Search NASA⌕ Search

SEARCH · Search NASA

Results for “equipment management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Securing the Modern Grid: Federal Investments, Digitization, and Supply Chain Strategy

Across the United States (U.S.) grid expansion and modernization is underway, paving the way for accelerated load growth and intelligent resource management. Digitization of the grid is supported by several state and federal programs, providing support for utilities installing advanced metering infrastructure (AMI), AI-powered analytics systems, battery energy storage systems (BESS), and distributed energy resource management systems (DERMS) to transform the grid from a one-way power delivery system into an intelligent, responsive network that will enable faster load growth and power expansion of data centers for advanced artificial intelligence (AI) applications. The digital transformation of America's grid presents opportunity for increased efficiency and resiliency but also introduces new digital risks that require careful management. Digital equipment often contains several vulnerabilities such as unencrypted communication protocols, and persistent remote access capabilities that could be exploited to manipulate device settings, coordinate service disruptions, or inject false data into grid operations. These digital risks become particularly important as the grid must rapidly scale to support AI-driven data centers, which the administration has identified as essential for maintaining U.S. technological leadership and economic competitiveness. These vulnerabilities are compounded by supply chain realities: Chinese manufacturers currently produce 70-90% of essential grid components including inverters, batteries, and control systems, with the U.S. lacking domestic manufacturing capacity for critical assets like extra-high voltage transformers. Recent federal legislation has established Foreign Entity of Concern (FEOC) restrictions to address these risks, requiring projects to achieve escalating thresholds of non-FEOC content to receive tax credits while utilities work to expand sourcing channels for their supply chains and strengthen security measures. These restrictions arrive precisely when utilities face unprecedented electricity demand growth driven by the rapid growth in data centers, creating a considerable challenge: rapidly expanding infrastructure while navigating complex compliance requirements while lacking viable alternatives for many critical components. Idaho National Laboratory (INL) and its partners have developed practical approaches to help utilities navigate these intersecting challenges as they leverage federal investment to strengthen and grow the grid. These solutions include Cyber-Informed Engineering (CIE) principles that build resilience directly into systems, the Cirrus tool for secure cloud migration, and enhanced procurement guidance that embeds security requirements throughout equipment lifecycles. Federal initiatives, such as the Technical Assistance for Digital Assurance (TADA) project, provide direct support to utilities implementing these approaches while facilitating knowledge sharing across the industry. While these tools and frameworks cannot eliminate all risks inherent in foreign supply chain dependencies, they offer pragmatic pathways for strengthening security posture without sacrificing the deployment momentum essential to meeting surging electricity demand. Ultimately, securing America's digital energy infrastructure demands dedicated coordination across multiple fronts: building domestic supply chains, implementing robust digital assurance practices, and maintaining the aggressive modernization timeline necessary for reliability, resilience, and energy independence.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Peak Load Management in Distribution Systems Using Legacy Utility Equipment and Distributed Energy Resources

The ability to perform peak load management in distribution systems has several benefits for utilities, including reduced demand charges and improved reliability, efficiency, and utilization of the network infrastructure. This paper demonstrates the coordinated operation of an advanced distribution management system (ADMS) and a distributed energy resource management system (DERMS) to achieve peak load management using a realistic laboratory test bed. A commercial ADMS reduces the peak demand by reducing system voltages using a dynamic voltage regulation (DVR) application. A prototype DERMS-based on real-time optimal power flow-controls distributed battery energy storage systems to further reduce the feeder power. Results from the experiments conducted using a model of a real distribution feeder show that the coordinated operation of the ADMS and DERMS is effective in accomplishing peak load management.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Peak Load Management in Distribution Systems Using Legacy Utility Equipment and Distributed Energy Resources: Preprint

The ability to perform peak load management in distribution systems has several benefits for utilities, including reduced demand charges and improved reliability, efficiency, and utilization of the network infrastructure. This paper demonstrates the coordinated operation of an advanced distribution management system (ADMS) and a distributed energy resource management system (DERMS) to achieve peak load management using a realistic laboratory test bed. A commercial ADMS reduces the peak demand by reducing system voltages using a dynamic voltage regulation (DVR) application. A prototype DERMS—based on real-time optimal power flow—controls distributed battery energy storage systems to further reduce the feeder power. Results from the experiments conducted using a model of a real distribution feeder show that the coordinated operation of the ADMS and DERMS is effective in accomplishing peak load management.

