Search NASA⌕ Search

SEARCH · Search NASA

Results for “coordinated scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Load Balancing for Multiphysics. In: AIAA 2013-2856,

Coupled Multi-Physics simulations, such as hybrid CFD-MD simulations, represent an increasingly important class of scientific applications. Often the physical problems of interest demand the use of high-end computers, such as TeraGrid resources, which are often accessible only via batch-queues. Batch-queue systems are not developed to natively support the coordinated scheduling of jobs – which in turn is required to support the concurrent execution required by coupled multi-physics simulations. In this paper we develop and demonstrate a novel approach to overcome the lack of native support for coordinated job submission requirement associated with coupled runs. We establish the performance advantages arising from our solution, which is a generalization of the Pilot-Job concept – which in of itself is not new, but is being applied to coupled simulations for the first time. Our solution not only overcomes the initial co-scheduling problem, but also provides a dynamic resource allocation mechanism. Support for such dynamic resources is critical for a load balancing mechanism, which we develop and demonstrate to be effective at reducing the total time-to-solution of the problem. We establish that the performance advantage of using Big Jobs is invariant with the size of the machine as well as the size of the physical model under investigation. The Pilot-Job abstraction is developed using SAGA, which provides an infrastructure agnostic implementation, and which can seamlessly execute and utilize distributed resources.

Lohner, Rainald↗

Multi-Time Scale Coordinated Control and Scheduling of Inverter-Based TCLs With Variable Wind Generation

To address microgrid tie flow errors caused by wind generation variability, here we propose and develop a multi-time scale coordinated control and scheduling strategy for inverter-based thermostatically controlled loads (TCLs). First, in hour-time scale, inverter-based TCLs with adjusting temperature set-point are modeled as virtual generators to compensate tie flow deviations in the day-ahead plan. Next, in minute-time scale, virtual batteries representing operating behaviors of inverter-based TCLs with frequency control are scheduled determined by the control of virtual generators in hour-time scale. The virtual batteries are scheduled to smooth out tie flow errors corresponding to day-ahead plan and hour-time scale schedules. The multi-time scale control methods are coordinated to employ the response potential of inverter-based TCLs and response curve-based methods are proposed to control inverter-based TCLs considering the customer privacy. The multi-time scale stochastic schedules which are based on response curves of inverter-based TCLs are coordinated to accommodate wind generation variability. Simulation results demonstrate that the microgrid tie flow errors are effectively mitigated by the proposed multi-time scale coordinated control and scheduling of inverter-based TCLs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Scheduling Earth Observing Satellites with Evolutionary Algorithms

We hypothesize that evolutionary algorithms can effectively schedule coordinated fleets of Earth observing satellites. The constraints are complex and the bottlenecks are not well understood, a condition where evolutionary algorithms are often effective. This is, in part, because evolutionary algorithms require only that one can represent solutions, modify solutions, and evaluate solution fitness. To test the hypothesis we have developed a representative set of problems, produced optimization software (in Java) to solve them, and run experiments comparing techniques. This paper presents initial results of a comparison of several evolutionary and other optimization techniques; namely the genetic algorithm, simulated annealing, squeaky wheel optimization, and stochastic hill climbing. We also compare separate satellite vs. integrated scheduling of a two satellite constellation. While the results are not definitive, tests to date suggest that simulated annealing is the best search technique and integrated scheduling is superior.

