Search NASA⌕ Search

SEARCH · Search NASA

Results for “deployment status”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Galileo completing VEEGA - A mid-term report

In December Galileo will complete its Venus-Earth-Earth-Gravity Assist (VEEGA) mission phase and will be placed on a direct trajectory to Jupiter arriving in December 1995. Galileo will be the first aircraft to orbit Jupiter and send a probe into its atmosphere and will perform an intensive and comprehensive investigation of the planet. Observations made during the October 1991 encounter with the asteroid Gaspra are discussed. The observation plan to be used for earth and moon observations during the December 1992 gravity assist encounter is described. The Galileo High-Gain Antenna (HGA) deployment anomaly status is reported and future corrective actions are outlined. The low-gain antenna contingency mission to be implemented if the HGA cannot be deployed is described and overall performance and status of the space craft are discussed. The selected tour for the Galileo Jupiter satellite-gravity-assist orbital tour is described and the decision rationale for performing the August 1993 asteroid Ida flyby option is presented.

O'Neil, William J.↗

Space deployable truss structure design

The development status of the deployable box truss structure is summarized. Potential applications for this structural system are described. Structural and component design requirements derived from these applications are discussed. Components of prototype 4.6 m cubes which incorporate graphite/epoxy structural members, fittings, and mechanisms are described. The benefits of the component designs and their respective manufacturing processes are presented.

Coyner, J. V., Jr.↗

Smart Grid: Transforming the Electric System

This paper introduces smart grid concepts, summarizes the status of current smart grid related efforts, and explains smart grid priorities.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Long Island Smart Metering Pilot Project

The Long Island Power Authority (LIPA) Smart Meter Pilots provided invaluable information and experience for future deployments of Advanced Metering Infrastructure (AMI), including the deployment planned as part of LIPA's Smart Grid Demonstration Project (DE-OE0000220). LIPA will incorporate lessons learned from this pilot in future deployments, including lessons relating to equipment performance specifications and testing, as well as equipment deployment and tracking issues. LIPA ultimately deployed three AMI technologies instead of the two that were originally contemplated. This enabled LIPA to evaluate multiple systems in field conditions with a relatively small number of meter installations. LIPA experienced a number of equipment and software issues that it did not anticipate, including issues relating to equipment integration, ability to upgrade firmware and software over the air (as opposed to physically interacting with every meter), and logistical challenges associated with tracking inventory and upgrade status of deployed meters. In addition to evaluating the technology, LIPA also piloted new Time-of-Use (TOU) rates to assess customer acceptance of time-differentiated pricing and to evaluate whether customers would respond by adjusting their activities from peak to non-peak periods. LIPA developed a marketing program to educate customers who received AMI in the pilot areas and to seek voluntary participation in TOU pricing. LIPA also guaranteed participating customers that, for their initial year on the rates, their electricity costs under the TOU rate would not exceed the amount they would have paid under the flat rates they would otherwise enjoy. 62 residential customers chose to participate in the TOU rates, and every one of them saved money during the first year. 61 of them also elected to stay on the TOU rate without the cost guarantee at the end of that year. The customer who chose not to continue on the rate was also the one who achieved the greatest savings. However, after the first year, the customer in question installed equipment that would have made TOU rates a more costly option than the residential flat rate. During the second year, all but one customer saved money. That customer increased usage during peak hours, and as a result saw an increase in annual costs (as compared to the flat rate) of $\$$24.17. The results were less clear for commercial customers, which LIPA attributes to rate design issues that it will take into account for future deployments. LIPA views this pilot as a complete success. Not only is LIPA better prepared for a larger deployment of AMI, but it is confident that residential customers will accept AMI and TOU rates and shift their energy consumption from peak to non-peak periods in response to pricing. On a larger scale, this will benefit LIPA and all of its customers by potentially lowering peak demand when energy costs are highest.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Automation of User Analysis Workflow in CMS

