Search NASA⌕ Search

SEARCH · Search NASA

Results for “data center air management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Acceptability of Flight Deck-Based Interval Management Crew Procedures

The Interval Management for Near-term Operations Validation of Acceptability (IM-NOVA) experiment was conducted at the National Aeronautics and Space Administration (NASA) Langley Research Center (LaRC) in support of the NASA Next Generation Air Transportation System (NextGen) Airspace Systems Program's Air Traffic Management Technology Demonstration - 1 (ATD-1). ATD-1 is intended to showcase an integrated set of technologies that provide an efficient arrival solution for managing aircraft using NextGen surveillance, navigation, procedures, and automation for both airborne and ground-based systems. The goal of the IM-NOVA experiment was to assess if procedures outlined by the ATD-1 Concept of Operations, when used with a minimum set of Flight deck-based Interval Management (FIM) equipment and a prototype crew interface, were acceptable to and feasible for use by flight crews in a voice communications environment. To investigate an integrated arrival solution using ground-based air traffic control tools and aircraft automatic dependent surveillance broadcast (ADS-B) tools, the LaRC FIM system and the Traffic Management Advisor with Terminal Metering and Controller Managed Spacing tools developed at the NASA Ames Research Center (ARC) were integrated in LaRC's Air Traffic Operations Laboratory. Data were collected from 10 crews of current, qualified 757/767 pilots asked to fly a high-fidelity, fixed based simulator during scenarios conducted within an airspace environment modeled on the Dallas-Fort Worth (DFW) Terminal Radar Approach Control area. The aircraft simulator was equipped with the Airborne Spacing for Terminal Area Routes algorithm and a FIM crew interface consisting of electronic flight bags and ADS-B guidance displays. Researchers used "pseudo-pilot" stations to control 24 simulated aircraft that provided multiple air traffic flows into DFW, and recently retired DFW air traffic controllers served as confederate Center, Feeder, Final, and Tower controllers. Pilot participant feedback indicated that the procedures used by flight crews to receive and execute interval management (IM) clearances in a voice communications environment were logical, easy to follow, did not contain any missing or extraneous steps, and required the use of an acceptable level of workload. The majority of the pilot participants found the IM concept, in addition to the proposed FIM crew procedures, to be acceptable and indicated that the ATD-1 procedures can be successfully executed in a near-term NextGen environment.

Murdock, Jennifer L.↗

Integrating the Base of Aircraft Data (BADA) in CTAS Trajectory Synthesizer

The Center-Terminal Radar Approach Control (TRACON) Automation System (CTAS), developed at NASA Ames Research Center for assisting controllers in the management and control of air traffic in the extended terminal area, supports the modeling of more than four hundred aircraft types. However, 90% of them are supported indirectly by mapping them to one of a relatively few aircraft types for which CTAS has detailed drag and engine thrust models. On the other hand, the Base of Aircraft Data (BADA), developed and maintained by Eurocontrol, supports more than 300 aircraft types, about one third of which are directly supported, i.e. they have validated performance data. All these data were made available for CTAS by integrating BADA version 3.8 into CTAS Trajectory Synthesizer (TS). Several validation tools were developed and used to validate the integrated code and to evaluate the accuracy of trajectory predictions generated using CTAS "native" and BADA Aircraft Performance Models (APM) comparing them with radar track data. Results of these comparisons indicate that the two models have different strengths and weaknesses. The BADA APM can improve the accuracy of CTAS predictions at least for some aircraft types, especially small aircraft, and for some flight phases, especially climb.

Abramson, Michael↗

Evaluation of Aerosol Data Assimilation and Forecasts in the NASA GEOS Model during the ASIA-AQ Campaign

