Blind Validation Study of PRICE TruePlanning and SEER-H

Two of the primary parametric costing tools used to estimate the development and production cost of future spacecraft hardware are PRICE TruePlanning by PRICE Systems, and System Estimation and Evaluation of Resources-Hardware (SEER-H) by Galorath. These are standard tools used by NASA and industry to estimate the cost of new aerospace hardware. This study is an independent verification of the accuracy of these tools and was originally published in 2018. The purpose of this presentation is to circulate the findings of that study among the NASA cost community. Both PRICE Systems and Galorath have completed internal validation studies of their parametric cost estimating tools; however, they only provided the results of the studies and did not detail the exact methods used to perform the validation. In the present study, cost estimators used PRICE TruePlanning and SEER-H to estimate the cost of twelve different past NASA science missions. The estimators were prevented from knowing the actual cost of the missions in an effort to minimize cognitive biases. In the present study, SEER-H had an average error of 23%, median error of -0.3%, with a standard deviation of 43%. PRICE had an average error of 52%, median error of 50%, and standard deviation of 45%. Nine of the twelve mission's actual costs fell within the 80% confidence interval of SEER's probabilistic estimates; however, none of the missions fell within PRICE’s confidence intervals. There were several factors independent of PRICE and SEER-H which may have affected the accuracy of the results in the present study including: uncertainty in the technical data used for the estimates, the methods used to estimate uncertainty in spacecraft component mass and numbers of prototypes, and the experience of the estimators.

SEER↗

A Survey of Cost Estimating Methodologies for Distributed Spacecraft Missions

Satellite constellations and Distributed Spacecraft Mission (DSM) architectures offer unique benefits to Earth observation scientists and unique challenges to cost estimators. The Cost and Risk (CR) module of the Tradespace Analysis Tool for Constellations (TAT-C) being developed by NASA Goddard seeks to address some of these challenges by providing a new approach to cost modeling, which aggregates existing Cost Estimating Relationships (CER) from respected sources, cost estimating best practices, and data from existing and proposed satellite designs. Cost estimation through this tool is approached from two perspectives: parametric cost estimating relationships and analogous cost estimation techniques. The dual approach utilized within the TAT-C CR module is intended to address prevailing concerns regarding early design stage cost estimates, and offer increased transparency and fidelity by offering two preliminary perspectives on mission cost. This work outlines the existing cost model, details assumptions built into the model, and explains what measures have been taken to address the particular challenges of constellation cost estimating. The risk estimation portion of the TAT-C CR module is still in development and will be presented in future work. The cost estimate produced by the CR module is not intended to be an exact mission valuation, but rather a comparative tool to assist in the exploration of the constellation design tradespace. Previous work has noted that estimating the cost of satellite constellations is difficult given that no comprehensive model for constellation cost estimation has yet been developed, and as such, quantitative assessment of multiple spacecraft missions has many remaining areas of uncertainty. By incorporating well-established CERs with preliminary approaches to approaching these uncertainties, the CR module offers more complete approach to constellation costing than has previously been available to mission architects or Earth scientists seeking to leverage the capabilities of multiple spacecraft working in support of a common goal.

A Survey of Cost Estimating Methodologies for Distributed Spacecraft Missions

Satellite constellations and Distributed Spacecraft Mission (DSM) architectures offer unique benefits to Earth observation scientists and unique challenges to cost estimators. The Cost and Risk (CR) module of the Tradespace Analysis Tool for Constellations (TAT-C) being developed by NASA Goddard seeks to address some of these challenges by providing a new approach to cost modeling, which aggregates existing Cost Estimating Relationships (CER) from respected sources, cost estimating best practices, and data from existing and proposed satellite designs. Cost estimation through this tool is approached from two perspectives: parametric cost estimating relationships and analogous cost estimation techniques. The dual approach utilized within the TAT-C CR module is intended to address prevailing concerns regarding early design stage cost estimates, and offer increased transparency and fidelity by offering two preliminary perspectives on mission cost. This work outlines the existing cost model, details assumptions built into the model, and explains what measures have been taken to address the particular challenges of constellation cost estimating. The risk estimation portion of the TAT-C CR module is still in development and will be presented in future work. The cost estimate produced by the CR module is not intended to be an exact mission valuation, but rather a comparative tool to assist in the exploration of the constellation design tradespace. Previous work has noted that estimating the cost of satellite constellations is difficult given that no comprehensive model for constellation cost estimation has yet been developed, and as such, quantitative assessment of multiple spacecraft missions has many remaining areas of uncertainty. By incorporating well-established CERs with preliminary approaches to approaching these uncertainties, the CR module offers more complete approach to constellation costing than has previously been available to mission architects or Earth scientists seeking to leverage the capabilities of multiple spacecraft working in support of a common goal.

