Search NASA⌕ Search

SEARCH · Search NASA

Results for “energy storage service agreement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

28 records · Page 2

EXERGETIC: De-Risking Next-Generation Resilient Geothermal Hybrids via At-Scale Evaluation Using Virtual Emulation Digital Twin Environment for Efficient Operation

The DOE-GTO-funded project, award number 5.1.2.12, entitled "EXERGETIC - De-risking Next Generation Resilient Geothermal Hybrids via at-Scale Evaluation Using a Virtual Emulation Digital Twin Environment for Efficient Operation," advances the solution to these challenges by developing and validating a geothermal co-emulation environment implemented at the National Laboratory of the Rockies (NLR)'s Advanced Research on Integrated Energy Systems (ARIES) platform. This framework enables the de-risking of next-generation geothermal and geothermal hybrid systems through high-fidelity modeling, real-time digital emulation, advanced control strategies, and techno-economic assessment. The project focused on geothermal hybrid configurations that integrate geothermal power plants with concentrated solar power and underground thermal energy storage, enabling enhanced efficiency, flexibility, and grid support capabilities. The main goal of this project was the development of a geothermal digital co-emulation environment to demonstrate the technical and economic value of geothermal hybrid systems and their contribution to grid stability and flexibility. The EXERGETIC framework combined physics-based models, controls, and real assets at ARIES, including digital real-time simulators (DRTS), a 20-MW-scale controllable grid interface (CGI), and a 2-MW conventional generator. Detailed transient models were developed for the key subsystems of a hybrid geothermal plant, including parabolic trough solar collectors, reservoir thermal energy storage (RTES), and a binary Organic Rankine Cycle (ORC) power plant. The ORC model explicitly captured thermal inertia and off-design operation and integrated control strategies to dynamically respond to electric load profiles. The models were validated against published experimental and numerical studies, demonstrating strong agreement and confirming the accuracy and robustness of the modeling approach. The resulting digital twin represents geothermal-solar-storage systems at multiple scales (1 MW to 100 MW) and enables realistic emulation of grid-connected operation. The control architecture allows the geothermal resource to provide stable baseload generation, while solar and stored thermal energy supply flexible, dispatchable support during periods of high demand or variable grid conditions. A key contribution of the EXERGETIC project is the demonstration that geothermal hybrid systems can be designed to be active grid assets rather than passive baseload generators. Using the ARIES platform, the digital twin was evaluated under multiple grid scenarios, including load following, voltage support at the distribution level, and frequency response at the transmission level. Results show that hybrid geothermal systems can respond effectively to dynamic grid conditions, providing inertia-like behavior, primary frequency support, and voltage regulation through coordinated control. In addition to the performance and grid services capability analysis of geothermal and hybrid geothermal systems, the EXERGETIC project also focused on scalability and techno-economic analysis of geothermal hybrid plants. In particular, for the scalability analysis, machine-learning (ML)-based surrogate models were trained using data generated from the geothermal digital twin under different grid-connected scenarios and plant capacities. These ML models demonstrated strong interpolation and extrapolation capabilities across plant sizes, accurately reproducing both steady-state and transient responses with very low errors. Regarding the techno-economic analysis, plant performance results were integrated with cost models for hybrid geothermal systems, and the levelized cost of electricity (LCOE) was used as the main economic metric to evaluate system performance across a range of system capacities, solar shares, solar multiples, and storage durations. Results indicate that economies of scale significantly reduce geothermal LCOE as plant capacity increases, with large-scale systems (25-100 MW) achieving substantially lower costs than small plants. Hybridization with solar thermal energy and storage further improves economic performance by increasing capacity utilization and enabling flexible dispatch. In addition, thermal storage plays a critical role in reducing LCOE by maximizing geothermal, solar, and stored energy resources. In summary, the results from this project demonstrate that geothermal hybrid systems represent a promising alternative for increasing the energy conversion efficiency of geothermal technologies, contributing to the preservation of geothermal resources, and supporting the transition of geothermal plants from traditional baseload resources into flexible, resilient, and cost-competitive energy conversion technologies.

