Search NASA⌕ Search

SEARCH · Search NASA

Results for “day of launch processes”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Space Launch System and Missions to Near Rectilinear Halo Orbits

The first major evolution of NASA’s Space Launch System (SLS) will begin its flights starting in the mid-2020’s. This new configuration, called Block 1B, replaces the Interim Cryogenic Propulsion Stage with a larger Exploration Upper Stage (EUS). The additional capability provided by the new upper stage will allow SLS to send heavier payloads into deep space. One destination of interest to the SLS program is called a Near Rectilinear Halo Orbit (NRHO). This is a type of lunar orbit with multiple advantages for deep space exploration. These benefits include Earth/lunar access, low station-keeping requirements, and high communication potential with Earth. Therefore, it is a leading candidate for the proposed Lunar Orbital Platform-Gateway (LOP-G). This paper will provide a detailed assessment of the SLS Block 1B requirements and capabilities for sending payloads to an NRHO. Analysts at Marshall Space Flight Center are producing a multi-year mission availability scan for the SLS Block 1B configuration to a predefined NRHO orbit. The analysis produces an optimized trajectory for each day of the scan window. A maximized payload and minimized propellant requirement are determined for each day. All maneuvers from launch to the end of the Trans-Lunar-Injection (TLI) are being modeled as finite burns. Injections into an NRHO are being modeled as impulsive maneuvers. The payload element is arbitrary, but includes sufficient mass to represent a large habitat or propulsion module. The resulting parameters of payload capability, delta-v requirements, and launch windows length vary over the course of the scan. Many launch days in the scan are eliminated in post-processing as they violate mission constraints such as payload mass and propellant usage to insert into an NRHO. Based off previous one-year scan results for the SLS Block 1B Design Analysis Cycle 2 (DAC-2), it is expected that there will be one to three days per week where the payload is able to insert into an NRHO within SLS constraints objectives. This scan provides results for longer than one-year, allowing analysts to better understand the launch availability and energy requirements of SLS Block 1B over time. The in-space mission design and scans utilize Copernicus, an n-body trajectory optimization tool originally developed out of the University of Texas at Austin with further development at Johnson Space Center in Houston, TX. To seed the in-space trajectory, Copernicus uses a plugin to call a database of SLS ascent trajectories optimized in the Program to Simulate Optimized Trajectories II (POST2). The ascent trajectories are developed using a framework that parametrizes payload mass and LEO inclination, and targets a 100 nmi (nautical mile) altitude circular parking orbit. Though this analysis is specific to the SLS program, it will provide a summary of mission design benefits and constraints associated with generic NRHO access, and may be applied to other programs or concepts that will utilize this orbit.

Statham, T. L.↗

Study of extraterrestrial disposal of radioactive wastes. Part 2: Preliminary feasibility screening study of extraterrestrial disposal of radioactive wastes in concentrations, matrix materials, and containers designed for storage on earth

The results are reported of a preliminary feasibility screening study for providing long-term solutions to the problems of handling and managing radioactive wastes by extraterrestrial transportation of the wastes. Matrix materials and containers are discussed along with payloads, costs, and destinations for candidate space vehicles. The conclusions reached are: (1) Matrix material such as spray melt can be used without exceeding temperature limits of the matrix. (2) The cost in mills per kw hr electric, of space disposal of fission products is 4, 5, and 28 mills per kw hr for earth escape, solar orbit, and solar escape, respectively. (3) A major factor effecting cost is the earth storage time. Based on a normal operating condition design for solar escape, a storage time of more than sixty years is required to make the space disposal charge less than 10% of the bus-bar electric cost. (4) Based on a 10 year earth storage without further processing, the number of shuttle launches required would exceed one per day.

