ongoing rendezvous trajectory relative motion, and ensures visiting vehicles stay within agreed corridors. The software provides the ability to update or re-plan a rendezvous to support contingency operations. Adding new parameters and incorporating them into the system was previously not available on-the-fly. If an unanticipated capability wasn't discovered until the vehicle was flying, there was no way to update things.

Hamm, Dustin

Leveraging public AI tools to explore systems biology resources in mathematical modeling

Predictive mathematical modeling is an essential part of systems biology and is interconnected with information management. Systems biology information is often stored in specialized formats to facilitate data storage and analysis. These formats are not designed for easy human readability and thus require specialized software to visualize and interpret results. Therefore, comprehending modeling and underlying networks and pathways is contingent on mastering systems biology tools, which is particularly challenging for users with no or little background in data science or system biology. To address this challenge, we investigated the usage of public Artificial Intelligence (AI) tools in exploring systems biology resources in mathematical modeling. We tested public AI’s understanding of mathematics in models, related systems biology data, and the complexity of model structures. Our approach can enhance the accessibility of systems biology for non-system biologists and help them understand systems biology without a deep learning curve.

59 BASIC BIOLOGICAL SCIENCES

ICAROUS - Integrated Configurable Algorithms for Reliable Operations Of Unmanned Systems

NASA's Unmanned Aerial System (UAS) Traffic Management (UTM) project aims at enabling near-term, safe operations of small UAS vehicles in uncontrolled airspace, i.e., Class G airspace. A far-term goal of UTM research and development is to accommodate the expected rise in small UAS traffic density throughout the National Airspace System (NAS) at low altitudes for beyond visual line-of-sight operations. This paper describes a new capability referred to as ICAROUS (Integrated Configurable Algorithms for Reliable Operations of Unmanned Systems), which is being developed under the UTM project. ICAROUS is a software architecture comprised of highly assured algorithms for building safety-centric, autonomous, unmanned aircraft applications. Central to the development of the ICAROUS algorithms is the use of well-established formal methods to guarantee higher levels of safety assurance by monitoring and bounding the behavior of autonomous systems. The core autonomy-enabling capabilities in ICAROUS include constraint conformance monitoring and contingency control functions. ICAROUS also provides a highly configurable user interface that enables the modular integration of mission-specific software components.

Consiglio, María

A case study of a system engineered for control by humans

Alternatives to the traditional concepts for real time health and safety operations were examined. The pitfalls of the conventional contingency planning for health and safety are highlighted. The Solar Maximum Mission (SMM) contingency planning and operations provides the evolution from the conventional people intensive health and safety operation, toward a night watchman mode of operations. The SMM spacecraft health and safety operations were budget constrained to the point that one operator was responsible for the health and safety of the entire spacecraft one week after launch. The spacecraft was a protoflight with brand new subsystem configurations, software and procedures. To manage the risks associated with this one man SMM health and safety operation, the real time contingency planning and operations centered around unambiguously identifying a system level problem, and reactively safing components susceptible to unrecoverable damage. The methodology applied to both analyzing and implementing this approach of SMM is shown.

Rothenberg, J.

Inviscid Flow Computations of the Shuttle Orbiter for Mach 10 and 15 and Angle of Attack 40 to 60 Degrees

This report documents the results of a computational study done to compute the inviscid longitudinal aerodynamic characteristics of the Space Shuttle Orbiter for Mach numbers 10 and 15 at angles of attack of 40, 50, 55, and 60 degrees. These computations were done to provide limited aerodynamic data in support of the Orbiter contingency abort task. The Orbiter had all the control surfaces in the undeflected position. The unstructured grid software FELISA was used for these computations with the equilibrium air option. Normal and axial force coefficients and pitching moment coefficients were computed. The hinge moment coefficients of the body flap and the inboard and outboard elevons were also computed. These results were compared with Orbiter Air Data Book (OADB) data and those computed using GASP. The comparison with the GASP results showed very good agreement in Cm and Ca at all the points. The computed axial force coefficients were smaller than those computed by GASP. There were noticeable differences between the present results and those in the OADB at angles of attack greater than 50 degrees.