15 GEOTHERMAL ENERGY↗

Transactive Campus Energy Systems: An R&D Testbed for Renewables, Integration, Efficiency, and Grid Services (CRADA 356 / Amendment 1)

The Clean Energy and Transactive Campus (CETC) work described in this report was done as part of Amendment 1 to Campus Cooperative Research and Development Agreement (CRADA) 356, the Transactive Campus CRADA with the Washington State Department of Commerce (Commerce) between the U.S. Department of Energy’s (DOE’s), Pacific Northwest National Laboratory (PNNL) and the Commerce through the Clean Energy Fund (CEF). The original project team consisted of PNNL, the University of Washington (UW) and Washington State University (WSU), to connect the PNNL, UW, and WSU campuses to construct and operate the testbed as both a regional flexibility resource and as a platform for research and development (R&D) for buildings/grid integration. Building on the foundational transactive system established by the Pacific Northwest Smart Grid Demonstration (PNWSGD), the purpose of the project was to construct the testbed as both a regional flexibility resource and as a platform for R&D on buildings/grid integration and information-based energy efficiency. The testbed supports the integration of renewables and other regional needs, using the flexibility provided by building loads, energy storage, and smart inverters for batteries and photovoltaic (PV) solar systems, at four physical scales: multiple campuses, campus, microgrid and building.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Front End Engineering Design of Linde-BASF Advanced Post-Combustion CO 2 Capture Technology at a Southern Company Natural Gas-Fired Power Plant (Final Scientific/Technical Report)

This document details the execution of Cooperative Agreement DE-FE0031847, “Front End Engineering Design of Linde-BASF Advanced Post-Combustion Carbon Dioxide (CO 2 ) Capture Technology at a Southern Company Natural Gas-Fired Power Plant” during the period of 10/1/2019 to 6/30/2022. The project was funded by the U.S. Department of Energy’s Office of Fossil Energy and Carbon Management (FECM) and managed by the National Energy Technology Laboratory (NETL). Southern Company Services, Inc. (SCS) was the prime recipient and led the project team. Other members of the project team included Linde, Inc. (Linde), Linde Engineering – Dresden (LED), and BASF. The overall goal of the project was to complete a front-end engineering design (FEED) study for installing the Linde-BASF post-combustion capture (PCC) technology at an existing domestic natural gas-fired combined cycle (NGCC) power plant within Southern Company’s portfolio of assets. The CO 2 capture plant was to be of commercial scale (at least 375 MWe) and include process units for pre-conditioning of the flue gas system, the CO 2 capture plant island, storage vessels, the CO 2 compression train, and any necessary components for integration into the NGCC plant. Mississippi Power’s Plant Daniel Unit #4 was chosen as the host site for the FEED with the target of capturing 90% of CO 2 emissions from the existing combustion turbines. The information produced by the FEED was used to develop a cost estimate of +/- 15% accuracy. Capital costs, excluding financing, are estimated at approximately $\$752$ million dollars (2021). The execution of a project based on this FEED study has an estimated duration of almost five years.

03 NATURAL GAS↗

Common Grid Services: Terms and Definitions Report

This document is prepared as part of the Department of Energy’s Grid Modernization Laboratory Consortium (GMLC) 2.5.2 project, whose goal is to develop and socialize a common set of grid service definitions relevant to grid-related interactions with distributed energy resources (DER: responsive generation, storage, and loads) and to advance the concept and requirements of the Energy Services Interface (ESI) to the point of launching related interface standards and guides that can be implemented in communication protocols and business process definitions. The notion of grid services is associated with the definition of an ESI because a key principle of the ESI is that it permits coordination between grid operators and DER facilities in a way that is service-oriented with an understanding of performance expectations. The project investigated the current state of North American grid service definitions from various market operators and utilities, as well as the Federal Energy Regulatory Commission and the North American Electric Reliability Corporation, actively used today (Liu et al. 2022). This document builds on that work to propose terms and definitions for a set of grid service types that address operational objectives commonly found in power system operations. These grid service types derive from existing grid services used in bulk electric market operations, recognizing that each operational authority uses somewhat different names with variations on service performance parameters. Finding commonality at the wholesale or bulk system operation level will hopefully engender progress in seeking agreement on grid services for DER engagement at the distribution level in the emerging retail marketplace.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Enhancement of phase change material hysteresis model: A case study of modeling building envelope in EnergyPlus

