Search NASA⌕ Search

SEARCH · Search NASA

Results for “coordinated response”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Corn stover variability drives differences in bisabolene production by engineered Rhodotorula toruloides

Microbial conversion of lignocellulosic biomass represents an alternative route for production of biofuels and bioproducts. While researchers have mostly focused on engineering strains such as Rhodotorula toruloides for better bisabolene production as a sustainable aviation fuel, less is known about the impact of the feedstock heterogeneity on bisabolene production. Critical material attributes like feedstock composition, nutritional content, and inhibitory compounds can all influence bioconversion. Further, the given feedstocks can have a marked influence on selection of suitable pretreatment and hydrolysis technologies, optimizing the fermentation conditions, and possibly even modifying the microorganism's metabolic pathways, to better utilize the available feedstock. Here, this work aimed to examine and understand how variations in corn stover batches, anatomical fractions, and storage conditions impact the efficiency of bisabolene production by R. toruloides. All of these represent different facets of feedstock heterogeneity. Deacetylation, mechanical refining, and enzymatic hydrolysis of these variable feedstocks served as the basis of this research. The resulting hydrolysates were converted to bisabolene via fermentation, a sustainable aviation fuel precursor, using an engineered R. toruloides strain. This study showed that different sources of feedstock heterogeneity can influence microbial growth and product titer in counterintuitive ways, as revealed through global analysis of protein expression. The maximum bisabolene produced by R. toruloides was on the stalk fraction of corn stover hydrolysate (8.89 ± 0.47 g/L). Further, proteomics analysis comparing the protein expression between the anatomic fractions showed that proteins relating to carbohydrate metabolism, energy production, and conversion as well as inorganic ion transport metabolism were either significantly upregulated or downregulated. Specifically, downregulation of proteins related to the iron–sulfur cluster in stalk fraction suggests a coordinated response by R. toruloides to maintain overall metabolic balance, and this was corroborated by the concentration of iron in the feedstocks.

09 BIOMASS FUELS↗

Operational Technology Behavioral Analytics (OTBA) (Final Technical Report DE-FE0031640)

This final report provides a summary of the methodology, findings, lessons learned, and insights from an investigation into the feasibility of the Operational Technology Behavioral Analytics (OTBA) cybersecurity approach. The concept was evaluated with data from the National Carbon Capture Center (NCCC) – a U.S. Department of Energy (DOE) funded facility that is managed and operated by Southern Company Services, Inc. at Alabama Power Company’s E. C. Gaston generating power plant in Wilsonville, Alabama. Appropriate data sources for the post-combustion carbon capture system were identified. Infrastructure was deployed to monitor, capture and archive data for the system. Critical parameters for each subsystem were identified and analyzed. Machine-learning algorithms were used to establish and characterize normal operations and subsequently identify anomalies. This effort yielded valuable insights and formed the basis of a data-centric strategy for detecting cyber-attacks along with a coordinated response philosophy. A significant takeaway is that the OTBA cybersecurity approach is quite portable; it can be applied to other critical infrastructure beyond fossil power generation.

20 FOSSIL-FUELED POWER PLANTS↗

Gap Analysis of Supply Chain Cybersecurity for Distributed Energy Resources

A supply chain is the combination of the ecosystem of resources needed to design, manufacture, and distribute a product. In the context of supply chain cybersecurity, the resources that directly influence this ecosystem include software, data, and/or other digital components. Compromised equipment or software in the supply chain may lead to attacks such as financial loss; denial of service; a breach of confidential or proprietary information from a company, its customers, or its suppliers; ransomware that denies operation of automated equipment for payment; and malicious control actions that could damage equipment and endanger personnel. Currently 60.8% of US energy comes from fossil fuels, 18.9% comes from nuclear energy, and the last 20.1% comes from renewable sources. Federal Energy Regulatory Commission order FERC 2222 and Executive Order 14017 on America's Supply Chains are important milestones for safely expanding generation from renewable energy and achieving the goal of a decarbonized U.S. energy sector by 2035. This report analyzes gaps and opportunities in the supply chain currently available to the renewable energy sector, to help stakeholders formulate a coordinated response.

