Questions Utilities Should Ask to Mitigate PV Technology Risk (Presentation)
This presentation outlines utility concerns when evaluating PV technologies for risk.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
This presentation outlines utility concerns when evaluating PV technologies for risk.
The adoption of distributed photovoltaic (PV) systems grew significantly in recent years. Market projections anticipate future growth for both residential and commercial installations. To understand grid impacts associated with distributed PV, useful hosting capacity studies require accurate representations of the spatial distribution of PV adoptions. Prediction of PV locations and numbers depends on median income data, building use zoning maps, and permit records to understand existing trends and predict future adoption rates and locations throughout an entire city. Using the PV adoption data, advanced and realistic simulations were performed to capture the distributed PV impacts on the grid. Also, using graph theory community detection hundreds of neighborhood microgrids can be discovered for the entire city by identifying densely connected loads that are sparsely connected to other communities. Then, based on the PV adoption predictions, this work identified the contribution of PV within each of the newly discovered graph theory defined microgrid communities.
Here, the growing usage of decentralized renewable energy sources has made accurate estimation of their aggregated generation crucial for maintaining grid flexibility and reliability. However, the majority of distributed photovoltaic (PV) systems are behind-the-meter (BTM) and invisible to utilities, leading to three challenges in obtaining an accurate forecast of their aggregated output. Firstly, traditional centralized prediction algorithms used in previous studies may not be appropriate due to privacy concerns. There is therefore a need for decentralized forecasting methods, such as federated learning (FL), to protect privacy. Secondly, there has been no comparison between localized, centralized, and decentralized forecasting methods for BTM PV production, and the trade-off between prediction accuracy and privacy has not been explored. Lastly, the computational time of data-driven prediction algorithms has not been examined. This article presents a FL power forecasting method for PVs, which uses federated learning as a decentralized collaborative modeling approach to train a single model on data from multiple BTM sites. The machine learning network used to design this FL-based BTM PV forecasting model is a multi-layered perceptron, which ensures privacy and security of the data. Comparing the suggested FL forecasting model to non-private centralized and entirely private localized models revealed that it has a high level of accuracy, with an RMSE that is 18.17% lower than localized models and 9.9% higher than centralized models.
The Performance-based Energy Resource Feedback, Optimization, and Risk Management (PERFORM) program is an initiative intended to foster "a fundamental shift in grid management rooted in an understanding of asset risk and system risk" (ARPA-E 2020). Launched by the Advanced Research Projects Agency-Energy (ARPA-E), the program supports efforts to incorporate uncertainty in electric power decision making. In support of PERFORM, the National Renewable Energy Laboratory (NREL) has produced a set of time-coincident forecasts of solar, wind, and load profiles. As part of Phase I of the PERFORM effort, NREL created a dataset that consists of one year of time-coincident load, wind, and solar actuals and probabilistic forecasts based on data from the Electric Reliability Council of Texas (ERCOT) (Bryce et al. 2023). In Phase II, NREL developed similar datasets for three other U.S. Independent System Operators (ISO): the Midcontinent Independent System Operator (MISO), the New York Independent System Operator (NYISO), and the Southwest Power Pool (SPP).
This poster presents an overview of the third edition of the Best Practices Handbook for the Collection and Use of Solar Resource Data for Solar Energy Applications.
Although utility-scale solar photovoltaic (PV) power plants are becoming a cost-effective energy resource, there is belief within the energy industry that the increasing penetrations of PV technologies could potentially impact grid reliability. This is due to the variability across timescales, the forecast uncertainty of the solar energy resource, and the impacts on both distribution and transmission systems. This can cause utilities to severely limit PV installations or to assign PV integration costs when considering a least-cost portfolio of resources. As California and other regions in the United States are marching toward fulfilling - and probably exceeding - their renewables portfolio standards goals, grid operators are beginning to face operational challenges that could have implications for existing renewable and nonrenewable generators and that will shape opportunities for future projects. In this work, we focused on developing controls and conducting demonstrations for AC-coupled PV-battery energy storage systems (BESS) in which PV and BESS are collocated and share a point of common coupling (PCC).
