Results for “cost best practices”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Small Hydropower Interconnections: Best Practices

Small hydropower projects have been the predominant source of capacity growth of U.S. hydropower for more than a decade, and they present the most cost-effective and environmentally permissible avenues for hydropower growth (DOE 2016; Johnson et al. 2018). However, interconnection to electricity distribution and transmission grids is a persistent barrier due to cost surprises and schedule overruns. As a culmination to research into the status and requirements of small hydropower interconnection across the United States, this paper presents the best practices for setting interconnection standards that can improve the process for small hydropower developers. As part of the analysis, the interconnection costs are compared between small hydropower, solar, and wind. The analysis of the small hydropower interconnection landscape across the United States was carried out by Pacific Northwest National Laboratory (PNNL) and Oak Ridge National Laboratory (ORNL) with support from the U.S. Department of Energy Water Power Technologies Office. The research team was guided by a Technical Advisory Group (TAG) and gleaned data from publicly available sources, such as the HydroSource database (ORNL 2020) and interconnection queues hosted by utilities, balancing authorities, independent system operators (ISOs), and regional transmission organizations (RTOs). The results of this work are shared in a series of papers detailing the state of small hydropower in the United States (“Small Hydropower Interconnections: Small Hydropower in the United States”), the variety of state interconnection processes to connect power generators with the grid (“Small Hydropower Interconnections: State Interconnection Processes”), and an analysis of the interconnection processes (“Small Hydropower Interconnections: Analysis of Interconnection Processes”). In this, the final paper in the series, best practices for interconnection processes (“Small Hydropower Interconnections: Best Practices”) are identified from the solar energy and distributed wind energy industries that are transferrable to small hydropower development. This information will help overcome barriers to future small hydropower development.

13 HYDRO ENERGY↗

Operation and Maintenance of PV Systems: Data Science, Analysis, and Standards

This effort improves the effectiveness and reduce uncertainty in O&M cost through four primary objectives/tasks: 1) institutionalize standards for reliability and availability reporting for large PV power plants; 2) bridge systemic O&M knowledge gaps around important topics affecting O&M; 3) characterize systemic failure modes and patterns and accelerate O&M experiential learning cycles using field data; and 4) establish a baseline understanding of UPVS O&M cost drivers. Key results of this effort include publication of IEC standards, published topical papers on O&M topics, training, and characterize field data for climate- and service-related patterns (additional details below). Integrating these results serves to reduce performance risk and facilitate improvement in the way solar projects are operated and maintained. Results are well received and two publications are among the most successful SETO publications at NREL ("Model of Operation and Maintenance Costs for Photovoltaic Systems with over 40,000 downloads and "Best Practices in Operation and Maintenance of PV Systems, 3rd Ed." with over 90,000 downloads).

14 SOLAR ENERGY↗

Developing Consensus Recommendations to Address Challenges with Solar and Solar-Plus-Storage Code Enforcement and Permitting Approvals

The Sustainable Energy Action Committee (SEAC) provides a national platform for collaboration between key stakeholders in code enforcement and permitting for solar and solar-plus-storage projects. The outcomes from SEAC include code and standard proposals, guidance documents, information bulletins and stakeholder education. With this work, permitting and inspection of solar and solar+storage systems uses best practices, enhances safety, and becomes more efficient reducing costs for both jurisdictions and installers.