Hyland, R. E.↗

25 Years of Contamination Control on the James Webb Space Telescope

The James Webb Space Telescope (JWST) has actively been in process since 1996, and at last, on Christmas Day 2021, it launched. This launch was the fulfillment of an astounding level of work performed by thousands of people across the globe in dozens of disciplines. From the start, effective contamination control was considered essential for the JWST mission due to the large, exposed optics and tight sensitivity required to measure first light and faint signals at the dawn of the universe. This paper will present the JWST mission and requirements overview, including mission requirements that led to optimizing performance for collecting light in the Near Infrared (NIR, 0.6μm) – Mid Infrared (MIR, 29μm) range. Molecular films absorb in the IR bands and can alter thermal emissivity, resulting in increased noise at the longer wavelengths (MIRI). Particles increase light scatter and background noise levels at the shorter wavelengths (NIRSpec, NIRCam and FGS). The passively cooled design of JWST led to an open architecture for the optical telescope element (OTE), presenting the challenge of maintaining cleanliness throughout assembly, integration, and test in a multitude of environments. The paper will describe the mission and will introduce the specific areas of contamination control developed and advanced to keep JWST clean at an unsurpassed level of cleanliness.

Contamination Control↗

25 Years of Contamination Control on the James Webb Space Telescope

The James Webb Space Telescope (JWST) has actively been in process since 1996, and at last, on Christmas Day 2021, it launched. This launch was the fulfillment of an astounding level of work performed by thousands of people across the globe in dozens of disciplines. From the start, effective contamination control (CC) was considered essential for the JWST mission due to the large, exposed optics and tight sensitivity required to measure first light and faint signals at the dawn of the universe. This presentation will present the JWST mission and requirements overview, including mission requirements that led to optimizing performance for collecting light in the Near Infrared (NIR, 0.6μm) – Mid Infrared (MIR, 29μm) range. Molecular films absorb in the IR bands and can alter thermal emissivity, resulting in increased noise at the longer wavelengths (MIRI). Particles increase light scatter and background noise levels at the shorter wavelengths (NIRSpec, NIRCam and FGS). The passively cooled design of JWST led to an open architecture for the optical telescope element (OTE), presenting the challenge of maintaining cleanliness throughout assembly, integration, and test in a multitude of environments for over 2 decades. The presentation will describe CC for the mission starting with the first architecture in 1996, then introducing the specific areas of contamination control developed and advanced to keep JWST clean at an unsurpassed level of cleanliness.

Contamination Control↗

Doppler Radar Profiler for Launch Winds at the Kennedy Space Center (Phase 1a)

The NASA Engineering and Safety Center (NESC) received a request from the, NASA Technical Fellow for Flight Mechanics at Langley Research Center (LaRC), to develop a database from multiple Doppler radar wind profiler (DRWP) sources and develop data processing algorithms to construct high temporal resolution DRWP wind profiles for day-of-launch (DOL) vehicle assessment. This document contains the outcome of Phase 1a of the assessment including Findings, Observations, NESC Recommendations, and Lessons Learned.

Murri, Daniel G.↗

Quality-Controlled Wind Data from the Kennedy Space Center 915 Megahertz Doppler Radar Wind Profiler Network

The National Aeronautics and Space Administration s (NASA) Kennedy Space Center (KSC) has installed a five-instrument 915-Megahertz (MHz) Doppler Radar Wind Profiler (DRWP) system that records atmospheric wind profile properties. The purpose of these profilers is to fill data gaps between the top of the KSC wind tower network and the lowest measurement altitude of the KSC 50-MHz DRWP. The 915-MHz DRWP system has the capability to generate three-dimensional wind data outputs from approximately 150 meters (m) to 6,000 m at roughly 15-minute (min) intervals. NASA s long-term objective is to combine the 915-MHz and 50-MHz DRWP systems to create complete vertical wind profiles up to 18,300 m to be used in trajectory and loads analyses of space vehicles and by forecasters on day-of-launch (DOL). This analysis utilizes automated and manual quality control (QC) processes to remove erroneous and unrealistic wind data returned by the 915-MHz DRWP system. The percentage of data affected by each individual QC check in the period of record (POR) (i.e., January to April 2006) was computed, demonstrating the variability in the amount of data affected by the QC processes. The number of complete wind profiles available at given altitude thresholds for each profiler in the POR was calculated and outputted graphically, followed by an assessment of the number of complete wind profiles available for any profiler in the POR. A case study is also provided to demonstrate the QC process on a day of a known weather event.

