Search NASA⌕ Search

SEARCH · Search NASA

Results for “decision rationale”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Software-defined Networking for Energy Delivery Systems (SDN4EDS): An Architectural Blueprint (Final Report)

This is the initial version of a reference for suppliers and energy companies of all sizes to deploy networks based on software-defined networking technology (SDN) to improve reliability, reduce cyber security attack surface, and facilitate mitigation of adversarial behavior. It is a living document and will progress over the life cycle of the Software-Defined Networking for Energy Delivery Systems (SDN4EDS) project. Version 2 of this report provides information on the Red Team tabletop assessment performed against the initial reference architecture. Version 3 of this report updates the reference architecture with lessons learned from the Red Team tabletop assessment, as well as provides additional details for the use cases. It also provides information on the decision process that could be used by an organization when considering deploying SDN in their environment. The final version of this report consolidates all the interim reports generated by the project into a final report. It also draws from PNNL’s experience in deploying SDN to make recommendations on how SDN could be deployed in a utility environment, and provides rationale for those decisions allowing individual utilities to make risk-based and knowledge-based decisions on how to best deploy SDN in their own environment

97 MATHEMATICS AND COMPUTING↗

Software-defined Networking for Energy Delivery Systems (SDN4EDS): An Architectural Blueprint (Final Summary Report)

This is the initial version of a reference for suppliers and energy companies of all sizes to deploy networks based on software-defined networking technology (SDN) to improve reliability, reduce cyber security attack surface, and facilitate mitigation of adversarial behavior. It is a living document and will progress over the life cycle of the Software-Defined Networking for Energy Delivery Systems (SDN4EDS) project. Version 2 of this report provides information on the Red Team tabletop assessment performed against the initial reference architecture. Version 3 of this report updates the reference architecture with lessons learned from the Red Team tabletop assessment, as well as provides additional details for the use cases. It also provides information on the decision process that could be used by an organization when considering deploying SDN in their environment. The final version of this report consolidates all the interim reports generated by the project into a final report. It also draws from PNNL’s experience in deploying SDN to make recommendations on how SDN could be deployed in a utility environment, and provides rationale for those decisions allowing individual utilities to make risk-based and knowledge-based decisions on how to best deploy SDN in their own environment. This summary report provides a higher-level overview of the project reports. Readers interested in additional detail, including results of the Red Team assessments and the final configuration, are encouraged to read the full final report.

97 MATHEMATICS AND COMPUTING↗

Natural Resource Information System, design analysis

The computer-based system stores, processes, and displays map data relating to natural resources. The system was designed on the basis of requirements established in a user survey and an analysis of decision flow. The design analysis effort is described, and the rationale behind major design decisions, including map processing, cell vs. polygon, choice of classification systems, mapping accuracy, system hardware, and software language is summarized.

Source record↗

Health impact assessment in the United States: Has practice followed standards?

As an emerging practice, Health Impact Assessment is heterogeneous in purpose, form, and scope and applied in a wide range of decision contexts. This heterogeneity challenges efforts to evaluate the quality and impact of practice. We examined whether information in completed HIA reports reflected objectively-evaluable criteria proposed by the North American HIA Practice Standards Working Group in 2009. From publically-available reports of HIAs conducted in the U.S. and published from 2009 to 2011, we excluded those that were components of, or comment letters on, Environmental Impact Assessments (5) or were demonstration projects or student exercises (8). For the remaining 23 reports, we used practice standards as a template to abstract data on the steps of HIA, including details on the rationale, authorship, funding, decision and decision-makers, participation, pathways and methods, quality of evidence, and recommendations. Most reports described screening, scoping, and assessment processes, but there was substantial variation in the extent of these processes and the degree of stakeholder participation. Community stakeholders participated in screening or scoping in just two-thirds of the HIAs (16). On average, these HIAs analyzed 5.5 determinants related to 10.6 health impacts. Most HIA reports did not include evaluation or monitoring plans. This study identifies issues for field development and improvement. The standards might be adapted to better account for variability in resources, produce fit-for-purpose HIAs, and facilitate innovation guided by the principles. - Highlights: • Our study examined reported HIAs in the U.S. against published practice standards. • Most HIAs used some screening, scoping and assessment elements from the standards. • The extent of these processes and stakeholder participation varied widely. • The average HIA considered multiple health determinants and impacts. • Evaluation or monitoring plans were generally not included in reports.