61 RADIATION PROTECTION AND DOSIMETRY↗

Integrated Large-Scale Data Management Platform for Photovoltaic Power Conversion Equipment (PCE) Reliability Data

To meet the demand for accuracy and real-time capability of PV system degradation evaluation, massive volume data is needed to run high-fidelity and high-efficiency simulations and perform advanced data analysis. However, PV farm operators have a series of difficulties with PV inverter data, such as data collection from multiple channels, massive data storage, data management and massive data analysis. To address these challenges, we developed an integrated data management platform capable of data acquisition, processing, storage, query, and performing big data analysis utilizing AI algorithms. The platform can also achieve data correctness verification and provide an effective distributed data management solution to retrieve massive data and establish a connection to distributed computational frameworks.

data management platform↗

Integrated Large-Scale Data Management Platform for Photovoltaic Power Conversion Equipment (PCE) Reliability Data: Preprint

To meet the demand for accuracy and real-time capability of PV system degradation evaluation, massive volume data is needed to run high-fidelity and high-efficiency simulations and perform advanced data analysis. However, PV farm operators have a series of difficulties with PV inverter data, such as data collection from multiple channels, massive data storage, data management and massive data analysis. To address these challenges, we developed an integrated data management platform capable of data acquisition, processing, storage, query, and performing big data analysis utilizing AI algorithms. The platform can also achieve data correctness verification and provide an effective distributed data management solution to retrieve massive data and establish a connection to distributed computational frameworks.

data management↗

Bridging Equipment Reliability Data and Risk Informed Decisions in a Plant Operation Context

Industry equipment reliability and asset management programs are essential elements that help ensure the safe and economical operation of nuclear power plants. The effectiveness of these programs is addressed in several industry-developed and regulatory programs. The Risk-Informed Asset Management (RIAM) project is tasked to develop tools in support of the equipment reliability and asset management programs at nuclear power plants. These tools are designed to create a direct bridge between component health/lifecycle data and decision making (e.g., maintenance scheduling and project prioritization). The goal of this article is to provide a guide for specific use cases that the RIAM project is targeting. We have grouped uses cases into three main areas. The first area focuses on the analysis of equipment reliability data with a particular emphasis on condition-based data, such as test/surveillance reports and component monitoring data. The second area focuses on the integration of equipment reliability into system/plant reliability models to determine system/plant health and identify the components that are critical to maintain an operational system. Lastly, the third area manages plant resources, such as maintenance activities and replacement scheduling using optimization methods. Here the primary focus is on supporting typical system engineer decisions regarding maintenance activity scheduling and component aging management. This is performed in a risk-informed context where the term “risk” is broadly constructed to include both plant reliability and economics. This framework combines data analytics tools to analyze equipment reliability data with risk-informed methods designed to support system engineer decisions (e.g., maintenance and replacement schedules, optimal maintenance posture) in a customizable workflow.

97 - MATHEMATICS AND COMPUTING↗

The Port Hope Areas Initiative's Port Granby Project: The Decontamination of Site Equipment from a Low Level Waste Facility - 20330

The Port Hope Area Initiative (PHAI) is the Government of Canada's response to the community recommended solutions for the remediation and safe, long-term management of historic low-level radioactive waste (LLRW) that was the result of uranium and radium processing operations in the Municipality of Port Hope, Ontario from the 1930's to the 1980's. The Eldorado refinery, on the shores of Lake Ontario, began refining radium-226 from pitchblende ore, later transitioning to the refining of uranium ore. Process residues were deposited at the Welcome Waste Management Facility in Port Hope until the mid-1950's switching to the Port Granby Waste Management Facility (PGWMF), which continued to accept waste until the late 1980's. The Port Granby Project involves the construction of a new, secure long-term waste management facility (LTWMF) and supporting infrastructure, and the excavation and relocation of approximately 1,200,000 m{sup 3} of historic low-level radioactive waste and marginally contaminated soil from the PGWMF to the newly constructed LTWMF. Since the project's inception in 2016, the bulk of the material has since been moved to the final long term storage cell. This has taken over 500,000 person-hours and a large amount of one site heavy equipment to accomplish including excavators, bulldozers, rock trucks, baker tanks and vacuum trucks. While many of the pieces of heavy equipment and water management equipment has further work to do on site, several of the sites larger items have already undergone the decontamination process prior to release from the site. This process has posed a serious challenge as the waste has a caustic nature to it and over the last few years it has had time to work its way into the metallic structures and framework of the equipment. Coupled with the tight work spaces and in some cases confined work areas there have been many issues that needed to be addressed to successfully reach a state where items can be free released to the unrestricted limits of the sites license. This ongoing process has led to a more refined decontamination program at the Port Granby Facility and has had a rather high success rate considering the length of time the equipment has been exposed to the waste materials on site. This paper discusses the varied challenges of decontamination faced at a low-level radioactive waste facility with a focus on the following aspects: - Challenges faced regarding different equipment types and the solutions implemented by Wood to address these challenges; - An examination of various decontamination methods employed throughout the project; and - Lessons learned over three years of remediation work and how they impact the decontamination process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Utility Microgrid Controller Test Plan

