The Role of the U.S. Electric Distribution System in Serving Data Center and Other Large Loads

The rapid expansion of data centers in the United States is reshaping how the electric distribution system must plan for and accommodate large load interconnections. This report evaluates the role of the distribution grid in serving these loads, from small edge facilities to hyperscale campuses. Using national datasets, utility filings, and industry studies, we assess demand growth, reliability requirements, interconnection thresholds, and infrastructure needs at substations and feeders. The analysis highlights the mismatch between fast data center development timelines and slower utility planning and construction cycles, as well as strategies such as phased energization, on-site generation, hosting capacity maps, and structured interconnection frameworks. While focused on data centers, the insights also apply to other high-density loads such as advanced manufacturing, hydrogen production, and electrified transportation. The report concludes with approaches to align planning processes, transparency tools, and regulatory frameworks so utilities can manage new large loads in ways that support a reliable and resilient grid.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

1000 Soils Pilot Dataset, version 8, May 2025

This record hosts data generated by the 1000 Soils Pilot. Data will be updated as more become available. Please see the most recent data upload for current data. A beta visualization tool is available for some data types at https://shinyproxy.emsl.pnnl.gov/app/1000soils. Please submit any suggestions or comments through the 'contact' tab. We are actively working to improve visualizations and value all feedback. Data completed include: Geochemistry, texture, respiration, and enzyme activities FTICR-MS organic matter chemistry Microbial biomass C and N TOC/TDN of water-extractable OM X-ray computed tomography (derived metrics available here, raw data available upon request) Metagenomes; a variety of data formats are available upon request Soil hydraulic properties Data in progress: LC-MS/MS in development, timeline TBD, inquire for status 1000S_processed_BGC_summary.csv contains all available biogeochemical data; microbial biomass C and N; and TOC/TDN of water-extractable OM; and 1000S_Tomography.xslx contains a summary of data generated via X-ray computed tomography. icr_v2_corems2.csv contains FTICR-MS data processed by CoreMS version 2. These data are merged by formula across instrument runs to enable cross-sample comparisons. Technical replicates are merged by retaining peaks present in 2 out of 3 replicates. 1000Soils_Metadata_Site_Mastersheet_v1.csv contains site information. Soil Hydraulics_corrected_02042025.xlsx contains soil hydraulics information. Readme File_v4.xlsx is the readme file. Please contact the MONet project (monet.emsl@pnnl.gov) or Emily Graham (emily.graham@pnnl.gov) with questions. The following file and all raw data are available upon request: icr_by_mass_for_single_sample_analysis_only.csv contains FTICR-MS data processed by CoreMS and is intended for usage in the calculation of biochemical transformations within samples only. These data are not acceptable for cross-sample comparison of masses because they are from multiple instrument runs. For more information, please see: https://www.emsl.pnnl.gov/monet and https://sc-data.emsl.pnnl.gov/monet Acknowledgment: Soil data were provided by the Molecular Observation Network (MONet) at the Environmental Molecular Sciences Laboratory (https://ror.org/04rc0xn13), a DOE Office of Science user facility sponsored by the Biological and Environmental Research program under Contract No. DE-AC05-76RL01830. The work (proposal: 10.46936/10.25585/60008970) conducted by the U.S. Department of Energy, Joint Genome Institute (https://ror.org/04xm1d337), a DOE Office of Science user facility, is supported by the Office of Science of the U.S. Department of Energy operated under Contract No. DE-AC02-05CH11231. The Molecular Observation Network (MONet) database is an open, FAIR, and publicly available compilation of the molecular and microstructural properties of soil. Data in the MONet open science database can be found at https://sc-data.emsl.pnnl.gov/.

biogeochemistry↗

HEP Software Foundation Community White Paper Working Group -- Data Organization, Management and Access (DOMA)

Without significant changes to data organization, management, and access (DOMA), HEP experiments will find scientific output limited by how fast data can be accessed and digested by computational resources. In this white paper we discuss challenges in DOMA that HEP experiments, such as the HL-LHC, will face as well as potential ways to address them. A research and development timeline to assess these changes is also proposed.