In this project we address multiple resource integration challenges associated with increasing levels of solar penetration that arise from the variability and uncertainty in solar irradiance. We will model the SMUD service region as its own balancing region, and develop an integrated, real-time operational tool that takes solar-load forecast uncertainties into consideration and commits optimal energy resources and reserves for intra-hour and intra-day decisions. The primary objectives of this effort are to reduce power system operation cost by committing appropriate amount of energy resources and reserves, as well as to provide operators a prediction of the generation fleet’s behavior in real time for realistic PV penetration scenarios. The proposed methodology includes the following steps: clustering analysis on the expected solar variability per region for the SMUD system, Day-ahead (DA) and real-time (RT) load forecasts for the entire service areas, 1-year of intra-hour CPR forecasts for cluster centers, 1-year of smart re-forecasting CPR forecasts in real-time for determination of irreducible errors, and uncertainty quantification for integrated solar-load for both distributed and central stations (selected locations within service region) PV generation.
With increasing penetration of solar PV, some distribution feeders are experiencing highly variable net-load flows and even reverse flows. To optimize distribution systems under such conditions, the scheduling of mechanical devices, such as OLTCs and capacitor banks, needs to take into account forecasted solar PV and actual grid conditions. However, these legacy switching assets are operated on a daily or hourly timescale, due to the wear and tear associated with mechanical switching, which makes them unsuitable for real-time control. Therefore, there is a natural timescale- separation between these slower mechanical assets and the responsive nature of inverter-based resources. In this paper, we present a network admissible convex formulation for holistically scheduling controllable grid assets to position voltage optimally against solar PV. An optimal hourly schedule is presented that utilizes mechanical resources to position the predicted voltages close to nominal values, while minimizing the use of inverter-based resources (i.e., DERs), making them available for control at a faster time-scale (after the uncertainty reveals itself). A convex, inner approximation of the OPF problem is adapted to a mixed-integer linear program that minimizes voltage deviations from nominal (i.e., maximizes voltage margins). Here, the resulting OPF solution respects all the network constraints and is, hence, robust against modeling simplifications. Simulation based analysis on IEEE distribution feeders validates the approach.
This paper presents a computational approach to forecast photovoltaic (PV) power in kW based on a neural network linkage of publicly available cloud cover data and on-site solar irradiance sensor data. We also describe a control approach to utilize rooftop air conditioning units (RTUs) to support renewable integration. The PV forecasting method is validated using data from a rooftop PV panel installed on the Distributed Energy, Communications, and Controls (DECC) laboratory at Oak Ridge National Laboratory. The validation occurs in multiple phases to ensure that each component of the approach is the best representation of the actual expected output. The control of the RTU is based on model predictive methods.