24 POWER TRANSMISSION AND DISTRIBUTION↗

High Energy Physics Research at the Energy Frontier with the CMS Experiment

The physics analysis goals are to continue improving upon the search for the Higgs to dimuon decay using the CMS experiment at the LHC to further improve the Higgs coupling measurement with the additional data from LHC Run 3, and to explore searches for long-lived particles that reach the muon system of CMS using new Level-1 muon triggers the group is developing. An additional physics goal is to further develop the science case for a novel muonion collider. The experimental goals are to continue operational support of the CMS Endcap Muon Track Finder, a key component of the CMS Level-1 trigger system. The group also proposes to continue its leadership role in muon triggering for the HL-LHC upgrade through algorithm and electronics R&D. Finally, Acosta will continue as CMS Trigger Co-Coordinator responsible for the High Level Trigger system of CMS, lead the EMTF project, and serve as USCMS Trigger Operations Level-2 manager.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Integration and Test for Small Shuttle Payloads

Recommended approaches for shuttle small payload integration and test (I&T) are presented. The paper is intended for consideration by developers of small shuttle payloads, including I&T managers, project managers, and system engineers. Examples and lessons learned are presented based on the extensive history of the NASA's Hitchhiker project. All aspects of I&T are presented, including: (1) I&T team responsibilities, coordination, and communication; (2) Flight hardware handling practices; (3) Documentation and configuration management; (4) I&T considerations for payload development; (5) I&T at the development facility; (6) Prelaunch operations, transfer, orbiter integration, and interface testing; and (7) Postflight operations. This paper is of special interest to those payload projects which have small budgets and few resources: That is, the truly 'faster, cheaper, better' projects. All shuttle small payload developers are strongly encouraged to apply these guidelines during I&T planning and ground operations to take full advantage of today's limited resources and to help ensure mission success.

Wright, Michael R.↗

Integration and Test of Shuttle Small Payloads

Recommended approaches for space shuttle small payload integration and test (I&T) are presented. The paper is intended for consideration by developers of shuttle small payloads, including I&T managers, project managers, and system engineers. Examples and lessons learned are presented based on the extensive history of NASA's Hitchhiker project. All aspects of I&T are presented, including: (1) I&T team responsibilities, coordination, and communication; (2) Flight hardware handling practices; (3) Documentation and configuration management; (4) I&T considerations for payload development; (5) I&T at the development facility; (6) Prelaunch operations, transfer, orbiter integration and interface testing; (7) Postflight operations. This paper is of special interest to those payload projects that have small budgets and few resources: that is, the truly faster, cheaper, better projects. All shuttle small payload developers are strongly encouraged to apply these guidelines during I&T planning and ground operations to take full advantage of today's limited resources and to help ensure mission success.