Fine particulate matter (PM2.5) poses significant risks to human health and the environment by penetrating the lungs and causing respiratory and cardiovascular diseases, making it crucial to understand its sources and behavior for effective air quality management. The Goddard Earth Observing System (GEOS) Forward Processing (FP) system model, operated by the Global Modeling and Assimilation Office (GMAO) at NASA's Goddard Space Flight Center, provides real-time weather and aerosol analyses and forecasts. In addition to meteorological data assimilation, the GEOS-FP system also assimilates aerosol using Moderate Resolution Imaging Spectroradiometer (MODIS) Aerosol Optical Depth (AOD) and Aerosol Robotic Network (AERONET) AOD data. In this study, the aerosol data assimilation and forecasts performance of the GEOS-FP model were evaluated for predicting PM2.5 in Korea using observations from the Airborne and Satellite Investigation of Asian Air Quality (ASIA-AQ) campaign. The ASIA-AQ campaign, an international collaborative field study initiative, aims to enhance understanding of local air quality issues and address common challenges in interpreting satellite data and air quality modeling. Conducted in South Korea from February 15 to March 13, 2024, during the high PM2.5 concentration winter season, this campaign provided extensive airborne and ground observations for intensive analysis of PM2.5 model simulations. We demonstrate how the assimilation runs and the forecasting performance of PM2.5 at 24-hour and 48-hour intervals vary. Additionally, we analyzed the differences and characteristics of PM2.5 composition in cases of long-range transport and local emissions. Using ASIA-AQ airborne data, we also examined the vertical profile of fine particulate matter. Through the intensive observations of this campaign, the GEOS model was assessed over South Korea using both in situ and airborne measurements to establish a baseline and identify priorities for future development.

Seunghee Lee↗

ATD-2 Benefits Mechanism

NASA has been developing and demonstrating a suite of decision support capabilities for integrated arrival, departure, and surface (IADS) operations in a metroplex environment. The effort is being made in three phases, under NASA’s Airspace Technology Demonstration 2 (ATD-2) sub-project, through a close partnership with the Federal Aviation Administration (FAA), air carriers, airport, and general aviation community. The Phase 1 Baseline IADS capabilities provide enhanced operational efficiency and predictability of flight operations through data exchange and integration, tactical surface metering, and automated coordination of release time of controlled flights for overhead stream insertion. The Phase 2 Fused IADS capabilities include the fusion of strategic and tactical surface metering, Atlanta Center airspace tactical scheduling, Electronic Flight Data (EFD) integration, Terminal Flight Data Manager (TFDM) Terminal Publication (TTP) prototype, and Mobile App for General Aviation (GA) community. In the Phase 2 field evaluation, strategic surface metering provides advance notice of metering and additional stability to the assigned gate holds. The users of the IADS system in Phases 1 and 2 include the personnel at Charlotte Douglas International Airport (CLT) air traffic control tower, American Airlines ramp tower, CLT terminal radar approach control (TRACON), and Washington and Atlanta Center. This document describes the ATD-2 benefits mechanism used to assess the Phases 1 and 2 IADS capabilities and field evaluation conducted at CLT since September 2017. The ATD-2 benefits mechanism mainly consists of surface metering and overhead stream insertion. This document provides detailed calculation methods of major benefit metrics, such as fuel savings, gas emissions savings, and engine runtime reduction, which can be obtained through surface metering, gate hold of Approval Request (APREQ) flights prior to pushback, and the renegotiation of release time while taxiing. As of March 31, 2020, it is estimated that 5,075,981 pounds of fuel savings and 15,634,022 pounds of CO2 emission reduction have been achieved so far, with a reduction of 3,832 hours in total engine runtime. The amount of CO2 savings is estimated to be equivalent to planting 116,254 urban trees. The pre- and post-metering comparison results using FAA’s Aviation System Performance Metrics (ASPM) data have also shown that the surface metering had no negative impact on the on-time arrival performance of both outbound and inbound flights at CLT.

ATD-2↗

ATD-2 Benefits Mechanism

NASA has been developing and demonstrating a suite of decision support capabilities for integrated arrival, departure, and surface (IADS) operations in a metroplex environment. The effort is being made in three phases, under NASA’s Airspace Technology Demonstration 2 (ATD-2) sub-project, through a close partnership with the Federal Aviation Administration (FAA), air carriers, airport, and general aviation community. The Phase 1 Baseline IADS capabilities provide enhanced operational efficiency and predictability of flight operations through data exchange and integration, tactical surface metering, and automated coordination of release time of controlled flights for overhead stream insertion. The Phase 2 Fused IADS capabilities include the fusion of strategic and tactical surface metering, Atlanta Center airspace tactical scheduling, Electronic Flight Data (EFD) integration, Terminal Flight Data Manager (TFDM) Terminal Publication (TTP) prototype, and Mobile App for General Aviation (GA) community. In the Phase 2 field evaluation, strategic surface metering provides advance notice of metering and additional stability to the assigned gate holds. The users of the IADS system in Phases 1 and 2 include the personnel at Charlotte Douglas International Airport (CLT) air traffic control tower, American Airlines ramp tower, CLT terminal radar approach control (TRACON), and Washington and Atlanta Center. This document describes the ATD-2 benefits mechanism used to assess the Phases 1 and 2 IADS capabilities and field evaluation conducted at CLT since September 2017. The ATD-2 benefits mechanism mainly consists of surface metering and overhead stream insertion. This document provides detailed calculation methods of major benefit metrics, such as fuel savings, gas emissions savings, and engine runtime reduction, which can be obtained through surface metering, gate hold of Approval Request (APREQ) flights prior to pushback, and the renegotiation of release time while taxiing. As of April 30, 2020, it is estimated that 5,097,173 pounds of fuel savings and 15,699,292 pounds of CO2 emission reduction have been achieved so far, with a reduction of 3,831 hours in total engine runtime. The amount of CO2 savings is estimated to be equivalent to planting 116,739 urban trees. The pre- and post-metering comparison results using FAA’s Aviation System Performance Metrics (ASPM) data have also shown that the surface metering had no negative impact on the on-time arrival performance of both outbound and inbound flights at CLT.