Berzano, Dario↗

Accelerating Materials Discovery: Artificial Intelligence for Sustainable, High-Performance Polymers

PolyID enables the discovery of polymers with advanced performance and greater sustainability while reducing material development timelines. The material design space is immense and cannot be reasonably probed using an Edisionian approach. High-throughput property prediction, enabled by artificial intelligence provides a hypothesis driven approach for down selection of candidate polymers to pursue experimentally. To aid experimentalists in the down selection of material targets this high-throughput, machine learning-based tool is capable of predicting polymer properties simply from molecular structures. Currently, transport, thermal, and mechanical properties across 7 polymer class (polyamides, polyesters, polycarbonates, polyimides, polyolefins, polyacrylates, and polyurethanes) can be predicted, and the PolyID platform has been flexibly designed so new materials and properties can be added.

artificial intelligence↗

Incorporating A Risk-Informed, Performance-Based Concept into Nuclear Fuel and Materials Development for Advanced Reactors

The NRC’s regulatory concept for advanced reactors under 10 CFR Part 53 promotes the use of an RIPB concept. RIPB is usually referenced as a general, overarching concept. This paper is focused on how to, and if it would be worthy to, incorporate an RIPB concept into nuclear fuel and materials development for advanced reactors. This paper proposes three potential RIPB applications for nuclear fuel and materials development, including RIPB test matrix development, RIPB test matrix reduction, and RIPB design optimization. This paper discusses the projected benefits from incorporating RIPB in reducing development timeline, cost, and regulatory risk.

99 GENERAL AND MISCELLANEOUS↗

Assessing Government and Industry Roles to Accelerate Commercialization of Advanced Reactors and Supporting Fuel Cycles

Recent growth in private sector interest and investment in advanced reactor designs signals a new period in the greater than six decade pursuit of commercial nuclear technology. This nuclear entrepreneurship is primarily centered in the North America; meanwhile, national programs in China, France, India, Russia, and South Korea also feature active efforts to design, construct, operate and export advanced reactors .The business case for most private ventures calls for an aggressive commercialization timeline-tied to expectations for returns on investment. Finally, strategic energy portfolio projections and utility resource planning point to the 2030 - 2050 window as the period of greatest need for dispatchable, energy intensive, low-carbon generation options to address retirement of baseload capacity, increased penetration of renewables and economy-scale decarbonization. However, lead times for commercialization range from 30 to 50 years based on more traditional government-centric timelines. Fuel development and fuel cycle infrastructure deployment represent parallel timelines that directly influence the timeline for commercialization of many advanced reactor concepts. While multi-decade development periods appear to be commonplace for new nuclear projects, such timelines were not always the norm-three separate countries set out to develop civilian commercial power from fundamental nuclear principles, in just over a decade, on average. The US led light-water reactor (LWR) development in the 1950's, the UK pioneered a gas-cooled reactor (GCR) concept in the same time period, and Canada forged the path to commercializing the heavy-water reactor (HWR) starting in the mid-1950's and into the mid-1960's. The necessary fuel cycle facilities to support the commercial reactor design also did not appear suddenly, but were a collaborative effort between government and private partners. In this paper, the efforts of these three governments and their private industry partnerships in reactor and fuel cycle development are explored, and a select sample of representative milestones for each is presented, with the roles that each group played. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Non-Technical Barriers to Geothermal Development in California and Nevada

