Search NASA⌕ Search

SEARCH · Search NASA

Results for “electric vehicle support equipment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

FedFleet 2023: FAST - What's New, What's Coming, What's Next?

This presentation presents an overview and demonstration of new capabilities being incorporated into the Federal Automotive Statistical Tool (FAST) to gather information from Federal agencies about electric vehicle supply equipment (EVSE) they are planning to deploy in support of EO 14057 and its implementing instructions. It also includes an overview other related changes being made to FAST over FY 2023 and following years. FAST is a web-based information system sponsored by GSA's Office of Government-wide Policy and DOE's Federal Energy Management Program to collect information about the US federal government's fleet of motor vehicles; FAST is developed, maintained, and supported by DOE's Idaho National Laboratory (INL).

99 GENERAL AND MISCELLANEOUS↗

Energy, power, and infrastructure demands from electrifying airport ground support equipment at United States airports

As the airline industry seeks to reduce costs and transition to clean energy, electric ground support equipment is emerging as a favorable option. The integration of electric ground support equipment into airport operations requires careful planning for vehicle deployment, charging infrastructure, and grid impacts. We develop a flexible, bottom-up modeling framework to assess energy and infrastructure needs across more than 300 U.S. airports. Our analysis estimates site-specific power and energy demand, equipment counts by type, charger requirements, and costs. Here we quantify the magnitude of new electrical loads created by the electrification of airport ground support equipment, finding that peak power demand at the largest airports can reach up to 20 megawatts, with annual electricity consumption approaching 51,000 megawatt-hours. We further show that behind-the-meter battery energy storage systems and solar photovoltaic systems can reduce peak load and lower total system costs by as much as 10 million dollars.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Fuel Cell Powered Airport GSE (Ground Support Equipment) Deployment

The Fuel Cell Powered Airport GSE (Ground Support Equipment) Deployment Project was initiated in 2013 between Plug Power and U. S. Department of Energy Fuel Cell Technologies Office (DOE). The project plan included development and deployment of fifteen fuel cell powered units for two years at an airport to understand the feasibility and economic viability of hydrogen powered GSE. Project participants were the Department of Energy, Plug Power, and FedEx. The Memphis, TN airport is the hub of FedEx’s freight operation and was selected as the site for the demonstration portion of the project.

08 HYDROGEN↗

Airport Ground Support Equipment Infrastructure & Logistics Electrification Assessment Tool: 2025 Data Development, Modeling and Analysis for DFW

The aviation industry is increasingly turning to modernize freight facilities by integrating electric Ground Support Equipment (eGSE) to enhance operational efficiency of freight facility moving vehicles and equipment. Airports worldwide are adopting eGSE to streamline cargo movement, reduce fuel and maintenance costs, and improve logistics coordination.1 North America, with its advanced aviation infrastructure, leads this transition, leveraging Internet of things (IoT)-enabled automation and zero emission technologies to boost reliability and reduce human errors.2 Electrification of freight facility moving vehicles and equipment boosts turnaround times, improves equipment reliability, and optimizes logistics coordination, giving operators a competitive advantage. With rising fuel price volatility and the pressure to meet stringent performance benchmarks, airports are focusing on cost-effective, scalable solutions for long-term financial and operational gains. To further accelerate electrification, airports are integrating Zero Emission Vehicles (ZEVs) into rental car fleets and deploying electric baggage carts, requiring strategic investments in charging infrastructure. 3 The shift, however, presents challenges, such as limited technical expertise, high capital costs, and complex procurement processes. By forging strategic partnerships, leveraging advanced technologies, and optimizing infrastructure investments, airports can create a resilient, future-ready ecosystem that enhances the movement of people and goods through electrification-driven efficiency. Supported by the U.S. Department of Energy (DOE) Vehicle Technologies Office (VTO), this electrification effort provides a scalable, cost-effective solution to improve airport freight operations. Through targeted investments and innovation, airports enhance efficiency, reduce costs, and meet performance benchmarks while advancing toward a resilient, electrified future.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Camp Lejeune Federal Fleet Tiger Team EVSE Site Assessment

The National Renewable Energy Laboratory (NREL) was contracted by the Department of Defense (DOD) Environmental Security Technology Certification Program (ESTCP) and the Department of Energy (DOE) Federal Energy Management Program (FEMP) to develop a web tool and complete pilot assessments for the installation of Electric Vehicle Supply Equipment (EVSE). NREL has deployed Tiger Teams comprising engineers and fleet experts to support DOD and DOE on several EVSE site assessments since 2015. However, the advancements developed in support of this report, including a cost-estimation tool and geospatial mapping tool, will enable a user-driven path to assess EVSE needs. This report details the site design recommendations for Camp Lejeune, North Carolina.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Electric Vehicle Supply Equipment (EVSE) Study for Vernon County, Wisconsin [Slides]

