A multicriteria decision analysis framework to measure equitable healthcare access during COVID-19
Not Available
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Not Available
Not Available
Traditionally electric grid planning strives to maintain safe, reliable, efficient, and affordable service for current and future customers. As policies, social preferences, and the threat landscape evolve, additional considerations for power system planners are emerging, including decarbonization, resilience, and energy equity and justice. The MOD-Plan framework leverages and extends prior work to provide a framework for integrating incorporating resilience, equity, and decarbonization into integrated distribution system planning.
Abstract not provided.
Explore the source record for details and available documents.
INL Virtual Walkdown for source recovery
Climate change and its impacts already pose considerable challenges for societies that will further increase with global warming (IPCC, 2014a, b). Uncertainties of the climatic response to greenhouse gas emissions include the potential passing of large-scale tipping points (e.g. Lenton et al., 2008; Levermann et al., 2012; Schellnhuber, 2010) and changes in extreme meteorological events (Field et al., 2012) with complex impacts on societies (Hallegatte et al., 2013). Thus climate change mitigation is considered a necessary societal response for avoiding uncontrollable impacts (Conference of the Parties, 2010). On the other hand, large-scale climate change mitigation itself implies fundamental changes in, for example, the global energy system. The associated challenges come on top of others that derive from equally important ethical imperatives like the fulfilment of increasing food demand that may draw on the same resources. For example, ensuring food security for a growing population may require an expansion of cropland, thereby reducing natural carbon sinks or the area available for bio-energy production. So far, available studies addressing this problem have relied on individual impact models, ignoring uncertainty in crop model and biome model projections. Here, we propose a probabilistic decision framework that allows for an evaluation of agricultural management and mitigation options in a multi-impactmodel setting. Based on simulations generated within the Inter-Sectoral Impact Model Intercomparison Project (ISI-MIP), we outline how cross-sectorally consistent multi-model impact simulations could be used to generate the information required for robust decision making. Using an illustrative future land use pattern, we discuss the trade-off between potential gains in crop production and associated losses in natural carbon sinks in the new multiple crop- and biome-model setting. In addition, crop and water model simulations are combined to explore irrigation increases as one possible measure of agricultural intensification that could limit the expansion of cropland required in response to climate change and growing food demand. This example shows that current impact model uncertainties pose an important challenge to long-term mitigation planning and must not be ignored in long-term strategic decision making
Human Exploration Framework Team (HEFT) was formulated to create a decision framework for human space exploration that drives out the knowledge, capabilities and infrastructure NASA needs to send people to explore multiple destinations in the Solar System in an efficient, sustainable way. The specific goal is to generate an initial architecture that can evolve into a long term, enterprise-wide architecture that is the basis for a robust human space flight enterprise. This paper will discuss the initial HEFT activity which focused on starting up the cross-agency team, getting it functioning, developing a comprehensive development and analysis process and conducting multiple iterations of the process. The outcome of this process will be discussed including initial analysis of capabilities and missions for at least two decades, keeping Mars as the ultimate destination. Details are provided on strategies that span a broad technical and programmatic trade space, are analyzed against design reference missions and evaluated against a broad set of figures of merit including affordability, operational complexity, and technical and programmatic risk.