Prabhu, Ramadas K.

An empirical study of software design practices

Software engineers have developed a large body of software design theory and folklore, much of which was never validated. The results of an empirical study of software design practices in one specific environment are presented. The practices examined affect module size, module strength, data coupling, descendant span, unreferenced variables, and software reuse. Measures characteristic of these practices were extracted from 887 FORTRAN modules developed for five flight dynamics software projects monitored by the Software Engineering Laboratory (SEL). The relationship of these measures to cost and fault rate was analyzed using a contingency table procedure. The results show that some recommended design practices, despite their intuitive appeal, are ineffective in this environment, whereas others are very effective.

Card, David N.

A Generalized approach to the operationalization of Software Quality Models

Comprehensive measures of quality are a research imperative, yet the development of software quality models is a wicked problem. Definitive solutions do not exist and quality is subjective at its most abstract. Definitional measures of quality are contingent on a domain, and even within a domain, the choice of representative characteristics to decompose quality is subjective. Thus, the operationalization of quality models brings even more challenges. A promising approach to quality modeling is the use of hierarchies to represent characteristics, where lower levels of the hierarchy represent concepts closer to real-world observations. Building upon prior hierarchical modeling approaches, we developed the Platform for Investigative software Quality Understanding and Evaluation (PIQUE). PIQUE surmounts several quality modeling challenges because it allows modelers to instantiate abstract hierarchical models in any domain by leveraging organizational tools tailored to their specific contexts. Here, we introduce PIQUE; exemplify its utility with two practical use cases; address challenges associated with parameterizing a PIQUE model; and describe algorithmic techniques that tackle normalization, aggregation, and interpolation of measurements.

Data aggregation

Grain2Mesh: Mesh Generation for Grain-Scale Nonlinear Elasticity Modeling

The nonlinear hysteretic behavior of rocks under cyclic loading is a crucial area of study in geomechanics. The macroscopic response of a variety of materials has been found to be contingent upon the behavior of the micro-scale structure. This project aims to develop a functional and maintainable software package for generating a multi-phase numerical mesh and accompanying simulation files for finite element modeling used in computational mechanics solvers. Meshes generated from images often lack key preprocessing that reduces noise and prevents mesh element distortion that can increase computational cost. By incorporating user feedback throughout, grain2mesh ensures a high-fidelity mesh that can be used to model grain-scale interactions such as shearing, crack propagation, and interfacial material contrast. Scientific applications of this software include material fracturing, stress-strain analysis for natural and engineered materials, and nonlinear meso-scale analysis.

54 ENVIRONMENTAL SCIENCES

Testing of the on-board attitude determination and control algorithms for SAMPEX

Algorithms for on-board attitude determination and control of the Solar, Anomalous, and Magnetospheric Particle Explorer (SAMPEX) have been expanded to include a constant gain Kalman filter for the spacecraft angular momentum, pulse width modulation for the reaction wheel command, an algorithm to avoid pointing the Heavy Ion Large Telescope (HILT) instrument boresight along the spacecraft velocity vector, and the addition of digital sun sensor (DSS) failure detection logic. These improved algorithms were tested in a closed-loop environment for three orbit geometries, one with the sun perpendicular to the orbit plane, and two with the sun near the orbit plane - at Autumnal Equinox and at Winter Solstice. The closed-loop simulator was enhanced and used as a truth model for the control systems' performance evaluation and sensor/actuator contingency analysis. The simulations were performed on a VAX 8830 using a prototype version of the on-board software.

Mccullough, Jon D.