The functional requirements of many microgrid controllers (MGCs) are expanding and evolving to meet growing utility and community needs. At a high level, the utility microgrid controller serves resilience and reliability use cases by coordinating transitions between grid-connected and islanded states and by managing the system during island operations. This includes control scenarios that require the microgrid controller to use flexible microgrid boundaries, maintain energy balance, coordinate with peer systems, and manage grid-forming (GFM) and grid-following (GFL) DER. In order to evaluate these functional enhancements, microgrid controller test plans must also be developed to ensure that the implemented controllers provide adequate performance. This report provides MGC test plans for both island operation and transition functions. The functions covered in this first edition report include feeder level energy management, island constraint management, secondary voltage and frequency control, black start, and synchronized reconnection. These test cases can be applied to utility-managed microgrid controllers that exclusively manage utility-owned equipment; the tests also apply to third-party managed microgrid controllers that coordinate with utility- and customer-owned equipment. The report can also be used by technology developers and project developers in industry to evaluate control strategies and performance characteristics for community microgrid controllers.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Characterizing Plug Load Energy Use and Savings Potential in Army Buildings

The Assistant Secretary of the Army (Installations, Energy and Environment) tasked the Pacific Northwest National Laboratory to examine plug loads in typical Army buildings. Plug loads (also known as miscellaneous electric loads (MELs)) represent the electricity used by appliances and devices that are plugged in or hardwired and serve functions outside of a building’s core end uses. Common plug loads include computers, printers, copiers, networking devices, refrigerators, and vending machines. They also include personal electronic devices such as televisions, smart phones, tablets, and gaming systems. Examples of hardwired MELs include elevators, air compressors, and fire and security systems. The findings from this study confirm that significant energy is consumed within Army buildings by plug load devices and hardwired MEL equipment. A number of opportunities are identified for reducing unnecessary energy use that could save the Army over $5 million per year when broadly applied. Army regulations clearly spell out expectations for the purchase and operation of information technology equipment (computers, laptops, monitors, printers, and multi-function devices). However, the policies regarding the shutdown or activation of sleep and other lower power modes after 30 minutes of inactivity (15 minutes for monitors) do not appear to be consistently followed. There are many effective approaches and pathways for impacting change as it relates to improving awareness, implementing measures, and adjusting behaviors to identify and reduce plug load energy use. The Army should prioritize and consider deploying all of these to better understand and manage plug load equipment to save energy and enhance resilience across their facilities. Engaging the building occupants who use these devices daily via outreach and education should be a strong component of the strategy. The focus should be on reducing waste without sacrificing productivity or the benefits that many of these devices provide. Continued evaluation of plug loads beyond that performed here is important to gather lessons from additional building and equipment types, and to stay aware of evolving device technology and management options. This will highlight additional needs for policies, best practices, control technologies, and education of personnel to achieve real reductions in energy waste from plug load equipment. It is recommended that this study may serve as the foundation for a broader and sustained focus on plug loads and MELs, towards simultaneously enhancing the productivity, readiness, and resilience of the Army while reducing energy use and demand, and freeing up resources to better support the mission.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Evaluation of Digital Twin Modeling and Simulation

A digital twin has intelligent modules that continuously monitor the condition of the individual components and the whole of a system. Digital twins can provide nuclear power plants (NPP) operators an unprecedented level of monitoring, control, supervision, and security by contributing a greater volume of data for more comprehensive data analysis and increased accuracy of insights and predictions for decision making throughout the entire NPP lifecycle. NPP operators and managers have historically relied on limited, second hand or incomplete data. With proper implementation, digital twins can provide a central hub of all intel that allows for a multidisciplinary view of an NPP. This equips operators and managers with the ability to have more information, context, and intel that can be used for greater granularity during planning and decision making. Digital twins can be used in many activities as the technology has many different concepts surrounding it. From the various definitions of a digital twin within the industry, digital twins can be differentiated by levels of integration/automation. The three main models include digital model, digital shadow, and digital twin. Digital twins offer many potential advancements to the nuclear industry that could reduce costs, improve designs, provide safer operation, and improve their overall security.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Scaling Demand Flexibility: Building on 30 Years of Energy Efficiency Success