Foreman, Veronica L.↗

Streamlining the Design Tradespace for Earth Imaging Constellations

Satellite constellations and Distributed Spacecraft Mission (DSM) architectures offer unique benefits to Earth observation scientists and unique challenges to cost estimators. The Cost and Risk (CR) module of the Tradespace Analysis Tool for Constellations (TAT-C) being developed by NASA Goddard seeks to address some of these challenges by providing a new approach to cost modeling, which aggregates existing Cost Estimating Relationships (CER) from respected sources, cost estimating best practices, and data from existing and proposed satellite designs. Cost estimation through this tool is approached from two perspectives: parametric cost estimating relationships and analogous cost estimation techniques. The dual approach utilized within the TAT-C CR module is intended to address prevailing concerns regarding early design stage cost estimates, and offer increased transparency and fidelity by offering two preliminary perspectives on mission cost. This work outlines the existing cost model, details assumptions built into the model, and explains what measures have been taken to address the particular challenges of constellation cost estimating. The risk estimation portion of the TAT-C CR module is still in development and will be presented in future work. The cost estimate produced by the CR module is not intended to be an exact mission valuation, but rather a comparative tool to assist in the exploration of the constellation design tradespace. Previous work has noted that estimating the cost of satellite constellations is difficult given that no comprehensive model for constellation cost estimation has yet been developed, and as such, quantitative assessment of multiple spacecraft missions has many remaining areas of uncertainty. By incorporating well-established CERs with preliminary approaches to approaching these uncertainties, the CR module offers more complete approach to constellation costing than has previously been available to mission architects or Earth scientists seeking to leverage the capabilities of multiple spacecraft working in support of a common goal.

Science Data Processing↗

Satellite Constellation Cost Modeling: An Aggregate Model

Satellite constellations and Distributed Spacecraft Mission (DSM) architectures offer unique benefits to Earth observation scientists and unique challenges to cost estimators. The Cost and Risk (CR) module of the Tradespace Analysis Tool for Constellations (TAT-C) being developed by NASA Goddard seeks to address some of these challenges by providing a new approach to cost modeling, which aggregates existing Cost Estimating Relationships (CER) from respected sources, cost estimating best practices, and data from existing and proposed satellite designs. Cost estimation through this tool is approached from two perspectives: parametric cost estimating relationships and analogous cost estimation techniques. The dual approach utilized within the TAT-C CR module is intended to address prevailing concerns regarding early design stage cost estimates, and offer increased transparency and fidelity by offering two preliminary perspectives on mission cost. This work outlines the existing cost model, details assumptions built into the model, and explains what measures have been taken to address the particular challenges of constellation cost estimating. The risk estimation portion of the TAT-C CR module is still in development and will be presented in future work. The cost estimate produced by the CR module is not intended to be an exact mission valuation, but rather a comparative tool to assist in the exploration of the constellation design tradespace. Previous work has noted that estimating the cost of satellite constellations is difficult given that no comprehensive model for constellation cost estimation has yet been developed, and as such, quantitative assessment of multiple spacecraft missions has many remaining areas of uncertainty. By incorporating well-established CERs with preliminary approaches to approaching these uncertainties, the CR module offers more complete approach to constellation costing than has previously been available to mission architects or Earth scientists seeking to leverage the capabilities of multiple spacecraft working in support of a common goal.

