Search NASA⌕ Search

SEARCH · Search NASA

Results for “distributed wind CIP”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

U.S. Department of Energy Competitiveness Improvement Project (CIP) 2025 Prototype Manufacture Awardee: XFlow Energy

Vertical-axis wind turbines offer a compelling path to low-cost, reliable distributed energy that can compete with utility prices for businesses, landowners, and municipalities in rural areas. They generate power by using a main rotor shaft perpendicular to the ground to pick up wind from different directions without a yaw mechanism. However, previous commercialization attempts struggled to account for the unsteady aerodynamics of this design, leading to low power production and/or premature structural failure. To address these challenges, Competitiveness Improvement Project recipient XFlow Energy is building on work completed during three previous CIP funding awards to develop a 30-kW vertical-axis wind turbine that achieves both low costs and high energy output.

17 WIND ENERGY↗

2022 Component Innovation Awardee: Windurance

Combining battery energy storage with distributed wind energy systems can increase production, ability to meet local electricity demands, interconnection capacity, and potential sales of surplus energy back to the grid, while reducing demand charges and the overall levelized cost of energy (LCOE). Energy storage options for distributed wind energy systems can vary widely in terms of power level and energy storage capacity, and their potential benefits depend on factors including wind resource, turbine design, connection requirements, use patterns, utility rates, and regulations. Windurance received a 2022 Competitiveness Improvement Project (CIP) funding award to add battery energy storage capabilities to the company's bidirectional DC converter. The energy storage component will complete a comprehensive portfolio of power conversion and control electronics that can be seamlessly integrated with distributed wind systems. The company received earlier CIP awards to fund prototype design and construction of wind turbine pitch actuators, inverters, and controllers.

CIP↗

United States Supports Distributed Wind Technology Improvements; NREL (National Renewable Energy Laboratory)

This presentation provides information on the activities conducted through the Competitiveness Improvement Project (CIP), initiated in 2012 by the U.S. Department of Energy (DOE) and executed through the National Renewable Energy Laboratory (NREL) to support the distributed wind industry. The CIP provides research and development funding and technical support to improve distributed wind turbine technology and increase the competitiveness of U.S. small and midsize wind turbine manufacturers. Through this project, DOE/NREL assists U.S. manufacturers to lower the levelized cost of energy of wind turbines through component improvements, manufacturing process upgrades, and turbine testing. Ultimately, this support is expected to lead to turbine certification through testing to industry-recognized wind turbine performance and safety standards.

17 WIND ENERGY↗

2021 Prototype Manufacture and Installation Awardee: Pecos Wind Power, Inc.

Through the 2021 Competitiveness Improvement Project (CIP), Pecos Wind Power will manufacture a prototype of its 85-kilowatt (kW) horizontal-axis distributed wind turbine, the PW85, a new wind turbine that began development in 2017 when the company was founded. The PW85 wind turbine includes an industry-leading rotor diameter (30 meters) and full-span variable pitch blades to target a levelized cost of energy (LCOE) of $0.103/kilowatt-hour in low annual wind speeds (6 meters per second). This is 55% lower than the average small wind turbine project installed in 2018. The goal of this project is to spur the development of increasingly lower-cost, high-capacity-factor distributed wind turbines. As a result, Pecos Wind Power will manufacture and install wind turbines that increase the geographic area in which distributed wind power is cost competitive with retail-priced electricity and other distributed energy resources - primarily solar energy.

CIP↗

2022 Product Commercialization and Market Development Awardee: Bergey Windpower

In 2023, consumers will finance more than 80% of the residential solar energy systems they purchase, which they use as collateral (called "non-recourse loans"). Similar loans are not yet offered to fund distributed wind energy systems. To accelerate deployment of small wind systems, which power individual rural homes and farms, the United States will need to make consumer loans available at reasonable rates with modest downpayments and collateral requirements. A team led by Bergey Windpower Co. is creating new consumer financing options to reduce or eliminate the upfront cash needed to buy distributed wind energy systems. This new financing structure would decrease purchase costs for small wind turbines produced by Bergey Windpower and possibly other manufacturers. Product financing is instrumental in growing wind power market share, clean energy manufacturing, and installation jobs while reducing greenhouse gas emissions. Bergey Windpower's previous Competitiveness Improvement Project (CIP) awards have led to the development of affordable, high-performance wind turbines, microgrids, and components.