With electricity consumption across the United States (US) and Canada anticipated to grow, energy efficiency program administrators have a key role to play in helping to ensure energy affordability and reliability in support of the broader economic systems utilities and grid support. Connected, demand side load balancing solutions, such as load shifting heating, ventilation and air conditioning (HVAC) systems and managed charging for electric vehicles (EVs), can dynamically manage energy, allowing for more volumetric electricity consumption without incurring the expense of upgraded transmission and distribution capabilities. When combined, or aggregated, many small loads can be managed to have meaningful impact on energy demand on the grid. Utilities and their partners have an opportunity to leverage decades of experience and the infrastructure needed to assess, design, implement, and measure programs to scale up the adoption of equipment with built-in load flexibility capabilities. Current efforts among a wide variety of electricity system service providers, utilities, standards agencies, regulators, national labs and private industry stakeholders aim to identify common standards, metrics, and methodologies for valuing grid services offered by demand side equipment. By combining those efforts with decades of proven energy efficiency resources, utilities are poised to effectuate a scaling up of equipment with energy management capabilities installed in homes and businesses across the US and Canada. This paper will provide an overview of how utilities are approaching this era of load growth and new peak demands across the United States and Canada. It will highlight the specific strategies that program administrators are employing to advance market transformation for grid-enabled products and devices that have the greatest potential to reduce energy use and increase load flexibility.

Grant, Peter↗

Dual-Functional Thermocapacitive Heat Pump with Electrochemical Supercapacitors for Building Thermal Management and Energy Storage

Efficient heating and cooling technologies can help reduce the energy consumption and carbon emissions of buildings. This work explores the use of supercapacitive cells in a multifunctional, liquid-regenerated thermocapacitive heat pump that can provide electrical energy storage in addition to heating and cooling. A proof-of-concept prototype based on eight commercial supercapacitors and using deionized water as a liquid regenerator demonstrated cooling and energy storage capabilities. A peak cooling coefficient of performance (COPc) of 0.27 was achieved at a temperature drop of 0.24 K. The highest measured electrical energy storage density of the cells was 5.93 J cm-3, and the highest cooling power delivered relative to the volume of the cells was 0.58 mW cm-3. This work demonstrates the use of electrochemical energy storage devices in multifunctional equipment for thermal management in buildings.

25 ENERGY STORAGE↗

Dual Purpose Canister Reactivity and Groundwater Absorption Analyses

The current spent nuclear fuel (SNF) management strategy includes reliance on dry storage. Utilities are meeting their interim storage needs on an individual basis with use of large-capacity dry storage casks, with a current focus on meeting existing storage and transportation requirements, as disposal requirements are not currently available. These casks are commonly known as dual-purpose (i.e., storage and transportation) canisters (DPCs). However, a small percentage of single-purpose (storage only) systems is also being used to meet storage needs. These are included under the “DPC” heading. This report investigates the postclosure criticality safety aspects of DPCs. Placing large, heavy waste packages containing DPCs into a repository for direct disposal has not yet been implemented domestically or internationally. Therefore, direct disposal of DPCs represents new engineering and scientific challenges. Some of the engineering challenges that have already been addressed include handling and placement, use of ramps vs. shafts, use of hoists, use of transport equipment, and thermal management. Additionally, some studies have been conducted in the past regarding the feasibility of direct disposal from a criticality analysis perspective and have concluded that while possible, demonstrating subcriticality over the disposal time period is a challenge. The alternative to direct disposal of DPCs into a repository is to repackage the SNF into different canisters. The direct disposal of DPCs without cutting them open and repackaging is appealing because it could be more cost-effective, reduce the complexity of fuel management operations both in and outside reactor facilities, and result in less cumulative worker dose during interim storage and handling before eventual disposal in a deep geologic repository.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Dual Purpose Canister Reactivity and Groundwater Absorption Analyses