This document presents a structured procedure for characterizing and evaluating candidate project sites for concentrating solar power (CSP) and solar heat for industrial processes (SHIP) applications. The objective is to provide project developers, researchers, and other stakeholders with a consistent, technology-agnostic framework for early-stage site assessment, enabling informed decision-making prior to significant investment in project development. Site selection is a critical factor in project success or failure for both CSP and SHIP projects. Key factors such as solar resource availability, land characteristics, environmental and regulatory constraints, infrastructure availability, and community context are determined by the choice of project site and can materially impact project performance, cost, schedule, and overall viability. This procedure is designed to systematically evaluate these factors, identify potential fatal flaws, and prioritize the most favorable candidate sites for further development. The process begins with rapid screening-level evaluation, using publicly available data to assess solar resource, land availability and suitability, zoning and land-use compatibility, and exclusion zones such as protected lands or sensitive habitats. Sites that meet the minimum screening criteria advance to a more detailed characterization. Subsequent sections of this report provide guidance for a next-level assessment of the most important technical and environmental parameters, including: 1) Solar resource quality, variability, and uncertainty using multiyear datasets and, where appropriate, on-site measurement campaigns; 2) Meteorological conditions such as wind, temperature, extreme weather events, and soiling impacts; 3) Land characteristics including slope, shading, and geotechnical conditions; and 4) Environmental and regulatory considerations, including permitting processes, endangered species, cultural resources, and visual impacts. The procedure also addresses infrastructure and integration considerations, including: 1) Grid interconnection requirements for CSP power generation projects; 2) Electrical and operational integration for SHIP facilities; 3) Water availability, quality, and permitting constraints, which are particularly critical for CSP in arid regions; and 4) Site access, construction logistics, and availability of workforce and supporting services. Recognizing the importance of social and economic context, the procedure includes evaluation of community engagement factors, such as stakeholder sentiment, proximity to sensitive visual receptors, workforce development opportunities, and local economic incentives. The outputs of these assessments are synthesized in a cost and risk evaluation, translating site characteristics into expected impacts on capital cost, operating cost, schedule, and technical risk. This is complemented by screening-level performance modeling, including 8760 simulations and long-term projections, to quantify expected energy or thermal output, assess variability thereof, and support comparison between candidate sites. Finally, the procedure provides high-level guidance on a structured go/no-go decision framework, categorizing sites based on identified risks and constraints, and outlining a clear path forward to feasibility studies and front-end engineering design for viable projects. By standardizing the site characterization process across both CSP and SHIP applications, this guideline aims to: 1) Improve consistency and transparency in early-stage project evaluation; 2) Reduce development risk and avoid investment in nonviable project sites; 3) Support collaboration between developers, researchers, and public agencies; and 4) Accelerate successful deployment of concentrating solar technologies for both power generation and industrial process heat.
The Cybersecurity Value-at-Risk Framework is a tool that can be used by hydropower plant manager to make more educated cybersecurity investments. Users can take a self guided assessment allowing the tools to generate risk, impact and cybersecurity scores and be given risk-based recommendations to enhance decision-making.
Ecological responses to climate change occur across vastly different time-scales, from minutes for physiological plasticity to decades or centuries for community turnover and evolutionary adaptation. Accurately predicting the range of ecosystem trajectories will require models that incorporate both fast processes that may keep pace with climate change and slower ones likely to lag behind and generate disequilibrium dynamics. However, the knowledge necessary for this integration is currently fragmented across disciplines. We develop ‘ecological acclimation’ as a unifying framework to emphasize the similarity of dynamics driven by processes operating on dramatically different time-scales and levels of biological organization. The framework focuses on ecoclimate sensitivities, measured as the change in an ecological response variable per unit of climate change. Acclimation processes acting at different time-scales cause these sensitivities to shift in magnitude and even direction over time. We highlight shifting ecoclimate sensitivities in case studies from diverse ecosystems, including terrestrial plant communities, coral reefs and soil microbiomes. Models predicting future ecosystem states inevitably make assumptions about acclimation processes; these assumptions must be explicit for users to evaluate whether a model is appropriate for a given forecast horizon. Similarly, decision frameworks that clearly account for multiple acclimation processes and their distinct time-scales will help natural resource managers plan for ecological impacts of climate change from years to many decades into the future. We outline a synthetic research programme focused on the time-scales of ecological acclimation to reduce uncertainty in ecological forecasts.