ATD-2↗

Human-Centered Technologies and Procedures for Future Air Traffic Management: A Preliminary Overview of 1996 Studies and Results

In this project, we have been exploring the use of a general methodology to predict the impact of future Air Traffic Management (ATM) concepts and technologies. In applying this methodology, our emphasis has been on the importance of modeling coordination and cooperation among the multiple agents within this system, and on understanding how the interactions among these agents will be influenced as new roles, responsibilities, procedures and technologies are introduced. To accomplish this, we have been collecting data on performance under the current air traffic management system, trying to identify critical problem areas and looking for exemplars suggestive of general approaches for solving such problems. Based on the results of these field studies, we have developed a set of scenarios centered around potential future system designs, and have conducted studies using these scenarios involving a total 40 controllers, dispatchers, pilots and traffic managers. The purpose of this report is to provide NASA with an early summary of the major recommendations that have resulted from our research under the AATT Program thus far. Recommendations 1-3 deal with general approaches that our findings suggest should be incorporated in future AATT Program activities, while Recommendations 4-11 identify some specific topics and technologies that merit research and development activities. Detailed technical reports containing supporting data, as well as the results of our still ongoing analyses, will be provided at a later date. The remainder of this report is organized as follows. Section 1 briefly describes the general design philosophy supported by our empirical studies. Section 2 presents the research methods we have used for identifying requirements for future system designs and for evaluating alternative design solutions. Section 3 discusses preliminary results from an initial set of investigations that we have conducted using these research methods. Section 4 then provides an overall summary. An outline of the rest of this preliminary project summary is provided on the following page.

Smith, Philip↗

Human-Centered Technologies and Procedures for Future Air Traffic Management

The use of various methodologies to predict the impact of future Air Traffic Management (ATM) concepts and technologies is explored. The emphasis has been on the importance of modeling coordination and cooperation among multiple agents within this system, and on understanding how the interactions among these agents will be influenced as new roles, responsibilities, procedures and technologies are introduced. To accomplish this, we have been collecting data on performance under the current air traffic management system, identifying critical problem areas and looking for examples suggestive of general approaches for solving such problems. Using the results of these field studies, we have developed a set of concrete scenarios centered around future designs, and have studied performance in these scenarios with a set of 40 controllers, dispatchers, pilots and traffic managers.

Smith, Philip↗

Air-ground information transfer in the National Airspace System

This paper reviews NASA's Aviation Safety Reporting System incident data for a two-year period in order to identify the frequency of air-ground information transfer errors and the factors associated with their occurrence. Of the more than 14,000 primary reports received during the 1985 and 1986 reporting period, one out of four reports concerned problems of information transfer between aircraft and ATC. Approximately half of these errors were associated directly or indirectly with aircraft deviations from assigned heading or altitude. The majority of incidents cited some human-system problem such as workload, cockpit distractions, etc., as the primary contributing factor. Improvements in air-ground information transfer using existing and future (e.g., data link) technology are proposed centering on the development and application of user-centered information management principles.

Lee, Alfred T.↗

Data Mining for Understanding and Improving Decision-making Affecting Ground Delay Programs

The continuous growth in the demand for air transportation results in an imbalance between airspace capacity and traffic demand. The airspace capacity of a region depends on the ability of the system to maintain safe separation between aircraft in the region. In addition to growing demand, the airspace capacity is severely limited by convective weather. During such conditions, traffic managers at the FAA's Air Traffic Control System Command Center (ATCSCC) and dispatchers at various Airlines' Operations Center (AOC) collaborate to mitigate the demand-capacity imbalance caused by weather. The end result is the implementation of a set of Traffic Flow Management (TFM) initiatives such as ground delay programs, reroute advisories, flow metering, and ground stops. Data Mining is the automated process of analyzing large sets of data and then extracting patterns in the data. Data mining tools are capable of predicting behaviors and future trends, allowing an organization to benefit from past experience in making knowledge-driven decisions.

