Search NASA⌕ Search

SEARCH · Search NASA

Results for “cost of installing charging stations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

26 records · Page 2

Dynamic Charging Rendezvous and Motion Planning for a Multi-AGV Team Including a Mobile Charging Host

Teams of automated battery-powered electric vehicles have the potential to execute complex mission tasks in off-road environments for agriculture, military, and other applications. Limited onboard energy reserves hinder their adoption in large-scale resource-constrained environments, where recharging is a necessity. It may be infeasible to install a network of static charging stations in off-road environments. For this reason, dedicated mobile host vehicles with charging capabilities are proposed as a means to increase range and capabilities of the multivehicle team. Here, in this study, we consider an ad hoc planning framework, where results from a high-confidence trajectory planner are leveraged to plan charging rendezvous between a host and other worker vehicles in a receding horizon fashion to provide high confidence that energy reserves will not be prematurely exhausted. The core problem is posed so as to minimize the impact of recharging on the mission in terms of task delays, overall energy utilization, and costs of fast charging. Through extensive Monte Carlo simulations of an off-road mission, we show a decrease in task delays without substantial increases in energy needs by updating the charging rendezvous plan during the mission. However, if updates are made too often, model mismatch may cause unnecessary cycling and mission failure.

Energy constraints↗

Extreme-scale EV charging infrastructure planning for last-mile delivery using high-performance parallel computing

Here, this paper addresses stochastic charger location and allocation problems under queue congestion for last-mile delivery using electric vehicles (EVs). The objective is to decide where to open charging stations and how many chargers of each type to install, subject to budgetary and waiting-time constraints. We formulate the problem as a mixed-integer non-linear program, where each station-charger pair is modeled as a multiserver queue with stochastic arrivals and service times to capture the notion of waiting in fleet operations. The model is extremely large, with billions of variables and constraints for a typical metropolitan area; even loading the model in solver memory is difficult, let alone solving it. To address this challenge, we develop a Lagrangian-based dual decomposition framework that decomposes the problem by station and leverages parallelization on high-performance computing systems, where the subproblems are solved by using a cutting plane method and their solutions are collected at the master level. We also develop a three-step rounding heuristic to transform the fractional subproblem solutions into feasible integral solutions. Computational experiments on data from the Chicago metropolitan area with hundreds of thousands of households and thousands of candidate stations show that our approach produces high-quality solutions in cases where existing exact methods cannot even load the model in memory. We also analyze various policy scenarios, demonstrating that combining existing depots with newly built stations under multiagency collaboration substantially reduces costs and congestion. These findings offer a scalable and efficient framework for developing sustainable large-scale EV charging networks.

Capacity allocation↗

There's No Place Like Home: Residential Parking, Electrical Access, and Implications for the Future of Electric Vehicle Charging Infrastructure

In March 2021, the cumulative sale of plug-in electric vehicles (PEVs), including plug-in hybrid electric vehicles (PHEV) and battery electric vehicles (BEV), reached 1.8 million in the United States (Argonne National Laboratory 2021). However, PEV adoption is still in its infancy; its market share has just reached around 3% of new light-duty vehicle (LDV) sales by the end of 2020 (Alliance for Automotive Innovation 2021). Current trends suggest that PEV market share in the United States is increasing. The U.S. Energy Information Administration's (EIA's) 2020 Annual Energy Outlook forecasts PEV registrations to exceed 8 million vehicles by 2030 (AEO 2020). PEV adoption is expected to be led by states that are regulating the sale of zero emission vehicles (ZEVs) (California Air Resources Board). California continues to push for more aggressive ZEV regulations; the state recently issued an executive order aimed at 100% of LDV sales being ZEVs by 2035 (Office of Governor Newsom). At the federal level, the Biden administration has shown great ambition in encouraging broader electric vehicle (EV) adoption, including setting the goal of installing 500,000 new chargers nationwide (The White House 2021). Access to charging infrastructure is consistently cited as one of the primary barriers to the increased sale of PHEVs and BEVs (Carley et al. 2019). In the United States, PEV charging options are often described using a pyramid structure, with residential charging as the foundation, workplace charging in the middle, and public charging on top (Figure 1). The existing electricity system, which generates, transmits, and distributes electric fuel to residential households, has helped PEVs partially overcome the "chicken and egg" conundrum that has haunted other alternative fuels. Viable home access to electric charging is also an important equity issue, because non-residential PEV charging options (e.g., workplace or public charging stations) are generally more expensive. Households without residential charging access may experience higher total cost of PEV ownership if non-residential charging options are more costly.

