Search NASA⌕ Search

SEARCH · Search NASA

Results for “deployment timelines”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Pathways to Overcome Geothermal Deployment Barriers

Geothermal resources represent a vast domestic energy supply that can provide a fexible and reliable source of electricity as well as contribute to clean energy goals. In the United States, geothermal exploration and development are subject to numerous permits, authorizations, and other regulatory requirements at the federal, state, and local level. These are necessary to address potential environmental and resource impacts at geothermal project sites, but may act as barriers to geothermal deployment, slowing timelines and raising costs. The 2022 NREL report, Non-Technical Barriers to Geothermal Development in California and Nevada, presents fndings of a study on non-technical barriers that may infuence geothermal project development.

geothermal↗

Assessing Government and Industry Roles to Accelerate Commercialization of Advanced Reactors and Supporting Fuel Cycles

Recent growth in private sector interest and investment in advanced reactor designs signals a new period in the greater than six decade pursuit of commercial nuclear technology. This nuclear entrepreneurship is primarily centered in the North America; meanwhile, national programs in China, France, India, Russia, and South Korea also feature active efforts to design, construct, operate and export advanced reactors .The business case for most private ventures calls for an aggressive commercialization timeline-tied to expectations for returns on investment. Finally, strategic energy portfolio projections and utility resource planning point to the 2030 - 2050 window as the period of greatest need for dispatchable, energy intensive, low-carbon generation options to address retirement of baseload capacity, increased penetration of renewables and economy-scale decarbonization. However, lead times for commercialization range from 30 to 50 years based on more traditional government-centric timelines. Fuel development and fuel cycle infrastructure deployment represent parallel timelines that directly influence the timeline for commercialization of many advanced reactor concepts. While multi-decade development periods appear to be commonplace for new nuclear projects, such timelines were not always the norm-three separate countries set out to develop civilian commercial power from fundamental nuclear principles, in just over a decade, on average. The US led light-water reactor (LWR) development in the 1950's, the UK pioneered a gas-cooled reactor (GCR) concept in the same time period, and Canada forged the path to commercializing the heavy-water reactor (HWR) starting in the mid-1950's and into the mid-1960's. The necessary fuel cycle facilities to support the commercial reactor design also did not appear suddenly, but were a collaborative effort between government and private partners. In this paper, the efforts of these three governments and their private industry partnerships in reactor and fuel cycle development are explored, and a select sample of representative milestones for each is presented, with the roles that each group played. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Non-Constant Learning Rates in Retrospective Experience Curve Analyses and their Correlation to Deployment Programs

A key challenge for policy-makers and technology market forecasters is to estimate future technology costs and in particular the rate of cost reduction versus production volume. A related, critical question is what role should state and federal governments have in advancing energy efficient and renewable energy technologies? This work provides retrospective experience curves and learning rates for several energy-related technologies, each of which have a known history of federal and state deployment programs. We derive learning rates for eight technologies including energy efficient lighting technologies, stationary fuel cell systems, and residential solar photovoltaics, and provide an overview and timeline of historical deployment programs such as state and federal standards and state and national incentive programs for each technology. Piecewise linear regimes are observed in a range of technology experience curves, and public investments or deployment programs are found to be strongly correlated to an increase in learning rate across multiple technologies. A downward bend in the experience curve is found in 5 out of the 8 energy-related technologies presented here (electronic ballasts, magnetic ballasts, compact fluorescent lighting, general service fluorescent lighting, and the installed cost of solar PV). In each of the five downward-bending experience curves, we believe that an increase in the learning rate can be linked to deployment programs to some degree. This work sheds light on the endogenous versus exogenous contributions to technological innovation and highlights the impact of exogenous government sponsored deployment programs. This work can inform future policy investment direction and can shed light on market transformation and technology learning behavior.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Crossing the Barriers: An Analysis of Permitting Barriers to Geothermal Development and Potential Improvement Scenarios