Nowadays, buildings are expected to offer demand side services to the power grid to enhance the electrical load flexibility, which leads to the concepts of grid-interactive efficient buildings (GEBs). Phase change material (PCM)-based thermal energy storage has seen increasing attention in recent years for peak load shifting of grid-interactive efficient buildings (GEBs). Numerical models are critical tools for design and evaluation of PCM-integrated systems. Most industrial-grade PCMs are reported to melt/freeze over a temperature range instead of at a unique temperature. Such thermal hysteresis effect significantly affects the reliability of simulation results because not only the heat transfer process depends on melting and freezing temperatures, the PCM thermal properties change significantly during the phase change process as well. This study is aimed to develop a model for the PCMs used in the building envelope with the capability to accurately simulate hysteretic behaviors. Further, this model is based on a two-phase assumption and is implemented in a whole building energy performance simulation program (i.e., EnergyPlus). A comparison between numerical results and experimental data shows that during a complete phase transition, the two-phase model could achieve a good agreement with the experimental data. During a partial phase transition, the two-phase model could lead to significant improvements compared to other alternative PCM models, including the existing PCM model in EnergyPlus. Last, whole building simulations were performed to study this model's performance regarding heating/cooling loads and zone mean air temperature of a given building. The results show that the difference in hourly heating/cooling loads introduced by the models was less than 1% in design conditions, while significant changes were observed in both hourly heating/cooling loads and zone mean air temperature when the PCM envelope underwent partial phase transition processes.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Safe Response to Renewable Energy Hazards

The International Association of Fire Fighters (IAFF) and Underwriters Laboratories, LLC (UL) in conjunction with UL Solutions initiated a joint project in 2022 under an agreement with the United States Department of Energy-Office of Energy Efficiency and Renewable Energy (DOE-EERE). This project focused on two separate and important initiatives related to energy efficiency in residential buildings. Initiative 1: Fire Performance on Energy Efficient Exterior Walls. Initiative 2: Firefighting Tactics in Residential Properties with Building Energy Storage Systems (BESS). The project’s first initiative addresses concerns surrounding new technologies with enhanced, energy-efficient exterior walls installed on residential properties. The concerns of fire rapidly traveling vertically up the exterior of these walls were examined. This addressed a growing concern from the first responder community that many times, the fires on the exterior of residential buildings have already evolved into an attic fire by the time of arrival – making it problematic to address the fire scenario. The test plan for Initiative 1 incorporated a modified version of an American Society for Testing and Materials (ASTM) test method, ASTM E2707, Standard Test Method for Determining Fire Penetration of Exterior Wall Assemblies Using a Direct Flame Impingement Exposure, as the foundation of the research. The test method involved a wall structure intended to represent retrofit construction to evaluate how fire would spread vertically or laterally. The second aspect of the UL-IAFF Project focuses on the fire service response to Residential Battery Energy Storage System (RBESS) incidents. These simulation tests were constructed in the large-scale fire test facility at UL Solutions’ Northbrook, IL campus. A baseline test was conducted that involved a test structure with no batteries—shelving units populated with standardized commodities, representing a typical garage with cellulosic and plastic contents. Three additional tests have been conducted to generate data with the contribution of energy storage system (ESS) batteries to compare fire and explosion hazards against the baseline test. Through this work, fire service tactical considerations can be explored. From the data, the team can determine 1) the visual indicators of a residential fire that has involved an RBESS (or, potentially, other large batteries) and 2) the impact of fire service-initiated ventilation of the structure on the fire conditions and explosion risks.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Updates to a Preliminary Probabilistic Performance Assessment Model for Radiological and Chemical Contamination at the West Valley Site, New York - 20420