Viroqua is a town in Wisconsin with a population of approximately 4,500. The Vernon County Energy district is a local nonprofit in Viroqua that provides energy education, individualized energy consulting and coaching to residents and businesses. They have a very good relationship with our county government and wish to support their efforts. The Vernon County government is currently working on a comprehensive plan and would like to include planning for electric vehicle (EV) charging infrastructure in the plan. They are seeking guidance on logical phases for implementation and identifying the best locations for Level 2 and Level 3 EV chargers. NREL provided technical input on strategic planning for electric vehicle (EV) adoption and electric vehicle supply equipment (EVSE) expansion in Vernon County through the Clean Energy to Communities (C2C) Expert Match technical assistance program. NREL provided strategic planning support for EV expansion planning in Vernon County and siting considerations for locating EVSE.

24 POWER TRANSMISSION AND DISTRIBUTION↗

EVI-LOCATE User Manual

One of the longest stages in the deployment of electric vehicle supply equipment (EVSE) is the initial planning of the infrastructure itself. Engineers and fleet experts from the National Renewable Energy Laboratory (NREL) have supported dozens of charging infrastructure site plans over the past couple decades, including the generation of site schematics, determinations of electric capacity, and estimates for likely costs. As the market for electric vehicles (EVs) has matured, this approach should no longer require a time and personnel intensive process. In order to shorten the time taken to develop site plans and cost estimates, NREL developed a tool that fleet managers, facility managers, electricians, EVSE installers, and members of the public can use to develop initial schematics and ballpark pricing for charging station installations. The Electric Vehicle Infrastructure - Locally Optimized Charger Assessment Tool and Estimator (EVI-LOCATE) provides a structured and consistent way for users to enter information about their planned EVSE project in a relatively simple web-based format. EVI-LOCATE then calculates electrical equipment capacity, wiring runs, and project costs. It produces a site diagram optimized around surface characteristics with differential trenching costs for softscape such as grass compared to hardscape such as asphalt that can be adjusted by users in the tool. It also stores the resulting site plans and costs in a dashboard for access at a later date, including plan revisions if necessary. This document guides users through the EVI-LOCATE screens and associated questions. It contains tip text boxes throughout on how best to interface with the tool and find additional information or context. The appendices contain the assumptions and calculations underpinning the tool. Much of the information for EVI-LOCATE was gathered through industry engagements with EVSE installers, invoices from completed EVSE installations, Gordian's RS Means construction data, and the General Services Administration blanket purchase agreement for EVSE. For a visual tutorial of the tool, users can watch EVI-LOCATE Step-by-Step Video. The tool itself is available at https://evi-locate.nrel.gov.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Foundations of an Electric Mobility Strategy for the City of Mexicali

The Foundations of an Electric Mobility Strategy for the city of Mexicali aligns with numerous energy, environmental, and transport plans and will help Mexicali meet multiple related goals. Mexicali’s energy mix, with 28% renewables, already enables plugin electric vehicles (PEVs) to reduce the mass of greenhouse gases (GHGs) per km driven 2/3 below that of their conventional counterparts. This GHG benefit will increase should Mexicali take steps to further increase their share of renewables in their electricity supply. Beyond increasing renewables, Mexicali could possibly deploy PEVs so that electric load is added in the right location (depending on further analysis of substations and feeders) and at the right time (between 21:00 and 11:00) in order to minimize grid upgrade costs. There are a handful of charge timing control mechanisms –at various stages of development– that Mexicali could implement. Transport electrification can facilitate mass transit by powering buses, trains, and small vehicles that get people from their homes or work to the transit stations and vice versa. Mexicali could utilize fleets as early PEV adopters in order to gain acceptance and add electric vehicle supply equipment (EVSE). Recommended prioritization of different types of fleets are suggested in this report: transit buses, school buses, airport ground support equipment (GSE), refuse trucks, taxis, shuttle buses, campus vehicles, delivery trucks, utility trucks, and finally semitrailers. There are a handful of policy options that Mexicali could use to incentivize fleets to purchase PEVs, including mandates, economic incentives, energy performance contracts, waivers to access restrictions, electricity discounts, and EVSE requirements in building codes. Mexicali’s taxi fleet was an early adopter of PEVs and had experienced some challenges—mostly related to the insufficient range of the taxis due to hot weather. In this report, we strategize ways to extend the range of the current electric taxis, including ways to make charging more convenient to the drivers, and more suggestions for appropriate vehicles to purchase in the future. This report also includes the groundwork of geotracking Mexicali’s taxi fleet so that more detailed recommendations can be made in the future. Once fleets have increased PEV acceptance and EVSE installations, the market will be ready to expand to private vehicle owners. In order to do this, more EVSE needs to be installed in the right locations. This mobility strategy lays out general local areas where EVSE could be well utilized, based on traffic patterns, land use, and demographic data. Mexicali could approach businesses within these areas that would likely make suitable hosts, based on how well they can profit from the additional business that EVSE would bring. Mexicali could then adopt a series of purchase incentives (including sales tax waivers or access to high-occupancy vehicles [HOV] lanes) that would encourage private vehicle owners to purchase PEVs. Purchase incentives run the risk of creating equity issues, which can be countered by promoting electrification in mass transit, creating more HOV lanes that have PEV exemptions, and installing EVSEs in underserved communities. Private PEV ownership will require a set of experts that Mexicali can help train, including PEV repair technicians, EVSE installation electricians, and first responders.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Qualification of Electrical Ground Support Equipment for New Space Programs