Weather↗

A Frequency Analysis Approach for Categorizing Air Traffic Behavior

A method of analyzing National Air Space (NAS) air traffic that uses the Discrete Fourier Transform (DFT) is presented. The DFT is used to transform time domain traffic count data into the frequency domain where the sources of traffic in air spaces can be identified and characterized more easily. It is shown in simulation that individual traffic flows within Air Route Traffic Control Centers can be distinguished by their periodicity in the DFT plot. Next, three Traffic Management Initiatives (playbook rerouting, metered flows, and Ground Delay Programs) are implemented in simulations and their signature effects on the traffic are identified using the DFT. Finally, historical flight data is studied and the DFT is applied to sector traffic count data. It is found that in many cases, variations in traffic due to rerouting and convective weather disturbances are better highlighted in the frequency domain than in the original time domain data. Initial results of the DFT show it has potential as a tool for measuring and/or predicting NAS behavior for daily tactical planning and control purposes.

fourier transform↗

Generic Airspace Concepts and Research

The purpose of this study was to evaluate methods for reducing the training and memorization required to manage air traffic in mid-term, Next Generation Air Transportation System (NextGen) airspace. We contrasted the performance of controllers using a sector information display and NextGen automation tools while working with familiar and unfamiliar sectors. The airspace included five sectors from Oakland and Salt Lake City Centers configured as a "generic center" called "West High Center." The Controller Information Tool was used to present essential information for managing these sectors. The Multi Aircraft Control System air traffic control simulator provided data link and conflict detection and resolution. There were five experienced air traffic controller participants. Each was familiar with one or two of the five sectors, but not the others. The participants rotated through all five sectors during the ten data collection runs. The results addressing workload, traffic management, and safety, as well as controller and observer comments, supported the generic sector concept. The unfamiliar sectors were comparable to the familiar sectors on all relevant measures.

Mogford, Richard H.↗

Airspace Technology Demonstration 2 (ATD-2) Phase 1 Concept of Use (ConUse)

This document presents an operational Concept of Use (ConUse) for the Phase 1 Baseline Integrated Arrival, Departure, and Surface (IADS) prototype system of NASA's Airspace Technology Demonstration 2 (ATD-2) sub-project, which began demonstration in 2017 at Charlotte Douglas International Airport (CLT). NASA is developing the IADS system under the ATD-2 sub-project in coordination with the Federal Aviation Administration (FAA) and aviation industry partners. The primary goal of ATD-2 sub-project is to improve the predictability and the operational efficiency of the air traffic system in metroplex environments, through the enhancement, development, and integration of the nation's most advanced and sophisticated arrival, departure, and surface prediction, scheduling, and management systems. The ATD-2 effort is a five-year research activity through 2020. The initial phase of the ATD-2 sub-project, which is the focus of this document, will demonstrate the Phase 1 Baseline IADS capability at CLT in 2017. The Phase 1 Baseline IADS capabilities of the ATD-2 sub-project consists of: (a) Strategic and tactical surface scheduling to improve efficiency and predictability of airport surface operations, (b) Tactical departure scheduling to enhance merging of departures into overhead traffic streams via accurate predictions of takeoff times and automated coordination between the Airport Traffic Control Tower (ATCT, or Tower) and the Air Route Traffic Control Center (ARTCC, or Center), (c) Improvements in departure surface demand predictions in Time Based Flow Management (TBFM), (d) A prototype Electronic Flight Data (EFD) system provided by the FAA via the Terminal Flight Data Manager (TFDM) early implementation effort, and (e) Improved situational awareness and demand predictions through integration with the Traffic Flow Management System (TFMS), TBFM, and TFDM (3Ts) for electronic data integration and exchange, and an on-screen dashboard displaying pertinent analytics in real-time. The surface scheduling and metering element of the capability is consistent with the Surface CDM Concept of Operations published in 2014 by the FAA Surface Operations Directorate.1 Upon successful demonstration of the Phase 1 Baseline IADS capability, follow-on demonstrations of the matured IADS traffic management capabilities will be conducted in the 2018-2020 timeframe. At the end of each phase of the demonstrations, NASA will transfer the ATD-2 sub-project technology to the FAA and industry partners.