The New York State Energy Research and Development Authority (NYSERDA) is the owner of the Western New York Nuclear Service Center (WNYNSC), a 1,351-ha site located approximately 48 km south of Buffalo, New York. In 1962, Nuclear Fuel Services, Inc. (NFS) entered into agreements with the Atomic Energy Commission and New York State to construct the first commercial reprocessing plant of nuclear fuel in the United States at the WNYNSC. NFS built and operated the spent fuel reprocessing plant and waste disposal facilities, processing 640 Mg (640 metric tons) of spent nuclear fuel from 1966 to 1972 under an Atomic Energy Commission license. Nuclear fuel reprocessing operations halted in 1972 and never restarted, leaving behind radioactive and chemical wastes. The U.S. Department of Energy (DOE) was required to complete certain waste management activities under the West Valley Demonstration Project (WVDP) Act of 1980 including decommissioning of WVDP facilities. As collaborating agencies, NYSERDA and the DOE are tasked with making decisions about decommissioning and risk reduction for the West Valley Site. Neptune and Company, Inc. (Neptune) was contracted to develop a probabilistic performance assessment (PPA) model to assist the agencies in their decision making process for decommissioning the WVDP and WNYNSC. One important tool that is needed in order to inform the decision-making process is a science-based model of the West Valley Site that evaluates potential future consequences for human health and the environment. This forms the core of the spatial domain of the West Valley PPA Model. The PPA Model, developed using the GoldSim system modeling software, is a tool intended to provide support for decision making that evaluates uncertainty, in a manner that is transparent, defensible, and robust. The PPA Model includes contaminant transport and health effects components, and is organized around geographically-grouped contaminated facilities. These include the waste disposal areas licensed by the U.S. Nuclear Regulatory Commission and the State of New York, a waste tank farm for storage of high level radioactive waste resulting from reprocessing operations, and several areas contaminated with radioactive and chemical constituents. The PPA Model evaluates contaminant transport from these sources to points of exposure across the site and into receiving surface waters and sediments. Hypothetical people and wildlife could be exposed to contamination at these locations, and the effects of these exposures are evaluated. Contaminant transport processes to be evaluated in the PPA Model include groundwater and surface water transport, contaminant translocation by plants and animals, diffusion, and erosion. The evaluation of exposures to people in this preliminary model is limited to a resident farmer scenario, and ecological assessment is performed at the level of a screening analysis. The results of these preliminary evaluations inform future model developments. PPA Model results are subjected to sensitivity analysis in order to determine those pathways and parameters that are most significant in influencing the results. This information allows analysts and decision makers to focus on those aspects of Site behavior and processes. With this information, the decision makers can drive informed, defensible decisions regarding decommissioning of the Site. This paper includes an update of the information presented at WM2019 [1]. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Subtask 1.3 – Integrated Carbon Capture and Storage for North Dakota Ethanol Production