54 ENVIRONMENTAL SCIENCES↗

Deployment of the MARSIS Radar Antennas On-Board Mars Express

On the first European planetary mission, the deployment of the two 20-meter long MARSIS antennas onboard the ESA Mars Express spacecraft has represented an unprecedented technological challenge, in the middle of a successful science mission. While Mars Express was already performing regular observations at Mars, a complex process has been performed on Earth, involving the ESA Project, coordination between ESA, NASA and ASI, the Mars Science community, the spacecraft manufacturer EADS Astrium and the Mission Control Centre at ESOC. This paper describes the steps that led from an initial nogo in 2004 to deployment one year later, as well as the conditions and difficulties encountered during the actual deployment. It provides insights in the technical and managerial processes that made it a success, and analyses the rationale behind the decisions.

deployment↗

Design Evolution of the Wide Field Infrared Survey Telescope using Astrophysics Focused Telescope Assets (WFIRST-AFTA) and Lessons Learned

The design of the Wide Field Infrared Survey Telescope using Astrophysics Focused Telescope Assets (WFIRST-AFTA) continues to evolve as each design cycle is analyzed. In 2012, two Hubble sized (2.4 m diameter) telescopes were donated to NASA from elsewhere in the Federal Government. NASA began investigating potential uses for these telescopes and identified WFIRST as a mission to benefit from these assets. With an updated, deeper, and sharper field of view than previous design iterations with a smaller telescope, the optical designs of the WFIRST instruments were updated and the mechanical and thermal designs evolved around the new optical layout. Beginning with Design Cycle 3, significant analysis efforts yielded a design and model that could be evaluated for Structural-Thermal-Optical-Performance (STOP) purposes for the Wide Field Imager (WFI) and provided the basis for evaluating the high level observatory requirements. Development of the Cycle 3 thermal model provided some valuable analysis lessons learned and established best practices for future design cycles. However, the Cycle 3 design did include some major liens and evolving requirements which were addressed in the Cycle 4 Design. Some of the design changes are driven by requirements changes, while others are optimizations or solutions to liens from previous cycles. Again in Cycle 4, STOP analysis was performed and further insights into the overall design were gained leading to the Cycle 5 design effort currently underway. This paper seeks to capture the thermal design evolution, with focus on major design drivers, key decisions and their rationale, and lessons learned as the design evolved.

Thermal Design↗

Design Evolution of the Wide Field Infrared Survey Telescope Using Astrophysics Focused Telescope Assets (WFIRST-AFTA) and Lessons Learned

The design of the Wide Field Infrared Survey Telescope using Astrophysics Focused Telescope Assets (WFIRST-AFTA) continues to evolve as each design cycle is analyzed. In 2012, two Hubble sized (2.4 m diameter) telescopes were donated to NASA from elsewhere in the Federal Government. NASA began investigating potential uses for these telescopes and identified WFIRST as a mission to benefit from these assets. With an updated, deeper, and sharper field of view than previous design iterations with a smaller telescope, the optical designs of the WFIRST instruments were updated and the mechanical and thermal designs evolved around the new optical layout. Beginning with Design Cycle 3, significant analysis efforts yielded a design and model that could be evaluated for Structural-Thermal-Optical-Performance (STOP) purposes for the Wide Field Imager (WFI) and provided the basis for evaluating the high level observatory requirements. Development of the Cycle 3 thermal model provided some valuable analysis lessons learned and established best practices for future design cycles. However, the Cycle 3 design did include some major liens and evolving requirements which were addressed in the Cycle 4 Design. Some of the design changes are driven by requirements changes, while others are optimizations or solutions to liens from previous cycles. Again in Cycle 4, STOP analysis was performed and further insights into the overall design were gained leading to the Cycle 5 design effort currently underway. This paper seeks to capture the thermal design evolution, with focus on major design drivers, key decisions and their rationale, and lessons learned as the design evolved.

WFIRST↗

One NASA PEM qualification standard : comparison of JPL and GSFC standards

Although use of Plastic Encapsulated Microelectronics (PEMs) in space applications is discouraged, their use is mandatory for selected applications involving the need for advanced technology and small packages. Various space systems designers and manufacturers have developed methods to qualify and screen PEMs. In general, each procedure is different. The purpose of this fiscal year’s investigation is to initiate a process to coordinate the efforts at various NASA centers to eventually develop a One NASA method. Part of this activity includes sharing of test data and PEM qualification methodologies. Various experts in the NASA community were identified and contacted to support this effort. We were successful in finding such experts at GSFC, APL and the Constellation office (Orion and Ares). All these experts provided typical qualification program plans. Since funding was severely restricted, it was decided to concentrate on coordination activity with GSFC. GSFC is planning a new version of IEEE-INST-002 section applying to PEMs. The GSFC expert (Dr. Alexander Teverovsky) provided a detailed assessment of the differences between the planned new version of IEEE-INST-002 and the JPL-D-19426 (JPL guideline) as well as a summary rationale for the decisions within the IEEE-INST-002. It should be noted that GSFC’s assessment of IEEE-INST-002 in the area of PEMs is not finalized. JPL is also considering changes in PEM qualification methodologies based on test data from recent qualification testing for their newer Projects (MSL, Grail, Juno). A spreadsheet delineating the differences between the JPL standard and the GSFC standard is presented.

