Search NASA⌕ Search

SEARCH · Search NASA

Results for “cost benefit analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Hypergolic Propellant Destruction Evaluation Cost Benefit Analysis

At space vehicle launch sites such as Vandenberg Air Force Base (VAFB), Cape Canaveral Air Force Station (CCAFS) and Kennedy Space Center (KSC), toxic vapors and hazardous liquid wastes result from the handling of commodities (hypergolic fuels and oxidizers), most notably from transfer operations where fuel and oxidizer are transferred from bulk storage tanks or transfer tankers to space launch vehicles. During commodity transfer at CCAFS and KSC, wet chemical scrubbers (typically containing four scrubbing towers) are used to neutralize fuel saturated vapors from vent systems on tanks and tanker trailers. For fuel vapors, a citric acid solution is used to scrub out most of the hydrazine. Operation of both the hypergolic fuel and oxidizer vapor scrubbers generates waste scrubber liquor. Currently, scrubber liquor from the fuel vapor scrubber is considered non-hazardous. The scrubber liquor is defined as spent citric acid scrubber solution; the solution contains complexed hydrazine I methylhydrazine and is used to neutralize nonspecification hypergolic fuel generated by CCAFS and KSC. This project is a collaborative effort between Air Force Space Command (AFSPC), Space and Missile Center (SMC), the CCAFS, and National Aeronautics and Space Administration (NASA) to evaluate microwave destruction technology for the treatment of non-specification hypergolic fuel generated at CCAFS and KSC. The project will capitalize on knowledge gained from microwave treatment work being accomplished by AFSPC and SMC at V AFB. This report focuses on the costs associated with the current non-specification hypergolic fuel neutralization process (Section 2.0) as well as the estimated costs of operating a mobile microwave unit to treat non-specification hypergolic fuel (Section 3.0), and compares the costs for each (Section 4.0).The purpose of this document is to assess the costs associated with waste hypergolic fuel. This document will report the costs associated with the current fuel neutralization process and also examine the costs of an alternative technology, microwave destruction of waste hypergolic fuel. The microwave destruction system is being designed as a mobile unit to treat non-specification hypergolic fuel at CCAFS and KSC.

Kessel, Kurt↗

Cost and Benefit Analysis of Orbital Debris Remediation

This report describes a cost-benefit analysis of approaches for debris remediation, which is defined as any action taken to reduce the risks posed by orbital debris by moving, removing, or reusing it. A better understanding of the near-term costs and benefits of the different approaches to remediation can support decision-making about R&D investment and policy creation in this area.

Thomas J. Colvin↗

Market Assessment of Forward-Looking Turbulence Sensing Systems

This viewgraph presentation provides a cost benefit analysis of three next-generation forward-looking turbulence sensing systems: X band turbulence radar system for convective turbulence, LIDAR based turbulence systems to sense clear air turbulence and a combined hybrid system. Parameters for the cost benefit analysis were established using a business model which considered injury rates, cost of injuries, indirect costs, market penetration rate estimates and product success characteristics. Topics covered include: study approach, business case equations, data acquisition, benchmark analysis. Data interpretation from the cost benefit analysis is presented. The researchers conclude that the market potential for these products is based primarily on injury cost reduction and that X band radar systems have the greatest chance for commercial success.

Kauffmann, Paul↗

A Cost and Benefit Analysis of Orbital Debris Remediation, Mitigation,Tracking, and Characterization

Orbital debris may collide with crewed and robotic spacecraft, placing them at risk. The wide range of debris, from 9,000-kilogram rocket bodies to millions of millimeter-size debris, has led to a similarly wide range of proposed actions for addressing the risks posed by debris. However, the costs and benefits of these actions have historically been unknown. This is a challenge for decision makers who are choosing which actions to support through technology development or policy changes. NASA’s Office of Technology, Policy, and Strategy is addressing these technical and economic uncertainties by building a capability to (1) complete rigorous calculations of the net present value of each action, (2) identify an optimal portfolio of actions to reduce risk, and (3) quantitatively analyze policies related to space sustainability. This report describes our progress toward that capability and to solicit feedback from the space and economic communities. Our previous work(Colvin, Karcz, and Wusk. 2023), referred to here as Phase 1, assessed the costs and benefits of performing debris remediation on operationally relevant timescales. The current paper summarizes the work of Locke and Colvin (2024), which contains major updates to the risk model used in Phase 1 and expands the breadth of actions considered to include mitigating the creation of debris, improving the ability to track debris, and more methods for cleaning up existing debris. We demonstrate that our approach of measuring risks in dollars allows for the effectiveness of seemingly incommensurate actions to be compared and generates insights that other approaches to measuring risk have missed.