33 ADVANCED PROPULSION SYSTEMS↗

Federal Workplace Charging Program Guide

The 2015 Fixing America's Surface Transportation (FAST) Act authorizes the installation, operation, and maintenance of electric vehicle supply equipment (EVSE) for the purpose of recharging employees' privately owned vehicles (POVs) under the custody or control of the General Services Administration (GSA) or a Federal agency. It requires the collection of fees to recover the costs of installing, operating, and maintaining this equipment and imposes reporting requirements. This program guide reviews those requirements, excerpts the relevant language in Appendix A, and describes when and how fees may be required to cover costs of electricity, network costs, EVSE units, and installations in various scenarios. This program guide is designed to support Federal agencies developing and refining workplace charging programs for employee POVs. While it provides guidance and best practices, it does not replace agencywide policies or agency-specific legal counsel. It contains a roadmap for agency workplace charging programs and defines roles and responsibilities. This guide explains how to determine the number of POVs likely to charge at a given site and contains a sample employee survey in Appendix B. It reviews EVSE planning, including unit selection and acquisition, charger location(s), accounting for available power capacity, using existing infrastructure, and funding an incentive program. It also discusses the costs associated with EVSE acquisition, installation, and network management. These costs inform the subsequently provided information, which describes how to amortize costs to determine appropriate fees for each charging session. The final two sections of this guide address aspects of ongoing program management that the facility coordinator should consider and the reporting requirements associated with the FAST Act. The insights in this guide are applicable to all agency-owned and GSA-leased buildings or facilities offering the use of EVSE or a 120-volt receptacle for the purpose of recharging an employee's POV. However, the FAST Act requirements typically do not apply to any building or facility operated and maintained by a third-party vendor offering the use of EVSE as part of a commercial building lease unless the agency is managing the station and/or energy on behalf of the building and collecting POV fees.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Improving the Freight Productivity of a Heavy-Duty, Battery Electric Truck by Intelligent Energy Management

This project aimed to enhance the range and reduce the operating costs of battery electric Class 8 trucks traveling over 250 miles daily. This was achieved through the development and implementation of an intelligent-Energy Management System (i-EMS) that leverages vehicle and operations data, physics-aware machine learning algorithms, and vehicle-to-cloud (V2C) connectivity. The project hypothesized that advanced machine learning algorithms and real-time data analytics could significantly improve the energy efficiency and range of these trucks. Key objectives included developing a physics-aware machine learning algorithm, implementing an i-EMS with V2C connectivity and physics-aware spatial data analytics (PSDA), and validating the system’s effectiveness with fleet partners HEB Companies and Murphy Logistics. Extensive data collection from vehicle operations, including vehicle characteristics, road conditions, and payload, was conducted. A machine learning algorithm was developed to predict energy consumption and enable proactive decision-making. The i-EMS was implemented on two Volvo VNR BEVs, with operators receiving charging and routing recommendations. Charging stations were installed at depot locations in Texas and Minnesota, with an additional on-route charger in Minnesota. Significant findings included a 14% range improvement for Murphy Logistics on a highway-driving eco-route and a 22% range improvement for HEB Companies on a city-driving eco-route. The i-EMS utilized rule-based methods and physics-based algorithms to predict and reduce energy consumption, with real-time monitoring and analysis through V2C connectivity enabling proactive decision-making. The project demonstrated the feasibility and economic viability of battery electric Class 8 trucks for long-haul operations, showcasing the potential of physics-aware machine learning in optimizing energy management. The successful implementation of the i-EMS in real-world scenarios validates its practical application and effectiveness, paving the way for the widespread adoption of battery electric vehicles in the freight transportation industry.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Foundations of an Electric Mobility Strategy for the City of Mexicali