In this Project we collaborated with two DOE National Laboratories, Pacific Northwest National Lab (PNNL) and Lawrence Berkeley National Lab (LBL). Dr. Hammerstrom of PNNL initially supported our project and was on the graduate committee of one of the Ph.D. students (graduated in 2014) who was supported by this project. He is also a committee member of a current graduate student of the PI who was supported by this project in the last two years (August 2014-July 2016). The graduate student is now supported be the Electrical and Computer Engineering (ECE) Department at Montana State University (MSU). Dr. Chris Marney of LBL provided actual load data, and the software WEBOPT developed at LBL for microgrid (MG) design for our project. NEC-Labs America, a private industry, also supported our project, providing expert support and modest financial support. We also used the software “HOMER,” originally developed at the National Renewable Energy Laboratory (NREL) and the most recent version made available to us by HOMER Energy, Inc., for MG (hybrid energy system) unit sizing. We compared the findings from WebOpt and HOMER and designed appropriately sized hybrid systems for our case studies. The objective of the project was to investigate real-time power management strategies for MGs using intelligent control, considering maximum feasible energy sustainability, reliability and efficiency while, minimizing cost and undesired environmental impact (emissions). Through analytic and simulation studies, we evaluated the suitability of several heuristic and artificial-intelligence (AI)-based optimization techniques that had potential for real-time MG power management, including genetic algorithms (GA), ant colony optimization (ACO), particle swarm optimization (PSO), and multi-agent systems (MAS), which is based on the negotiation of smart software-based agents. We found that PSO and MAS, in particular, distributed MAS, were more efficient and better suited for our work. We investigated the following: • Intelligent load control - demand response (DR) - for frequency stabilization in islanded MGs (partially supported by PNNL). • The impact of high penetration of solar photovoltaic (PV)-generated power at the distribution level (partially supported by PNNL). • The application of AI approaches to renewable (wind, PV) power forecasting (proposed by the reviewers of our proposal). • Application of AI approaches and DR for real-time MG power management (partially supported by NEC Labs-America) • Application of DR in dealing with the variability of wind power • Real-time MG power management using DR and storage (partially supported by NEC Labs-America) • Application of DR in enhancing the performance of load-frequency controller • MAS-based whole-sale and retail power market design for smart grid A
The uncoordinated charging of electric vehicles (EVs) in time and space brings congestion issues to the distribution network. This paper proposes an EV charging demand forecasting-based model predictive control (MPC) method for distribution system congestion management. To effectively forecast the time-series EV station charging demand, a hybrid forecasting model that integrates the long short-term memory network (LSTM) and Transformer is proposed. The Transformer-LSTM model is trained using a one-year real historical charging dataset of EV stations to forecast future charging demand in 15-minute intervals. This informs the MPC for distribution network congestion management and minimization of PV curtailment. Numerical results carried out on the modified IEEE 123-bus distribution system demonstrate that the proposed method can effectively resolve line congestion issues through EV smart charging and PV curtailment while outperforming other benchmarks.
Abstract—The impact of integrating large-scale solar photovoltaic (PV) generation on the balancing requirements in terms of regulation and load-following requirements in the southern Nevada balancing area is evaluated. The “swinging door” algorithm and the “probability box” method developed by Pacific Northwest National Laboratory (PNNL) were used to quantify the impact of large PV generation on the balancing requirements of the system operations. The system’s actual scheduling, real-time dispatch and regulation processes were simulated. Different levels of distributed generation were also considered in the study. The impact of hourly solar PV generation forecast errors on regulation and load-following requirements was assessed. The sensitivity of balancing requirements with respect to real-time forecast errors of large PV generation was analyzed. Index Terms—Ancillary services, balancing requirements, load following, regulation, renewables integration, swinging door
In order to support the continued integration of utility-scale solar photovoltaic sites into the Florida transmission system and to further enhance our understanding of the effects of cloud-induced output variability on the site and transmission operations, participant elects to enter a Cooperative Research and Development Agreement (CRADA) with the National Renewable Energy Lab (NREL). Under this agreement, NREL will work with participant to instrument their PV plant in DeSoto county FL and obtain solar radiation and power output data. The Florida Power & Light's (FPL) DeSoto Next Generation Energy Center is the largest installed PV plant in the country (25 MW). Our goal is that this site be instrumented and used for research into PV variability and forecasting.
Degradation remains a large uncertainty in forecasting production for PV plants, creating significant risk for developers and financiers. This study aims to quantify the distribution and drivers of degradation across 10,000 PV systems deployed for distributed or utility generation by training a machine learning model to predict year-over-year degradation rates from metadata characteristics. A combination of K-Means clustering and random forest regressor were found to associate multiple metadata features as potential drivers of degradation, including module characteristics, system design, and climate features. From this, it is inferred that if machine learning is able to find complex patterns between metadata features and system performance loss, such methods can be employed to help developers and financiers make data-informed decisions when estimating long-term energy production forecasts in financial models.