Developers have identified many non-technical barriers to geothermal power development, including permitting. Activities required for permitting, such as the associated environmental reviews, can take a considerable amount of time and delay project development. This paper discusses the impacts to geothermal development timelines due to the permitting challenges, including the regulatory framework, environmental review process, and ancillary permits. We identified barriers that have the potential to prevent geothermal development or delay timelines and defined improvement scenarios that could assist in expediting geothermal development and permitting timelines and lead to the deployment of additional geothermal resources by 2030 and 2050: (1) the creation of a centralized federal geothermal permitting office and utilization of state permit coordination offices as well as (2) an expansion of existing categorical exclusions applicable to geothermal development on Bureau of Land Management public lands to include the oil and gas categorical exclusions passed as part of the Energy Policy Act of 2005. We utilized the Regional Energy Deployment System (ReEDS) and the Geothermal Electricity Technology Evaluation Model (GETEM) to forecast baseline geothermal deployment based on previous analysis of geothermal project development and permitting timelines. The model results forecast that reductions in geothermal project timelines can have a significant impact on geothermal deployment. For example, using the ReEDS model, we estimated that reducing timelines by two years, perhaps due to the creation of a centralized federal geothermal permitting office and utilization of state permit coordination offices, could result in deployment of an additional 204 MW by 2030 and 768 MW by 2050 - a 13% improvement when compared to the business as usual scenario. The model results forecast that a timeline improvement of four years - for example with an expansion of existing categorical exclusions coupled with the creation of a centralized federal geothermal permitting office and utilization of state permit coordination offices - could result in deployment of an additional 2,529 MW of geothermal capacity by 2030 and 6,917 MW of geothermal capacity by 2050 - an improvement of 116% when compared to the business as usual scenario. These results suggest that reducing development timelines could be a large driver in the deployment of geothermal resources.

15 GEOTHERMAL ENERGY↗

A Framework to Assess Advanced Reactor Spent Fuel Management Facility Deployment

Previous planning and prioritization for LWR SNF management investigated the risks and uncertainties of deploying facilities such as consolidated interim storage [1, 2, 3, 4]. As part of that work, activities and milestones were collected into success precedence diagrams that charted a path to achieving facility deployment [1]. In that framework, activities are any research, development, design, or decision required to achieve an intermediate goal; milestones are activity endpoints and mark the completion of deliverables. Milestones can be thought of as achievements required to reach the final goal of facility deployment; activities are the means by which milestones are accomplished. In planning, activities and milestones are compiled into comprehensive flow charts that visualize the steps necessary for deployment. This framework has been used to quantify risks, timelines, and costs of deploying SNF management facilities.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Deploying Darter A Cray XC30 System

TheUniversityofTennessee,KnoxvilleacquiredaCrayXC30 supercomputer, called Darter, with a peak performance of 248.9 Ter- aflops. Darter was deployed in late March of 2013 with a very aggressive production timeline - the system was deployed, accepted, and placed into production in only 2 weeks. The Spring Experiment for the Center for Analysis and Prediction of Storms (CAPS) largely drove the accelerated timeline, as the experiment was scheduled to start in mid-April. The Consortium for Advanced Simulation of Light Water Reactors (CASL) project also needed access and was able to meet their tight deadlines on the newly acquired XC30. Darter s accelerated deployment and op- erations schedule resulted in substantial scientific impacts within the re- search community as well as immediate real-world impacts such as early severe tornado warnings

Fahey, Mark R↗

Development and Evaluation of Embrittlement Resistant Alloys for Advanced LWR Cladding