With the Space Shuttle program coming to an end, the National Aeronautics and Space Administration (NASA) is moving to a new space flight program that will allow expeditions beyond low earth orbit. The space vehicles required to comply with these missions will be carrying heavy payloads. This implies that the Earth departure stage capabilities must be of higher magnitudes, given the current propulsion technology. The engineering design of the new flight hardware comes with some structural, thermal, propulsion and other subsystems' challenges. Meanwhile, the necessary ground support equipment (GSE) used to test, validate, verify and process the flight hardware must withstand the new program specifications. This paper intends to provide the qualification considerations during implementation of new electrical GSE for space programs. A team of engineers was formed to embark on this task, and facilitate the logistics process and ensure that the electrical, mechanical and fluids subsystems conduct the proper level of testing. Ultimately, each subsystem must certify that each piece of ground support equipment used in the field is capable of withstanding the strenuous vibration, acoustics, environmental, thermal and Electromagnetic Interference (EMf) levels experienced during pre-launch, launch and post-launch activities. The benefits of capturing and sharing these findings will provide technical, cost savings and schedule impacts infon11ation to both the technical and management community. Keywords: Qualification; Testing; Ground Support Equipment; Electromagnetic Interference Testing; Vibration Testing; Acoustic Testing; Power Spectral Density.

SotoToro, Felix A.↗

Concepts to Automate Fluid Transfer Capability of Low Impact Docking System (LIDS)

The capability to transfer mass between spacecraft is necessary for many mission scenarios. Docking and berthing operations have enabled fluid, electrical, crew and equipment transfers to some degree on all manned space operations since the Gemini program. The Apollo program performed some sophisticated docking maneuvers to land men on the moon and return them safely to Earth. These programs primarily transferred crew, equipment, and pressurized atmosphere between docked spacecraft. The International Space Station (ISS) U.S. modules are connected by Common Berthing Mechanism (CBM) portals. They provide many feed-through ports for electrical, and fluid transfer between modules, as well as a large diameter crew and equipment tunnel. Fluid and electrical jumpers are manually installed after the CBM sealing surfaces have been securely mated to maintain the pressurized cabin environment. CBM berthing and subsequent fluid transfer capability requires a lengthy manual process involving an active interface that mates with a passive half. The Androgynous Peripheral Attach System (MAS) a Russian technology that docked the Russian Zarya module to Unity, or Node 1, is a more complex system that also is capable of fuel transfer, enabling refueling of the Russian re-boost engines on ISS. For several years, a Low Impact Docking System (LIDS) has been under development at Johnson Space Center (JSC). This docking technology has a requirement to be androgynous in order to allow the fabrication of a single configuration that can dock with all other LIDS units. It is desired to make electrical and fluid coupling mating an automated process to enable routine docking and undocking operations to support future exploration missions. It is envisioned that modular design and vehicle assembly will require an efficient LIDS for fuel, electrical, crew, and equipment transfer. Marshall Space Flight Center (MSFC) has joined the LIDS development effort and plans to employ fluid transfer concepts and technology from previous development programs, such as the Automated Fluid Interface System (AFIS) and the Ohital Fluid Transfer System (OFTS) that were developed and tested by MSFC. Orbital Expressderived robotic satellite servicing technology is scheduled to fly soon to demonstrate fluid transfer technology developed for the Air Force. This paper will compare known technology against possible fluid transfer requirements for LIDS to develop design strategies for automated fluid transfer.