Science Data Processing↗

The use of activity-based cost estimation as a management tool for cultural change

It will be shown that the greatest barrier to American exploration of the planet Mars is not the development of the technology needed to deliver humans and return them safely to earth. Neither is it the cost of such an undertaking, as has been previously suggested, although certainly, such a venture may not be inexpensive by some measures. The predicted costs of exploration have discouraged serious political dialog on the subject. And, in fact, even optimistic projections of the NASA budget do not contain the resources required, under the existing development and management paradigm, for human space exploration programs. It will be demonstrated that the perception of the costs of such a venture, and the cultural responses to the perceptions are factors inhibiting American exploration of the moon and the planet Mars. Cost models employed in the aerospace industry today correctly mirror the history of past space programs, and as such, are representative of the existing management and development paradigms. However, if, under this current paradigm no major exploration programs are feasible, then cost analysis methods based in the past may not have great utility in exploring the needed cultural changes. This paper explores the use of a new type of model, the activity based cost model, which will treat management style as an input variable, in a sense providing a tool whereby a complete, affordable program might be designed, including both the technological and management aspects.

Mandell, Humboldt↗

NASA Air Force Cost Model (NAFCOM): Capabilities and Results

NAFCOM is a parametric estimating tool for space hardware. Uses cost estimating relationships (CERs) which correlate historical costs to mission characteristics to predict new project costs. It is based on historical NASA and Air Force space projects. It is intended to be used in the very early phases of a development project. NAFCOM can be used at the subsystem or component levels and estimates development and production costs. NAFCOM is applicable to various types of missions (crewed spacecraft, uncrewed spacecraft, and launch vehicles). There are two versions of the model: a government version that is restricted and a contractor releasable version.

McAfee, Julie↗

Optimal selection of space transportation fleet to meet multi-mission space program needs

A space program that spans several decades will be comprised of a collection of missions such as low earth orbital space station, a polar platform, geosynchronous space station, lunar base, Mars astronaut mission, and Mars base. The optimal selection of a fleet of several recoverable and expendable launch vehicles, upper stages, and interplanetary spacecraft necessary to logistically establish and support these space missions can be examined by means of a linear integer programming optimization model. Such a selection must be made because the economies of scale which comes from producing large quantities of a few standard vehicle types, rather than many, will be needed to provide learning curve effects to reduce the overall cost of space transportation if these future missions are to be affordable. Optimization model inputs come from data and from vehicle designs. Each launch vehicle currently in existence has a launch history, giving rise to statistical estimates of launch reliability. For future, not-yet-developed launch vehicles, theoretical reliabilities corresponding to the maturity of the launch vehicles' technology and the degree of design redundancy must be estimated. Also, each such launch vehicle has a certain historical or estimated development cost, tooling cost, and a variable cost. The cost of a launch used in this paper includes the variable cost plus an amortized portion of the fixed and development costs. The integer linear programming model will have several constraint equations based on assumptions of mission mass requirements, volume requirements, and number of astronauts needed. The model will minimize launch vehicle logistic support cost and will select the most desirable launch vehicle fleet.

Morgenthaler, George W.↗

Software Development Cost Estimation Executive Summary

Identify simple fully validated cost models that provide estimation uncertainty with cost estimate. Based on COCOMO variable set. Use machine learning techniques to determine: a) Minimum number of cost drivers required for NASA domain based cost models; b) Minimum number of data records required and c) Estimation Uncertainty. Build a repository of software cost estimation information. Coordinating tool development and data collection with: a) Tasks funded by PA&E Cost Analysis; b) IV&V Effort Estimation Task and c) NASA SEPG activities.

data mining↗

A Life-Cycle Cost Estimating Methodology for NASA-Developed Air Traffic Control Decision Support Tools

This paper describes the development of a life-cycle cost (LCC) estimating methodology for air traffic control Decision Support Tools (DSTs) under development by the National Aeronautics and Space Administration (NASA), using a combination of parametric, analogy, and expert opinion methods. There is no one standard methodology and technique that is used by NASA or by the Federal Aviation Administration (FAA) for LCC estimation of prospective Decision Support Tools. Some of the frequently used methodologies include bottom-up, analogy, top-down, parametric, expert judgement, and Parkinson's Law. The developed LCC estimating methodology can be visualized as a three-dimensional matrix where the three axes represent coverage, estimation, and timing. This paper focuses on the three characteristics of this methodology that correspond to the three axes.