The primary challenge preventing the deployment of reactor designs that leverage wrought FeCrAl as an advanced light-water reactor (LWR) cladding is irradiation hardening and embrittlement. Wrought FeCrAl alloys experience a loss of post-irradiation ductility and fracture toughness under low-temperature neutron irradiation (< 350°C) resulting from the combined effects of dislocation loop formation and the irradiation-enhanced precipitation of Cr-rich alpha-prime precipitates throughout the microstructure. Over the past decade, significant improvements in our understanding regarding the effect of Cr and Al content have been enabled through neutron irradiations, but even optimized wrought alloys such as C26M remain vulnerable to brittle failure during storage, transportation, and handling following irradiation. This report summarizes multiple irradiation campaigns initiated over the past 7 years and provides recent insights into the effect of (1) minor alloying composition, (2) alloy processing strategy, (3) crystal structure, and (4) the use of advanced oxide dispersion strengthened (ODS) alloys. The first irradiation campaign irradiated body-centered cubic FeCrAl alloy C26M with and without elements such as Mo and Y. It also included face-centered cubic alumina-forming austenitic (AFA) alloys that have a steeper neutronic penalty but that have far superior high-temperature strength than wrought FeCrAl. Finally, this campaign compared conventional wrought C26M with the same material produced using modern powder metallurgical hotisostatic pressing (PM-HIP). The second irradiation campaign, initiated in 2018, irradiated wrought and FeCrAl-ODS materials up to 50 dpa to assess their irradiation resistance to high-doses. The results of this work indicate that wrought C26M suffers significant degradation following neutron irradiation at LWR-relevant temperatures regardless of Mo and Y content. The PM-HIP variant appears to be more resilient to irradiation-induced ductility loss in comparison with wrought variants but still loses almost all ductility by 8 dpa. Notably, the AFAs retained at least 5% total elongation after irradiation at the same dose and temperature condition, although additional deterioration may be expected at higher fluence levels. FeCrAl-ODS materials show the greatest promise as a transformative longer-term accident-tolerant fuel (LT-ATF) cladding material. The extruded 106ZY10C alloy retained 10% total elongation after 16 dpa irradiation and retained 8% total elongation after 50 dpa. Additional challenges with FeCrAl-ODS alloys also remain, including optimization of end cap joining methodologies, enhancement of fracture toughness, scaling production to prove economic viability, and optimizing post-pilger heat treatments to maximize ductility and irradiation resistance. This series of irradiations demonstrates the efficacy of the LWR testbed available within the United States for the rapid irradiation and down-selection of LT-ATF candidates. As the country rapidly accelerates its timeline for the deployment of advanced reactor concepts, the effective utilization of the High Flux Isotope Reactor for separate-effects style irradiations should continue to be prioritized to answer the final questions pertaining to LT-ATF candidates necessary for the deployment of advanced boiling water reactors and small modular reactors.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Artificial Intelligence for Multiphysics Nuclear Design Optimization with Additive Manufacturing

The geometric flexibility of additively manufactured metals and ceramics generates a very large and open design space that requires advanced modeling and simulation tools for physics simulations and the rigorous definition of design problems. This effort deploys artificial intelligence (AI) and machine learning (ML) algorithms to understand the design space, evaluate potential designs, and more efficiently generate optimized results. The Transformational Challenge Reactor (TCR) program is leveraging advances in several scientific areas—including materials, manufacturing, sensors and control systems, data analytics, and high-fidelity modeling and simulation—to accelerate the design, manufacturing, qualification, and deployment of advanced nuclear energy systems. Through a manufacturing-informed design approach, the TCR program seeks to integrate digital data for rapid nuclear innovation; accelerate the adoption of advances in manufacturing, materials, and computational sciences for nuclear applications; and dramatically reduce deployment costs and timelines for new nuclear reactor technologies. This report documents efforts under the TCR program to leverage advanced modeling and simulation techniques driven by AI/ML algorithms on high-performance computing (HPC) systems to yield more optimized TCR core designs. A multiphysics ML surrogate model was developed to run on the HPC architectures. The surrogate model is trained on high-fidelity simulation data of coupled neutronics and thermofluidics and is used to quickly evaluate thousands of candidate core designs in parallel, which drives the evolution of the cooling channel shapes to minimize temperature peaking and material stress. Outcomes from these activities provide design information and feedback into the core design efforts.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A Supply Chain Road Map for Offshore Wind Energy in the United States