CIP↗

2022 Small Turbine Certification Awardee: NPS Solutions

Inverters convert the direct current power generated by wind turbines into the alternating current needed to serve local loads and feed onto the electricity grid. Although distributed wind systems typically supply electricity for homes and businesses near the turbines, these systems can also provide clean power to strengthen grid resilience. Certification to UL 1741 SA ensures that inverters will enable distributed wind turbines to provide grid support services and stay online when the grid experiences stability issues. Small companies often find the electrical listing process too complex and expensive to undertake on their own, so few distributed wind turbine inverters are certified to this standard. A U.S. Department of Energy (DOE) Competitiveness Improvement Project (CIP) award is helping NPS Solutions (NPS) secure this critical certification for the inverter in its 100-kilowatt NPS 100C wind turbine, which is optimized for on-site generation at farms, businesses, schools, hospitals, and remote locations.

CIP↗

2021 Small Turbine Certification Awardee: Intergrid LLC

Currently, there are no U.S., fully certified inverters for wind turbines in the 10-15-kilowatt (kW) range. The federal government's Competitiveness Improvement Project (CIP) and Small Business Innovation Research programs present the most viable paths for manufacturers in the distributed wind energy industry to conduct research, develop their products, and, ultimately, commercialize them. Through CIP, Intergrid LLC is reducing the cost, size, and weight of its legacy inverter for distributed wind turbines while increasing efficiency, reliability, and serviceability. To accomplish this, Intergrid will address three areas related to power electronics for distributed wind turbines: (1) Software verification and functional safety certification; (2) Simulation for grid-interconnecting testing; (3) Component alternatives that reduce cost and improve reliability and serviceability. The first two areas relate to long-term management of inverter software, which, for grid-connected inverters, must comply with three standards - one issued by Underwriters Laboratories (UL) and two issued by the Institute of Electrical and Electronics Engineers.

CIP↗

2021 Prototype Installation and Testing Awardee: XFlow Energy Company

XFlow Energy Company (XFlow Energy) aims to reduce the cost of wind energy by designing vertical-axis wind turbines (VAWTs), which have a cheaper blade manufacturing process and a mechanically simpler design than traditional wind turbines, among other cost-saving advantages. However, a lack of modeling or simulation tools that can predict the coupling between aerodynamic and structural forces poses a significant challenge to developers of VAWTs. Known as aeroelastic models, these are not just important design tools - they're critical for certifying VAWTs of 25 kilowatts (kW), which is the size of XFlow Energy's prototype wind turbine. Without certification, XFlow Energy will not be able to deliver an independently validated product to its customers, and those customers will not be eligible for state and federal incentives. An accurate aeroelastic model could provide less-conservative structural optimization tactics than are currently used, resulting in a wind turbine with lower capital costs.

CIP↗

2021 Prototype Testing Awardee: Sonsight Wind

For small wind turbines - those under 10 kilowatts (kW) in generating capacity - the combined costs for turbines, towers, foundations, power electronics, installation, and maintenance can result in a high levelized cost of energy (LCOE). This makes it difficult for small wind turbines to gain a foothold in the distributed energy revolution currently being led by solar power. Sites with high average wind speeds generally allow lower LCOE, but the vast majority of Americans live and work within more moderate-wind-speed areas, so small turbines should be cost effective to buy and use within such areas. Sonsight Wind's 3.5-kW horizontal-axis wind turbine (HAWT) is being developed to address these challenges.

CIP↗

2022 Component Innovation Awardee: Pecos Wind Power

Distributed wind energy systems supply electricity for nearby homes and businesses, often in remote and rural regions. Systems capable of capturing energy in areas with low wind speeds make it possible to deploy these clean energy systems in many geographic locations. Pecos Wind Power's 85-kilowatt (kW) horizontal-axis PW85 wind turbine shows potential to reduce the levelized cost of energy by approximately 55% when compared to typical small wind systems while achieving utility-scale capacity factors of more than 40% in areas with lower wind speeds. To maximize cost competitiveness, the Pecos Wind Power turbine needs a blade optimized for low wind speeds. Through its 2022 Competitiveness Improvement Project (CIP) award, Pecos Wind Power and partner Wetzel Wind Energy Services will model, optimize, fabricate, and validate a 14.5-meter wind turbine blade made specifically for these applications. Three prior CIP awards supported Pecos Wind Power's initial development of the PW85 turbine.

CIP↗

2022 Prototype Installation and Testing Awardee: Windward Engineering

The 60-kilowatt (kW) Zephyr 21/60 wind turbine from Windward Engineering uses a low-cost, full-span independent pitch system that can act as a redundant aerodynamic braking system. This design uses a relatively simple pneumatic rotary vane actuator, allowing each of the turbine's three blades to be pitched independently and any single blade to activate emergency braking for the entire turbine. A previous Competitiveness Improvement Project (CIP) funding award enabled Windward Engineering to design and develop the Zephyr 21/60 wind turbine's aeroelastic model and pitch system. At the end of this current Competitiveness Improvement Project award, a fully validated aeroelastic model will make it possible to certify Windward Engineering's Zephyr 21/60 design and quantify the technology's levelized cost of energy in preparation for certification and entry into the distributed wind market. The Zephyr 21/60 will feature an attractive levelized cost of energy, improved reliability, and a full-span pitch system for safe and redundant protection against rotor overspeed (which occurs when the rotor turns beyond its design limit).

