Search NASA⌕ Search

SEARCH · Search NASA

Results for “extended mission”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Dawn's Second and Final Extended Mission: A New Operational Campaign at Ceres

Dawn has been in orbit around Ceres since March 2015. In 2016, Dawn completed its prime mission of exploring Vesta and Ceres, and it completed an extended mission at the dwarf planet in 2017. The spacecraft has lost all reaction wheel control, making attitude control dependent on a dwindling supply of hydrazine. Nevertheless, in 2017 the project was approved for a second and final extended mission at Ceres. Starting in April 2018, Dawn used its ion propulsion system to maneuver to two new orbits. These highly elliptical orbits provided hydrazine-efficient opportunities for the acquisition of valuable new data. Now in the second of these orbits, Dawn's lowest altitude is only 9% of the lowest altitude previously in the mission, enabling significant improvements in the spatial resolution of the data. We describe Dawn operations in its second extended mission, the nature of the orbits, and the observation campaigns. We also summarize expectations for the end of the mission.

Rayman, Marc D.↗

Lunar Prospector Extended Mission

The National Aeronautics and Space Administration (NASA) selected Lunar Prospector (LP) as one of the discovery missions to conduct solar system exploration science investigations. The mission is NASA's first lunar voyage to investigate key science objectives since Apollo and was launched in January 1998. In keeping with discovery program requirements to reduce total mission cost and utilize new technology, Lunar Prospector's mission design and control focused on the use of innovative and proven trajectory analysis programs. As part of this effort, the Ames Research Center and the Goddard Space Flight Center have become partners in the Lunar Prospector trajectory team to provide the trajectory analysis, maneuver planning, orbit determination support, and product generation. At the end of 1998, Lunar Prospector completed its one-year primary mission at 100 km altitude above the lunar surface. On December 19, 1998, Lunar Prospector entered the extended mission phase. Initially the mission orbit was lowered from 100 km to a mean altitude of 40 km. The altitude of Lunar Prospector varied between 25 and 55 km above the mean lunar geode due to lunar potential effects. After one month, the lunar potential model was updated based upon the new tracking data at 40 km. On January 29, 1999, the altitude was lowered again to a mean altitude of 30 km. This altitude varies between 12 and 48 km above the mean lunar geode. Since the minimum altitude is very close to the mean geode, various approaches were employed to get accurate lunar surface elevation including Clementine altimetry and line of sight analysis. Based upon the best available terrain maps, Lunar Prospector will reach altitudes of 8 km above lunar mountains in the southern polar and far side regions. This extended mission phase of six months will enable LP to obtain science data up to 3 orders of magnitude better than at the mission orbit. This paper details the trajectory design and orbit determination planning and actual results of the Lunar Prospector extended mission including maneuver design, eccentricity & argument of perigee evolution, and lunar potential modeling.

Folta, David↗

Lunar Prospector Extended Mission

The National Aeronautics and Space Administration (NASA) selected Lunar Prospector as one of the discovery missions to conduct solar system exploration science investigations. The mission is NASA's first lunar voyage to investigate key science objectives since Apollo and was launched in January 1998. In keeping with discovery program requirements to reduce total mission cost and utilize new technology, Lunar Prospector's mission design and control focused on the use of innovative and proven trajectory analysis programs. As part of this effort, the Ames Research Center and the Goddard Space Flight Center have become partners in the Lunar Prospector trajectory team to provide the trajectory analysis, maneuver planning, orbit determination support, and product generation. At the end of 1998, Lunar Prospector completed its one-year primary mission at 100 km altitude above the lunar surface. On December 19, 1998, Lunar Prospector entered the extended mission phase. Initially the mission orbit was lowered from 100 km to a mean altitude of 40 km. The altitude of Lunar Prospector varied between 25 and 55 km above the mean lunar geode due to lunar potential effects. After one month, the lunar potential model was updated based upon the new tracking data at 40 km. On January 29, 1999, the altitude was lowered again to a mean altitude of 30 km. This altitude varies between 12 and 48 km above the mean lunar geode. Since the minimum altitude is very close to the mean geode, various approaches were employed to get accurate lunar surface elevation including Clementine altimetry and line of sight analysis. Based upon the best available terrain maps, Lunar Prospector will reach altitudes of 8 km above lunar mountains in the southern polar and far side regions. This extended mission phase of six months will enable LP to obtain science data up to 3 orders of magnitude better than at the mission orbit. This paper details the trajectory design and orbit determination planning, and actual results of the the Lunar Prospector extended mission including maneuver design, eccentricity & argument of perigee evolution, and lunar potential modeling.