14 SOLAR ENERGY↗

Quantifying Capital Cost Reduction Pathways for Advanced Nuclear Reactors

The framework developed in this study is provided both as an excel sheet (https://inl.gov/content/uploads/2023/11/Nuclear-Reactor-Cost-Reduction-Pathway-Spreadsheet-Tool.xlsx) and a Python (Jupyter) Notebook (link: https://github.com/accert-dev/ACCERT/tree/main/Cost%20Reduction). Capital cost considerations are one of the primary inhibitors to the large-scale deployment of nuclear power plants. While it is widely accepted that first units will likely be expensive and relatively uncompetitive, it is reasonable to expect that subsequent units, built in relative quick succession, will be cheaper as they benefit from the so-called “learning effects”. However, the large degree of uncertainty associated with this parameter renders it challenging for first movers to invest in the first few expensive units. To resolve this impasse, the U.S. Department of Energy’s Advanced Nuclear Liftoff study advocated for the formation of large, committed order books of plants of the same technology to spread the costs across several units and kickstart the nuclear supply chain. The study also advocated best practices for avoiding overruns and keeping reactors on budget. This report builds on these key recommendations by attempting to quantify specific pathways toward cost reduction for nuclear energy. A capital cost estimation framework was built to untangle the effect of learning into a subset of key cost drivers, referred to as “levers”. Collectively, the choice of these levers is intended to reflect the decision-making of high-level stakeholders like plant owners and the government. In addition to the size of the firm orderbook, these levers included (a) cost drivers that are most often attributed to cost overruns such as architect/engineering (A/E) proficiency, construction proficiency, procurement service proficiency, design completion prior to the start of construction, and design maturity, and (b) cost reduction strategies such as modular construction, cross-site standardization, safety classification of the reactor building, and of the balance of plant. Two advanced reactor designs were leveraged as use cases and bottom-up cost estimates made with assumptions consistent with a well-executed first-of-a-kind project (WE-FOAK, i.e., almost no overruns) were used as baselines for the models. Cost correlations were surveyed from the literature to determine the impact of important variables on projected timelines and costs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Energy Storage in Long-Term System Models: A Review of Considerations, Best Practices, and Research Needs

Technological change and policy support have heightened expectations for the role of energy storage in power systems, creating a need to enhance representations of energy storage in long-term models to inform decision-making. Energy storage technologies have complex and diverse cost, value, and performance characteristics that make them challenging to model, but there is limited guidance about best practices and research gaps for energy storage analysis. This paper reviews the literature and draws upon our collective experience to provide recommendations to analysts on approaches for representing energy storage in long-term electric sector models, navigating tradeoffs in model development, and identifying research gaps for existing tools and data. The review focuses on national-scale models with technological, temporal, and regional detail given their prevalence in planning and policy, though many insights are transferable to other modeling contexts. It also offers guidance to consumers of model outputs on proper use and interpretation based on model strengths and limitations. In particular, this review demonstrates the importance of capturing how the values of energy storage and other resources change as the system composition changes (e.g. with different levels of storage, renewables deployment, and emissions outcomes). These considerations require model detail like high spatiotemporal resolutions and endogenous investments that global integrated assessment models and price-taker frameworks do not typically resolve. Research gaps include linking tools of different resolutions, developing reduced-form representations of value streams, incorporating hybrid energy storage and renewable systems, and representing longer-duration energy storage technologies.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Evaluation of pre-training large language models on leadership-class supercomputers

Large language models (LLMs) have arisen rapidly to the center stage of artificial intelligence as the foundation models applicable to many downstream learning tasks. However, how to effectively build, train, and serve such models for many high-stake and first-principle-based scientific use cases are both of great interests and of great challenges. Moreover, pre-training LLMs with billions or even trillions of parameters can be prohibitively expensive not just for academic institutions, but also for well-funded industrial and government labs. Furthermore, the energy cost and the environmental impact of developing LLMs must be kept in mind. Here, in this work, we conduct a first-of-its-kind performance analysis to understand the time and energy cost of pre-training LLMs on the Department of Energy (DOE)’s leadership-class supercomputers. Employing state-of-the-art distributed training techniques, we evaluate the computational performance of various parallelization approaches at scale for a range of model sizes, and establish a projection model for the cost of full training. Our findings provide baseline results, best practices, and heuristics for pre-training such large models that should be valuable to HPC community at large. We also offer insights and optimization strategies for using the first exascale computing system, Frontier, to train models of the size of GPT-3 and beyond.

97 MATHEMATICS AND COMPUTING↗

Integrating Safety, Security, and Nuclear Operations for Advanced Reactors

The traditional separation between safety, security, and operations teams has created significant barriers to achieving optimal outcomes. When security considerations are introduced late in the design process, they often conflict with already-established architectural, operational, or engineering parameters. Retrofitting security measures can lead to increased costs, schedule delays, and compromises in security effectiveness. For instance, the need to retrofit physical barriers or surveillance systems often results in trade-offs that could have been avoided with earlier input from security professionals. Delayed integration can also affect regulatory processes and result in licensing delays. Security reviews conducted at later stages frequently identify gaps that necessitate significant redesign efforts, impacting not only scope, schedule, and budget, but also adding risk and lowering stakeholder confidence in the project. This paper aims to address these challenges by identifying practical opportunities for integrating security considerations seamlessly with design and operations teams throughout the entire lifecycle of nuclear facilities—from conceptual design to commissioning and beyond. The research emphasizes the value of early and continuous collaboration among stakeholders to ensure that security measures are robust, operationally effective, and cost-efficient. By examining case studies, analyzing past incidents, and leveraging best practices from other high-security industries, this study highlights actionable strategies for bridging the gap between safety, security, and operations teams.