"A Supply Chain Road Map for Offshore Wind Energy in the United States" identifies pathways to developing a domestic offshore wind supply chain that can manufacture and deploy the major components needed to set the United States on a pathway to installing 30 GW of offshore wind by 2030 and 110 GW by 2050. The report estimates that this supply chain could require an investment of at least $\$$22.7 billion this decade to meet an annual demand for components, ports, and vessels in 2030. Although this is a considerable investment, it could allow the industry to install around $\$$100 billion worth of offshore wind this decade by reducing risk of delays due to global supply chain bottlenecks and creating a robust network of assets that will continue to be effective well beyond 2030. The United States would need at least 34 manufacturing facilities employing 10,000 workers, 39,000 jobs in the supporting supply chain, 10 marshaling ports, 4-6 dedicated wind turbine installation vessels, 4-6 dedicated heavy-lift vessels, and 4-8 U.S.-flagged specialized feeder barges to come online this decade to support an average annual deployment of 4-6 gigawatts offshore wind capacity per year. This supply chain could be developed in 6-9 years, but would require near-term decision making and efficient permitting and planning to strategically develop these resources by 2030. Additional investment and expansion would be required in the 2030s as the sector expands into new regions (such as the Gulf of Mexico) and new technologies (such as larger wind turbines and floating wind energy projects). Furthermore, the planning process needs to meaningfully engage with communities that will be impacted by supply chain expansion to achieve just outcomes and maximize benefits to these stakeholders, which will result in a more equitable and sustainable supply chain. While U.S. offshore wind has made significant progress in recent years, remaining supply chain challenges include uncertainty surrounding deployment and procurement timelines; a lack of port and vessel infrastructure; and limitations in the available workforce, supporting supplier networks, and energy justice best practices. However, many of these problems can be addressed through improved communication between key stakeholder groups, support from federal and state governments, and forward-thinking designs of supply chain assets to accommodate future technology changes for fixed-bottom and floating offshore wind. Although it is a significant task, developing these domestic capabilities represents a once-in-a-generation opportunity to contribute to a decarbonized energy future and also create massive economic benefits that are distributed throughout the country.

17 WIND ENERGY↗

Performance of B-10 based detectors

Helium-3 gas-filled detectors have been used in nuclear safeguards applications, in homeland security neutron detection modules and in research for over 30 years. With the current shortage of {sup 3}He gas, GE's Reuter-Stokes business developed a {sup 10}B lined proportional counter and a {sup 10}B hybrid detector, in which a small amount of {sup 3}He is added to a 10B detector to enhance the neutron sensitivity. In 2010, GE's Reuter-Stokes successfully developed a commercial alternative to 3He gas-filled detectors for homeland security neutron detection modules based on 10B lined proportional counters. We will present the concept behind the {sup 10}B neutron detection modules, as drop-in replacement to existing 3He neutron detection modules deployed, and the timeline and development needed to get a fully commercial application. To ensure the highest quality, each {sup 10}B neutron detection unit is put through a series of tests: temperature cycles from -40 deg. C to +55 deg. C, vibration testing at levels up to 2.5 g from 10 Hz to 50 Hz in every direction, neutron sensitivity reaching up to 4.5 cps/(ng {sup 252}CF at 2 m), and gamma insensitivity with field reaching 1 Sv/hr. In 2013, GE's Reuter-Stokes developed the B10Plus+{sup R} detector, in which a small amount of {sup 3}He is added to a {sup 10}B lined proportional counter. Depending on the amount of {sup 3}He added, the B10Plus+{sup R} can more than double the neutron sensitivity compared to a {sup 10}B lined proportional counter. {sup 10}B lined proportional counters and B10Plus+{sup R} have excellent gamma rejection and excellent performance even at very high neutron flux. The gamma rejection and high neutron flux performance of these detectors are comparable, if not better, than traditional {sup 3}He proportional counters. GE's Reuter-Stokes business modelled, designed, built and tested prototype coincidence counters using the {sup 10}B lined detectors and the {sup 10}B hybrid detectors. We will present these systems and their applications for non-destructive assay. We will also show other examples of applications where {sup 10}B lined proportional counters and B10Plus+{sup R} detectors can be used. (authors)