Folta, David↗

Navigation of the GRAIL Spacecraft Pair Through the Extended Mission at the Moon

The GRAIL extended mission (XM) dramatically expands the scope of GRAIL's gravity science investigation by flying the pair of spacecraft at the lowest orbit the flight team can safely support. From the perspective of the Navigation team, the low orbit altitude introduces new challenges. At this lower altitude, navigation is more sensitive to higher-order terms of the gravity field so that orbit determination solutions are more difficult and there is less certainty of achieving maneuver targets. This paper reports on the strategy and performance of the Navigation system for GRAIL's XM. On a weekly basis, the Navigation team provided reference trajectory updates, designed three maneuvers, and reconstructed the execution of those maneuvers. In all, the XM involved 55 planned maneuvers; five were canceled. The results of the Navigation team's efforts, in terms of maintaining the reference-trajectory targets, satisfying requirements, and achieving desired separation distances, are assessed.

orbit↗

Results from the ASTERIA CubeSat Extended Mission Experiments

Over the past two years, JPL has used the ASTERIA (Arcsecond Space Telescope Enabling Research In Astrophysics) CubeSat as an in-flight test platform during extended missions. ASTERIA successfully completed its prime mission in early 2018, and continued to operate in low Earth orbit (LEO) for an additional twenty months. This paper describes demonstrations that were performed on the spacecraft and on the ground-based testbed during the extended mission. These demonstrations fall into three categories: Autonomy technology maturation, hardware characterization, and science discovery. Autonomy technology maturation supported three development efforts. The first shifted the spacecraft commanding paradigm from time-based sequences to Task Networks (tasknets), which allow simpler commanding and more robust onboard execution. The second demonstrated onboard orbit determination in Low Earth Orbit (LEO) without GPS. This activity used a fully-independent means of spacecraft orbit determination for Earth orbiters using only passive imaging. The third technology provided in situ hardware health state estimation using a model-based reasoning technique. These three technologies were demonstrated either in flight or on the testbed individually, and then were combined to demonstrate the capability to perform autonomous navigation on board without ground intervention, even in the presence of anomalies. Hardware characterization involved both onboard and ground-based activities. On board, nonstandard attitude control modes were commanded to characterize the spacecraft pointing jitter as a function of target brightness, reaction wheel speed, controller gain, and the number of guide stars. The results provide insights into the contribution of jitter to the ASTERIA photometry and inform the feasibility of future astrophysics small satellite missions for which jitter control is an enabling technology. On the ground, the ASTERIA Operations Team coordinated with Amazon Web Services (AWS) to configure their new ground stations to communicate with ASTERIA to prove out their viability. ASTERIA used AWS ground stations for nominal operations for the last four months of the mission. Finally, ASTERIA continued to perform exoplanet science as the spacecraft was well-suited to execute long-term monitoring of stars such as alpha Centauri to search for small transiting planets. The science team also imaged a number of interesting objects including a comet, an asteroid, cities at night, and the moon, and coordinated with other projects on Targets of Opportunity for follow-up confirmations and co-observations. Throughout the prime and the extended missions, the ASTERIA spacecraft proved to be a mighty platform that “will go into history as an innovative milestone.”[1 - Zurbuchen]

Doran, Patrick↗

Mariner 9 extended mission sequence design optimization

This paper discusses the Mariner 9 science sequence design during the extended mission including science objectives, and mission operation and spacecraft constraints. The primary objectives of the extended mission were to complete 100% mapping of the planet, photograph special interest targets, obtain high resolution coverage of prospective Viking landing sites, and to function through the superior conjunction period. The optimization of planet viewing characteristics by moving to different celestial reference stars, and the techniques used to efficiently allocate science links to data taking days are described.

Reichert, R. J.↗

The DS1 hyper-extended mission

The Primary Mission for Deep Space (DS1) was to demonstrate 12 new technologies one of which was the Ion Propulsion System (IPS). After successfully completing its primary mission, DS1 was given a new mission. The objective of this Extended Mission was to fly by the Comet Borrelly. After the successful Borrelly encounter, the ion thruster on DS1 had to be operated for more than 14,000 hours in space. This provided a unique opportunity to investigate the condition of the thruster after long-term operation in space and determine, to the extent possible, if the thruster wear in space is consistent with that observed in long-duration ground tests.