Zineddin, Dr. Z. [ORNL] (ORCID:0009000848740725)↗

Optimizing green infrastructure placement under precipitation uncertainty

Increased urbanization, infrastructure degradation, and climate change threaten to overwhelm stormwater systems across the nation, rendering them ineffective. Green Infrastructure (GI) practices are low cost, low regret strategies that can contribute to urban runoff management. However, questions remain as to how to best distribute GI practices through urban watersheds given precipitation uncertainty and the variable hydrological responses to them. We develop stochastic programming models to determine the optimal placement of GI practices across a set of candidate locations in a watershed to minimize the total expected runoff under medium-term precipitation uncertainties. Specifically, we first develop a two-stage stochastic programming model. Next, we reformulate this model using perturbed parameters to reduce the requisite computational time and extend it to multi-stage. In addition, we introduce constraints that allow for incorporating sub-catchment-level runoff reduction considerations. Furthermore, we account for hydrological connectivity in the watershed using an underlying acyclic connectivity graph of sub-catchments and incorporate various practical considerations into the models. In addition, we develop a systemic approach to downscale the existing daily precipitation projections into hourly units and efficiently estimate the corresponding hydrological responses. These advancements are brought together in a case study for an urban watershed in a mid-sized city in the U.S., where we perform sensitivity analyses, evaluate the importance of the considered constraints, and provide insights.

54 ENVIRONMENTAL SCIENCES↗

Data Acquisition and Control for Marine Energy Devices: Cost Considerations

This document discusses the process involved with developing a data acquisition system specifically in the context of applications for Marine Renewable Energy (MRE) technologies however, much of what is presented is applicable to applications requiring data acquisition in general. The detail on the process is provided to highlight the critical steps and needs for a successful measurement campaign and to understand what can impact the overall outcome, cost, and schedule. The process presented is an amalgamation of best practices, lessons learned, recommendations, and prudent technical project planning and management. Data acquisition systems may be tightly integrated with or into the device under measurement and it often has its own dependencies that must be met. Therefore, early consideration and planning for the data acquisition system are stressed throughout this document.

13 HYDRO ENERGY↗

Industry case studies: Finance

This article, the third in a series on the U.S. Department of Energy and IDEA collaboration, focuses on financial strategies used by institutions to support district energy system modernization and decarbonization. It highlights how effective funding models, long-term cost analysis, and leadership support are critical to implementing large-scale infrastructure upgrades. The case studies show different approaches to financing. Ball State University demonstrates how life-cycle cost analysis and phased funding—supported by state funding, bonds, and grants—enabled a transition to geothermal energy. Penn State’s Hershey Medical Center emphasizes the importance of financial leadership, shifting from reactive budgeting to data-driven, proactive investment in infrastructure. The University of Washington highlights how comprehensive data collection and analytics can justify investments and even create self-sustaining funding mechanisms like green revolving funds. Overall, the article shows that combining strong financial planning, data-driven decision-making, and innovative funding approaches is essential for advancing sustainable district energy systems while managing high upfront costs.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

R3IT, Rapid Rural Resilient Interconnection Toolkit, Final Technical Report

Utilities nationwide are beginning to experience multiple solar interconnection requests per day. This request volume will soon overwhelm utility engineers, especially at smaller utilities which serve the majority of the landmass of the United States. In this project, we developed open-source software tool that automates the interconnection approval process and removes 80% of the time required to approve an interconnection and hence allow more solar to be quickly and safely integrated with the grid. This software is accompanied by a guidebook detailing interconnection best practices and utility lessons learned. Competing solar interconnection software is extremely expensive at ten times the cost of typical distribution engineering tools, it’s closed source which makes it hard to integrate into utility workflows, and it doesn’t address the hardest power flow modeling challenges of interconnection screening. Our solution was built built with our utility partners who are already experiencing multiple interconnection requests per day and integrates best practices from our past work with DOE and the cooperative community on solar integration. The resulting free and open-source solution has been disseminated through our media channels and conferences that engage over 1,900 utilities nationwide.