Miernik, Janie H.↗

Breakdown of Electric Vehicle Supply Equipment Installation Costs

The plug-in electric vehicles (PEVs) market is receiving help from the current political climate, incentives at the federal and state levels, excessive cost of petroleum fuel, growing focus on climate solutions, increasing investment and direction by automobile manufacturers and increased awareness through media reports and advertising. Increasingly, the transportation industry, in both the United States and many other countries, is aimed at electric motive energy where practical. Increased investment in research and development have led to increasing vehicle range and lower battery costs; both of which have been deterrents in the past. The increasing demand for PEVs (consisting of the battery electric vehicle [BEV] and plug-in hybrid electric vehicle [PHEV], is challenged by the need for charging infrastructure to support these vehicles. The BEV relies totally on the on-board battery to supply the motive energy while the PHEV utilizes its battery and an installed internal combustion engine (ICE). The maximum benefit is achieved by using the battery power as much as possible. This arrangement requires the use of battery charging equipment, known as electric vehicle supply equipment (EVSE).

33 ADVANCED PROPULSION SYSTEMS↗

Ion propulsion technology requirements for planetary mission applications

Integrating a clustered, four engine ion propulsion system to the Mariner Mark II spacecraft is shown to reduce total trip time for the five proposed Mariner Mark II missions by fifteen years. In addition, this advanced Solar Electric Propulsion (SEP) system enables rendezvous encounters with five main belt asteroids rather than one. A precursor Advanced Capability Explorer (ACE) technology demonstration vehicle is proposed to investigate SEP spacecraft interaction and control requirements in support of these future mission opportunities. It is shown that the ACE spacecraft could be assembled from existing residual hardware, protoflight equipment and commercially available flight tested components. The ion propulsion system requirements to support ambitious Nuclear Electric Propulsion (NEP) missions are also examined and specific technology development objectives presented.

Aston, G.↗

The space station - An overview of the design process

The design factors being considered in the NASA space-station development program are summarized. The currently envisioned mission requirements are listed, and the system architecture is defined as a core station, mission-dedicated elements, and supporting equipment such as an orbit maneuvering vehicle. System design factors discussed include orbit selection, contamination control, autonomy, system safety, technology implementation, long life, reliability and maintainability, and cost; subsystem design factors include structural considerations, electrical power, environmental control and life support, data management, communications and tracking, onboard propulsion, habitability, and crew support. Configurational design is seen as driven by a number of factors, primarily the need to fit all components into the Shuttle payload bay for assembly in LEO by the Shuttle crew.

Covington, C.↗

Large-scale Hydrogen Storage – Risk Assessment Seattle City Light and Port of Seattle [Abstract]

This CRADA presents the strategy that Pacific Northwest National Laboratory (PNNL) and Sandia National Laboratories (SNL) will take to support Seattle City Light (SCL), and the Port of Seattle (Port) in performing a risk assessment of large-scale hydrogen storage. Risk assessment is often used to ensure that adequate measures are taken to protect workers and the public, the environment, infrastructure, and assets. A detailed risk assessment can also be used to direct funding and upgrades, to specific components and sub-systems in order to mitigate risks to the larger system. In this way risk assessments are often employed as a part of a larger risk management strategy, with the goal of minimizing the occurrence of hazards and to identify means to limit their consequences. Risk assessment is often used to engage and inform regulators, and to communicate how specific regulations are being met. However, it is important to note that the proposed work is not intended for SCL and the Port to use in order to gain regulatory acceptance for their proposed activities. The work performed as a part of this effort will be a preliminary risk assessment for early-stage component and system designs and should be considered research and development (R&D). As such, the proposed work will be performed to a quality level and design maturity consistent with R&D and is not considered appropriate for final safety analysis and regulatory compliance purposes. Previous and on-going work at SCL and the Port demonstrated the utility of deploying hydrogen systems at the Port. The deployment of hydrogen at the Port is a part of a larger vision of using hydrogen to address a range of issues for SCL and the Port. These include large-scale fueling of MD/HD vehicles, cargo-handling equipment (CHE), and harbor vessels to reduce emissions; support of adjacent LD vehicles; support of critical port operations during extreme events (i.e., resiliency); deferral of more capital- and time-intensive electrical distribution system upgrades while still supporting evolving port operations and decarbonization efforts; facilitating electrification by establishing energy storage as a grid resource, starting at strategic port locations; creation of a flexible market resource that can be used by SCL to generate revenue via arbitrage; support of planned future maritime operations that involve heavy use of hydrogen for ocean-going vessels; and future end-use applications involving natural gas pipeline hydrogen injection. Ultimately, the success of these activities is underpinned by the deployed storage capacity. Large-scale deployment of hydrogen systems will require hydrogen storage at a scale that has not been demonstrated. In addition, the ideal location for such multi-use systems is near the end user which will often necessitate deploying into urban and/or industrial areas. A detailed risk assessment using the Port as a test case is necessary to ensure the deployment of large-scale hydrogen is successful. Many technologies have been proposed for hydrogen storage; however, these technologies need to be analyzed as they apply to an actual site. The physical infrastructure and hydrogen use cases for the Port will be analyzed, and a risk assessment for compressed hydrogen, liquified hydrogen, and Liquid Organic Hydrogen Carrier (LOHC) storage will be performed. These risk assessments will be useful for understanding how each of these technologies would perform in terms of facility and public safety. The operating states of the proposed hydrogen systems at the Port will be analyzed and incorporated into the storage risk assessment. Scalability will also be analyzed to understand how future port uses would affect the overall risk assessment. Finally, using the risk assessment as a tool to inform engagement and to gain stakeholder acceptance will be explored.