Globus, Al↗

Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. I -- National Study

The use of renewable energy (RE) sources, primarily wind and solar generation, is poised to grow significantly within the Indian power system. The Government of India has established a target of 175 gigawatts (GW) of installed RE capacity by 2022, including 60 GW of wind and 100 GW of solar, up from 29 GW wind and 9 GW solar at the beginning of 2017. Thanks to advanced weather and power system modeling made for this project, the study team is able to explore operational impacts of meeting India's RE targets and identify actions that may be favorable for integration. Our primary tool is a detailed production cost model, which simulates optimal scheduling and dispatch of available generation in a future year (2022) by minimizing total production costs subject to physical, operational, and market constraints. Our team comprises a core group from the Power System Operation Corporation, Ltd. (POSOCO), which is the national grid operator (with representation from the National, Southern, and Western Regional Load Dispatch Centers) under Ministry of Power, National Renewable Energy Laboratory (NREL), and Lawrence Berkeley National Laboratory (LBNL), and a broader modeling team that includes Central Electricity Authority (CEA), POWERGRID (the central transmission utility, CTU), and State Load Dispatch Centers in Maharashtra, Gujarat, Tamil Nadu, Karnataka, Rajasthan, and Andhra Pradesh. Our model includes high-resolution wind and solar data (forecasts and actuals), unique properties for each generator, CEA/CTU's anticipated buildout of the power system, and enforced state-to-state transmission flows. Assuming the fulfillment of current efforts to provide better access to the physical flexibility of the power system, we find that power system balancing with 100 GW of solar and 60 GW of wind is achievable at 15-minute operational timescales with minimal RE curtailment. This RE capacity meets 22% of total projected 2022 electricity consumption in India with annual RE curtailment of 1.4%, in line with experiences in other countries with significant RE penetrations (Bird et al. 2016). Changes to operational practice can further reduce the cost of operating the power system and reduce RE curtailment. Coordinating scheduling and dispatch over a broader area is the largest driver to reduce costs, saving INR 6300 crore (USD $920 million) annually when optimized regionally. Lowering minimum operating levels of coal plants (from 70% to 40%) is the biggest driver to reduce RE curtailment - from 3.5% down to 0.76%. In fact, this operating property is more influential than faster thermal generation ramp rates in lowering the projected levels of curtailment. While this study does not answer every question relevant to planning for India's 2022 RE targets, it is an important step toward analyzing operational challenges and cost saving opportunities using state-of-the-art power system planning tools. Further analysis can build upon this basis to explore optimal renewable resource and intrastate transmission siting, system stability during contingencies, and the influence of total power system investment costs on customer tariffs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India’s Electric Grid, Vol. 1. National Study

The use of renewable energy (RE) sources, primarily wind and solar generation, is poised to grow significantly within the Indian power system. The Government of India has established a target of 175 gigawatts (GW) of installed RE capacity by 2022, including 60 GW of wind and 100 GW of solar, up from 29 GW wind and 9 GW solar at the beginning of 2017. Using advanced weather and power system modeling made for this project, the study team is able to explore operational impacts of meeting India’s RE targets and identify actions that may be favorable for integration. Our primary tool is a detailed production cost model, which simulates optimal scheduling and dispatch of available generation in a future year (2022) by minimizing total production costs subject to physical, operational, and market constraints. Our team comprises a core group from the Power System Operation Corporation, Ltd. (POSOCO), which is the national grid operator (with representation from the National, Southern, and Western Regional Load Dispatch Centers) under Ministry of Power, National Renewable Energy Laboratory (NREL), and Lawrence Berkeley National Laboratory (Berkeley Lab), and a broader modeling team that includes Central Electricity Authority (CEA), POWERGRID (the central transmission utility, CTU), and State Load Dispatch Centers in Maharashtra, Gujarat, Tamil Nadu, Karnataka, Rajasthan, and Andhra Pradesh. Our model includes high-resolution wind and solar data (forecasts and actuals), unique properties for each generator, CEA/CTU’s anticipated buildout of the power system, and enforced state-to-state transmission flows. Assuming the fulfillment of current efforts to provide better access to the physical flexibility of the power system, we find that power system balancing with 100 GW of solar and 60 GW of wind is achievable at 15-minute operational timescales with minimal RE curtailment. This RE capacity meets 22% of total projected 2022 electricity consumption in India with annual RE curtailment of 1.4%, in line with experiences in other countries with significant RE penetrations (Bird et al. 2016). Changes to operational practice can further reduce the cost of operating the power system and reduce RE curtailment. Coordinating scheduling and dispatch over a broader area is the largest driver to reduce costs, saving INR 6300 crore (USD 980 million) annually when optimized regionally. Lowering minimum operating levels of coal plants (from 70% to 40%) is the biggest driver to reduce RE curtailment—from 3.5% down to 0.76%. In fact, this operating property is more influential than faster thermal generation ramp rates in lowering the projected levels of curtailment. While this study does not answer every question relevant to planning for India’s 2022 RE targets, it is an important step toward analyzing operational challenges and cost saving opportunities using state-of-the-art power system planning tools. Further analysis can build upon this basis to explore optimal renewable resource and intrastate transmission siting, system stability during contingencies, and the influence of total power system investment costs on customer tariffs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Machine learning-enhanced MPC for demand flexibility in small commercial buildings: An experimental study