14 SOLAR ENERGY↗

Geothermal Play Fairway Analysis Best Practices

Play fairway analysis (PFA) is a methodology that can improve success rates for geothermal exploration drilling, thus reducing the costs of geothermal projects while facilitating development in new areas. It was originally developed for the oil and gas industry, but has been adapted for discovering geothermal resources over the last decade. The geothermal PFA methodology involves systematically screening a set geographic area for promising qualities typically related to the presence of heat, permeability, and fluid. Successful application of PFA can identify hidden hydrothermal systems. From 2014 to 2021 the U.S. Department of Energy (DOE) Geothermal Technologies Office (GTO) supported the development of PFA for geothermal resources through awards to 11 research teams across the country. The goal of these projects was to advance and adapt PFA for geothermal exploration to produce regional-scale maps that reduce exploration uncertainty. This report is an outcome of the NREL-led PFA Retrospective project, which compiled, synthesized, analyzed the results of GTO's geothermal PFA program. Ultimately, we find that these projects greatly advanced approaches to geothermal exploration and resulted in extensive new data and new discoveries of unrecognized geothermal systems. We used the results to distill best practices in this report and to provide guidance for future applications of geothermal PFA.

15 GEOTHERMAL ENERGY↗

Non-Technical Barriers to Geothermal Development in California and Nevada

Geothermal project development in the United States may be subject to numerous permits, authorizations, and other regulatory requirements at the federal, state, and local level, which are necessary to address potential environmental and resource impacts at geothermal project sites. This report presents the findings of our study, including an analysis of federal, state, and local geothermal regulatory and permitting processes, case studies analyzing site-specific attributes that may impact project development at four selected geothermal project sites, an analysis of cost and timeline implications for geothermal project development, and the results of a qualitative study focused on inter-agency coordination and collaboration efforts between federal, state, and/or local agencies for geothermal projects located in California and Nevada. Our analysis found that development timelines may be impacted by multiple federal and state environmental review processes and duplicative permitting requirements as well as coordination efforts between numerous federal, state, and local agencies involved in issuing authorizations and permits necessary for project development. In addition, projects in California and Nevada may face site-specific environmental challenges due to the presence of sensitive resources (e.g., biological species and species habitat, cultural resources) that may result in project construction delays. Our study results also indicate that protracted geothermal development timelines caused by delays in acquiring necessary permits and environmental reviews may result in loss of generated electricity revenue and additional financing costs, which may increase economic uncertainty associated with project development. Through our qualitative analysis, we found that utilization of best practices, including tiering to existing environmental review documents and developing memoranda of understanding, which clearly delineate agency roles and responsibilities may reduce overall project timelines, costs, and uncertainties associated with geothermal project development in California and Nevada.

15 GEOTHERMAL ENERGY↗

Non-Technical Barriers to Geothermal Development in California and Nevada [Slides]

This presentation presents the findings of our study, including an analysis of federal, state, and local geothermal regulatory and permitting processes, case studies analyzing site-specific attributes that may impact project development at four selected geothermal project sites, an analysis of cost and timeline implications for geothermal project development, and the results of a qualitative study focused on inter-agency coordination and collaboration efforts between federal, state, and/or local agencies for geothermal projects located in California and Nevada. Our analysis found that development timelines may be impacted by multiple federal and state environmental review processes and duplicative permitting requirements as well as coordination efforts between numerous federal, state, and local agencies involved in issuing authorizations and permits necessary for project development. In addition, projects in California and Nevada may face site-specific environmental challenges due to the presence of sensitive resources (e.g., biological species and species habitat, cultural resources) that may result in project construction delays. Our study results also indicate that protracted geothermal development timelines caused by delays in acquiring necessary permits and environmental reviews may result in loss of generated electricity revenue and additional financing costs, which may increase economic uncertainty associated with project development. Through our qualitative analysis, we found that utilization of best practices, including tiering to existing environmental review documents and developing memoranda of understanding, which clearly delineate agency roles and responsibilities may reduce overall project timelines, costs, and uncertainties associated with geothermal project development in California and Nevada.