Wright, Michael R.↗

Monitoring Disasters by Use of Instrumented Robotic Aircraft

Efforts are under way to develop data-acquisition, data-processing, and data-communication systems for monitoring disasters over large geographic areas by use of uninhabited aerial systems (UAS) robotic aircraft that are typically piloted by remote control. As integral parts of advanced, comprehensive disaster- management programs, these systems would provide (1) real-time data that would be used to coordinate responses to current disasters and (2) recorded data that would be used to model disasters for the purpose of mitigating the effects of future disasters and planning responses to them. The basic idea is to equip UAS with sensors (e.g., conventional video cameras and/or multispectral imaging instruments) and to fly them over disaster areas, where they could transmit data by radio to command centers. Transmission could occur along direct line-of-sight paths and/or along over-the-horizon paths by relay via spacecraft in orbit around the Earth. The initial focus is on demonstrating systems for monitoring wildfires; other disasters to which these developments are expected to be applicable include floods, hurricanes, tornadoes, earthquakes, volcanic eruptions, leaks of toxic chemicals, and military attacks. The figure depicts a typical system for monitoring a wildfire. In this case, instruments aboard a UAS would generate calibrated thermal-infrared digital image data of terrain affected by a wildfire. The data would be sent by radio via satellite to a data-archive server and image-processing computers. In the image-processing computers, the data would be rapidly geo-rectified for processing by one or more of a large variety of geographic-information- system (GIS) and/or image-analysis software packages. After processing by this software, the data would be both stored in the archive and distributed through standard Internet connections to a disaster-mitigation center, an investigator, and/or command center at the scene of the fire. Ground assets (in this case, firefighters and/or firefighting equipment) would also be monitored in real time by use of Global Positioning System (GPS) units and radio communication links between the assets and the UAS. In this scenario, the UAS would serve as a data-relay station in the sky, sending packets of information concerning the locations of assets to the image-processing computer, wherein this information would be incorporated into the geo-rectified images and maps. Hence, the images and maps would enable command-center personnel to monitor locations of assets in real time and in relation to locations affected by the disaster. Optionally, in case of a disaster that disrupted communications, the UAS could be used as an airborne communication relay station to partly restore communications to the affected area. A prototype of a system of this type was demonstrated in a project denoted the First Response Experiment (Project FiRE). In this project, a controlled outdoor fire was observed by use of a thermal multispectral scanning imager on a UAS that delivered image data to a ground station via a satellite uplink/ downlink telemetry system. At the ground station, the image data were geo-rectified in nearly real time for distribution via the Internet to firefighting managers. Project FiRE was deemed a success in demonstrating several advances essential to the eventual success of the continuing development effort.

Wegener, Steven S.↗

OPERATIONAL TECHNOLOGY BEHAVIORAL ANALYTICS (OTBA) – A DATA-CENTRIC APPROACH FOR REDUCING CYBERSECURITY RISK

This paper provides a summary of the methodology, findings, lessons learned, and insights from an investigation into the feasibility of the Operational Technology Behavioral Analytics (OTBA) cybersecurity approach. The concept was evaluated with data from the National Carbon Capture Center (NCCC) – a U.S. Department of Energy (DOE) funded facility that is managed and operated by Southern Company at Alabama Power’s E. C. Gaston generating power plant in Wilsonville, Alabama. Appropriate data sources for the post-combustion carbon capture system were identified. Infrastructure was deployed to monitor, capture and archive data for the system. Critical parameters for each subsystem were identified and analyzed. Machine-learning algorithms were used to establish and characterize normal operations and subsequently identify anomalies. This effort yielded valuable insights and formed the basis of a data-centric strategy for detecting cyber-attacks along with a coordinated response philosophy. A significant takeaway is that the OTBA cybersecurity approach is quite portable; it can be applied to other critical infrastructure beyond fossil power generation.

Black, Clifton↗

Distribution Feeder-Scale Fast Frequency Response via Optimal Coordination of Net-load Resources Part II: Large-Scale Demonstration

This work is the second of a two-part series in which we develop and experimentally demonstrate a hierarchical control solution for optimally coordinating thousands of deferrable loads and distributed energy resources (DERs) to provide fast frequency response (FFR) from an entire distribution feeder. In Part I, we developed and proved practical algorithms for fast, cost-based optimal dispatch and for determining the optimal amount of headroom to operate solar inverters with to support FFR dispatch while minimizing opportunity cost. Simulation results in Part I demonstrated the advantages of the hierarchical dispatch approach in being able to maintain fast solution times needed for FFR even when the problem size increases. In Part II, we implement the algorithms developed in Part I in a novel, large-scale power hardware-in-the-loop experiment including embedded controllers and more than 100 powered appliance loads and DER connected to a simulated real-world distribution system with more than 10,000 controlled devices. Experimental results from multiple scenarios confirm that the optimal FFR dispatch approach scales well and can optimally coordinate more than 10,000 net-load resources across a distribution network while achieving hardware response times within 500 ms, which is not possible using state-of-the-art optimal coordination approaches.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Distribution Feeder-Scale Fast Frequency Response via Optimal Coordination of Net-load Resources Part I: Solution Design