Dryden, Rachel L.↗

Ground Winds Experienced by the Space Launch System Rocket on the Pad before the Artemis I Launch

Over the course of the development of the Space Launch System (SLS) human-rated heavy-lift launch vehicle, the magnitude and nature of the ground winds experienced by the rocket and its Mobile Launcher (ML) on Pad 39B at the NASA Kennedy Space Center (KSC) became a more critical environment that required characterization as well as a more accurate prediction of the vehicle and ML response in the form of detailed wind loads. The numerous reasons for the sensitivity of the launch system to these ground winds and the growing importance of high fidelity rollout and launch pad wind loading estimates are discussed in this article. A description of the wind measurement instrumentation at and around the Launch Complex is provided. A methodology is developed to estimate from these raw anemometer measurements the winds experienced by the rocket and mobile launcher on the launch pad, either in real time or during post-processing. An analysis is then performed and documented on the 121 days worth of wind measurements recorded while the SLS vehicle was secured on the pad during various launch attempts and wet dress rehearsals. This included the occurrence of a tropical storm that evolved into a named hurricane by the time it arrived on Cape Canaveral and hit the vehicle while sitting on the launch pad. Plans for further developments to improve on this predictive capability in preparation for Artemis II are also presented.

Jeremy T Pinier↗

Ground Winds Experienced by the Space Launch System Rocket on the Pad before the Artemis I Launch

Over the course of the development of the Space Launch System (SLS) human-rated heavy-lift launch vehicle, the magnitude and nature of the ground winds experienced by the rocket and its Mobile Launcher (ML) on Pad 39B at the NASA Kennedy Space Center (KSC) became a more critical environment that required characterization as well as a more accurate prediction of the vehicle and ML response in the form of detailed wind loads. The numerous reasons for the sensitivity of the launch system to these ground winds and the growing importance of high fidelity rollout and launch pad wind loading estimates are discussed in this article. A description of the wind measurement instrumentation at and around the Launch Complex is provided. A methodology is developed to estimate from these raw anemometer measurements the winds experienced by the rocket and mobile launcher on the launch pad, either in real time or during post-processing. An analysis is then performed and documented on the 121 days worth of wind measurements recorded while the SLS vehicle was secured on the pad during various launch attempts and wet dress rehearsals. This included the occurrence of a tropical storm that evolved into a named hurricane by the time it arrived on Cape Canaveral and hit the vehicle while sitting on the launch pad. Plans for further developments to improve on this predictive capability in preparation for Artemis II are also presented.

Jeremy T. Pinier↗

Use of Smoothed Measured Winds to Predict and Assess Launch Environments

Since many of the larger launch vehicles are operated near their design limits during the ascent phase of flight to optimize payload to orbit, it often becomes necessary to verify that the vehicle will remain within certification limits during the ascent phase as part of the go/no-go review made prior to launch. This paper describes the approach used to predict Ares I-X launch vehicle structural air loads and controllability prior to launch which represents a distinct departure from the methodology of the Space Shuttle and Evolved Expendable Launch Vehicle (EELV) programs. Protection for uncertainty of key environment and trajectory parameters is added to the nominal assessment of launch capability to ensure that critical launch trajectory variables would be within the integrated vehicle certification envelopes. This process was applied by the launch team as a key element of the launch day go/no-go recommendation. Pre-launch assessments of vehicle launch capability for NASA's Space Shuttle and the EELV heavy lift versions require the use of a high-resolution wind profile measurements, which have relatively small sample size compared with low-resolution profile databases (which include low-resolution balloons and radar wind profilers). The approach described in this paper has the potential to allow the pre-launch assessment team to use larger samples of wind measurements from low-resolution wind profile databases that will improve the accuracy of pre-launch assessments of launch availability with no degradation of mission assurance or launch safety.