Geothermal project development in the United States may be subject to numerous permits, authorizations, and other regulatory requirements at the federal, state, and local level, which are necessary to address potential environmental and resource impacts at geothermal project sites. This report presents the findings of our study, including an analysis of federal, state, and local geothermal regulatory and permitting processes, case studies analyzing site-specific attributes that may impact project development at four selected geothermal project sites, an analysis of cost and timeline implications for geothermal project development, and the results of a qualitative study focused on inter-agency coordination and collaboration efforts between federal, state, and/or local agencies for geothermal projects located in California and Nevada. Our analysis found that development timelines may be impacted by multiple federal and state environmental review processes and duplicative permitting requirements as well as coordination efforts between numerous federal, state, and local agencies involved in issuing authorizations and permits necessary for project development. In addition, projects in California and Nevada may face site-specific environmental challenges due to the presence of sensitive resources (e.g., biological species and species habitat, cultural resources) that may result in project construction delays. Our study results also indicate that protracted geothermal development timelines caused by delays in acquiring necessary permits and environmental reviews may result in loss of generated electricity revenue and additional financing costs, which may increase economic uncertainty associated with project development. Through our qualitative analysis, we found that utilization of best practices, including tiering to existing environmental review documents and developing memoranda of understanding, which clearly delineate agency roles and responsibilities may reduce overall project timelines, costs, and uncertainties associated with geothermal project development in California and Nevada.

15 GEOTHERMAL ENERGY↗

Non-Technical Barriers to Geothermal Development in California and Nevada [Slides]

This presentation presents the findings of our study, including an analysis of federal, state, and local geothermal regulatory and permitting processes, case studies analyzing site-specific attributes that may impact project development at four selected geothermal project sites, an analysis of cost and timeline implications for geothermal project development, and the results of a qualitative study focused on inter-agency coordination and collaboration efforts between federal, state, and/or local agencies for geothermal projects located in California and Nevada. Our analysis found that development timelines may be impacted by multiple federal and state environmental review processes and duplicative permitting requirements as well as coordination efforts between numerous federal, state, and local agencies involved in issuing authorizations and permits necessary for project development. In addition, projects in California and Nevada may face site-specific environmental challenges due to the presence of sensitive resources (e.g., biological species and species habitat, cultural resources) that may result in project construction delays. Our study results also indicate that protracted geothermal development timelines caused by delays in acquiring necessary permits and environmental reviews may result in loss of generated electricity revenue and additional financing costs, which may increase economic uncertainty associated with project development. Through our qualitative analysis, we found that utilization of best practices, including tiering to existing environmental review documents and developing memoranda of understanding, which clearly delineate agency roles and responsibilities may reduce overall project timelines, costs, and uncertainties associated with geothermal project development in California and Nevada.

15 GEOTHERMAL ENERGY↗

Methods integrating innate and adaptive immune responses in human in vitro immunization assays

Rapid vaccine development and innovative immunotherapeutics are critical in the fight against emerging outbreaks and global pandemic threats, yet the high costs and prolonged timelines for developing new vaccines underscore the urgent need for robust, predictive pre-clinical testing platforms. The rapid down-selection of vaccine candidates and identification of optimal vaccine formulations can be performed using human in vitro immunization (IVI) assays that recapitulate the complex interactions of the innate and adaptive human immune response. In this review, we present a comprehensive evaluation of three key IVI platforms: the whole blood assay (WBA), monocyte-derived dendritic cell (MoDC) assay with dendritic cell-T cell interface assay (DTI), and the microphysiological human tissue construct assay (HTC). The WBA offers a cost-effective and straightforward approach, while the MoDC + DTI system represents the current gold standard for balancing experimental efficiency with immunological complexity. The HTC assay, by mimicking both spatial and temporal aspects of immune interactions, provides enhanced physiological relevance. We discuss the methodological advantages and limitations of each platform, explore their roles in rapid vaccine candidate screening, and propose strategies for integrating these assays with complementary in vivo models. These insights pave the way for refining IVI assays and accelerating the translational pipeline for next-generation vaccines and immunotherapies.