Misforecasting the adoption of customer-owned distributed photovoltaics (DPV) can have operational and financial implications for utilities - forecasting capabilities can be improved, but generally at a cost.This paper informs this decision-space by quantifying the costs of misforecasting across a wide range of DPV growth rates and misforecast severities. Using a simplified probabilistic method presented within, an analyst can make a first-order estimate of the financial benefit of improving a utility's forecasting capabilities, and thus be better informed about whether to make such an investment. For example, we show that a utility with 10 TWh per year of retail electric sales who initially estimates that the increase in DPV's contribution to total generation could range from 2 percent to 7.5 percent over the next 15 years could expect total present-value savings of approximately 4 million if they could keep the severity of successive five-year misforecasts within +/- 25 percent. We also have more general discussions about how misforecasting DPV impacts the buildout and operation of the bulk power system - for example, we observed that misforecasting DPV most strongly influenced the amount of utility-scale PV that gets built, due to the similarity in the energy and capacity services offered by the two solar technologies.
The temporal and spatial mismatch between PV generation and electric vehicle (EV) charging and discharging may cause voltage violations in active distribution networks. Despite the widespread use of deep reinforcement learning (DRL) in power system optimization and control, it lacks guarantees on constraint satisfaction during both training and deployment. This paper proposes a Lagrangian-based safe DRL approach for model predictive control (MPC) of active distribution systems with large-scale integration of PVs, EVs, and energy storage systems (ESSs). A Transformer-LSTM time-series model is proposed to forecast EV charging demand, which is then formulated as a constraint to ensure charging requirements are met. Using this prediction, a Lagrangian-based safe soft actor-critic (SAC) framework is developed for real-time control in a three-phase unbalanced distribution system, enforcing voltage safety constraints while optimizing the cumulative net reward. By integrating the forecasting model with multi-period constraints, the proposed framework jointly coordinates PV systems, EV charging and discharging, and ESS scheduling within the MPC horizon. Numerical experiments on a modified IEEE 123-bus system with real-world data show that, under a high PV penetration scenario, the proposed method increases the net reward by 30.74% and reduces average voltage violations from 0.0011 p.u. to 0.0002 p.u. compared with standard SAC. Compared with the optimal power flow (OPF) approach, it achieves similar voltage security while yielding lower line losses. It also maintains real-time control capability, reducing operation latency to 53.21 ms per 15-minute control interval. The proposed method remains effective under varying PV/EV penetrations and load conditions.
Solar generation is experiencing an exponential growth in power systems worldwide and, along with wind power, is posing new challenges to power system operations. Those challenges are characterized by an increase of system variability and uncertainty across many time scales: from days, down to hours, minutes, and seconds. Much of the research in the area has focused on the effect of solar forecasting across hours or days. This paper presents a methodology to capture the effect of short-term forecasting strategies and analyzes the economic and reliability implications of utilizing a simple, yet effective forecasting method for solar PV in intra-day operations.
The Electric Access System Enhancement (EASE) project demonstrated a scalable, interoperable, and cost-effective means of integrating high penetration of distributed energy resources (DERs). The control architecture developed leveraged a Distributed Energy Resource Management System, Distribution System Operator for transacting energy, and 3rd Party DER Aggregator platform. The project identified ways to enhance the customer interconnection process to the grid and improve access to information from DERs and optimize the usage of DERs to provide energy services in a simulated day-ahead shadow market while maintain grid reliability. By integrating these capabilities into a scalable system of systems, the DSO can effectively balance DER generation and customer demand on the distribution network. This capability allows the grid to host more DER than traditionally possible on wires alone. Hosting more DER has the added benefit of supplying increased demand growth, sometimes beyond the capacity limits of the distribution network itself. This is known as a dynamic hosting capacity, which could help utilities manage the forecasted growth in electricity demand as California switch to electric vehicles and appliances. This could help to establish energy storage and PV generation as a “pseudo firm” generation resource mix if managed appropriately and provide sufficient resource adequacy for distribution capacity upgrade deferrals.