This work is the first of a two-part series that develops and experimentally demonstrates a first-of-its-kind hierarchical control solution for optimally dispatching thousands of deferrable loads and distributed energy resources (DERs) across a distribution feeder to provide fast frequency response (FFR) within 500 ms to the bulk power system. This approach rapidly coordinates resources online after a frequency event occurs, allowing fast-changing, behind-the-meter (BTM) resources to be incorporated and aggregate FFR power set points to be achieved more quickly and accurately than existing approaches. We also present a solution for determining the optimal amount of headroom to operate solar inverters with to minimize opportunity cost while ensuring the FFR response viability of a building with the inverter and deferrable loads. In Part I, we develop practical algorithms for fast, cost-based optimal dispatch at multiple aggregation scales (single building, multiple buildings, and full distribution feeder), establish their optimality, and demonstrate via simulation that they are faster than state-of-the-art, coordinated frequency response approaches. In Part II, the entire platform is implemented and experimentally verified using a unique power hardware-in-the-loop demonstration, including more than 100 powered loads and DERs connected to a real-world distribution network model and over 10,000 net-load resources dispatched.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Circadian immunometabolic states impart a temporal response to SARS-CoV-2 spike proteins in mammalian macrophages

Circadian rhythms, the 24-hour cycles that tune organismal physiology to the daily rhythms of light and dark, optimally organize cellular processes such as metabolism and mitochondrial function. In mammals, macrophage functions are regulated by these 24-hour circadian rhythms such that the immunometabolic response is coordinated across the day, consolidating macrophage physiology into temporally distinct phases to time the cellular immune response. However, while it is known that there are time-of-day specific responses to stress in a macrophage, little has been done to determine if circadian regulation coordinates the response of a macrophage to real-world pathogens. Importantly, key proteins in the response to viral infection have been found to be under circadian control, and time of day of application is known to affect the efficacy of vaccinations, including in the case of the COVID-19 virus. Therefore, to investigate if the circadian regulation of macrophage physiology imparted a time-of-day response to viral exposure, we exposed primary mouse and human macrophages to the SARS-CoV-1 and CoV-2 spike proteins at different times over the circadian day. To establish a time-of-day effect, we performed a multi-omics analysis and in vitro tissue culture assays examining macrophage responses over circadian time. We found that, conserved across the species, the timing of spike protein exposure dictated two distinct temporal responses which were characterized by hallmarks of immunometabolic suppression and modest inflammatory activation. However, these responses were primarily influenced by central metabolic and mitochondrial changes and not by classical immune activation.

Circadian Biology↗

FRMAC Assessment Manual Volume 1 - Assessment Division Operations

In the event of a major radiological incident or accident, the Federal Radiological Monitoring and Assessment Center (FRMAC) will coordinate the federal agencies that have various statutory responsibilities and/or capabilities for responding to such incidents (Ref. FRMAC10). The FRMAC is responsible for coordinating all environmental radiological monitoring, sampling, and assessment activities for the response. For less severe radiological incidents, elements of the Department of Energy (DOE) Consequence Management (CM) program, such as the CM Response Team (CMRT) or CM Home Team (CMHT) may be activated to provide similar support activities to regional or local response assets. This manual describes the roles and responsibilities of the Assessment Division of the FRMAC during a response to a radiological incident. Every effort will be made in this manual in accordance with the Implementation of the National Incident Management System (NIMS)/Incident Command System (ICS) in the Federal Radiological Monitoring and Assessment Center (FRMAC) – Emergency Phase (Ref. RSL07) to use terminology consistent with the National Incident Management System (NIMS) for Incident Command System (ICS) organizations, planning processes, and leadership positions (Ref. FEMA17). This manual also applies to smaller scale CM responses that may involve the CMRT or CMHT elements without the formation of a FRMAC. It details the concept of operations for the Assessment Division, including common tasks performed by the Division. This manual also describes the organizational structure of the Assessment Division and roles of the personnel within the Division.