Cooper, Mark↗

Recommendation on Orbiting Sample Cleanliness

The National Aeronautics and Space Administration-European Space Agency (NASA-ESA) Mars Sample Return (MSR) campaign involves the collection of samples on Mars by the Perseverance (Mars 2020) rover and their return to Earth. To accomplish this, the Orbiting Sample container (OS) will be sent to Mars to accommodate the collected samples then launched from Mars and returned to Earth, where the samples will be removed for examination in the Sample Return Facility (SRF). Crucial to this entire sequence will be establishment of the required level of cleanliness inside the OS. In February 2021, the NASA Headquarters' Mars Sample Return Program and Office of Planetary Protection assembled an MSR OS Tiger Team (OSTT) to discuss the appropriate cleanliness level options of the interior of the OS. The team's remit was primarily focused on evaluating the trade-offs between Planetary Protection cleanliness levels 4a and 4b. These cleanliness levels are determined by the Committee on Space Research (COSPAR) planetary protection regulations, where 4a requires <300 bacterial spores/m^2 and <3 x 10^5 bacterial spores on the spacecraft (in this case, the interior of the OS) and 4b mandates the more stringent requirement of <30 bacterial spores on the spacecraft. This report documents the consensus opinion submitted by the OSTT that recommended the interior of the OS be cleaned to a 4a requirement with any feasible added effort toward 4b. This report provides, as well, the rationale for that decision.

Charles S. Cockell↗

Fermilab HEPCloud Facility Decision Engine Design

The Decision Engine is a critical component of the HEP Cloud Facility. It provides the functionality of resource scheduling for disparate resource providers, including those which may have a cost or a restricted allocation of cycles. Along with the architecture, design, and requirements for the Decision Engine, this document will provide the rationale and explanations for various design decisions. In some cases, requirements and interfaces for a limited subset of external services will be included in this document. This document is intended to be a high level design. The design represented in this document is not complete and does not break everything down in detail. The class structures and pseudo-code exist for example purposes to illustrate desired behaviors, and as such, should not be taken literally. The protocols and behaviors are the important items to take from this document. This project is still in prototyping mode so flaws and inconsistencies may exist and should be noted and treated as failures.

97 MATHEMATICS AND COMPUTING↗

A quantitative method for evaluating alternatives

When faced with choosing between alternatives, people tend to use a number of criteria (often subjective, rather than objective) to decide which is the best alternative for them given their unique situation. The subjectivity inherent in the decision-making process can be reduced by the definition and use of a quantitative method for evaluating alternatives. This type of method can help decision makers achieve degree of uniformity and completeness in the evaluation process, as well as an increased sensitivity to the factors involved. Additional side-effects are better documentation and visibility of the rationale behind the resulting decisions. General guidelines for defining a quantitative method are presented and a particular method (called 'hierarchical weighted average') is defined and applied to the evaluation of design alternatives for a hypothetical computer system capability.

Forthofer, M. J.↗

Application of Structured Decision Making to Hanford Site Radiological Air Monitoring - 17924

