Search NASA⌕ Search

SEARCH · Search NASA

Results for “financial assumptions”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

A Study of Financial Impacts of Pooled Rideshare Based on Assignment Strategies

This study explores the potential profitability of a pooled rideshare service in a simulation-based case study of two US metropolitan regions in the context of two fleet assignment strategies. A new method of obtaining more accurate fares is created to address scalability and accuracy assumptions relevant to pooling choice. Cases for private rideshare fleets, public mobility on demand offerings, and autonomous fleets are explored and analyzed. Two regions of differing types are explored to illustrate the impacts of geo-spatial demand density of profitability, with one region capturing a large urban and suburban environment and the second a less dense more compact small city. Results indicate that the cost of human drivers is prohibitively expensive, and regulation of driver pay extends the issue of financial viability. Despite these shortcomings, a more efficient rideshare assignment strategy is shown to increase profitability by as much as 60%. The smaller, more dense region was illustrated to experience a greater increase in profitability than the larger region when pooling was improved.

Paul, Joseph↗

Financial Analysis of the High Flow Experiment conducted at the Glen Canyon Dam during Water Year 2023

The Glen Canyon Dam (GCD) is a Colorado River Storage Project (CRSP) power resource that is a component of the Salt Lake City Area Integrated Projects (SLCA/IP). The 2016 record of decision (ROD) for the GCD long-term experimental and management plan (LTEMP) final Environmental Impact Statement (EIS) specified criteria for GCD monthly water releases, daily and hourly operating limits, and experimental releases. This report examines the financial implications of the high flow experiment (HFE) conducted at GCD during the spring of Water Year (WY) 2023 as required by the LTEMP HFE Protocol. This report is part of a series of reports that describe the financial costs of LTEMP experimental releases since the 2016 ROD was adopted in January 2017. Previous reports analyzed the impact of several past HFEs and Bug Flow Experiments. This report focuses on the HFE conducted in April 2023. For this experimental release, financial costs of approximately $1.33 million were incurred because the HFE required sustained water releases exceeding the power plant’s maximum turbine flow rate. In addition, during the experiment, operators were not allowed to shape GCD power production, either to follow Firm Electric Service (FES) customer day-ahead energy deliveries or to respond to market prices. This study identifies the main factors contributing to the HFE costs and examines the interdependencies among these factors. It applies an integrated set of tools to estimate Western Area Power Administration (WAPA) financial impacts by simulating GCD under two types of cases; namely, (1) a “With Experiment” case that mimics the operations that actually occurred and (2) a “Without Experiment” case that simulates operations under the assumption that the HFE did not occur. The “With Experiment” case mimics operations during the HFE and the entire month the HFE occurred. It complies with LTEMP hourly and daily operating criteria. The “Without Experiment” case assumes that the HFE did not occur. The monthly water release volume is assumed to be identical under both cases. The Colorado River Storage Project Python-based model (CRiSPPy) model was the main modeling tool used to simulate the dispatch of the GCD hydropower plant and associated water releases from Lake Powell. In the modeling process, the research team used extensive data sets and historical information on SLCA/IP power plant characteristics, hydrologic conditions, and WAPA’s power purchases and sales prices. In addition to estimating the financial impact of the HFE, the team used the CRiSPPy model to gain insights into the interplay among ROD operating criteria, exceptions made to criteria to accommodate the HFE, and WAPA operating practices.

13 HYDRO ENERGY↗

Examples of State and Utility Actions on Proactive Planning and Investments

As states across the U.S. confront rising electricity demand, clean energy deployment, grid modernization imperatives, and the integration of large new loads, some regulators and utilities are shifting away from reactive, “just-in-time” investment approaches toward more proactive planning and investment frameworks. This report compiles examples of jurisdictional and utility actions that reshape planning processes, cost recovery mechanisms, and performance oversight to anticipate—rather than simply respond to—future grid needs. Several themes emerge from state actions examined in this report. First, legislatures and commissions are increasingly directing utilities to proactively upgrade their distribution and transmission systems, reflecting a shift toward a forward-looking system that aligns planning with state policy goals. Second, states are establishing long-term, iterative planning frameworks that often feature multi-year horizons, biannual or annual compliance reporting, structured opportunities for stakeholder engagement, and emphasis on collaboration among utilities, regulators, and stakeholders. Third, states are actively investigating innovative cost recovery mechanisms designed to support accelerated electrification and grid modernization, while balancing consumer advocates’ concerns regarding the ratepayer financial risks of premature investments. Fourth, performance metrics and reporting requirements are being developed to ensure transparency and accountability for proactive investments. Fifth, methodological improvements in planning—such as aligning load forecasting assumptions, incorporating sensitivities, and considering load management potential across building, vehicles, storage, and demand response—are recurring areas of stakeholder focus across jurisdictions. Overall, these developments signify a growing recognition among state regulators, utilities, and stakeholders that proactive planning—supported by clear definitions, consistent and transparent methodologies, robust performance metrics, and innovative cost recovery mechanisms—is a tool that can be used to address the scale and urgency of contemporary grid needs.