61 RADIATION PROTECTION AND DOSIMETRY↗

Towards the Flexibility of HVDC-Interconnected Systems: A Novel Emergency Freqeuncy Response Model

In this paper, we propose a novel multi-time scale emergency frequency response model by unlocking the flexibility of High Voltage Direct Current (HVDC) systems. Unlike assigning power ramping rates for FACTS to regulate frequency in traditional methods, this paper designs a step-change electromagnetic power frequency response (EPFR) scheme, by leveraging the temporal over/under DC voltage capability of HVDC. Wherein the Kullback-Leibler Divergence is adopted to convexify the modified swing equation after integrating the step-change power. Further, to avoid the complicated differential equations, we equivalently reformulate the duration limits of DC voltage deviation into the HVDC decreasing power ramping rates, which participate in the system primary frequency response. Finally, the new steady-state operation level of HVDC is involved with the secondary frequency response. As a result, an improved three-level algorithm is developed to solve the model, wherein the instant step-change, primary, and secondary frequency response are coordinated together. After applying the proposed frequency response scheme on the test system, the EPFR is validated to effectively provide the most instantaneous supports when faced with bulk power loss due to extreme contingencies, and the resilience is ensured within acceptable expenditures.

Jiang, Sufan↗

Evolution of the Lunar Network

The National Aeronautics and Space Administration (NASA) is planning to upgrade its network Infrastructure to support missions for the 21st century. The first step is to increase the data rate provided to science missions to at least the 100 megabits per second (Mbps) range. This is under way, using Ka-band 26 Gigahertz (GHz), erecting an 18-meter antenna for the Lunar Reconnaissance Orbiter (LRO), and the planned upgrade of the Deep Space Network (DSN) 34-meter network to support the James Webb Space Telescope (JWST). The next step is the support of manned missions to the Moon and beyond. Establishing an outpost with several activities such as rovers, colonization, and observatories, is better achieved by using a network configuration rather than the current method of point-to-point communication. Another challenge associated with the Moon is communication coverage with the Earth. The Moon's South Pole, targeted for human habitat and exploration, is obscured from Earth view for half of the 28-day lunar cycle and requires the use of lunar relay satellites to provide coverage when there is no direct view of the Earth. The future NASA and Constellation network architecture is described in the Space Communications Architecture Working Group (SCAWG) Report. The Space Communications and Navigation (SCAN) Constellation Integration Project (SCIP) is responsible for coordinating Constellation requirements and has assigned the responsibility for implementing these requirements to the existing NASA communication providers: DSN, Space Network (SN), Ground Network (GN) and the NASA Integrated Services Network (NISN). The SCAWG Report provides a future architecture but does not provide implementation details. The architecture calls for a Netcentric system, using hundreds of 12-meter antennas, a ground antenna array, and a relay network around the Moon. The report did not use cost as a variable in determining the feasibility of this approach. As part of the SCIP Mission Concept Review and the second iteration of the Lunar Architecture Team (LAT), the focus is on cost, as well as communication coverage using operational scenarios. This approach maximizes use of existing assets and adds capability in small increments. This paper addresses architecture decisions such as the Radio Frequency (RF) signal and network (Netcentric) decisions that need to be made and the difficulty of implementing them into the existing Space Network and DSN. It discusses the evolution of the lunar system and describes its components: Tracking and Data Relay Satellite System (TDRSS), Earth-based ground stations, Lunar Relay, and surface systems.