The Energy & Environmental Research Center (EERC), in partnership with Red Trail Energy, LLC (RTE), a North Dakota ethanol producer; the North Dakota Industrial Commission (NDIC) Renewable Energy Program (REP); and the U.S. Department of Energy (DOE), conducted a feasibility and implementation study for a commercial carbon capture and storage (CCS) effort. This subtask provided technical support and developed recommended practices of how small-scale industrial CO2 emitters (<1,000,000 tonnes of CO2 emitted annually) may economically deploy CCS. The 64-million-gallon dry mill RTE ethanol facility, emitting an average 180,000 tonnes of CO2 annually, was the subject of the case study. The positive outcome of this research, which shows technical and economic potential for ethanol–CCS in North Dakota, has resulted in RTE acquiring an approved Permit to Drill on December 2, 2019, for a stratigraphic test well in early 2020, a necessary step toward a North Dakota CO2 Storage Facility Permit (SFP) for the RTE CCS effort. Outcomes include 1) validating the Broom Creek Formation as a regional target for CCS, 2) determining the full carbon life cycle of an industrial fuel production facility with CCS, 3) developing a field implementation plan (FIP) for small-scale CCS, and 4) determining the validity and pathway for using CCS to meet low-carbon fuel (LCF) standards. The technical team included the EERC, RTE, Trimeric Corporation, Schlumberger Carbon Services, and Computer Modelling Group (CMG). Findings from activities conducted November 2016 – May 2020 are summarized as follows. Several key steps have been accomplished toward validating the Broom Creek Formation as a CO2 injection and storage target at the RTE CCS site, including verification of the presence and structure of sandstone layers that may comprise the potential CO2 storage reservoir and the several thousand feet of overlying confining zone. Work included site characterization using existing data, interpretation of seismic data within the study area, and geologic modeling simulation of CO2 injection. Interpreted results estimate 3000 feet of confining zone between the Broom Creek Formation (storage target) and the lowermost underground source of drinking water (e.g., the Fox Hills Formation). The thickness of the Broom Creek injection target varies 230–420 ft within the survey area. Results were used to inform the location of a stratigraphic test well and associated characterization test program. No impediments were identified within the targeted CO2 storage complex that would prevent the project from moving forward. A stratigraphic test well is the next step to validate these results and to acquire remaining data necessary to develop a North Dakota CO2 SFP application. The EERC generated full carbon life cycle estimates for CCS integration with the RTE ethanol facility. Results indicated that an average 40% reduction in CO2 emissions is possible through CCS implementation. Approximately half of the carbon in the overall life cycle for a dry mill ethanol plant is generated through the fermentation process and emitted to the atmosphere; this is the CO2 stream targeted for CCS. The remaining carbon is attributed to corn feedstock farming (diesel, fertilizer), energy for fuel processing (natural gas, electricity), and transportation (diesel) of the fuel product. Life cycle carbon estimates are also affected by the anticipated energy consumption of a potential capture facility, which depend on the type of CO2 product generated. For example, a 30%–40% net CO2 emission reduction is estimated if a liquefied CO2 facility were incorporated compared to a 40%–50% net CO2 reduction if a supercritical “injection-grade” CO2 product is generated; i.e., more energy is required to further refine the CO2 stream, affecting the full carbon life cycle estimates. A CCS FIP was developed and initiated at the RTE CCS site, resulting in the development of several guidance documents: a CO2 Capture Process Design Package, a North Dakota CO2 geologic Storage Permits Template, and a Public Outreach Package for CCS in North Dakota. General FIP components include CO2 capture system, pipeline and well designs; monitoring, verification, and accounting (MVA) plans; geologic characterization and testing programs; and permitting and outreach plans. Vendor bids were also acquired for the CO2 liquefaction facility. Near-surface characterization (groundwater and soil gas sampling) and geologic characterization (seismic survey) were initiated to inform development of a UIC Class VI-compliant MVA plan compliant with a North Dakota CO2 SFP. Designs (well and geologic testing) were completed for a stratigraphic test well compliant with a North Dakota CO2 SFP. In addition, the outreach plan was executed, including community open houses, meetings with city/county/state officials, and development of public materials. Although other entities continued to mature incentive programs in 2019–2020, California and the Internal Revenue Service (IRS) currently provide the most advanced economic opportunities for CCS integrated with fuel production. The California Low-Carbon Fuel Standard (LCFS) adopted a CCS Protocol in January 2019, allowing submittal of a design-based pathway (DBP) application for an approved temporary (not certified) carbon intensity value for a fully engineered facility. An ethanol–CCS DBP application to the California LCFS Program (officially approved February 28, 2020) was developed to show that the RTE CCS effort meets LCFS requirements. The approved DBP provides confidence to advance the project and supports potential investments. Other entities continue to mature incentive programs. The IRS issued guidance in February 2020 that addresses the definition of beginning of construction and revenue procedure on partnerships for the Enhancement of Carbon Dioxide Sequestration Credit (a.k.a. Section 45Q) CCS tax credit program; the IRS anticipates issuing further guidance on issues such as secure geologic storage, utilization qualifications, and recapture of claimed credits. Maturing incentive programs coupled with workable permitting regulations provide confidence to advance CCS projects in North Dakota and support financial investment to proceed with designing, constructing, and implementing CCS projects at small-scale fuel production facilities. The largest hurdles for CCS implementation at small-scale industrial systems are often business/economic-related (i.e., not technical). Market uncertainty already exists for agriculture-based alternative fuels such as corn ethanol, for which production has increased by ~33%, and prices have correspondingly lowered since 2015. Passing the Section 45Q tax credit program improves economic feasibility for CCS but may require external investors for a small business to achieve maximum benefits. Public–private partnerships with NDIC and DOE have resulted in foundational technical and regulatory knowledge, growing stakeholder confidence, and a pathway to implementation that enables similar industrial CCS projects in the region to advance. This subtask was funded through the EERC–DOE Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by NDIC and RTE. The authors would also like to thank CMG, ESRI, IHS, Neuralog, and Schlumberger for allowing the use of their software packages in support of this work.