CIP↗

2021 Component Innovation Project Awardee: Bergey Windpower

In recent years, the cost of small wind turbines for homes, farms, and small businesses has decreased dramatically thanks to advances in American technology made possible by research and development support from the U.S. Department of Energy. But further reductions are needed to realize the gigawatt-scale potential of distributed wind energy to help electrify rural America, reduce carbon emissions, and create jobs. Currently, for residential- and farm-scale wind turbines with direct-drive, permanent-magnet alternators, the alternator is the highest-cost component of the wind turbine (excluding the tower). The Bergey Windpower Excel 15 wind turbine incorporates advanced technology in its rotor and controls and will soon incorporate advanced power electronics - but its alternator is based on technology that is more than a decade old. To help reduce capital expenditures of the Excel 15 wind turbine, Bergey Windpower is developing an advanced, lower- cost, permanent-magnet alternator.

CIP↗

2021 Prototype Design Development Awardee: Accelerate Wind, Inc.

In the United States, rooftop photovoltaic systems can be installed on most commercial buildings. However, even if all available rooftop space is used, solar energy cannot satisfy the building's total energy demand. With many building owners trying to move toward net-zero-carbon-emission energy generation, these customers often have no way to achieve this goal on-site. Rooftop wind energy technology could be an option, but most rooftop wind turbines are not economically viable because they do not produce meaningful amounts of energy and are not likely to pay for themselves within their lifetime. Some rooftop wind turbine companies have attempted to exploit the fact that wind naturally speeds up at the edge of a roof; but, so far, these solutions have also struggled to produce significant energy because only a small portion of that wind can be captured so close to the edge of the roof.

CIP↗

2021 Component Innovation Awardee: Windurance, LLC

Distributed wind turbine manufacturers seeking to enter the market are often hampered by two challenges: not enough capital and no specific expertise in developing certified electronic equipment. A harsh reality is that off-the-shelf power electronics are neither certified nor cost-effective. This lack of certified controller equipment in the distributed wind energy industry adds expense and impedes market penetration related to certification for individual wind turbines, wind system projects, and installations. Normally, these certification costs would be borne repeatedly by individual turbine manufacturers or developers on a model-by-model or project-by-project basis, resulting in cost and time delays as well as uncertainty and risk for project developers and prospective owners. Windurance seeks to eliminate these challenges by developing and obtaining third-party certification of a standardized wind turbine controller. This will facilitate development, certification, and production while supporting efficiencies not easily achievable by individual manufacturers. Windurance's Distributed Wind Industry Turbine Controller will enable manufacturers to apply proprietary turbine- specific configurations and functionality. When applicable, manufacturers can expand on a Windurance-provided software framework to add unique or proprietary functionality.

CIP↗

2022 Small Turbine Certification Awardee: Ryse Energy LLC - Americas

To meet the growing demands of the distributed wind market and comply with current U.S. standards, Ryse Energy LLC-Americas (Ryse Energy, formerly Primus Wind Power) plans to update all six products in its AIR Range family of micro wind turbines. A new, more cost-effective circuit board will be paired with other hardware upgrades, advanced control algorithms, and a Bluetooth function that allows users to more easily program and control the turbine. This Competitiveness Improvement Project (CIP) award will fund certification testing of the new circuit board to make sure it meets American National Standards Institute/American Clean Power Association (ANSI/ACP) and UL Federal Communications Commission (FCC) safety and quality standards. Primus Wind Power developed the prototype for the new circuit board with an earlier round of CIP funding, and Primus has received CIP awards supporting other certification and optimization projects.

CIP↗

2020 System Optimization Awardee: Pecos Wind Power

With support from the Competitiveness Improvement Project's System Optimization Award, Pecos Wind Power will help lower the cost of distributed wind technology and expand deployment. To do so, the company will optimize their PW85 distributed wind turbine to achieve a production levelized cost of energy of $0.099 per kilowatt hour, which is a 48% cost reduction in distributed wind energy costs. This reduction is a critical step toward Pecos Wind Power's ultimate target of $0.089 per kilowatt-hour. This fact sheet provides an overview of Pecos Wind Power's project, how the company will achieve the goals of the award, and how the project fits within the overall Competitiveness Improvement Project.

CIP↗