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

The Argonne SuperGel for CBRN Decontamination - 20160

The Argonne SuperGel was developed between 2003 and 2015 to fill a gap in our nation's capability to quickly decontaminate important structures following a radiological or nuclear release event. Specifically, the decontamination technology was developed to minimize damage to monuments, high valued structures, and critical infrastructure while reducing environmental and health impacts. An important criterion during its development, common reagents were employed that could be easily acquired in order to minimize the timeline for its deployment. Its current formulation uses off-the-shelf super-absorbing hydrogels common to the food and agricultural industry and common salts. Over the years, two formulations of the Argonne SuperGel have been developed to specifically target radioactive cesium contaminations and then, more generically, actinide and fission product contaminations. A biodegradable derivative of phosphoric acid is used in small amounts to promote the removal of insoluble actinide species. The original order of unit operations for the SuperGel technology was 1) applying the wash solution to promote mobility of the contaminants on the surface, 2) applying the hydrogel to absorb the wash solution and contaminants, and 3) removing the hydrogel for disposal. During the course of our studies, we tested a new formulation of the gel technology that eliminated the need for a separate step to apply the wash solution without a compromise in decontamination factors. Greater than 70% and >95% of Cs-137 were removed from concrete and tile coupons, respectively, after two decontaminations, with the best results using wash solutions of 1.0 M KCl and 1.0 M NH{sub 4}Cl formulations. We found no statistical difference between results at 30 deg. C and 40 deg. C or at 70% and 90% relative humidity. We tested the gel under strong UV irradiation to simulate extreme environments. While a tropical noontime UV flux did not adversely affect the gel system decontamination of Cs-137 from concrete or tile coupons, the noontime flux resulted in significant dehydration of the gel after two hours of constant exposure. The rehydration of the gel by the humid air (at 90% humidity and 40 deg. C) was slow and may not be sufficient to offset dehydration by the sun. Americium decontamination from concrete was 70% after optimizing the phosphoric acid derivative and carbonate salt concentration in the wash solution. Since its development, we have had the opportunity to test the SuperGel in the removal of legacy contaminations in hot cell facilities and former glovebox facilities at Argonne. This has provided a unique opportunity to evaluate the SuperGel on a range of contaminants outside the original specifications for its use. We will report on the origin of the gel formulation, some highlighted experimental data including independent testing by the US EPA which has never been reported, and its efficacy for removing legacy alpha contaminations and its potential use for removal of chemical and biological hazardous agents. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preliminary Logistics Modeling of the Integrated Wash Aid Treatment Emergency Reuse System - 19495

We employed Analysis of Mobility Platform (AMP) and GoldSim software to model the logistics of deploying materials to implement the Integrated Wash Aid Treatment Emergency Reuse System (IWATERS) in a hypothetical cesium-contamination scenario covering a four-block strip of downtown Chicago, IL. In this deployment of IWATERS, buildings were washed down via fire-hosing and contaminated wash solution was collected in the city's waste/stormwater collection system. The contaminated wash water was treated to remove Cs via ad hoc sand/clay filtration beds, and the treated wash solution was recycled during continuing decontamination operations. A detailed task timeline for the IWATERS deployment and information (or assumptions) on the availability and location of required resources for operations provided input parameters, as well as a framework, to enable the AMP and GoldSim simulations. From the decision to deploy IWATERS to the end of operations, including the completion of processing all contaminated wash water, took 49 days with decontamination teams active for 35 days and treatment bed teams active for 37 days. The modeling results showed the availability of vermiculite clay (based on data supplied by its commercial vendors/distributors) as the limiting factor for deploying treatment bed teams and, consequentially, the recycling rate of wash water and the timeline for decontamination operations. These simulations represent the first attempt at understanding the material and personnel requirements for large-scale IWATERS operation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Physical Security Timeline Analysis in Support of Advanced Reactor Demonstration and Deployment

This report presents the regulatory requirements and directions on the physical security of advanced nuclear reactors in USA. Presently, a rule is being proposed that allows for a performance-based analysis. In determining the physical security requirements for an advanced reactor, new tools may be desired to conduct a performance-based analysis. These tools should incorporate dynamic analysis methods to provide as much realism as possible. In comparison, the security requirements for existing light water reactors (LWRs) are much more prescriptive and the analysis conducted to establish the required physical security strategies were more easily performed with static analysis. In order to achieve the cost goals that advanced reactors require for adoption; the nuclear security force required should not be excessive. Dynamic physical security analysis methods and tools have been developed by the US Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) program. This report details how the dynamic risk analysis tools developed in the LWRS program using the dynamic risk modelling tool, EMRALD, may be adapted for use in analyzing the physical security designs for advanced reactors accounting for variable performance-based requirements. This report provides an example analysis of a hypothetical SFR using publicly available information and generic assumptions to demonstrate the methods and potential presentation and analysis of the results. No actual plant information is used in this example analysis. Future work in this area will create additional models that can be adapted for any advanced reactor concept and use various security features to create a physical security system that provides adequate protection from radiological theft and sabotage.