integrated arrival↗

Use of Data Comm by Flight Crew to Conduct Interval Management Operations to Parallel Dependent Runways

The Interval Management (IM) concept is being developed as a method to maintain or increase high traffic density airport arrival throughput while allowing aircraft to conduct near idle thrust descents. The Interval Management with Spacing to Parallel Dependent Runways (IMSPiDR1) experiment at NASA Langley Research Center used 24 commercial pilots to examine IM procedures to conduct parallel dependent runway arrival operations while maintaining safe but efficient intervals behind the preceding aircraft. The use of IM procedures during these operations requires a lengthy and complex clearance from Air Traffic Control (ATC) to the participating aircraft, thereby making the use of Controller Pilot Data Link Communications (CPDLC) highly desirable as the communication method. The use of CPDLC reduces the need for voice transmissions between controllers and flight crew, and enables automated transfer of IM clearance elements into flight management systems or other aircraft avionics. The result is reduced crew workload and an increase in the efficiency of crew procedures. This paper focuses on the subset of data collected related to the use of CPDLC for IM operations into a busy airport. Overall, the experiment and results were very successful, with the mean time under 43 seconds for the flight crew to load the clearance into the IM spacing tool, review the calculated speed, and respond to ATC. An overall mean rating of Moderately Agree was given when the crews were asked if the use of CPDLC was operationally acceptable as simulated in this experiment. Approximately half of the flight crew reported the use of CPDLC below 10,000 for IM operations was unacceptable, with 83% reporting below 5000 was unacceptable. Also described are proposed modifications to the IM operations that may reduce CPDLC Respond time to less than 30 seconds and should significantly reduce the complexity of crew procedures, as well as follow-on research issues for operational use of CPDLC during IM operations.

Baxley, Brian T.↗

Data Mining for Understanding and Impriving Decision-Making Affecting Ground Delay Programs

The continuous growth in the demand for air transportation results in an imbalance between airspace capacity and traffic demand. The airspace capacity of a region depends on the ability of the system to maintain safe separation between aircraft in the region. In addition to growing demand, the airspace capacity is severely limited by convective weather. During such conditions, traffic managers at the FAA's Air Traffic Control System Command Center (ATCSCC) and dispatchers at various Airlines' Operations Center (AOC) collaborate to mitigate the demand-capacity imbalance caused by weather. The end result is the implementation of a set of Traffic Flow Management (TFM) initiatives such as ground delay programs, reroute advisories, flow metering, and ground stops. Data Mining is the automated process of analyzing large sets of data and then extracting patterns in the data. Data mining tools are capable of predicting behaviors and future trends, allowing an organization to benefit from past experience in making knowledge-driven decisions. The work reported in this paper is focused on ground delay programs. Data mining algorithms have the potential to develop associations between weather patterns and the corresponding ground delay program responses. If successful, they can be used to improve and standardize TFM decision resulting in better predictability of traffic flows on days with reliable weather forecasts. The approach here seeks to develop a set of data mining and machine learning models and apply them to historical archives of weather observations and forecasts and TFM initiatives to determine the extent to which the theory can predict and explain the observed traffic flow behaviors.

data mining↗

Evaluation of Technology Concepts for Traffic Data Management and Relevant Audio for Datalink in Commercial Airline Flight Decks