On-demand Command and Control of ASTERIA with Cloud-based Ground Station Services

ASTERIA (Arcsecond Space Telescope Enabling Research in Astrophysics) was a 6-unit CubeSat technology demonstration mission that deployed from the International Space Station on November 20th, 2017. After successfully completing its 90-day primary mission that demonstrated arcsecond-level line-of-sight pointing and focal plane thermal stability for exoplanet detection, it entered an extended mission performing onboard software demonstrations to mature technology both in space and on the ground. One of the technologies was a completely cloud-based ground system leveraging Amazon Web Services (AWS) Ground Station service. Announced in December 2018 and launched in May 2019, AWS Ground Station is a fully managed ground station service that aims to reduce the overhead associated with developing and maintaining ground system infrastructure throughout the mission lifecycle. AWS Ground Station makes available the suite of features required for any ground system in support of low-Earth orbit (LEO) and medium-Earth Orbit (MEO) satellite operations on-demand and without setting up or maintaining long-term contracts. Charges are incurred on a per-minute basis for antenna usage during scheduled tracks. Support is available for S-band uplink and downlink, along with X-band narrowband and wideband downlink. Missions that use the service may reserve tracks with any licensed AWS Ground Station antennas located across each service region and have direct access to any AWS services in support of mission operations. The cloud-based architecture built around the AWS Ground Station service greatly enhanced ASTERIA mission operations by enabling end-to-end pass automation, on-demand contact scheduling and contingency planning, along with more efficient data downlink through station availability and station-tostation handovers. It incorporated open-source software, particularly NASA's AMMOS Instrument Toolkit (AIT) and Open Mission Control Technologies (OpenMCT), along with the AWS application programming interfaces (API) to the Ground Station, Elastic Compute Cloud (EC2) and Simple Storage Service (S3) services. After showcasing operability in August 2019, the team continued using and improving this novel ground system architecture until the end of mission in December 2019. This paper describes the cloud-based ground system, how it was designed, tested, and evaluated with an inorbit spacecraft, the operational capabilities that it enabled, along with lessons learned and recommendations for future missions.

Fesq, Lorraine

On-demand Command and Control of ASTERIA with Cloud-based Ground Station Services

ASTERIA (Arcsecond Space Telescope Enabling Research in Astrophysics) was a 6-unit CubeSat technology demonstration mission that deployed from the International Space Station on November 20th, 2017. After successfully completing its 90-day primary mission that demonstrated arcsecond-level line-of-sight pointing and focal plane thermal stability for exoplanet detection, it entered an extended mission performing onboard software demonstrations to mature technology both in space and on the ground. One of the technologies was a completely cloud-based ground system leveraging Amazon Web Services (AWS) Ground Station service.Announced in December 2018 and launched in May 2019, AWS Ground Station is a fully managed ground station service that aims to reduce the overhead associated with developing and maintaining ground system infrastructure throughout the mission lifecycle. AWS Ground Station makes available the suite of features required for any ground system in support of low-Earth orbit (LEO) and medium-Earth Orbit (MEO) satellite operations on-demand and without setting up or maintaining long-term contracts. Charges are incurred on a per-minute basis for antenna usage during scheduled tracks. Support is available for S-band uplink and downlink, along with X-band narrowband and wideband downlink. Missions that use the service may reserve tracks with any licensed AWS Ground Station antennas located across each service region and have direct access to any AWS services in support of mission operations.The cloud-based architecture built around the AWS Ground Station service greatly enhanced ASTERIA mission operations by enabling end-to-end pass automation, on-demand contact scheduling and contingency planning, along with more efficient data downlink through station availability and station-to-station handovers. It incorporated open-source software, particularly NASA's AMMOS Instrument Toolkit (AIT) and Open Mission Control Technologies (OpenMCT), along with the AWS application programming interfaces (API) to the Ground Station, Elastic Compute Cloud (EC2) and Simple Storage Service (S3) services. After showcasing operability in August 2019, the team continued using and improving this novel ground system architecture until the end of mission in December 2019. This paper describes the cloud-based ground system, how it was designed, tested, and evaluated with an in-orbit spacecraft, the operational capabilities that it enabled, along with lessons learned and recommendations for future missions.