The Foundations of an Electric Mobility Strategy for the city of Mexicali aligns with numerous energy, environmental, and transport plans and will help Mexicali meet multiple related goals. Mexicali’s energy mix, with 28% renewables, already enables plugin electric vehicles (PEVs) to reduce the mass of greenhouse gases (GHGs) per km driven 2/3 below that of their conventional counterparts. This GHG benefit will increase should Mexicali take steps to further increase their share of renewables in their electricity supply. Beyond increasing renewables, Mexicali could possibly deploy PEVs so that electric load is added in the right location (depending on further analysis of substations and feeders) and at the right time (between 21:00 and 11:00) in order to minimize grid upgrade costs. There are a handful of charge timing control mechanisms –at various stages of development– that Mexicali could implement. Transport electrification can facilitate mass transit by powering buses, trains, and small vehicles that get people from their homes or work to the transit stations and vice versa. Mexicali could utilize fleets as early PEV adopters in order to gain acceptance and add electric vehicle supply equipment (EVSE). Recommended prioritization of different types of fleets are suggested in this report: transit buses, school buses, airport ground support equipment (GSE), refuse trucks, taxis, shuttle buses, campus vehicles, delivery trucks, utility trucks, and finally semitrailers. There are a handful of policy options that Mexicali could use to incentivize fleets to purchase PEVs, including mandates, economic incentives, energy performance contracts, waivers to access restrictions, electricity discounts, and EVSE requirements in building codes. Mexicali’s taxi fleet was an early adopter of PEVs and had experienced some challenges—mostly related to the insufficient range of the taxis due to hot weather. In this report, we strategize ways to extend the range of the current electric taxis, including ways to make charging more convenient to the drivers, and more suggestions for appropriate vehicles to purchase in the future. This report also includes the groundwork of geotracking Mexicali’s taxi fleet so that more detailed recommendations can be made in the future. Once fleets have increased PEV acceptance and EVSE installations, the market will be ready to expand to private vehicle owners. In order to do this, more EVSE needs to be installed in the right locations. This mobility strategy lays out general local areas where EVSE could be well utilized, based on traffic patterns, land use, and demographic data. Mexicali could approach businesses within these areas that would likely make suitable hosts, based on how well they can profit from the additional business that EVSE would bring. Mexicali could then adopt a series of purchase incentives (including sales tax waivers or access to high-occupancy vehicles [HOV] lanes) that would encourage private vehicle owners to purchase PEVs. Purchase incentives run the risk of creating equity issues, which can be countered by promoting electrification in mass transit, creating more HOV lanes that have PEV exemptions, and installing EVSEs in underserved communities. Private PEV ownership will require a set of experts that Mexicali can help train, including PEV repair technicians, EVSE installation electricians, and first responders.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Optimized V1G and V2G Electric Vehicle Fleet Management and Grid Transaction at Marine Corps Air Station Miramar in San Diego, CA