CMS has a distributed computing model, based on a hierarchy of tiered regional computing centres. However, the end physicist is not interested in the details of the computing model nor the complexity of the underlying infrastructure, but only to a ccess and use efficiently and easily the remote services. The CMS Remote Analysis Builder (CRAB) is the official CMS tool that allows the access to the distributed data in a transparent way. We present the current development direction, which is focused o n improving the interface presented to the user and adding intelligence to CRAB such that it can be used to automate more and more the work done on behalf of user. We also present the status of deployment of the CRAB system and the lessons learnt in deplo ying this tool to the CMS collaboration.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Automated Ride Hailing - Status, Projections, and Critical Safety Review

Automated ride-hailing services, commonly known as 'robo-taxis' are beginning to proliferate and scale. Currently they are available in four major US cities with another 10 cities planning their implementation in the near future. In the US, automated ride-hailing services are dominated by a single provider, with announcements from several competitors of service offerings by end of calendar year 2025. Internationally, only three companies are currently in commercial operations, with many more planned. The scaling of robo-taxi services appears to be the leading application of automated vehicles (AVs), and provides evidence of their anticipated safety in comparison to conventional vehicles. This presentation will provide an overview of the status of deployments of fully operational AVs in ride-hailing services, projections of the number of trips, vehicles, and vehicle miles traveled for the immediate future, and a critical review of the safety data that has been reported, both in the US as well as internationally.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Current Status and Plans for Test and Deployment of the First NASA SLR System

Over the last decade the Space Geodesy Project has been progressing toward the development and deployment of NASA’s next generation network of geodetic stations ( https://space-geodesy.nasa.gov ). The Satellite Laser Ranging (SLR) part of this effort is called Space Geodesy Satellite Laser Ranging (SGSLR). Significant progress has been made in the development of SGSLR’s nine subsystems, and many of these subsystems are completed or are nearing completion. The next major step will be the Integration and Testing (I&T) of all subsystems into the first SGSLR system which will start before the end of 2022. Verification testing (collocation) with NASA’s legacy operational SLR system, MOBLAS-7, is planned for early 2024. The first SGSLR system is being developed for Kartverket, also known as the Norwegian Mapping Authority (NMA). The system will be installed at Ny-Ålesund in Svalbard, Norway. The planned start of operations is early 2025. This presentation will give the current status of development, the testing and deployment plans, and the future of NASA’s SGSLR global network.

Satellite Laser Ranging↗

Status Report on HTR Research, Development, and Deployment in the USA

Abstract – The Gas-Cooled Reactor deployment effort in the United States is a collaboration between the US government and private vendors. The US Department of Energy sponsors the qualification of fuels, materials, and analysis methods that exploit the capabilities of the national laboratories (mainly Idaho, Oak Ridge, and Argonne) to generate the fundamental fuel, material, and core behavior data needed to support design and licensing efforts by vendors in general. Private HTR vendors provide input to the R&D program and engage in the design of the systems, structures, and components that are unique to their design concepts. Their plant design all exploit the properties and behavior of the TRISO fuel, graphite, and alloys being tested in the DOE qualification programs. This paper will summarize the goals and recent progress of the US Gas-Cooled Reactor Program.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Fuel Cell Electric Bus Status Report 2025

This report highlights recent changes in the FCEB market, status updates for deployments, and a detailed performance evaluation of a large fleet of FCEBs operated by Foothill Transit in California during the period from June 2023 to December 2024.

33 ADVANCED PROPULSION SYSTEMS↗

Reducing water freshwater consumption at coal-fired power plants : approaches used outside the United States.