97 MATHEMATICS AND COMPUTING↗

Methodology and Application of Physical Security Effectiveness Based on Dynamic Force-on-Force Modeling

This report describes the research and development being performed at INL towards a dynamic modeling and simulation framework to enable physical security optimization at commercial nuclear power plants. The framework is based on the dynamic modeling tool EMRALD and is demonstrated for applications that can result in physical security optimization. Two main applications are presented: 1. Integrating FLEX portable equipment performance with FOF models of a plant’s physical security posture, and 2. Location optimization of bullet resistant enclosure. The generic framework for modeling FLEX portable equipment is described in detail, followed by a case study modeling an adversarial attack aimed at causing a radiological release by sabotaging the plant’s power supply and its ultimate heat sink capabilities at a hypothetical PWR. Two distinct FLEX deployment strategies, series and parallel, are modeled with distinct timelines. The results of the adversarial attack modeled in a commercial FOF tool, AVERT, are integrated with the FLEX deployment model in EMRALD. Monte Carlo simulation is used to model the distribution of the timeline in FLEX deployment strategies. Thermal-hydraulic analysis of FLEX performance is performed in RELAP5 and integrated with the EMRALD simulations to provide more realistic timelines in the models. The results demonstrate that, even in the extreme case of a successful adversarial attack, deployment of FLEX equipment can result in a significantly high likelihood of preventing radiological release. The modeling and simulation framework of integrating FLEX equipment with FOF models enables the NPPs to credit FLEX portable equipment in the plant security posture, resulting in an efficient and optimized physical security. The objective of location optimization of BRE is to determine the best location in the plant for a new BRE being planned by the plant to enhance their physical security effectiveness. The plant physical security FOF model is integrated with EMRALD that performs Monte Carlo simulation to run different attack scenarios and a discrete set of potential BRE locations. Sensitivity analysis is used to determine the most effective location for the BRE. The optimization approach can be extended to wide applications such as location optimization of remotely operated weapons and other strategic fixed assets.

97 MATHEMATICS AND COMPUTING↗

INTEGRATION OF FLEX EQUIPMENT AND OPERATOR ACTIONS IN PLANT FORCE-ON-FORCE MODELS WITH DYNAMIC RISK ASSESSMENT

The overall operation and maintenance cost to protect nuclear power plants accounts for approximately 7% of the total cost of power generation, with labor accounting for half of this cost. In the current research, from interaction with utilities and other stakeholders, it was determined that physical security forces account for nearly 20% of the entire workforce at several nuclear power plants. Labor costs continue to rise in the U.S., so any measures to reduce the cost of operating a nuclear power plant will need to include a reduction in labor. The physical security pathway within the DOE’s Light Water Reactor Sustainability program aims to lower the cost of physical security through directed research into modeling and simulation, application of advanced sensors or deployment of advanced weapons. This report presents a modeling and simulation framework for integrating Diverse and Flexible Mitigation Capability (FLEX) portable equipment performance with Force on Force models of a plant’s physical security posture. The generic framework is described in detail, followed by a case study of modeling an adversarial attack aimed at causing a radiological release by sabotaging the plant’s power supply and its ultimate heat sink capabilities at a hypothetical nuclear power plant. Two different FLEX deployment strategies, series and parallel, are modeled with distinct timelines. The results of the adversarial attack modeled in a commercial Force on Force tool are integrated with the FLEX deployment model in INL’s dynamic modeling tool EMRALD. Monte Carlo simulation is used to model the distribution of the timeline in FLEX deployment strategies. The results demonstrate that, even in the extreme case of a successful adversarial attack, deployment of FLEX equipment can result in a significantly high likelihood of preventing radiological release. The modeling and simulation framework integrating FLEX equipment with Force on Force models enables the nuclear power plants to credit FLEX portable equipment in the plant security posture, resulting in an efficient and optimized physical security.