Small- and medium-sized commercial buildings (SMCBs) represent the majority of U.S. commercial building stock and a significant share of peak electricity demand, yet they often lack centralized building automation systems, representing a significant untapped resource for urban energy management. This infrastructure gap makes advanced control implementation challenging, limiting the potential for widespread demand flexibility. Model Predictive Control (MPC) has shown strong potential for load shifting, peak demand reduction, and cost savings, but its effectiveness is hindered by unmeasured disturbances such as internal heat gains. This paper presents a Hybrid MPC framework that integrates a physics-based gray-box building thermal model, identified using a lumped disturbance (LD) approach, with a machine learning (ML) model for forecasting unmeasured disturbances. The hybrid approach is designed for buildings with multiple individually controlled heat pump and thermostat pairs, common in SMCBs, and aims to optimize coordinated scheduling of multiple heat pumps under dynamic electricity pricing while respecting comfort constraints. The methodology is validated through both simulations of case study buildings and experimental studies at a highly-instrumented test facility. Simulation results show that the Hybrid MPC achieves substantial load shifting and peak demand reduction, approaching the performance of an ideal MPC with perfect disturbance knowledge, and outperforming a conventional MPC without disturbance forecasting. In experiments, the Hybrid MPC reduced daily HVAC energy costs by 8.7%, peak-price time load (load shifting) by 41.7%, and peak demand by 29.2% compared to baseline control, demonstrating comparable benefits to the 11.6% cost savings, 42.9% load shifting, and 23.2% peak reduction of the ideal MPC. These results demonstrate that the proposed hybrid modeling approach can significantly improve MPC performance in real-world SMCB applications without requiring additional disturbance measurements.

Demand Flexibility↗

Safety-Class Uninterruptable Power Supply General Contractor for the TA-55 TRP II Project: REQUEST FOR QUALIFICATION No. ADPM-002 - PREQUALIFICATION CRITERIA

LANS is seeking to establish qualified suppliers for the procurement and construction of a Safety-Class Uninterruptable Power Supply (UPS) facility in accordance with ASME NQA-1 2008 and 2009 addenda. This scope includes Work required to construct a new UPS facility at Technical Area (TA)-55 including procurement, construction, installation, and post installation testing of all structures, systems, and equipment (e.g., foundations, concrete, structural steel, building components, HVAC, fire protection, site utilities) excluding the UPS system itself. Design of the facility and associated infrastructure are provided by LANL. Final design of the UPS system will be provided by the UPS Integrator under separate contract. Procurement of all safety-related components (specified by LANL) must be in accordance with NQA-1 and must be purchased from qualified suppliers that have an NQA-1 program or through Commercial Grade Dedication (CGD) in accordance with NQA-1a-2009, Subpart 2.14. The SUBCONTRACTOR shall plan, schedule, coordinate, test, inspect and assure effective performance of all aspects of the Work as described herein.

42 ENGINEERING↗

Safety-Class Uninterruptable Power Supply Integrator for the TA-55 TRP II Project: REQUEST FOR QUALIFICATION No. ADPM-001 - PREQUALIFICATION CRITERIA

LANS is seeking to establish qualified suppliers for the detailed design and installation of a Safety-Class, Class 1E Uninterruptable Power Supply (UPS) system in accordance with ASME NQA-1 2008 and 2009 addenda and IEEE Std. 344, respectively. This scope includes all activities from detailed design of the UPS through procurement, installation, post installation testing, and dedication (as required) at Technical Area (TA)-55. Design, procurement, installation and testing of all safety-related components must be in accordance with NQA-1 and must be purchased from qualified suppliers that have an NQA-1 program or through Commercial Grade Dedication (CGD) in accordance with NQA-1 a-2009, Subpart 2.14. The SUBCONTRACTOR shall plan, schedule, coordinate, test, inspect and assure effective performance of all aspects of the UPS system as described herein. LANL intends to issue a separate RFP (excluding work specified herein) for work to be performed by a General Contractor supporting the UPS Project including procurement and installation of the new UPS building, pre-stressed concrete, structural steel, HVAC, fire protection, site utilities, and other ancillary equipment and components required for the facility.

42 ENGINEERING↗

Sault Tribe Building Efficiency Audits of Tribally-Owned Governmental Buildings and Residential Tribal Housing