Coal-fired power plants consume huge quantities of water, and in some water-stressed areas, power plants compete with other users for limited supplies. Extensive use of coal to generate electricity is projected to continue for many years. Faced with increasing power demands and questionable future supplies, industries and governments are seeking ways to reduce freshwater consumption at coal-fired power plants. As the United States investigates various freshwater savings approaches (e.g., the use of alternative water sources), other countries are also researching and implementing approaches to address similar - and in many cases, more challenging - water supply and demand issues. Information about these non-U.S. approaches can be used to help direct near- and mid-term water-consumption research and development (R&D) activities in the United States. This report summarizes the research, development, and deployment (RD&D) status of several approaches used for reducing freshwater consumption by coal-fired power plants in other countries, many of which could be applied, or applied more aggressively, at coal-fired power plants in the United States. Information contained in this report is derived from literature and Internet searches, in some cases supplemented by communication with the researchers, authors, or equipment providers. Because there are few technical, peer-reviewed articles on this topic, much of the information in this report comes from the trade press and other non-peer-reviewed references. Reducing freshwater consumption at coal-fired power plants can occur directly or indirectly. Direct approaches are aimed specifically at reducing water consumption, and they include dry cooling, dry bottom ash handling, low-water-consuming emissions-control technologies, water metering and monitoring, reclaiming water from in-plant operations (e.g., recovery of cooling tower water for boiler makeup water, reclaiming water from flue gas desulfurization [FGD] systems), and desalination. Some of the direct approaches, such as dry air cooling, desalination, and recovery of cooling tower water for boiler makeup water, are costly and are deployed primarily in countries with severe water shortages, such as China, Australia, and South Africa. Table 1 shows drivers and approaches for reducing freshwater consumption in several countries outside the United States. Indirect approaches reduce water consumption while meeting other objectives, such as improving plant efficiency. Plants with higher efficiencies use less energy to produce electricity, and because the greater the energy production, the greater the cooling water needs, increased efficiency will help reduce water consumption. Approaches for improving efficiency (and for indirectly reducing water consumption) include increasing the operating steam parameters (temperature and pressure); using more efficient coal-fired technologies such as cogeneration, IGCC, and direct firing of gas turbines with coal; replacing or retrofitting existing inefficient plants to make them more efficient; installing high-performance monitoring and process controls; and coal drying. The motivations for increasing power plant efficiency outside the United States (and indirectly reducing water consumption) include the following: (1) countries that agreed to reduce carbon emissions (by ratifying the Kyoto protocol) find that one of the most effective ways to do so is to improve plant efficiency; (2) countries that import fuel (e.g., Japan) need highly efficient plants to compensate for higher coal costs; (3) countries with particularly large and growing energy demands, such as China and India, need large, efficient plants; (4) countries with large supplies of low-rank coals, such as Germany, need efficient processes to use such low-energy coals. Some countries have policies that encourage or mandate reduced water consumption - either directly or indirectly. For example, the European Union encourages increased efficiency through its cogeneration directive, which requires member states to assess their national potential for cogeneration, analyze barriers to achieving the potential, and then establish support schemes to achieve the potential. China's Eleventh Five-Year Plan (2006-2010) has an energy strategy that specifies, among other things, that production should be optimized by promoting the development of large-scale, high-efficiency units, and that air-cooled technologies should be used in areas with water shortages. The United States lacks many of these drivers. There are no government requirements that mandate more efficient plants. The United States has ample supplies of relatively cheap coal, and U.S. water-short areas are not as extensive as in countries such as China, South Africa, and Australia. Often, other countries have deployed water-savings technologies to a greater degree than the United States.

01 COAL, LIGNITE, AND PEAT↗

Evidence of Completion of Milestone 3: Experimental Testbed

Construction and deployment of the experimental testbed encountered scheduling delays, and completion was subsequently further delayed by curtailment of LANL operations due to the COVID-19 pandemic. Between March and October, LANL was in a state of “Limited Operations” such that only certain “mission-critical” work was performed with approximately 25% on-site staffing. In spite of this, much of the lab space preparation was executed and the five initial model house” units were constructed and installed during this period. Still, the pace of construction was impacted by difficulty in coordinating personnel and minimizing contact between workers. Currently, LANL is in the mode of “Normal Operations with Maximum Telework,” which continues to limit the availability of on-site personnel. Nevertheless, Milestone 3 is now complete. This document describes the experiment as it is deployed and provides status for each task for this milestone.