Cordova, Henry S.↗

Quality Control Algorithms and Proposed Integration Process for Wind Profilers Used by Launch Vehicle Systems

Impact of winds to space launch vehicle include Design, Certification Day-of-launch (DOL) steering commands (1)Develop "knockdowns" of load indicators (2) Temporal uncertainty of flight winds. Currently use databases from weather balloons. Includes discrete profiles and profile pair datasets. Issues are : (1)Larger vehicles operate near design limits during ascent 150 discrete profiles per month 110-217 seasonal 2.0 and 3.5-hour pairs Balloon rise time (one hour) and drift (up to 100 n mi) Advantages of the Alternative approach using Doppler Radar Wind Profiler (DRWP) are: (1) Obtain larger sample size (2) Provide flexibility for assessing trajectory changes due to winds (3) Better representation of flight winds.

Decker, Ryan↗

Neocytolysis: physiological down-regulator of red-cell mass

It is usually considered that red-cell mass is controlled by erythropoietin-driven bone marrow red-cell production, and no physiological mechanisms can shorten survival of circulating red cells. In adapting to acute plethora in microgravity, astronauts' red-cell mass falls too rapidly to be explained by diminished red-cell production. Ferrokinetics show no early decline in erythropolesis, but red cells radiolabelled 12 days before launch survive normally. Selective destruction of the youngest circulating red cells-a process we call neocytolysis-is the only plausible explanation. A fall in erythropoietin below a threshold is likely to initiate neocytolysis, probably by influencing surface-adhesion molecules. Recognition of neocytolysis will require re-examination of the pathophysiology and treatment of several blood disorders, including the anaemia of renal disease.

Review, Tutorial↗

Standard Measures During Spaceflight

The key goal of the Spaceflight Standard Measures project is to ensure that a set of measures, representing the Human Research Program’s key risks and acquired with minimal impact on time and resources, is consistently captured from crewmembers through the end of the International Space Station (ISS) Program. Data collected under the Spaceflight Standard Measures project include assessments of sleep/wake cycles, cognition, immune status and function, general blood and urine chemistry (urine is collected only before flight and after landing), microbiome composition (gastrointestinal tract, saliva, and body surface), cardiovascular structure and function (carotid intima-media thickness, orthostatic responses), sensorimotor function, and team processes. Data is collected once or twice before the flight (180 and 90 days before launch), twice during the 6-month missions (fight day 30 and 30 days before return to Earth) with the exception of actigraphy, which is recorded continuously during the mission, and during two-week periods before and after the mission. In this presentation, we will review the data collected to date on twelve ISS crew members. These data are placed in the NASA Life Sciences Data Archive and are available for occupational surveillance (using non-identifiable data) Institutional Review Board-approved data sharing requests, and retrospective data requests. This data repository enables high-level monitoring of the effectiveness of countermeasures and meaningful interpretation of health and performance outcomes for various mission durations. The knowledge gained from this project informs and supports future hypothesis-driven research that will enable the success of planetary missions.

G R Clement↗

Standard Measures During Spaceflight

The goal of the Spaceflight Standard Measures project is to ensure that a set of measures, representing the Human Research Program’s key risks and acquired with minimal impact on time and resources, is consistently captured from crewmembers through the end of the International Space Station (ISS) Program. Data collected under the Spaceflight Standard Measures project include assessments of sleep/wake cycles, cognition, immune status and function, general blood and urine chemistry (urine is collected only before flight and after landing), microbiome composition (gastrointestinal tract, saliva, and body surface), cardiovascular structure and function (carotid intima-media thickness, orthostatic responses), sensorimotor function, sleep quality, and team processes. Data is collected once or twice before the flight (180 and 90 days before launch), twice during the 6-month missions (flight day 30 and 30 days before return to Earth) with the exception of actigraphy, which is recorded during two-week periods before, during, and after the mission. In this presentation, we will review the data collected to date on 31 ISS crewmembers. These data are placed in the NASA Life Sciences Portal (NLSP) and are available for occupational surveillance (using non-identifiable data), Institutional Review Board-approved data sharing requests, and retrospective data requests. This data repository enables high-level monitoring of the effectiveness of countermeasures and meaningful interpretation of health and performance outcomes for various mission durations. The knowledge gained from this project informs and supports future hypothesis-driven research that will enable the success of planetary missions.