Benefits accrue to scientists, resource managers, companies, and policymakers when environmental scientists publish in peer-reviewed journals. However, environmental scientists and practitioners face challenges, including the sometimes low value placed on journal articles, institutional vested interests in outcomes, and the changing priorities of employers and project sponsors. Confidentiality agreements can also lead scientists to assume publication is not an option. Case studies may be viewed by potential authors as too routine for peer-reviewed journals. On the basis of 30 years of experience, we suggest that publishing hurdles can be overcome and that environmental scientists have a range of options. The topics of manuscripts can include not only results from case studies and perspectives based on them but also byproducts of assessments, including definitions, plans, monitoring methods and models, and decision frameworks. Environmental scientists have unique opportunities to move science forward with their practical knowledge if they can move across the institutional, logistical, data-related, and content-related hurdles.
Based on the U isotopic compositions and trace element concentrations - additional information provided in Inject 1b - we assess that the two samples are inconsistent with high confidence. Our assessment factored in the results of the graded decision framework (GDF) as well as expert knowledge of these kind of measurements.
Alcohols are attractive fuel blendstocks for spark ignition engines due to their high octane values and potentially positive influence on performance and emission. Although methanol, ethanol, and butanol have been widely studied, other biomass-derived alcohols may have similar or better properties. However, it is not feasible to experimentally investigate the fuel potential of every molecule. The goals of this study were to develop a methodology for rapid screening of a fuel property database for mono-alcohols and to identify alcohols with the potential of blending to produce advantaged motor gasolines. A database was developed with 13 fuel properties of all saturated C1–C10 mono-alcohols. A decision framework was used to evaluate alcohols suitable for blending in gasoline for spark ignition engines in two scenarios: low-range (up to 15 vol%) blends and high-range (greater than 40 vol%) blends. The low-range blend cases resulted in the identification of 48 alcohols. In the case of high-range blending, only six alcohols were found to be suitable. This is the first study to systematically evaluate all C1–C10 saturated alcohols for blending with gasoline using relevant fuel properties. A novel aspect of this study is the evaluation of the influence of errors in predicted property values. These scenario screenings focus attention on a smaller number of promising candidate molecules, and the approach could be modified for other classes of fuel molecules, engine types, and fuel blending goals.
Defining design alternatives constitutes one of the critical initial steps of the systems engineering process. Once these design alternatives have been identified, assessing which alternatives best satisfy the project’s objectives can prove to be challenging when dealing with complex decision frameworks. Complex systems often involve the participation of different interest groups, who have different value systems and are focused on distinct aspects of the project. For example, design alternatives might be assessed predominantly for their technical merit by one group of stakeholders, while a different group might be more inclined to assess the design alternatives primarily based on programmatic values. MESCAL (Monitoring the Evolving State of Clouds and Aerosol Layers) is an ongoing NASA / CNES (Centre National d’Etudes Spatiales) joint study for an active remote sensing Earth observing satellite. Several design alternatives have been identified and the assessment of these alternatives requires consideration of a variety of factors. This paper presents the approach that was used to support a global assessment of the MESCAL design alternatives. A mapping of the interactions between mission, instrument, and science requirements was modeled to support the assessment of the trade space. In addition, a set of metrics was developed to structure the assessment that was conducted. Finally, this paper also discusses the general applicability of these metrics to other science mission concepts in the formulation phase.