DS1 Deep Space 1 ion propulsion ion thruster↗

Extended mission life support systems

Extended manned space missions which include interplanetary missions require regenerative life support systems. Manned mission life support considerations are placed in perspective and previous manned space life support system technology, activities and accomplishments in current supporting research and technology (SR&T) programs are reviewed. The life support subsystem/system technologies required for an enhanced duration orbiter (EDO) and a space operations center (SOC), regenerative life support functions and technology required for manned interplanetary flight vehicles, and future development requirements are outlined. The Space Shuttle Orbiters (space transportation system) is space cabin atmosphere is maintained at Earth ambient pressure of 14.7 psia (20% O2 and 80% N2). The early Shuttle flights will be seven-day flights, and the life support system flight hardware will still utilize expendables.

Quattrone, P. D.↗

Mars atmosphere during the Mariner 9 extended mission: Television results

Data from the Mariner 9 extended mission provide a record of seasonally varying processes from mid-spring to early summer in the Northern Hemisphere of Mars. Atmospheric phenomena observed by the television cameras during this period are: (1) A faint shelf of brightness near 20 km in height; (2) condensate clouds over Hellas in the early morning, (3) wave clouds over the south polar region indicating strong west to east winds; (4) faint wave clouds over the north polar cap indicating northeast to southwest flow off the cap; and (5) clouds over the major vocanos and Tithonius Lacus which show remarkable repeatability, strong topographic control, and, in some cases, evidence for convective structure.

Leovy, C. B.↗

Giotto Extended Mission (GEM)

The primary objectives of the Giotto Extended Mission (GEM), are to determine the composition and physical state of the Grigg Skjellerup Comet's nucleus; to determine the processes that govern the composition and distribution of neutral and ionized species in the cometary atmosphere. Giotto consists of a single European Space Agency (ESA) spacecraft that was launched in 1985 from Center Spatial Guyanis in French Guiana on an Ariane launch vehicle. After a successful launch into geostationary orbit and a heliocentric transfer trajectory, the spacecraft successfully encountered Halley's Comet in 1986. One month after encountering Halley's Comet, Mar. 1986, the spacecraft was placed in hibernation in a heliocentric orbit slightly less than 1 AU. Between Feb. and Jul. 1990 the spacecraft was successfully reactivated, checked out, and placed on a trajectory course to intercept comet Grigg Skjellerup. The spacecraft has been in hibernation since Jul. 1990. Information is presented in tabular form in the following areas: coverage goals, Deep Space Network Support, frequency assignments, telemetry, command, and tracking support responsibility.

Wilkins, D. E. B.↗

50,000 Laps Around Mars: Navigating the Mars Reconnaissance Orbiter Through the Extended Missions (January 2009 - March 2017)

Orbiting Mars since March 2006, the Mars Reconnaissance Orbiter (MRO) spacecraft continues to perform valuable science observations, provide telecommunication relay for surface assets, and characterize landing sites for future missions. Previous papers reported on the navigation of MRO from interplanetary cruise through the end of the Primary Science Phase (PSP) in December 2008 and on maneuvers performed through November 2016. This paper highlights the navigation of MRO from January 2009 through its 50,000th orbit around Mars on March 27, 2017, an eight-year period covering the Extended Science Phase, the first three extended missions, and a portion of the fourth extended mission which began on October 1, 2016. Since the beginning of the PSP in November 2006, MRO’s navigation performance has continued to exceed expectations. Over that period of time, the mission has returned over 300 terabytes of data.

Schulze, William↗

Thermodynamic data report for the Titan/Centaur TC-5 extended mission

The Titan/Centaur vehicle, with the Helios B spacecraft, was launched on January 15, 1976. After the spacecraft was placed into its desired heliocentric trajectory, the Centaur vehicle continued into an extended mission to perform experiments demonstrating increased operational capabilities. The thermal performance of all pertinent Centaur systems and components was evaluated and its capability for satisfactory operation for long duration space coasts was verified. The selected thermal control techniques maintained the Centaur component temperatures within their qualification limits for the entire 8-hour and 22-minute duration of the extended mission.

Lacovic, R. F.↗