Orbital Debris↗

Cost benefits of advanced software: A review of methodology used at Kennedy Space Center

To assist rational investments in advanced software, a formal, explicit, and multi-perspective cost-benefit analysis methodology is proposed. The methodology can be implemented through a six-stage process which is described and explained. The current practice of cost-benefit analysis at KSC is reviewed in the light of this methodology. The review finds that there is a vicious circle operating. Unsound methods lead to unreliable cost-benefit estimates. Unreliable estimates convince management that cost-benefit studies should not be taken seriously. Then, given external demands for cost-benefit estimates, management encourages software enginees to somehow come up with the numbers for their projects. Lacking the expertise needed to do a proper study, courageous software engineers with vested interests use ad hoc and unsound methods to generate some estimates. In turn, these estimates are unreliable, and the cycle continues. The proposed methodology should help KSC to break out of this cycle.

Joglekar, Prafulla N.↗

Cost and Benefit Analysis of Mitigating, Tracking, and Remediating Orbital Debris

Orbital debris may collide with crewed and robotic spacecraft, placing them at risk. The wide range of debris, from 9,000-kilogram rocket bodies to millions of millimeter-size debris, has led to a similarly wide range of proposed actions for addressing the risks posed by debris. However, the costs and benefits of these actions have historically been unknown. This is a challenge for decision makers who are choosing which actions to support through technology development or policy changes. NASA’s Office of Technology, Policy, and Strategy is addressing these technical and economic uncertainties by building a capability to (1) complete rigorous calculations of the net present value of each action, (2) identify an optimal portfolio of actions to reduce risk, and (3) quantitatively analyze policies related to space sustainability. This report describes our progress toward that capability and to solicit feedback from the space and economic communities. Our previous work, referred to here as Phase 1, assessed the costs and benefits of performing debris remediation on operationally relevant timescales. The current analysis contains major updates to the risk model used in Phase 1 and expands the breadth of actions considered to include mitigating the creation of debris, improving the ability to track debris, and more methods for cleaning up existing debris. We demonstrate that our approach of measuring risks in dollars allows for the effectiveness of seemingly incommensurate actions to be compared and generates insights that other approaches to measuring risk have missed.

Jericho Locke↗

Cost and Benefit Analysis of Mitigating, Tracking, and Remediating Orbital Debris

Presentation accompanying the technical report with the same name. The abstract for the report and the full study is repeated below. Orbital debris may collide with crewed and robotic spacecraft, placing them at risk. The wide range of debris, from 9,000-kilogram rocket bodies to millions of millimeter-size debris, has led to a similarly wide range of proposed actions for addressing the risks posed by debris. However, the costs and benefits of these actions have historically been unknown. This is a challenge for decision makers who are choosing which actions to support through technology development or policy changes. NASA’s Office of Technology, Policy, and Strategy is addressing these technical and economic uncertainties by building a capability to (1) complete rigorous calculations of the net present value of each action, (2) identify an optimal portfolio of actions to reduce risk, and (3) quantitatively analyze policies related to space sustainability. This report describes our progress toward that capability and to solicit feedback from the space and economic communities. Our previous work, referred to here as Phase 1, assessed the costs and benefits of performing debris remediation on operationally relevant timescales. The current analysis contains major updates to the risk model used in Phase 1 and expands the breadth of actions considered to include mitigating the creation of debris, improving the ability to track debris, and more methods for cleaning up existing debris. We demonstrate that our approach of measuring risks in dollars allows for the effectiveness of seemingly incommensurate actions to be compared and generates insights that other approaches to measuring risk have missed.

Jericho Locke↗

Strategic Analysis Overview

NASA s Constellation Program employs a strategic analysis methodology in providing an integrated analysis capability of Lunar exploration scenarios and to support strategic decision-making regarding those scenarios. The strategic analysis methodology integrates the assessment of the major contributors to strategic objective satisfaction performance, affordability, and risk and captures the linkages and feedbacks between all three components. Strategic analysis supports strategic decision making by senior management through comparable analysis of alternative strategies, provision of a consistent set of high level value metrics, and the enabling of cost-benefit analysis. The tools developed to implement the strategic analysis methodology are not element design and sizing tools. Rather, these models evaluate strategic performance using predefined elements, imported into a library from expert-driven design/sizing tools or expert analysis. Specific components of the strategic analysis tool set include scenario definition, requirements generation, mission manifesting, scenario lifecycle costing, crew time analysis, objective satisfaction benefit, risk analysis, and probabilistic evaluation. Results from all components of strategic analysis are evaluated a set of pre-defined figures of merit (FOMs). These FOMs capture the high-level strategic characteristics of all scenarios and facilitate direct comparison of options. The strategic analysis methodology that is described in this paper has previously been applied to the Space Shuttle and International Space Station Programs and is now being used to support the development of the baseline Constellation Program lunar architecture. This paper will present an overview of the strategic analysis methodology and will present sample results from the application of the strategic analysis methodology to the Constellation Program lunar architecture.