Radiological air monitoring is a component of an Environmental Surveillance (ES) program that has been in operation at the Department of Energy Hanford Site for several decades. The primary objectives of the ES program are protection of human health and the environment (on and off-site) as well as regulatory compliance. The ES program was designed decades ago when the plutonium-production reactors and related facilities at the Hanford Site were operational and air emissions were more widespread and significant than today. We employed a structured decision making (SDM) approach that integrates science with values and preferences to a Hanford Site air monitoring program decision. Specifically, a decision was necessary pertaining to the possible replacement of three air monitoring stations located in the 100 Area of the Hanford Site because the power line that supports these stations was near the end of its lifecycle. Although focused on this specific decision, the SDM model is more broadly applicable to decisions pertaining to adapting the air monitoring network to current Hanford operations. The value focused thinking approach that underlies SDM facilitates transparent and defensible decision making, and aids in communicating monitoring rationale. Some of the fundamental objectives elicited from the decision makers regarding management options for the three air monitoring stations included maximizing the ability to measure releases, minimizing environmental impacts, and maximizing social and economic sustainability. The fundamental objectives were linked to six objectives that could be measured (quantified) to allow a decision-analytic solution to the decision problem. Value functions and preference weights were developed for each of the objectives measures based on information obtained during a project workshop as well as by review and analysis of environmental data. Lastly, a set of five management options was identified that might achieve at least one of the objectives. A Bayes Network was developed as a solution to the decision problem pertaining to the three air stations (the 3 air stations decision). The Bayes Network describes the decision model graphically, and also serves as the computational engine for the decision analysis. The Bayes Network defines the relationship among the five management options and six objectives measures. In addition to the weights and value functions noted above, key inputs to the Bayes Network include a set of probabilities related to the different model states defined by the network. These include the probability of a significant release occurring, the probability that a release would be detected under each of the five management options, and the probability of achieving the other objective measures under each management option. In this manner the Bayesian Network captures the uncertainty in the components of the decision model. Replacing the three air monitoring stations with thermoluminescent dosimeters was identified as the preferred management option. A brief report was developed documenting the SDM model, including the workshop notes and analyses that were used to develop the objectives and model input variable values. This application demonstrates SDM's utility for supporting monitoring program decisions and, critically, providing a transparent and traceable basis for the decision. This relatively simple SDM model also provides a basis for an SDM model for monitoring decisions related to the more complex and holistic goal of achieving ES program objectives. (authors)

61 RADIATION PROTECTION AND DOSIMETRY↗

Development of a new computer system for aircraft noise prediction

The paper presents an overview of the activities of NASA's Aircraft Noise Prediction Office (ANOPO). The principal goal of ANOPO is to develop a comprehensive, user-oriented, Aircraft Noise Prediction Program (ANOPP). ANOPO's activities in support of ANOPP development are briefly discussed. They include acquisition, implementation, and evaluation of an in-house, interim collection of programs and implementation of a plan for acquiring, in the form of Key Technology Documents, state-of-the-art methodology for aircraft noise prediction. The paper is primarily devoted to a presentation of the general architecture and functional capability planned for ANOPP together with the rationale supporting major design decisions.

Raney, J. P.↗

Large Space Telescope Program status

This paper provides an overview of the current status of the LST Program. The history of the program is treated briefly, with emphasis placed on the recent Phase B definition activity. The background and rationale leading to the decision of the aperture size of the LST primary mirror are discussed. The current technical definition status of the LST Optical Telescope Assembly and Support Systems Module is treated in a summary fashion. Key milestone events during the balance of the Phase B definition effort and schedule and over-all planning for the development phase of the program are described.

Downey, J. A., III↗

Skylab attitude control system

The attitude stabilization and control system for Skylab evolved from an analog controller into a fully digital processing system. Features of this system include a software-determined attitude reference to provide general maneuvering ability, an in-orbit programming capability, the use of large control moment gyros for attitude control, and the use of vehicle maneuvers to desaturate gyro momentum. The objectives, requirements, and implementations of the control system software are described, along with the rationales for certain design decisions and discussion of some system dynamics and actual performance.

Coon, T. R.↗

Preliminary design data package, appendix C

The data and documentation required to define the preliminary design of a near term hybrid vehicle and to quantify its operational characteristics are presented together with the assumptions and rationale behind the design decisions. Aspects discussed include development requirements for the propulsion system, the chassis system, the body, and the vehicle systems. Particular emphasis is given to the controls, the heat engine, and the batteries.

Source record↗

United States commitment to heavy lift launch vehicles

Progress made to date on a United States commitment to the development of heavy launch vehicles is reviewed. The involvement of the Executive Branch operating through the National Space Council, the Legislative Branch, the DOD, and NASA are addressed. The evolution of launch system requirements and the form, content, and rationale for the various decisions that have been made to date are discussed.

Gabris, Edward A.↗

Asteroid Redirect Crewed Mission Space Suit and EVA System Architecture Trade Study

This paper discusses the Asteroid Redirect Crewed Mission (ARCM) space suit and Extravehicular Activity (EVA) architecture trade study and the current state of the work to mature the requirements and products to the mission concept review level. The mission requirements and the resulting concept of operations will be discussed. A historical context will be presented as to present the similarities and differences from previous NASA missions. That will set the stage for the trade study where all options for both pressure garment and life support were considered. The rationale for the architecture decisions will then be presented. Since the trade study did identity risks, the subsequent tests and analyses that mitigated the risks will be discussed. Lastly, the current state of the effort will be provided.

Bowie, Jonathan T.↗