The Tribe is working to reduce energy consumption and expense in Tribally-owned governmental buildings and low income housing sites. In 2009, the Tribe applied to the U. S. Department of Energy for funding to conduct energy audits of Tribally-owned governmental buildings. Findings from the energy audits would define the extent and types of energy efficiency improvements needed, establish a basis for energy priorities, strategies and action plans, and provide a benchmark for measuring improvements from energy efficiency implementations. In 2010, the DOE awarded a grant in the amount of $95,238 to the Tribe to fund the energy audits of nine governmental buildings and to pay for travel expenses associated with attendance and participation at the DOE annual program reviews. In 2011, the Tribe applied for and was awarded a DOE grant in the amount of $75,509 to conduct energy audits of the remaining 30 Tribally-owned governmental buildings. Repeating mobilization steps performed during the first DOE energy audits grant, the Tribe initiated the second round of governmental building energy audits by completing energy auditor procurement. The selected energy auditor successfully passed DOE debarment and Sault Tribe background clearances. The energy audits contract was awarded to U. P. Engineers and Architects, Inc. of Sault Ste. Marie, Michigan. The Tribe continued mobilizing for the energy audits by providing the energy auditor with one year of electric, gas and water utility invoice copies per building, as well as supplemental building information, such as operating hours. The Tribe also contacted building occupants to coordinate scheduling for the on-site energy audit inspections and arranged for facilities management personnel to guide the energy auditor through the buildings and answer questions regarding building systems.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Apollo experience report: Ground-support equipment

The experience gained in management of the ground-support-equipment and site-readiness activity for the Apollo Program is summarized. The design of equipment and facilities are examined as well as some operational aspects. The organization for ensuring site readiness and the maintenance of ground-support equipment are discussed. Recommendations for use in future programs are given in the areas of design considerations, cleanliness requirements, periodic evaluation of changing requirements, maintenance and overhaul, special test equipment, site-activation schedule coordination, and schematics for ground-support equipment.

Cooper, J. S.↗

West Antarctic Ice Sheet Initiative. Volume 1: Science and Implementation Plan

The Science and Implementation Plan of the West Antarctic Ice Sheet Initiative (WAIS) is described. The goal of this initiative is the prediction of the future behavior of this ice sheet and an assessment of its potential to collapse, rapidly raising global sea level. The multidisciplinary nature of WAIS reflects the complexity of the polar ice sheet environment. The project builds upon past and current polar studies in many fields and meshes with future programs of both the U.S. and other countries. Important tasks in each discipline are described and a coordinated schedule by which the majority of these tasks can be accomplished in 5 years is presented. The companion report (Volume 2) contains seven discipline review papers on the state of knowledge of Antarctica and opinions on how that knowledge must be increased to attain the WAIS goal.

Bindschadler, Robert A.↗

Application of Agile for Systems Engineering, Project Management and Modeling and Lessons Learned

The Systems Engineering team within the Human Research Program (HRP) Exploration Medical Capability (ExMC) Element has been transforming its development processes to be more efficient, robust,and responsive to change and to its stakeholders. To these ends, the Systems Engineering team trialed the integration of agile development techniques into existing and new processes. Agile development methods are well understood within the software development community. Outside ofsoftware development, however, how non-software project management (PM) and systems engineering (SE) teams implement agile development techniques is less well understood. In its transformation efforts, the ExMC SE team focused on three main areas: Improving the project communications among subsystem teams and stakeholders by adopting a scrum-like process, Changing the status and reporting mechanisms to improve schedule coordination between the subsystem team, SE leadership, and ExMC Element leadership, and Unifying the model-based SE workflow to improve understanding of Concepts of Operations across projects.This presentation highlights several of these transformations and what the SE team learned while undergoing the transformation.

S Lumpkins↗

Linux Kernel Co-Scheduling For Bulk Synchronous Parallel Applications

This paper describes a kernel scheduling algorithm that is based on co-scheduling principles and that is intended for parallel applications running on 1000 cores or more where inter-node scalability is key. Experimental results for a Linux implementation on a Cray XT5 machine are presented.1 The results indicate that Linux is a suitable operating system for this new scheduling scheme, and that this design provides a dramatic improvement in scaling performance for synchronizing collective operations at scale.

99 GENERAL AND MISCELLANEOUS↗

Coordinated Science Campaign Scheduling for Sensor Webs

Future Earth observing missions will study different aspects and interacting pieces of the Earth's eco-system. Scientists are designing increasingly complex, interdisciplinary campaigns to exploit the diverse capabilities of multiple Earth sensing assets. In addition, spacecraft platforms are being configured into clusters, trains, or other distributed organizations in order to improve either the quality or the coverage of observations. These simultaneous advances in the design of science campaigns and in the missions that will provide the sensing resources to support them offer new challenges in the coordination of data and operations that are not addressed by current practice. For example, the scheduling of scientific observations for satellites in low Earth orbit is currently conducted independently by each mission operations center. An absence of an information infrastructure to enable the scheduling of coordinated observations involving multiple sensors makes it difficult to execute campaigns involving multiple assets. This paper proposes a software architecture and describes a prototype system called DESOPS (Distributed Earth Science Observation Planning and Scheduling) that will address this deficiency.