59 BASIC BIOLOGICAL SCIENCES↗

Preliminary Scaling Analysis of Reactivity Initiated Accidents

The life cycle for new fuel development requires extensive modeling and testing of the fuel concept from benchtop scale experiments to full scale assemblies in prototypical conditions. As a result, the timeline to develop new fuel types can extend up to 20 years and hinders the ability to develop a diverse assortment of fuel types. The licensing of recent reactor designs such as Westinghouse's AP-600/1000 designs utilized a scaling methodology to perform nuclear safety code validation on experimental test data from scaled down thermal hydraulic facilities. The advantage of using a scaling methodology was a significant cost decrease in the testing program because it avoided needing to build full scale prototypes and focused on improving safety code's ability to predict test data. This study investigates how to apply a scaling hierarchy for fuel performance during a Reactivity Initiated Accident that could be implemented with scaling methods such as Hierarchical Two Tiered Scaling (H2TS), Fractional Scaling Analysis (FSA), and Dynamical System Scaling (DSS) .

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Robotics Plan in Support of DOME Testbed Operations

Various robotic tooling options have been evaluated for the NRIC DOME concept of operations (ConOps). Framatome was contracted to develop a wide-ranging list of commercial off the shelf (COTS) and custom robotic systems to be considered for performing the DOME ConOps functions. Subsequent project tasks from Framatome narrowed down the list and scored the most viable options. The abbreviated list, and associated scoring, has been reviewed and assessed to provide formal recommendations for the robotic ConOps functions of DOME. The overhead telescoping mast & Kraft arm assembly is recommended as the primary system for reactor demobilization and removal. The estimated cost is $\$700$K with a timeline to develop and deliver of about 2.5 years. The mast & Kraft arm would still require an overhead lift system for mobilization and installation. Either the refurbished polar crane or a new gantry crane delivery platform could both serve as the overhead lift and delivery system. The estimated costs for the refurbishment polar crane and new gantry crane systems are, respectively, $\$4.4$M and $\$3$M with about 2.5 years to develop and deliver. A Brokk + Kraft crawler & arm is recommended as a secondary robotic system to support the overhead mast & Kraft arm system. The Brokk + Kraft crawler & arm would cost an estimated $\$726$k and would take about 1.5 years to develop and deliver. The Boston Dynamics SPOT robot is also recommended for the in-service monitoring during experimentation operations. The estimated cost is $\$220$K with a timeline to deliver of 8-14 months. The Elios 3 aerial drone is recommended to perform large area radiation dose rate mapping and visual inspections. The estimated cost is a $\$100$K and will also need about 8-14 months to develop and deliver. A mockup rig is also recommended to be procured an employed to test & verify the robotic capabilities as well as provide needed training for operations personnel. It is estimated that a mockup rig would cost about $\$500$k and would take up to a year to develop and build.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Risk Informed Timelines (RIT) v.1.0

Risk Informed Timelines (RIT) is a more modern and holistic method for understanding how access delay timelines are developed and utilized in physical security system evaluations. The software utilizes Bayesian methods to combine subject matter expert judgement and small performance test datasets in a consistent and defensible way. It allows a more holistic view of delay performance that provides distributions of task times and task success probabilities to account for tasks that, if failed, would result in failure of the attack. The RIT methodology is meant to enable security risk managers to begin the transition into more comprehensive delay timeline analysis. Sandia National Laboratories is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration under contract DE-NA0003525. SAND2021-8294 O

Noel, ToddG.↗

Learning from the Pandemic: the Future of Meetings in HEP and Beyond

The COVID-19 pandemic has by-and-large prevented in-person meetings since March 2020. While the increasing deployment of effective vaccines around the world is a very positive development, the timeline and pathway to "normality" is uncertain and the "new normal" we will settle into is anyone's guess. Particle physics, like many other scientific fields, has more than a year of experience in holding virtual meetings, workshops, and conferences. A great deal of experimentation and innovation to explore how to execute these meetings effectively has occurred. Therefore, it is an appropriate time to take stock of what we as a community learned from running virtual meetings and discuss possible strategies for the future. Continuing to develop effective strategies for meetings with a virtual component is likely to be important for reducing the carbon footprint of our research activities, while also enabling greater diversity and inclusion for participation. This report summarizes a virtual two-day workshop on Virtual Meetings held May 5-6, 2021 which brought together experts from both inside and outside of high-energy physics to share their experiences and practices with organizing and executing virtual workshops, and to develop possible strategies for future meetings as we begin to emerge from the COVID-19 pandemic. This report outlines some of the practices and tools that have worked well which we hope will serve as a valuable resource for future virtual meeting organizers in all scientific fields.