Cirillo, William M.↗

Systems engineering and integration: Cost estimation and benefits analysis

Space Transportation Avionics hardware and software cost has traditionally been estimated in Phase A and B using cost techniques which predict cost as a function of various cost predictive variables such as weight, lines of code, functions to be performed, quantities of test hardware, quantities of flight hardware, design and development heritage, complexity, etc. The output of such analyses has been life cycle costs, economic benefits and related data. The major objectives of Cost Estimation and Benefits analysis are twofold: (1) to play a role in the evaluation of potential new space transportation avionics technologies, and (2) to benefit from emerging technological innovations. Both aspects of cost estimation and technology are discussed here. The role of cost analysis in the evaluation of potential technologies should be one of offering additional quantitative and qualitative information to aid decision-making. The cost analyses process needs to be fully integrated into the design process in such a way that cost trades, optimizations and sensitivities are understood. Current hardware cost models tend to primarily use weights, functional specifications, quantities, design heritage and complexity as metrics to predict cost. Software models mostly use functionality, volume of code, heritage and complexity as cost descriptive variables. Basic research needs to be initiated to develop metrics more responsive to the trades which are required for future launch vehicle avionics systems. These would include cost estimating capabilities that are sensitive to technological innovations such as improved materials and fabrication processes, computer aided design and manufacturing, self checkout and many others. In addition to basic cost estimating improvements, the process must be sensitive to the fact that no cost estimate can be quoted without also quoting a confidence associated with the estimate. In order to achieve this, better cost risk evaluation techniques are needed as well as improved usage of risk data by decision-makers. More and better ways to display and communicate cost and cost risk to management are required.

Dean, ED↗

Summary and recommendations

An economic analysis using econometric and cost benefit analysis techniques was performed to determine the feasibility of space processing of certain products. The overall objectives of the analysis were (1) to determine specific products or processes uniquely connected with space manufacturing, (2) to select a specific product or process from each of the areas of semiconductors, metals, and biochemicals, and (3) to determine the overall price/cost structure of each product or process considered. The economic elements of the analysis involved a generalized decision making format for analyzing space manufacturing, a comparative cost study of the selected processes in space vs. earth manufacturing, and a supply and demand study of the economic relationships of one of the manufacturing processes. Space processing concepts were explored. The first involved the use of the shuttle as the factory with all operations performed during individual flights. The second concept involved a permanent unmanned space factory which would be launched separately. The shuttle in this case would be used only for maintenance and refurbishment. Finally, some consideration was given to a permanent manned space factory.

Source record↗

Decision Making Methods in Space Economics and Systems Engineering

This viewgraph presentation reviews various methods of decision making and the impact that they have on space economics and systems engineering. Some of the methods discussed are: Present Value and Internal Rate of Return (IRR); Cost-Benefit Analysis; Real Options; Cost-Effectiveness Analysis; Cost-Utility Analysis; Multi-Attribute Utility Theory (MAUT); and Analytic Hierarchy Process (AHP).

trade studies↗

Evaluation of solar electric propulsion technologies for discovery class missions

A detailed study examines the potential benefits that advanced electric propulsion (EP) technologies offer to the cost-capped missions in NASA's Discovery program. The study looks at potential cost and performance benefits provided by three EP technologies that are currently in development: NASA's Evolutionary Xenon Thruster (NEXT), an Enhanced NSTAR system, and a Low Power Hall effect thruster. These systems are analyzed on three straw man Discovery class missions and their performance is compared to a state of the art system using the NSTAR ion thruster. An electric propulsion subsystem cost model is used to conduct a cost-benefit analysis for each option. The results show that each proposed technology offers a different degree of performance and/or cost benefit for Discovery class missions.

discovery↗

Evaluation of a Drag-Free Control Concept for Missions in Low Earth Orbit

Atmospheric drag causes the greatest uncertainty in the equations of motion for spacecraft in Low Earth Orbit (LEO). If atmospheric drag eflects can be continuously and autonomously counteracted through the use of a drag-fee control system, drag may essentially be eliminated from the equations of motion for the spacecraft. The main perturbations on the spacecraft will then be those due to the gravitational field, which are much more easily predicted Through dynamical analysis and numerical simulation, this paper presents some potential costs and benefits associated with the fuel used during continuous drag compensation. In light of this cost-benefit analysis, simulation results are used to validate the concept of drag-free control for LEO spacecraft missions having certain characteristics.

Fleck, Melissa E.↗