The overall technical goal of the project was to demonstrate an all-electric bi-directional non-tactical fleet at Marine Corps Air Station (MCAS) Miramar that was integrated and controlled with other distributed energy resources (DERs) (i.e., PV, stationary battery, and building loads) to provide resilience to critical electric loads in the event of grid outages, to minimize charging costs, and to provide economic energy resources to electricity markets. In this project, the specific, technical objectives were: 1. Demonstrate that bi-directional electric vehicles can provide critical complementary services to fixed storage batteries in microgrid applications while performing function as non-tactical vehicles. 2. Demonstrate participation of bi-directional (V2G) and unidirectional (V1G) PEVs for demand management and minimization of charging costs. 3. Demonstrate integration of multiple DERs for grid service participation. US Marine Corps Air Station (MCAS) Miramar in San Diego was the site of this electric vehicle-to-microgrid-utility grid test and demonstration project. Existing microgrid assets in this study included (1) a public works building; (2) a 30-kW rooftop photovoltaic (PV) system and (3) a separate 250 kW carport PV system. In this project, six bi-directional V2G vans were located at the MCAS Miramar’s showcase building-scale microgrid to develop and test technical capabilities that V2G can provide in microgrid applications (e.g., cost reduction and resiliency). These resources provided aggregated demand management and simulated participation in current retail DR programs. The vehicles used in this demonstration were selected because they provided functionality that MCAS Miramar needed, 15 passenger transport and facilities work cargo carrying capacity, and bi-directional charging capability that the research project required. All vehicles in this study were manufactured and distributed by VIA Motors, Inc. There were six vehicles total and each was VIA’s VTRUX eREV V2G model, a modified General Motors Chevrolet 2500 2WD van. Three of the vans were configured as passenger vans and the other three were configured as cargo vans. Each van had an on-board bi-direcrtional inverter/charger, Bel Power Solutions model 350INVCHGT150-120-240-8G nominally rated at +/-15 kW. The VIA van’s charging connector follows the J1772 charging protocol. The bi-directional EVSEs demonstrated in this study were manufactured by Coritech, Inc. Each VGI-80-AC charging station enabled enhanced V2G charging capability to a Clipper Creek CS-100 charging module. The enhanced capabilities included ethernet communication following the SEP2.0 protocol with a distributed energy resource function set and an operator screen displaying real-time SOC, voltage, and current. The VGI-80-AC charging stations are classified as level 2 with a maximum current output of 80 A or effectively 19 kW. The VIA van’s onboard charger limited the charging and discharging power to 15 kW in each direction. A control computer was installed in the EWOC and connected to an existing monitor. The V2G control communication network was a completely stand-alone closed system that did not have any connection to any other networks on the base. A cybersecure remote communication connection was created with a cellular modem, firewall hardware, and a virtual private network configuration.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Investigation of precooling unit design options in hydrogen refueling station for heavy-duty fuel-cell electric vehicles

Precooling gaseous hydrogen fuel to a cold temperature before refueling a heavy-duty (HD) hydrogen fuel cell electric vehicle (HFCEV) is essential to avoid overheating the vehicle tank, as well as achieving a high state of charge (SOC). Because a large volume of hydrogen is dispensed during each fill, the need for a shorter fill time amplifies the need to precool each load for refueling a HFCEV. Thus, the design and operation of a precooling unit (PCU), as well as the associated capital and operating costs, plays a pivotal role in any plans for heavy-duty hydrogen refueling stations. Here, in this paper, we present a thermodynamic and technoeconomic analysis of a PCU in a gaseous hydrogen refueling station (HRS) for HD HFCEVs. By employing Argonne National Laboratory's hydrogen station cost optimization and performance evaluation (H2SCOPE) model, the refueling of 50 kg of hydrogen on-board type IV tank at ambient temperatures of 15–45 °C and varying fill rates is simulated. The required degree of precooling temperature to obtain either 100% or the maximum possible SOC is obtained from the simulation. Additionally, the simulation results demonstrate that the average flow rate of hydrogen is approximately 40% lower than the maximum flow rate during a typical fill; which motivates further evaluation of the instantaneous hydrogen mass flow rate profile and suggests the scope of improving precooling unit design. Accordingly, a hybrid strategy of precooling hydrogen has been proposed to address the cooling load by sizing the refrigeration unit for the average flow rate of hydrogen, while supplementing the above average peak hydrogen flow cooling load through thermal buffering. The combined technique enables the downsizing of the original PCU capacity by 25–40% and demonstrates a potential cost reduction of the PCU by approximately 30%, which translates to an installed cost reduction of ∼$125,000 per dispenser.

25 ENERGY STORAGE↗