Neubauer, Mark S.↗

FUSRAP Data Management and Information Transitions - 19459

The Formerly Utilized Sites Remedial Action Program (FUSRAP) was created in the mid-1970's to clean up radiological contamination resulting from early development of nuclear weapons. The US Department of Energy (US DOE) was responsible for FUSRAP until October 1997, when Congress transferred administration and execution of FUSRAP site cleanup to the US Army Corps of Engineers (USACE). Currently, the US DOE Office of Legacy Management (LM) determines the eligibility of a site for referral to USACE. USACE determines whether the site is included in FUSRAP for cleanup, conducts remedial actions, and transfers sites back to LM for long-term surveillance and maintenance (LTS and M). LM and USACE established the Data Management Working Group (DMWG) to (1) establish a common understanding of US DOE and USACE district-specific data, records practices, and requirements as they apply to FUSRAP programmatic documents for site transition and transfer; (2) establish methods to ensure accurate data transfer; and (3) develop a timeline for data and records transfer. These methods will ensure continuity of stewardship while transitioning from cleanup to LTS and M and beyond as more FUSRAP sites transfer from USACE to LM. The DMWG has met monthly and the meetings are attended by a wide range of LM and USACE project managers and subject matter experts. Discussion topics have addressed site records management, including data needs and uses; transfer and posting of Administrative Record and Permanent Record files for public accessibility; and management of legal and classified files. There have been a number of group successes, including the following: - Establishment of a common understanding of data and records practices and requirements as the sites transition and transfer from USACE to LM; - Development of effective lines of communication between USACE and LM concerning data management for transition; - Establishment of a cohesive approach to data management between the two agencies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Statistical chronometry of Meteorites: II. Initial abundances and homogeneity of short-lived radionuclides

Astrophysical models of planet formation require accurate radiometric dating of meteoritic components by short-lived (Al-Mg, Mn-Cr, Hf-W) and long-lived (U-Pb) chronometers, to develop a timeline of such events in the solar nebula as formation of Ca-rich, Al-rich Inclusions (CAIs), chondrules, planetesimals, etc. CAIs formed mostly around a time (“t=0”) when the short-lived radionuclide 26 Al (t 1/2 = 0.72 Myr) was present and presumably homogeneously distributed at a known level we define as ( 26 Al/ 27 Al) SS = 5.23 × 10 -5 . The time of formation after t=0 of another object can be found by determining its initial ( 26 Al/ 27 Al) 0 ratio and comparing it to ( 26 Al/ 27 Al) SS . Dating of meteoritic objects using the Mn-Cr or Hf-W systems is hindered because the abundances ( 53 Mn/ 55 Mn) SS and ( 182 Hf/ 180 Hf) SS at t=0 are not known precisely. To constrain these quantities, we compile literature Al-Mg, Mn-Cr, Hf-W and Pb-Pb data for 13 achondrites and use novel statistical techniques to minimize the discrepancies between their times of formation across these systems. We find that for ( 53 Mn/ 55 Mn) SS = (7.80±0.36)×10 -6 , ( 182 Hf/ 180 Hf) SS = (10.41 ± 0.12) × 10-5, t SS = 4568.65 ± 0.10 Myr, and a 53 Mn half-life of 3.98 ± 0.22 Myr, these four free parameters make concordant 18 formation times recorded by the different systems in all six known volcanic achondrites (the quenched angrites D’Orbigny, Sahara 99555, Northwest Africa 1670; the psuedo-eucrites Asuka 881394 and Ibitira; and the basaltic achondrite Northwest Africa 7325). These parameters also make concordant the ages derived for chondrules from CB/CH achondrites, formed simultaneously in an impact. The other seven achondrites are not quite concordant, but are plutonic angrites or ‘carbonaceous achondrites’ for which simultaneous closure of the isotopic systems might not be expected. Our findings provide very strong support for homogeneity of 26 Al, 53 Mn, and 182 Hf in the solar nebula, and our approach offers a path for more precise chronometry