Wang, Jianzhong Jay↗

Estimating Software-Development Costs With Greater Accuracy

COCOMOST is a computer program for use in estimating software development costs. The goal in the development of COCOMOST was to increase estimation accuracy in three ways: (1) develop a set of sensitivity software tools that return not only estimates of costs but also the estimation error; (2) using the sensitivity software tools, precisely define the quantities of data needed to adequately tune cost estimation models; and (3) build a repository of software-cost-estimation information that NASA managers can retrieve to improve the estimates of costs of developing software for their project. COCOMOST implements a methodology, called '2cee', in which a unique combination of well-known pre-existing data-mining and software-development- effort-estimation techniques are used to increase the accuracy of estimates. COCOMOST utilizes multiple models to analyze historical data pertaining to software-development projects and performs an exhaustive data-mining search over the space of model parameters to improve the performances of effort-estimation models. Thus, it is possible to both calibrate and generate estimates at the same time. COCOMOST is written in the C language for execution in the UNIX operating system.

Baker, Dan↗

Automated Estimation Of Software-Development Costs

COSTMODL is automated software development-estimation tool. Yields significant reduction in risk of cost overruns and failed projects. Accepts description of software product developed and computes estimates of effort required to produce it, calendar schedule required, and distribution of effort and staffing as function of defined set of development life-cycle phases. Written for IBM PC(R)-compatible computers.

Roush, George B.↗

Price and cost estimation

Price and Cost Estimating Program (PACE II) was developed to prepare man-hour and material cost estimates. Versatile and flexible tool significantly reduces computation time and errors and reduces typing and reproduction time involved in preparation of cost estimates.

Stewart, R. D.↗

Technology Estimating 2: A Process to Determine the Cost and Schedule of Space Technology Research and Development

As a leader in space technology research and development, NASA is continuing in the development of the Technology Estimating process, initiated in 2012, for estimating the cost and schedule of low maturity technology research and development, where the Technology Readiness Level is less than TRL 6. NASA' s Technology Roadmap areas consist of 14 technology areas. The focus of this continuing Technology Estimating effort included four Technology Areas (TA): TA3 Space Power and Energy Storage, TA4 Robotics, TA8 Instruments, and TA12 Materials, to confine the research to the most abundant data pool. This research report continues the development of technology estimating efforts completed during 2013-2014, and addresses the refinement of parameters selected and recommended for use in the estimating process, where the parameters developed are applicable to Cost Estimating Relationships (CERs) used in the parametric cost estimating analysis. This research addresses the architecture for administration of the Technology Cost and Scheduling Estimating tool, the parameters suggested for computer software adjunct to any technology area, and the identification of gaps in the Technology Estimating process.

Cole, Stuart K.↗

The Evolution of Team-X: 25 Years of Concurrent Engineering Design Experience

Established in 1995 in response to NASA’s “Faster, Better, Cheaper” era, Team-X was born from a need to perform rapid space mission design for principal investigator-led competed proposals. The success and sustainability of Team-X over the 25 years that have followed is directly attributable to the Team-X business model and its evolution over time. While dozens of organizations and institutions have emulated the Team-X design process, there are nuances to the Team-X business model that are unique to JPL, and explain why it is different than other concurrent design teams. One of the key components of a business model is the customer segments that are served. Team-X was founded to conduct the Pre-Phase A work necessary to formulate a portfolio of multiple planetary mission concepts, but has since expanded to include the capability to conduct studies for Earth science, astrophysics, and heliophysics missions as well as Human Exploration and Operations missions and space technology development. Team-X delivers value to its clients both in terms of speed and cost. Team-X has also added value by creating teams to enable the development of Instrument and SmallSat Concepts. Value has further been enhanced through a revision of its process for reviews and the addition of pre-design architecting capabilities. Other aspects of the Team-X infrastructure, in addition to study process, have enabled it to succeed for over a quarter century. From our most important resource, the people, our tools, especially for cost estimating, as well as our increasing capable IT infrastructure have contributed to our capability to meet the demands of our clients. The Team-X business model and its evolution over time, position it well for success in the decades to come.

Murphy, Jonathan↗