Gal-Edd, Jonathan↗

MYC transcription factors coordinate tryptophan–dependent defence responses and compromise seed yield in Arabidopsis

Robust plant immunity negatively affects other fitness traits, including growth and seed production. Jasmonate (JA) confers broad-spectrum protection against plant consumers by stimulating the degradation of JASMONATE ZIM-DOMAIN (JAZ) proteins, which in turn relieves repression on transcription factors (TFs) coincident with reduced growth and fecundity. The molecular mechanisms underlying JA-mediated decreases in fitness remain largely unknown. To assess the contribution of MYC TFs to growth and reproductive fitness at high levels of defence, we mutated three MYC genes in a JAZ-deficient mutant (jazD) of Arabidopsis thaliana that exhibits strong defence and low seed yield. Genetic epistasis analysis showed that de-repression of MYC TFs in jazD not only conferred strong resistance to insect herbivory but also reduced shoot and root growth, fruit size and seed yield. We also provided evidence that the JAZ–MYC module coordinates the supply of tryptophan with the production of indole glucosinolates and the proliferation of endoplasmic reticulum bodies that metabolise glucosinolates through the action of b-glucosidases. Our results establish MYCs as major regulators of growth- and reproductive–defence tradeoffs and further indicate that these factors coordinate tryptophan availability with the production of amino acid-derived defence compounds.

59 BASIC BIOLOGICAL SCIENCES↗

Connecting science and operations: The operations coordinator

For a current space mission under development at the Applied Physics Laboratory, the Mission Operations staff includes a team of 'Operations Coordinators' who have been working with the Mission Science and Spacecraft Development teams since completion of mission conceptual design. The Operations Coordinators are responsible for bringing knowledge of the spacecraft to the Mission Science team and bringing knowledge of the experiment requirements to the Spacecraft Development and Mission Operations teams. Once on-orbit operations begin, the Operations Coordinators will be responsible for implementation of specific science experiments from analysis through scheduling, generation of spacecraft command sequences, delivery of science data to the end user, and operations assessment. The Operations Coordinator concept is proving very effective during the development phase of the current mission.

Marshall, Madeleine H.↗

FRMAC Laboratory Analysis Manual Volume 1, Revision 0

The Federal Radiological Monitoring and Assessment Center (FRMAC) is an operational center, available on request by the Department of Homeland Security (DHS) to respond to nuclear and radiological incidents as described in the National Response Framework (NRF). Under the Federal Interagency Operational Plan for Response and Recovery’s Nuclear/Radiological Annex, the U.S. Department of Energy (DOE) has the responsibility to maintain the operational readiness of the FRMAC during the emergency phase of an event. FRMAC is initially established and managed by the Nuclear Emergency Support Team (NEST) and serves as an interagency operations center with representatives from various federal, state, and local radiological response organizations. The purpose of the FRMAC is to assist state, local, tribal, and territorial governments (SLTT) in their mission to protect the health and well-being of their citizens with: • Verified radiation measurements. • Interpretations of radiation distributions based on Environmental Protection Agency (EPA), Food and Drug Administration (FDA), or local Protective Action Guidelines (PAGs). • Characterization of overall radiological conditions. Once a declaration to respond to a radiological emergency has been made, the National Nuclear Security Administration (NNSA) Headquarters will coordinate the response in consultation with the cognizant NNSA Regional Coordinating Office (RCO). Each of the eight RCOs maintain a 24-hour response capability for radiological emergencies that may occur in states served by its region. When a FRMAC is established, it operates under the parameters of the Incident Command System (ICS), as defined in the National Incident Management Systems (NIMS) construct. The Consequence Management Home Team (CMHT) will be activated immediately during normal business hours (Pacific Time Zone), and within two hours otherwise. The Consequence Management Response Team (CMRT) is prepared for deployment within six hours after activation. Along with the assets, FRMAC provides an operational framework for coordinating of all federal off-site radiological monitoring and assessment activities during a response to a radiological emergency to support the coordinating agency and SLTT governments. Potential radiological emergencies that fall within FRMAC vary widely in terms of the area affected, the nature of the contamination, and the scope of the government’s response. Detonation of a nuclear device, accidental release of radiation from a nuclear power plant, and a terrorist threat are just a few of the many possible scenarios FRMAC must be prepared to address. Through all this, supporting the state, local, and tribal organizations in the protection of the public remains the primary goal of the federal response.

54 ENVIRONMENTAL SCIENCES↗