08 HYDROGEN↗

Ontario International Airport Fleet Electrification Blueprint: Zero-Emission Vehicle Technology Assessment for Energy Optimization [Slides]

Ontario International Airport Authority (OIAA)'s Electric Vehicle (EV) Blueprint project presentation focuses on the possibilities for fleet electrification, including medium heavy duty charging and hydrogen refueling and their associated planning, infrastructure, operation, and maintenance options. This report includes detailed list of available electric ground support equipment (GSE), description of NREL tools for EV infrastructure design and optimization, and analyses of the current fleet and the potential grid impacts of electrification. Key recommendations are made in regard to simulation-based and in-depth system analyses to identify optimal charging infrastructure and long-term grid stability, and to ensure that the selected station architecture will provide enough space and capacity for future expansion and resiliency.

30 DIRECT ENERGY CONVERSION↗

EMPOWERED Distributed Energy Resources Permit Accelerator Pilot

This report summarizes the EMPOWERED Distributed Energy Resources (DER) Permit Accelerator Pilot project. Its primary objective was to streamline the design, installation, permitting, and inspections of targeted Distributed Energy Resource (DER) solutions. Streamlining these processes is critical to strengthening and accelerating the adoption of DER solutions nationwide. Moreover, streamlined processes help expedite the clean energy transition and expand energy resilience by improving understanding and capability among key stakeholders like property owners, code officials, and the general workforce. The project team accomplished this by developing and deploying a set of design and permitting guides for simple DER solutions, which they rolled out via a permitting pilot program. The project team developed nine permitting and inspection guides for simple DER solutions, as follows: 1. Single-Family and Duplex: Electric Vehicle Service Equipment (EVSE), and Storage, Solar + Storage (each in two code cycles) 2. Multi-family and Office: EVSE, Storage, Solar + Storage (each in two code cycles) 3. A permitting process guide to support the implementation of the permitting guides. The guides cover key code requirements via plan review and field inspection checklists for code officials and building owners to follow to streamline the permitting and inspections process for DER solutions. Following the development of the initial set of guides, the project team formed two cohorts, each made up of four jurisdictions, to participate in the Permit Accelerator Pilot. Each cohort received training and technical assistance to support them in incorporating the guides into use. The project successfully engaged jurisdictions in two disparate US regions: Chelsea, Somerville, Natick, and Norwood in metro Boston; and Pima County, Town of Gilbert, Flagstaff, and Sedona in Arizona. Feedback gathered from the project was valuable in refining the guides to better address jurisdictional needs. After the pilot period, the project team developed final versions of the guides based on extensive feedback from the cohorts and from external technical peer review. Feedback included needs and barriers related to implementation, as well as detailed technical improvements from external peer review. The final guides were presented in a series of webinars with a national reach, with 192 attendees from 35 states in the live session of the final webinar, and the final guides are posted online and available for use nationwide. Key findings: • The most receptive jurisdictions were those adjacent to other jurisdictions that had already adopted similar initiatives. The least receptive jurisdictions were those in the midst of adopting new code cycles. • The most common barrier to jurisdictional adoption of new guidelines were internal administrative and process delays, more so than technical barriers. • The main technical barrier to adoption proved to be the concern of fire hazard risks posed by energy storage systems. There is some apprehension in the code enforcement community about the safety of the batteries. Education coordinated with fire and safety services will help alleviate concerns and increase confidence in the acceptance of innovative technologies. • Opportunities to further leverage and advance the guides and related resources include outreach, education, and jurisdictional support; updates to the resources to align with code cycle changes and local requirements; and advancements supporting emerging technologies.

14 SOLAR ENERGY↗