99 GENERAL AND MISCELLANEOUS↗

Automated scheduling for NASA’s Deep Space Network

This paper describes the DSN Scheduling Engine (DSE) component of a new scheduling system being deployed for NASA’s Deep Space Network. The DSE provides core automation functionality for scheduling the network, including the interpretation of scheduling requirements expressed by users, their elaboration into tracking passes, and resolving conflicts and constraint violations. The DSE incorporates both systematic search and repair-based algorithms, used for different phases and purposes in the overall system. It has been integrated in with a web application which provides its functionality to all DSN users through a standard web browser. The system is in the process of deployment to operational status.

Tran, Daniel↗

Shot Planning and Analysis Tools

Shot planning and analysis tools (SPLAT) integrate components necessary to help achieve a high over-all operational efficiency of the National Ignition Facility (NIF) by combining near and long-term shot planning, final optics demand and supply loops, target diagnostics planning, and target fabrication requirements. Currently, the SPLAT project is comprised of two primary tool suites for shot planning and optics demand. The shot planning component provides a web-based interface to selecting and building a sequence of proposed shots for the NIF. These shot sequences, or 'lanes' as they are referred to by shot planners, provide for planning both near-term shots in the Facility and long-term 'campaigns' in the months and years to come. The shot planning capabilities integrate with the Configuration Management Tool (CMT) for experiment details and the NIF calendar for availability. Future enhancements will additionally integrate with target diagnostics planning and target fabrication requirements tools. The optics demand component is built upon predictive modelling of maintenance requirements on the final optics as a result of the proposed shots assembled during shot planning. The predictive models integrate energetics from a Laser Performance Operations Model (LPOM), the status of the deployed optics as provided by the online Final Optics Inspection system, and physics-based mathematical 'rules' that predict optic flaw growth and new flaw initiations. These models are then run on an analytical cluster comprised of forty-eight Linux-based compute nodes. Results from the predictive models are used to produce decision-support reports in the areas of optics inspection planning, optics maintenance exchanges, and optics beam blocker placement advisories. Over time, the SPLAT project will evolve to provide a variety of decision-support and operation optimization tools.

42 ENGINEERING↗

Systems and Tools to Facilitate Aging Management Inspections of Used Nuclear Fuel Dry Storage Systems - 18382

The Used Nuclear Fuel (UNF) dry storage systems (DSSs) are currently used at almost all the nuclear plants in the USA for the storage of their UNF as the spent fuel pools are running out of capacity to store any additional discharged fuel. Even though these DSSs are supposed to be at the reactor site for a short amount of time, they are expected to be at the reactor sites for an extended duration due to the unavailability of Interim Storage Facilities (ISF) or a permanent disposal sites like Yucca Mountain. Maintaining the integrity of the DSS canisters and storage overpacks so they can safely protect the fuel and maintain the integrity of UNF is of utmost importance during storage at reactor site ISFSI or at the ISF. Comprehensive and robust Aging Management Program (AMP) is an important aspect for DSSs to satisfy these requirements. In order to address this industry need, TN Americas have developed an enhanced NUHOMS{sup R} DSS licensed by NRC under 10 CFR Part 72 regulations and a comprehensive AMP development which includes prevention, inspection, monitoring and mitigation of any corrosion or degradation of DSS components. For DSC and HSM inspection, two remotely operating delivery systems have been developed using non-destructive examination (NDE) methods including robotic crawler and inspection ring system. This paper describes details of these developments and status of their deployment for implementation at various utility ISFSI sites. TN Americas completed the detailed design of the DSC inspection system and conducted functional tests of the inspection system on a DSC mockup and the system is ready for deployment at any NUHOMS{sup R} ISFSI site. TN Americas is committed to offer the most robust and comprehensive AMP systems, tools and services to the industry to assure the safety of the deployed DSS at the utility sites. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Status Quo and Gap Analysis of Heliostat Field Deployment Processes for Concentrating Solar Tower Plants

In this study, deployment of the solar field of a concentrating solar power plant is one of many factors that are integral to the success of a project. Knowledge transfer from outside the industry is limited due to the unique nature of heliostats, which redirect sunlight to a receiver with high precision while maintaining a high level of reflectivity. Moreover, learning from project to project can be limited due to the site-specific nature of projects, as the market includes several developers, each with their own unique design. In this paper, we discuss the state of the art in heliostat field deployment. We cover all the key aspects of deployment from project assessment to a fully functioning system, which include site selection, layout development, supply chain, assembly, site preparation and construction, calibration, and operations and maintenance. We then perform a gap analysis on field deployment and recommend priorities for future research.