79 ASTRONOMY AND ASTROPHYSICS↗

GeoVision - Barriers Taskforce

This submission includes papers, presentations, and data developed during the multi-year GeoVision Barriers Taskforce effort. Developers have identified many non-technical barriers to geothermal power development, including land access, permitting, and market barriers. Included in this submission are three papers submitted to the Geothermal Resources Council (GRC) which detail how land access, permitting, and market barriers delay geothermal project development. Also included is the GeoVision Barriers Analysis Summary report, which projects and quantifies the future electric and nonelectric deployment potentials of geothermal technologies within a range of scenarios in addition to their impacts on U.S. jobs, the economy, and environment.

15 GEOTHERMAL ENERGY↗

Challenges in the post-licensing stage of U.S. hydropower development: Current status and some potential solutions

The issuance of a Federal Energy Regulatory Commission (FERC) license is an important milestone in the development process of new U.S. hydropower projects. The complexity and uncertain timeline of the licensing process have been often cited as a key deterrent to new hydropower installations in the United States. However, very little attention has been paid to post-licensing timelines and attrition rates. This article explores the challenges faced by developers in bringing their FERC-licensed hydropower projects to the construction stage. Post-licensing activities to be completed before starting construction include obtaining additional permitting from other federal or state agencies, completing the technical design, securing financing, and in most cases, negotiating a power purchase agreement. For the set of projects that obtained a FERC license between 2007 and 2018, we assembled a dataset—combining information from FERC dockets and responses from a questionnaire to developers—to calculate attrition rates and development timelines and to examine the reasons for delays and cancellations.

13 HYDRO ENERGY↗

Heat Exchanger Intensification Through Powder Processing and Enhanced Design (HIPPED)

High intensity, supercritical CO 2 heat exchangers capable of operating at temperatures between 800 and 1100 ˚C and pressures greater than 80 bar are considered a critical component for high efficiency power generation and a range of next-generation industrial processes. A novel heat exchanger concept was proposed in this project. The proposed concept involved a plate-type architecture with three-dimensional fins, called twisted s-shaped fins, that capitalize on additive manufacturing. Four manufacturing processes were studied to realize the complex envisioned design: press and sinter of metallic powders, directed energy deposition, laser powder bed fusion, and a novel powder bed process involving a photoreactive polymer called SEAM (scalable expeditious additive manufacturing), that later was developed at MSU. The team was able to manufacture subscale heat exchangers using laser powder bed fusion (LPBF) and SEAM. The team settled on using SEAM as a final manufacturing approach due to its very low cost. The SEAM-manufactured heat exchanger, however, when tested under pressure, exhibited leaks and the process still requires further development beyond the timeline of the project. To support the heat exchanger design and testing, the team developed a new high temperature flow loop allowing testing under high temperature and pressure. Computational modeling of the heat exchanger was also performed for the twisted s-shaped fins and the computations were validated with experimental data. The new twisted fins resulted in enhanced heat transfer and reduced pressure drop. To further minimize pressure drop in the plate heat exchanger, the team also developed a simplified model for flow maldistribution in the manifolds, providing a new tool for designers that eliminates the need for complex CFD calculations. A technoeconomic analysis was also developed to contrast SEAM with LPBF, this tool indicated that SEAM is several times less costly and offer significant promises as a rapid low cost additive manufacturing process for metallic systems.

30 DIRECT ENERGY CONVERSION↗