Edgington, Will↗

A Human-in-the Loop Evaluation of a Coordinated Arrival Departure Scheduling Operations for Managing Departure Delays at LaGuardia Airport

LaGuardia (LGA) departure delay was identified by the stakeholders and subject matter experts as a significant bottleneck in the New York metropolitan area. Departure delay at LGA is primarily due to dependency between LGA's arrival and departure runways: LGA departures cannot begin takeoff until arrivals have cleared the runway intersection. If one-in one-out operations are not maintained and a significant arrival-to-departure imbalance occurs, the departure backup can persist through the rest of the day. At NASA Ames Research Center, a solution called "Departure-sensitive Arrival Spacing" (DSAS) was developed to maximize the departure throughput without creating significant delays in the arrival traffic. The concept leverages a Terminal Sequencing and Spacing (TSS) operations that create and manage the arrival schedule to the runway threshold and added an interface enhancement to the traffic manager's timeline to provide the ability to manually adjust inter-arrival spacing to build precise gaps for multiple departures between arrivals. A more complete solution would include a TSS algorithm enhancement that could automatically build these multi-departure gaps. With this set of capabilities, inter-arrival spacing could be controlled for optimal departure throughput. The concept was prototyped in a human-in-the- loop (HITL) simulation environment so that operational requirements such as coordination procedures, timing and magnitude of TSS schedule adjustments, and display features for Tower, TRACON and Traffic Management Unit could be determined. A HITL simulation was conducted in August 2014 to evaluate the concept in terms of feasibility, controller workload impact, and potential benefits. Three conditions were tested, namely a Baseline condition without scheduling, TSS condition that schedules the arrivals to the runway threshold, and TSS+DSAS condition that adjusts the arrival schedule to maximize the departure throughput. The results showed that during high arrival demand period, departure throughput could be incrementally increased under TSS and TSS+DSAS conditions without compromising the arrival throughput. The concept, operational procedures, and summary results were originally published in ATM20151 but detailed results were omitted. This paper expands on the earlier paper to provide the detailed results on throughput, conformance, safety, flight time/distance, etc. that provide extra insights into the feasibility and the potential benefits on the concept.

trajectory-based operations↗

Control coordination in inverter‐based microgrids using AoI‐based 5G schedulers

Abstract A coordinated set point automatic adjustment with correction enabled (C‐SPAACE) framework that uses 5G communication for real‐time control coordination between inverter‐based resources (IBR) in microgrids is proposed. Utilising slicing capability, 5G offers low‐latency communication to C‐SPAACE under normal conditions. However, given the multitude of power grid use cases, a certain 5G slice for C‐SPAACE may have access only to limited radio spectrum resources, which if not managed well, greatly undermines the communication needs of C‐SPAACE framework. Thus, optimally scheduling the available spectrum resources among IBRs in a sliced 5G network‐based C‐SPAACE framework becomes a critical problem. To address this issue, the authors utilise a novel age of information (AoI) metric and designs an AoI‐based 5G scheduler to provide low‐latency communication to C‐SPAACE. Following this, a co‐simulation environment is designed using PSCAD/EMTDC and Python to simulate a microgrid supported by 5G communication. Time‐domain simulation case studies are performed using the proposed co‐simulation environment to evaluate the performance of C‐SPAACE using 5G with both AoI‐based and other baseline (non‐AoI) schedulers.

Choudhury, Biplav↗

Innovative Development of a Cross-Center Timeline Planning Tool

The Payload Operations Integration Center (POIC) at Marshall Space Flight Center (MSFC) is the United States focal point to support operations controllers and payload developers conducting payload science operations for the National Aeronautics and Space Administration (NASA) aboard the International Space Station (ISS). Some of the key functions are planning, coordination and scheduling of science activities. This effort occurs in coordination with other NASA centers, international partners, and payload developers. The ability to efficiently plan and re-plan in response to change is critical to the flight planning teams. Additionally, in Fall 2017, NASA will increase its ability to perform payload science operations aboard the ISS with a fourth crew member. In order to support this, there will be an increasing need to quickly plan and schedule more activities. In the past, it was cumbersome and time-consuming to consolidate copious amounts of planning and change request data from various sources. Planners would summarize information from the Johnson Space Center (JSC) Operations Planning Timeline Integration System (OPTIMIS) and manually integrate it with other data in order to produce a Timeline Planning Summary (TPS). This lengthy process of updating static documents while planning and re-planning was cumbersome, introduced human error, and was inflexible to last minute changes. There was a need for a dynamic, more efficient, less erroneous, and more concise way of building a report that could be readily updated as fast as payload science plans change.

Pedoto, Ramon W.↗