Fesq, Lorraine

Managing Variability: A Cognitive Ethnography of the Work of Airline Dispatchers

Airline dispatchers' workflow is often described in broad terms like 'flight planning' and 'flight following'. Such high-level descriptions fail to recognize the number and complexity of tasks involved in these activities. An ethnographic study was conducted at three US airlines to understand the cognitive workload involved in flight planning. Fuel planning was identified as one of five key flight planning tasks. Fuel planning was conducted concurrently with other planning and monitoring tasks which often led to interruptions. Planning fuel was dynamic, with recalculations required whenever other factors varied (e.g., payload, route, alternates). This rework increased workload and opportunities for error while reducing efficiency. Four main factors contributed variability to fuel planning: contingency planning, load planning, pilots, and station operations. Strategies for managing variability included pattern identification, use of buffers, rounding up, and leveraging software tools. Software design often added to workload by forcing dispatchers to attend to low level tasks.

dispatcher

ISS Regenerative Life Support: Challenges and Success in the Quest for Long-Term Habitability in Space

This presentation will discuss the International Space Station s (ISS) Regenerative Environmental Control and Life Support System (ECLSS) operations with discussion of the on-orbit lessons learned, specifically regarding the challenges that have been faced as the system has expanded with a growing ISS crew. Over the 10 year history of the ISS, there have been numerous challenges, failures, and triumphs in the quest to keep the crew alive and comfortable. Successful operation of the ECLSS not only requires maintenance of the hardware, but also management of the station resources in case of hardware failure or missed re-supply. This involves effective communication between the primary International Partners (NASA and Roskosmos) and the secondary partners (JAXA and ESA) in order to keep a reserve of the contingency consumables and allow for re-supply of failed hardware. The ISS ECLSS utilizes consumables storage for contingency usage as well as longer-term regenerative systems, which allow for conservation of the expensive resources brought up by re-supply vehicles. This long-term hardware, and the interactions with software, was a challenge for Systems Engineers when they were designed and require multiple operational workarounds in order to function continuously. On a day-to-day basis, the ECLSS provides big challenges to the on console controllers. Main challenges involve the utilization of the resources that have been brought up by the visiting vehicles prior to undocking, balance of contributions between the International Partners for both systems and resources, and maintaining balance between the many interdependent systems, which includes providing the resources they need when they need it. The current biggest challenge for ECLSS is the Regenerative ECLSS system, which continuously recycles urine and condensate water into drinking water and oxygen. These systems were brought to full functionality on STS-126 (ULF-2) mission. Through system failures and recovery, the ECLSS console has learned how to balance the water within the systems, store and use water for contingencies, and continue to work with the International Partners for short-term failures. Through these challenges and the system failures, the most important lesson learned has been the importance of redundancy and operational workarounds. It is only because of the flexibility of the hardware and the software that flight controllers have the opportunity to continue operating the system as a whole for mission success.

Bazley, Jesse A.

An Iterative Approach for Solving the SCOPF Problem Applying LP, SOCP, and NLP Subproblems

We propose to develop efficient algorithms and software for the SCOPF problem. We will employ an iterative approach that will: a) use linear subproblems and other active set filtering techniques to identify the most important contingencies and drastically reduce the SCOPF model size; b) solve SOCP relaxations of the reduced SCOPF to converge to the neighborhood of the global optimal solution and establish a lower bound on the solution, and; c) use a non-convex, nonlinear interior-point solver, Artelys Knitro, to converge quickly to the optimal solution. To identify the most effective approach, we will experiment with several techniques to identify the tradeoffs between contingency subproblem complexity and fast solvability.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Shuttle rendezvous and proximity operations

Shuttle rendezvous and proximity operations trajectory control techniques are reviewed and it is noted that they have been affected by many factors including Shuttle system design constraints such as limited forward RCS and single point radar failures. Crew training requirements and mission operations constraints such as large launch windows, flexibility, and contingency profile interrupts are also integral factors. The resulting trajectory control design primarily uses ground support for the launch and orbit adjust phases, standardized crew techniques utilizing onboard software for the relative navigation flight phase, and mission unique manual control for a flexible proximity operations phase.

Pearson, Don J.