Areas of high chlorinated volatile organic compound (cVOC) contamination at the Savannah River Site (SRS) have been undergoing remediation via soil vapor extraction, sometimes coupled with thermal treatments to enhance extraction rates. These active systems are effective in removing large amounts of contaminant mass from the subsurface and mitigating the impacts to groundwater. However, as extraction rates decline, costs must be evaluated with respect to the benefit of continued active operation. A decision framework for identifying conditions when a transition to a more passive remediation is appropriate has been developed with state and federal regulatory agencies. Two remediation areas have recently been transitioned from active soil vapor extraction (ASVE) to passive soil vapor extraction (PSVE) at the SRS. Performance evaluation goals including plume stabilization, overall mass removal trends, environmental sustainability and costs were considered in transitioning from active remediation to passive technologies at both sites. At the Dynamic Underground Stripping (DUS) project at the M-Area Settling Basin, ASVE was combined with steam injection to extract cVOCs during active operations. Steam injection occurred from September 2005 to September 2009. DUS utilized 63 steam injection wells, 34 active vapor extraction wells, and 3 active soil vapor extraction units (SVEUs). Two active SVEUs had 60 horsepower blowers; the third had a 25-horsepower blower. Mass removal was closely tracked during DUS operations; over 181,437 kilograms (400,000 pounds) of cVOCs were removed while active steam injection occurred. After steaming was stopped, ASVE continued. The 34 active wells were evaluated in 2012. The ASVE wells were grouped into categories of high, medium, and low extraction rates. High producing wells remained connected to a single active SVEU. Low producing wells were abandoned, and the medium producing wells were transitioned to PSVE (Microblowers{sup TM}). Microblowers{sup TM} utilize a dedicated blower per well and are solar powered. This passive technology provides energy, maintenance, and operation costs savings while still providing an efficient reduction in cVOC migration to groundwater. In 2018, the remaining ASVE wells were evaluated again. The purpose of this testing was to identify which wells removed the most mass. An optimal well configuration was determined. The criteria to discontinue ASVE was removal of less than 18 kilograms (40 pounds) per week of cVOCs. After 3 months of shutdown (rebound conditions), 2.7 kilograms (5.9 pounds) of cVOCs per week were being removed. Data from the rebound test justified ending ASVE and transitioning wells with higher extraction rates to PSVE. Wells that had depleted the cVOC mass within their zone of influence were abandoned. Performance data from existing PSVE wells justified ending PSVE at wells with depleted extraction rates. Currently the system has 16 PSVE wells operating. Another ASVE system was being used to treat cVOC contaminated soil at the A-Area Miscellaneous Rubble Pile (AMRP) at SRS. System operation began in 2004, with 7 ASVE wells connected to a 60- horsepower blower. Mass removal rates and contaminant concentrations remained consistently low over the ASVE lifespan at AMRP. This indicated that mass removal was diffusion limited. With this data, the 7 ASVE wells were transitioned to PSVE in 2017. Twelve pressure monitoring points were also transitioned to PSVE wells. AMRP currently has 19 PSVE wells operating. Both transitions from active to passive remediation had concurrence from the United States Environmental Protection Agency and the South Carolina Department of Health and Environmental Control. These transitions ensure that only the necessary amount of energy is being exerted to remediate the environment. (authors)
As an energy storage technology, pumped storage hydropower (PSH) supports various aspects of power system operations. However, determining the value of PSH plants and their many services and contributions to the system has been a challenge. While there is a general understanding that PSH resources provide many services and benefits for the operation of power systems, estimating the value of these services—and especially the monetary value of some of those services—has been a challenge. The objective of this project, funded by the U.S. Department of Energy’s (DOE’s) Water Power Technologies Office (WPTO), is to advance the state of the art in assessing the value of PSH plants and their contributions to the power system. The specific goal is to develop detailed, step-by-step valuation guidance that PSH developers, plant owners or operators, and other stakeholders can use to assess the value of existing or potential new PSH plants and their services. The specific goals of this project are: (1) to develop comprehensive and transparent valuation guidance that will support consistent valuation assessments and comparisons of PSH projects or project design alternatives, (2) to test the PSH valuation guidance and its underlying methodology by applying it to two selected PSH projects, and (3) to transfer and disseminate the PSH valuation guidance to the hydropower industry, PSH developers, and other stakeholders. The authors believe that the application of a consistent, transparent, and repeatable valuation process will advance valuation assessments and allow stakeholders to compare valuation analyses performed for different PSH projects or design alternatives. It will also increase the acceptance of valuation results and enable better understanding of the true value that PSH technology brings to the grid.