Datalink is currently operational for departure clearances and in oceanic environments and is currently being tested in high altitude domestic enroute airspace. Interaction with even simple datalink clearances may create more workload for flight crews than the voice system they replace if not carefully designed. Datalink may also introduce additional complexity for flight crews with hundreds of uplink messages now defined for use. Finally, flight crews may lose airspace awareness and operationally relevant information that they normally pickup from Air Traffic Control (ATC) voice communications with other aircraft (i.e., “party-line” transmissions). Once again, automation may be poised to increase workload on the flight deck for incremental benefit. Datalink implementation to support future air traffic management concepts needs to be carefully considered, understanding human communication norms and especially, the change from voice- to text-based communications modality and its effect on pilot workload and situation awareness. Increasingly autonomous systems, where autonomy is designed to support human-autonomy teaming, may be suited to solve these issues. NASA is conducting research and development of increasingly autonomous systems, utilizing machine-learning algorithms seamlessly integrated with humans whereby task performance of the combined system is significantly greater than the individual components. Increasingly autonomous systems offer the potential for significantly improved levels of performance and safety that are superior to either human or automation alone. Two increasingly autonomous systems concepts - a traffic data manager and a conversational co-pilot - were developed to intelligently address the datalink issues in a complex, future state environment with significant levels of traffic. The system was tested for suitability of datalink usage for terminal airspace. The traffic data manager allowed for automated declutter of the Automatic Dependent Surveillance-Broadcast (ADS-B) display. The system determined relevant traffic for display based on machine learning algorithms trained by experienced human pilot behaviors. The conversational co-pilot provided relevant audio air traffic control messages based on context and proximity to ownship. Both systems made use of the connected aircraft concepts to provide intelligent context to determine relevancy above and beyond proximity to ownship. A human-in-the-loop test was conducted in NASA Langley Research Center’s Integration Flight Deck B-737-800 simulator to evaluate the traffic data manager and the conversational co-pilot. Twelve airline crews flew various normal and non-normal procedures and their actions and performance were recorded in response to the procedural events. This paper details the flight crew performance and evaluation during the events.

Etherington, Timothy↗

High altitude aircraft remote sensing during the 1988 Yellowstone National Park wildfires

An overview is presented of the effects of the wildfires that occurred in the Yellowstone National Park during 1988 and the techniques employed to combat these fires with the use of remote sensing. The fire management team utilized King-Air and Merlin aircraft flying night missions with a thermal IR line-scanning system. NASA-Ames Research Center assisted with an ER-2 high altitude aircraft with the ability to down-link active data from the aircraft via a teledetection system. The ER-2 was equipped with a multispectral Thematic Mapper Simulator scanner and the resultant map data and video imagery was provided to the fire command personnel for field evaluation and fire suppression activities. This type of information proved very valuable to the fire control management personnel and to the continuing ecological research goals of NASA-Ames scientists analyzing the effects of burn type and severity on ecosystem recovery and development.

Ambrosia, Vincent G.↗

Introduction to Air Traffic Management

The presentation introduces students and faculty to air traffic management with focus on air traffic data for data-science. Starting with the common attributes of transportation systems — highway transportation, air transportation and data transportation, the initial set of slides discuss the purpose of data-science in air traffic management, reasons why air traffic management is challenging, and the multidisciplinary nature of air traffic management research. The history of flight from 1903 — Wright Flyer — to 1987 — formation of the National Air Traffic Controllers Association — is briefly discussed. The national airspace system is described in terms of airports in the U. S., air traffic control facilities (flight service stations, terminal, enroute and system command center), airspace geometry (sectors, airways and navaids), governing regulations and directives, airspace classification (Class A through G), special use airspace, visual flight rules and instrument flight rules. The contents of a flight-plan are described. Weather briefing is discussed. The surveillance equipment used for surface, terminal area and enroute are described, and the aircraft states obtained using the surveillance data are listed. Airline operations control functions — schedule development, flight planning, resource scheduling and flight following — are noted. Next, the roles and responsibilities of air traffic controllers and traffic flow managers are discussed. Separation standards and conflict resolution techniques are outlined. Finally, traffic flow management techniques are reviewed with an illustrative example.

Air Traffic Management↗

Introduction to Air Traffic Management

The presentation introduces students and faculty to air traffic management with focus on air traffic data for data-science. Starting with the common attributes of transportation systems — highway transportation, air transportation and data transportation, the initial set of slides discuss the purpose of data-science in air traffic management, reasons why air traffic management is challenging, and the multidisciplinary nature of air traffic management research. The history of flight from 1903 — Wright Flyer — to 1987 — formation of the National Air Traffic Controllers Association — is briefly discussed. The national airspace system is described in terms of airports in the U. S., air traffic control facilities (flight service stations, terminal, enroute and system command center), airspace geometry (sectors, airways and navaids), governing regulations and directives, airspace classification (Class A through G), special use airspace, visual flight rules and instrument flight rules. The contents of a flight-plan are described. Weather briefing is discussed. The surveillance equipment used for surface, terminal area and enroute are described, and the aircraft states obtained using the surveillance data are listed. Airline operations control functions — schedule development, flight planning, resource scheduling and flight following — are noted. Next, the roles and responsibilities of air traffic controllers and traffic flow managers are discussed. Separation standards and conflict resolution techniques are outlined. Finally, traffic flow management techniques are reviewed with an illustrative example.

Air Traffic Management↗