97 MATHEMATICS AND COMPUTING↗

Alfalfa

Alfalfa-based testbeds enable building equipment, control products, and workforce development tools to interact with dynamic building simulations representing the desired building, system, weather, and grid configuration. Alfalfa is used to de-risk implementation of load flexibility prior to field deployment, reducing the costs and timelines associated with adoption of decarbonization technology at the grid edge.

building energy modeling↗

Preliminary Analysis of Nuclear-Powered Data Center Scenarios

This report provides a comprehensive analysis of the potential for nuclear energy to meet the growing energy demands of data centers (DCs). It evaluates the technical, economic, and socio-environmental implications of coupling Nuclear Power Plants (NPPs) with DCs, providing initial responses to several key research questions: What is the potential increased energy demand from DCs in the U.S., in the short, medium and long term? The U.S. is experiencing a rapid increase in energy demand from DCs, with projections indicating a total increase of 24-74 GWy(e) by 2028. Meeting this demand with nuclear energy would require 27–85 GWe of installed capacity. While this surge is expected to slow in the long term, the DC industry needs reliable, scalable, and clean energy sources. How much nuclear capacity can be deployed to meet DC demand and in which timeframe? Several pathways for increasing nuclear capacity were identified, including uprates, restarts of recently retired reactors, power purchase agreements with existing fleet, and new construction. Approximately 20‒28 GWe of nuclear capacity could be dedicated to DCs by the early 2030s. How much High Assay Low Enriched Uranium (HALEU) would be needed to support some nuclear deployment scenarios for DCs? Meeting the deployment targets announced by Google and Amazon for the Kairos Power Fluoride-Salt-Cooled High-Temperature Reactor or KP-FHR (~500 MWe by 2035) and the Xe-100 (~1 GWe by 2040), respectively, requires ramping up 19.75% enriched HALEU production to ~6 t/yr by 2040. What types of nuclear energy/DC coupling options exist, and what are the different benefits/challenges? Five coupling options were analyzed, ranging from grid-connected configurations to colocated, behind-the-meter setups. Key design considerations include the proximity to high- and/or medium-voltage transmission lines, the desired internal fault tolerance, and the sources of alternative/backup power during outages. Each coupling option offers unique benefits and challenges in terms of reliability, system costs, regulation, timeline, etc. A list of NPP/DC deployment scenarios was developed, considering existing or newly built NPP or DC projects. Colocated DCs with new small modular reactors or large reactors on greenfield and brownfield sites are the focus of this report. What types of reactors, especially what size, may be incentivized by DCs? Reactor sizing optimization revealed that the ideal reactor size and number of units depend on DC demand, coupling configurations defined in this report, and other economic factors. Larger reactors are preferred for high-demand DCs and grid-connected systems, while larger number of smaller reactors are better suited for DC configurations without grid backup. Which sites may be compatible with co-located nuclear-powered DCs? Siting those projects is a complicated evaluation factoring local water resources, grid connection availability and reliability, IT infrastructure, local work force, proximity to population zones, etc. For this effort greenfield and brownfield sites such as retired coal-fired plants were used to evaluate this question. This evaluation is not meant to recommend any particular site but it highlights key siting criteria and demonstrates large-scale site availability. What are the socio-economic impacts of co-located nuclear-powered DCs? Those projects generate substantial economic benefits to the local economy, particularly in urban settings. Hyperscale DCs colocated with nuclear power plants (sized around 1 GW of power) can create nearly 1,700 jobs for annual operations and more than 7,300 jobs among the supply chain and local businesses as a result of increased household spending. Rural projects also provide significant benefits, but at lower magnitudes compared to urban deployments.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Weighing the Future: Strategic Options for U.S. Space Nuclear Leadership

We believe in speed, strength, and sovereignty. The government’s job is to unlock private sector investment, not micromanage it. Our approach shifts from endless studies to operational deployment, from bureaucratic gridlock to clear timelines and accountability. If done right, this strategy will unleash private capital, create high-tech American jobs, and put the United States back in the lead, not just in space, but in the future of energy and defense.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