G R Clement↗

A Simple, Scalable, Script-based Science Processor

The production of Earth Science data from orbiting spacecraft is an activity that takes place 24 hours a day, 7 days a week. At the Goddard Earth Sciences Distributed Active Archive Center (GES DAAC), this results in as many as 16,000 program executions each day, far too many to be run by human operators. In fact, when the Moderate Resolution Imaging Spectroradiometer (MODIS) was launched aboard the Terra spacecraft in 1999, the automated commercial system for running science processing was able to manage no more than 4,000 executions per day. Consequently, the GES DAAC developed a lightweight system based on the popular Per1 scripting language, named the Simple, Scalable, Script-based Science Processor (S4P). S4P automates science processing, allowing operators to focus on the rare problems occurring from anomalies in data or algorithms. S4P has been reused in several systems ranging from routine processing of MODIS data to data mining and is publicly available from NASA.

Lynnes, Christopher↗

Launch and Assembly Reliability Analysis for Mars Human Space Exploration Missions

NASA s long-range goal is focused upon human exploration of Mars. Missions to Mars will require campaigns of multiple launches to assemble Mars Transfer Vehicles in Earth orbit. Launch campaigns are subject to delays, launch vehicles can fail to place their payloads into the required orbit, and spacecraft may fail during the assembly process or while loitering prior to the Trans-Mars Injection (TMI) burn. Additionally, missions to Mars have constrained departure windows lasting approximately sixty days that repeat approximately every two years. Ensuring high reliability of launching and assembling all required elements in time to support the TMI window will be a key enabler to mission success. This paper describes an integrated methodology for analyzing and improving the reliability of the launch and assembly campaign phase. A discrete event simulation involves several pertinent risk factors including, but not limited to: manufacturing completion; transportation; ground processing; launch countdown; ascent; rendezvous and docking, assembly, and orbital operations leading up to TMI. The model accommodates varying numbers of launches, including the potential for spare launches. Having a spare launch capability provides significant improvement to mission success.

Cates, Grant R.↗

Overview od STS ground operations/orbiter turnaround STS-1 through STS-7

A review of STS-1 processing is presented as a reference for Shuttle processing time and the magnitude of the associated modifications, discrepancies, technical requirements, and ground systems activities. STS-1 processing provided the basis from which a plan to perform operational turnaround was established. Turnaround processing for Launch and Landing are treated separately to depict more clearly the progress made to reduce turnaround time and manhours expended. Turnaround time was reduced from 187 days for STS-2 to 60 days for STS-7 and landing turnaround was reduced from 14 days to 5 days. Modifications were reduced from 114 to 51. Requirements changes for launch readiness verification were reduced from 536 to 107. Special tests or inspections were reduced from 292 to 52. Anomalies resolved concurrent with processing were reduced from 13,000 to 4,000. Integration in the Vehicle Assembly Building (VAB) is about 10 percent of the flow, and Launch Pad operations comprise 40 percent of the turnaround. The work force has matured and has demonstrated the capability to perform planned and contingency operations. The turnaround program is fast approaching the goal of becoming operational.

Schwartz, R.↗

Position paper on the potential of inadvertent weather modification of the Florida Peninsula resulting from neutralization of space shuttle solid rocket booster exhaust clouds

A concept of injecting compounds into the exhaust cloud was proposed to neutralize the acidic nature of the low-level stabilized ground cloud (SGC) was studied. The potential Inadvertent Weather Modification caused by exhaust cloud characteristics from three hours to seven days after launch was studied. Possible effects of the neutralized SGC in warm and cloud precipitation processes were discussed. Based on a detailed climatology of the Florida Peninsula, the risk for weather modification under a variety of weather situations was assessed.

Bollay, E.↗

STS utilization planning

The paper shows how NASA plans to utilize the Shuttle to carry a wide variety of payloads. Topics covered include: Shuttle Transportation System (STS) description and capabilities, payload integration and manifesting payload business today, and NASA-JSC user services. Consideration is given to the flight assignment process and flight manifest which is a listing of flights with their attendant launch dates, payload names, days on-orbit, altitude, inclination, and crew required. Additional data such as weight, center of gravity, payload-on-orbit capability, and launch windows are checked to see if the manifest is still valid. The STS traffic model is described along with the small self-contained payloads.

Bauch, G. T.↗