14 SOLAR ENERGY↗

Fission Surface Power Technology Development Status

With the potential future deployment of a lunar outpost there is expected to be a clear need for a high-power, lunar surface power source to support lunar surface operations independent of the day-night cycle, and Fission Surface Power (FSP) is a very effective solution for power levels above a couple 10 s of kWe. FSP is similarly enabling for the poorly illuminated surface of Mars. The power levels/requirements for a lunar outpost option are currently being studied, but it is known that cost is clearly a predominant concern to decision makers. This paper describes the plans of NASA and the DOE to execute an affordable fission surface power system technology development project to demonstrate sufficient technology readiness of an affordable FSP system so viable and cost-effective FSP system options will be available when high power lunar surface system choices are expected to be made in the early 2010s.

Palac, Donald T.↗

Used Fuel Dry Storage Systems and Components for Shutdown Plants to Expedite Defueling of Spent Fuel Pool - 18378

For plants that have announced plans to shut down, their main priority is to off-load the Used Nuclear Fuel from the spent fuel pool to dry storage at an ISFSI so that they can proceed to 'Safe store' or other storage options, and start their decommissioning process as soon as possible. One of the major expenses for a decommissioned plant is the cost of maintenance of the spent fuel pool. Therefore, the ability of the dry storage system to store short cooled fuel is an important aspect of dry storage system for shutdown plants. When a shutdown plant evaluates the dry storage options, total cost of the transferring the fuel from the pool to ISFSI site needs to be evaluated. One of the major costs to the utility for dry storage is the cost of ISFSI pad (basemat) along with the cost of dry storage system hardware. Smaller ISFSI footprint saves utility for the cost of ISFSI site excavation, cost of engineered backfill and cost of ISFSI pad. In order to minimize the cost of dry storage systems, besides the size of the ISFSI pad as described above, other important considerations is to use high capacity systems. The highest capacity systems available in the dry storage market today are with 37 PWR or 89 BWR used fuel assemblies per canister. These dry storage systems are expected to be at the plant sites for extended duration due to the unavailability of Interim Storage Facilities or a permanent disposal sites like Yucca Mountain. Maintaining the integrity of the dry storage systems canisters and storage overpack so that they can safely protect the fuel and integrity of used nuclear fuel is maintained during storage period is of utmost importance. Robust Aging Management Program is an important aspect for dry storage systems not only at the shutdown plants but also at the operating plants. This paper will provide the update of a reduced footprint version of TN Americas NUHOMS{sup R} System with MATRIX HSM and NUHOMS{sup R} EOS Canisters that addresses the need for maximizing safety, ISFSI capacity while optimizing cost. It will provide an update on the current capabilities, design features and current status of the licensing and deployment of NUHOMS{sup R} EOS System. It will provide the current status of the MATRIX HSM along with the significant enhancement included for a robust Canister Evolved Safety Program for Aging Management. It will also describe the construction sequence; loading operations, and inspections during extended storage as a part of aging management program. The compact version of TN Americas NUHOMS{sup R} System with MATRIX HSM offers a 'Universal' Storage Overpack which is designed to accept all different designs dry storage canisters available in the industry. As UNF storage continues to drives the industry towards innovations that address the need for optimized dry storage systems, compact ISFSIs and prudent aging management programs, this new evolution of the TN Americas NUHOMS{sup R} system with MATRIX HSM and EOS Canisters offers a significant leap forward in addressing all of these challenges. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