The current spent nuclear fuel (SNF) management strategy includes reliance on dry storage. Utilities are meeting their interim storage needs on an individual basis with use of large-capacity dry storage casks, with a current focus on meeting existing storage and transportation requirements, as disposal requirements are not currently available. These casks are commonly known as dual-purpose (i.e., storage and transportation) canisters (DPCs). However, a small percentage of single-purpose (storage only) systems is also being used to meet storage needs. These are included under the “DPC” heading. This report investigates the postclosure criticality safety aspects of DPCs. Placing large, heavy waste packages containing DPCs into a repository for direct disposal has not yet been implemented domestically or internationally. Therefore, direct disposal of DPCs represents new engineering and scientific challenges. Some of the engineering challenges that have already been addressed include handling and placement, use of ramps vs. shafts, use of hoists, use of transport equipment, and thermal management. Additionally, some studies have been conducted in the past regarding the feasibility of direct disposal from a criticality analysis perspective and have concluded that while possible, demonstrating subcriticality over the disposal time period is a challenge. The alternative to direct disposal of DPCs into a repository is to repackage the SNF into different canisters. The direct disposal of DPCs without cutting them open and repackaging is appealing because it could be more cost-effective, reduce the complexity of fuel management operations both in and outside reactor facilities, and result in less cumulative worker dose during interim storage and handling before eventual disposal in a deep geologic repository.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Data Services for Visualization and Analysis - ASC Level II Milestone (7186)

A new in transit Data Service is presented and compared to the traditional file-based workflow and the newly refactored in situ Catalyst workflow. Each workflow is enabled by the IOSS mesh interface equipped with data management layers for Exodus and CGNS (file-based), Catalyst (in situ), and FAODEL (in transit). FAODEL is a distributed object store that can transmit data across MPI allocations. Catalyst is a Para View-based visualization capability developed as part of the CSSE Data Services effort. The workflows considered here take SPARC data into Catalyst for visualization post-processing. Although still in unoptimized form, we show that the in transit approach is a viable alternative to file-based and in situ workflows and offers several advantages to both simulation and post-processing developers. Since IOSS is a mature interface with wide adoption across Sandia and externally, each workflow can be reconfigured to use different simulations that generate mesh data and post-processing tools that consume it.

97 MATHEMATICS AND COMPUTING↗

Resurgence of a Nation’s Radiation Science Driven by Its Nuclear Industry Needs

This article describes the radiation facilities and associated sample preparation, management, and analysis equipment currently in place at the Dalton Cumbrian Facility, a facility which opened in 2011 to support the UK’s nuclear industry. Examples of measurements performed using these facilities are presented to illustrate their versatility and the breadth of research they make possible. Results are presented from research which furthers our understanding of radiation damage to polymeric materials, radiolytic yield of gaseous products in situations relevant to nuclear materials, radiation chemistry in light water reactor cooling systems, material chemistry relevant to immobilization of nuclear waste, and radiation-induced corrosion of fuel cladding elements. Applications of radiation chemistry relevant to health care are also described. Research concerning the mechanisms of radioprotection by dietary carotenoids is reported. An ongoing open-labware project to develop a suite of modular sample handling components suited to radiation research is described, as is the development of a new neutron source able to provide directional beams of neutrons.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Adaptive protection opportunities, gap assessments, and designs

This report provides a comprehensive overview of adaptive protection schemes in use by distribution systems for protection, switching and control on their systems. A significant focus is placed on how existing schemes can be impacted by increasing penetrations of DER as well as how these schemes can enable DER penetrations to increase. EPRI have conducted a survey of member utilities and performed a comprehensive literature review with the goal of baselining the research and identifying gaps with a focus on the issues that were encountered with adaptive protection on real systems. The five adaptive protection applications that are most prevalent on systems today are discussed in detail. These are weather-based fuse-saving, adaptive protection to reduce short-circuit current, adaptive protection for DER, adaptive protection for microgrids, and distribution automation. A broad overview of the technology is given for each scheme. Issues that have been encountered by utilities are highlighted and the safety and reliability impacts are also examined. As distribution systems, intelligent electronic devices, grid equipment and distribution management systems are rapidly evolving, adaptive protection techniques and technologies will become more widely adopted. This report proposes a framework for a conceptual automatic adaptive protection system. EPRI have ongoing research, development and demonstration projects in all of the constituent elements, however challenges remain to link the elements together in a secure and reliable way. EPRI will continue research into automated adaptive protection applications and challenges for the systems of today and future applications to assist system operators in managing the evolving system.

14 SOLAR ENERGY↗