15 GEOTHERMAL ENERGY↗

Phase 1 NuScale SMR FOAK Nuclear Demonstration Readiness Project (Final Scientific/Technical Report)

The overarching objective of the Phase 1 NuScale SMR First-of-a-Kind (FOAK) Nuclear Demonstration Readiness Project was to enhance competitiveness of the U.S. nuclear industry by enabling timely deployment of the NuScale small modular reactor (SMR). The scope of this Phase 1 project continued to advance the licensing and design maturity, particularly in those areas related to supporting customer readiness, supply chain integration, cost competitiveness, and cost confidence. This investment provided by the Government has accelerated development of these designs and technologies so that the existing domestic fleet of nuclear power plants remains viable and the most mature in the nuclear industry. The intent is to have the new, advanced U.S. designs be deployed as early 2026, and be globally competitive. As a part of the First-of-a-Kind Nuclear Demonstration Readiness Project, NuScale has been developing an advanced reactor design, leading the path for other development projects or complex technology advancements for existing plants that have significant technical and licensing risk. The NuScale Power team (NuScale) is advancing licensing, engineering, supply chain development, testing, and other required activities to enhance the innovation and competitiveness of the U.S. nuclear industry by enabling timely deployment of the NuScale SMR. Specifically, NuScale is performing the following activities in Phase 1. Fully supporting the NRC review of the NuScale DCA to ensure approval of a final safety evaluation report by the end of 2020. Improving plant cost confidence and cost competitiveness through design and supply chain advancement, incorporation of constructability best practices, and margin recovery to increase plant power output. Accelerating design maturity, technology development, and operational program readiness to support a customer commitment for plant deployment. The Department of Energy (DOE) Office of Scientific and Technical Information (OSTI), a unit of the Office of Science, fulfills agency-wide responsibilities to collect, preserve, and disseminate both unclassified and classified scientific and technical information (STI) emanating from DOE-funded research and development (R&D) activities at DOE national laboratories and facilities and at universities and other institutions nationwide. This scientific and technical report provides summaries of the analyses and research that was performed by NuScale under this project that achieves the objective of disseminating information to the nuclear industry to ensure the innovations realized are shared for the benefit of the industry at large.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Resilient Solar PV Structures a.k.a. the "Nuts and Bolts" of PV Resilience

Solar photovoltaic (PV) systems can and has survived many extreme weather events. On occasion, however, solar PV systems have been damaged. This damage is related more to the features of individual PV systems rather than the magnitude of the weather events. Much of this damage can be avoided with relatively simple, cost-effective measures that include design, installation, inspection, and O&M best practices.

14 SOLAR ENERGY↗

The Distributed Energy Resource Cybersecurity Framework

For facilities with distributed energy resources (DERs), cybersecurity must be considered holistically, across system architectures and down to individual components. It's hard to know where to start. That's why the National Renewable Energy Laboratory (NREL) has developed an assessment tool for organizations with DERs to understand and improve their cybersecurity. With support from the U.S. Department of Energy's Federal Energy Management Program, the Distributed Energy Resource Cybersecurity Framework (DER-CF) provides a holistic evaluation of a facility's DER cybersecurity and makes customized recommendations that follow widely recognized best practices for cybersecurity. The DER-CF is available at no cost as an interactive web tool (dercf.nrel.gov).

cybersecurity↗

Best Practices in Integrated Resource Planning: A guide for planners developing the electricity resource mix of the future

Most states today require regulated electric utilities to file an IRP every 1 to 5 years, and some utilities voluntarily prepare these plans. Planning needs have changed in recent years due to emerging load growth, plant retirements, rising costs, and more extreme weather events – among other factors. In response, Synapse Energy Economics and Lawrence Berkeley National Laboratory produced a joint report, Best Practices in Integrated Resource Planning: A guide for planners developing the electricity resource mix of the future. The guide offers best planning practices for electricity systems undergoing a major transition, but also contains a wealth of practical guidance to develop technically sophisticated, clearer, more effective, and state-of-the-art electric utility resource plans. The guide is for resource planning professionals and stakeholders involved in resource planning processes. This diverse group includes utility personnel tasked with conducting resource planning and making investment decisions, state regulatory commissions that develop planning guidance and oversee the resource planning process, and stakeholders that represent a wide range of interests—utility consumer advocates, environmental groups, industrial customers, local governments, independent power producers, and many other

29 ENERGY PLANNING, POLICY, AND ECONOMY↗