42 ENGINEERING↗

Outcomes of the DOE Workshop on Atmospheric Challenges for the Wind Energy Industry

The U.S. Department of Energy-funded Mesoscale-to-Microscale Coupling (MMC) project team planned and conducted a virtual Workshop on Atmospheric Challenges for the Wind Energy Industry on October 19 and 20, 2020. The goal of the workshop was to forge a dialog with the community, including industry representatives, on how modeling tools are currently being used, the present active atmospheric modeling research in support of wind energy, and required advancements in capabilities and technology to continue to advance wind energy deployment. The workshop was planned in collaboration with an industry advisory panel that included representatives from wind power plant developers, turbine manufacturers, and companies that provide resource assessment and forecasting services. The format of the workshop included panels from government research sponsors, visionaries from industry, and mixed panels of researchers discussing research status and needs. A shared keynote presentation from the Technical University of Denmark experts anchored the second day of the workshop. An emphasis was placed on understanding the research needs in the offshore environment. In addition, breakout opportunities were provided each day. On the first day, the breakout discussions addressed predesigned questions configured to elicit participants’ thoughts on needed research directions. The second-day breakouts treated three important technical topics through a combination of presentations and group conversations. Each workshop participant chose their breakout preference from among downscaling details, modeling for turbines, and using artificial intelligence for atmospheric modeling. The discussions were robust and productive. The outcomes of the workshop include archiving a series of recommendations from industry and the research community on research directions required to further advance wind energy deployment. Discussions confirmed the need for high-fidelity modeling but that there are specific areas of applicability and other areas where the time and cost of computation is prohibitive. In those cases, the high-fidelity models can inform low-order models that are more practical for real-time or widely deployed applications. Industry must consider the financial cost of performing more expensive modeling approaches, but industry engineers and researchers are using these approaches where there appears to be a return on investment. An emerging type of low-order model is based on machine learning (ML). Participants confirmed that there are many atmospheric phenomena that need to be modeled better, including low-level jets, cold air outbreaks, land-sea induced circulations, diurnal variability, thin stable boundary layers, dynamic changes such as from frontal passage, interaction of wakes and blockage, and more. For the offshore environment, there is wide agreement that some level of ocean-wave-atmospheric coupling is necessary to capture variations in rotor-level winds needed to plan and operate offshore wind plants. Another recurring recommendation is that more observations are needed, particularly for the offshore environment. Those observations should consider the needs for model improvement, both for physically based models and for ML models. Observations must capture atmospheric profiles of variables that are important to understanding and modeling atmospheric and oceanic phenomena that impact boundary layer winds. Models must be validated with data and the uncertainty quantified, particularly those that are sensitive to initial and boundary conditions. Finally, a repeated request was to consider the holistic needs of hybrid plants of wind, solar, and storage resources because those types of plants are likely to be the wave of the future. In addition, industry wishes to understand impacts of the resource under a changing climate for long-term planning.

17 WIND ENERGY↗

An Analysis of PNM's Renewable Reserve Requirements to Meet New Mexico's Decarbonization Goals

Over the next three years, the Public Service Company of New Mexico (PNM) plans to increase utility-scale solar photovoltaic (PV) capacity from today’s roughly 330MW to about 1600MW. This massive increase in variable generation—from about 15% to 75% of peak load—will require changes in how PNM operates their system. We characterize the 5 and 30-minute solar and wind forecast errors that the system is likely to experience in order to determine the level of reserves needed to counteract such events. Our focus in this study is on negative forecast error (in other words, shortfalls relative to forecast) – whereas excess variable generation can be curtailed if needed, a shortfall must be compensated for to avoid loss of load. Calculating forecast error requires the use of the same forecasting methods that PNM uses or a reasonable approximation thereof. For wind, we use a persistence forecast on actual 5-minute 2019 wind output data (scaled up to reflect the amount of wind capacity planned for 2025). For solar, we use a formula incorporating the clear sky index (CSI) for the forecast. As the solar on the grid now is a small fraction of what is planned for 2025, we generated 5-minute solar data using 2019 weather inputs. We find that to handle 99.9% of the 5-minute negative forecast errors, a maximum of 275MW of variable generation reserve during daylight hours, and a maximum of 75MW during non-daylight hours, should be sufficient. Note that this variable generation reserve is an additional reserve category that specifies reserves over and above what are currently carried for contingency reserve. This would require a significant increase in reserve relative to what PNM currently carries or can call upon from other utilities per reserve sharing agreements. This variable generation reserve specification may overestimate the actual level needed to deal with PNM’s planned variable generation in 2025. The forecasting methodologies used in this study likely underperform PNM’s forecasting – and better forecasting allows for less reserve. To obtain more precise estimates, it is necessary to consider load and use the same forecasting inputs and methods used by PNM.

14 SOLAR ENERGY↗