electricity market↗

Financial Analysis of the Smallmouth Bass Flows implemented at the Glen Canyon Dam during Water Year 2024

The Glen Canyon Dam (GCD) is a Colorado River Storage Project (CRSP) power resource that is a component of the Salt Lake City Area Integrated Projects (SLCA/IP). The 2016 record of decision (ROD) for the GCD long-term experimental and management plan (LTEMP) final Environmental Impact Statement (EIS) specifies criteria for GCD monthly water releases, daily and hourly operating limits, and experimental releases. This report presents a financial analysis of the Smallmouth bass (Micropterus dolomieu) (SMB) flows implemented at GCD during Water Year (WY) 2024. These bypass flows were introduced by the U.S. Bureau of Reclamation (USBR) as an emergency response to the growing threat posed by invasive SMB in the Colorado River ecosystem downstream of the dam. SMB are a non-native predatory species that pose a significant threat to native fish populations, including the endangered humpback chub (Gila cypha). The thermal regime below GCD, typically cold due to hypolimnetic releases from Lake Powell, has historically served as a thermal barrier limiting SMB establishment. However, persistently low reservoir levels in recent years have reduced stratification in Lake Powell, allowing warmer water to be released downstream. This has enabled SMB to spawn successfully below the dam, prompting urgent ecological concerns. To mitigate the risk of SMB proliferation, the USBR implemented a series of bypass flows in WY 2024. Drawn from a lower elevation than the penstocks, the bypass structures released cooler water downstream. These short-duration bypass flows aimed to keep temperatures cool enough to prevent SMB from spawning, thereby reducing the ecological threat posed by this invasive species. Although motivated by ecological objectives, these bypass flows came with financial tradeoffs. Releasing water through the bypass structures instead of the turbines at GCD reduced hydropower generation, resulting in a significantly lower financial position for Western Area Power Administration (WAPA), which is responsible for marketing the electricity produced by the GCD Powerplant. This report analyzes the financial impact of the SMB flows implemented from July to November 2024. These experimental releases led to an estimated financial cost of approximately $18.9 million, primarily driven by the substantial volume of water diverted through the bypass structures. This study applies an integrated set of tools to estimate WAPA financial impacts by simulating GCD under two types of cases; namely, (1) a “With Experiment” case that mimics the water operations that actually occurred, including the SMB bypass flows, and (2) a “Without Experiment” case that simulates operations under the assumption that the SMB flows did not occur. Both cases comply with LTEMP hourly and daily operating criteria, and the monthly water release volumes are assumed to be identical under both cases. The Colorado River Storage Project Python-based model (CRiSPPy) model was the main modeling tool used to simulate the dispatch of the GCD hydropower plant and associated water releases from Lake Powell. In the modeling process, the research team used extensive data sets and historical information on SLCA/IP power plant characteristics, hydrologic conditions, and WAPA’s power purchases and sales prices.

13 HYDRO ENERGY↗

Carbon Capture and Storage for Small-to-Medium Biorefineries: Promising Carbon Removal Solution with Economic Challenges

Carbon capture and storage (CCS) integrated with biomass-based fuel production can provide cost-effective biomass carbon removal and storage (BiCRS) and produce high-value bioproducts, such as sustainable aviation fuels. To accelerate BiCRS deployment, it is crucial to quantify the costs of CCS integration, particularly for small- and medium-scale biorefineries that are representative of early-stage deployment. Existing studies tend to focus on plant sizes that are orders-of-magnitude larger than early-stage installations, possibly underestimating CCS costs for small-to-medium biorefineries. We show that the capture, transport, and storage costs to maximize CO 2 removal from a 526 dry tonne per day (tpd) biomass gasification plant (largest existing size) could be 13–47% higher than costs for a typical modeled plant size (2000 dry tpd). The higher cost estimates are driven by less favorable economies of scale and realistic assumptions about the availability of affordable CO 2 transport infrastructure with both drivers broadly applicable to other BiCRS technologies. Compliance and voluntary carbon markets could incentivize biorefinery CCS, but both carry a high degree of uncertainty. In conclusion, these findings highlight that sufficient and reliable financial mechanisms would be essential to unlocking the full CO 2 removal potential of biorefineries and facilitating BiCRS scale-up.

Biological transport↗

A review of privacy in energy applications

As the distribution system continues to experience an increase in distributed energy resource (DER) and electric vehicle (EV) penetration, so does the need for new solutions that can help grid operators manage and leverage their capabilities. This will undoubtedly lead to new operational schemes and business opportunities that will transform the traditional consumer into a prosumer who will be more actively engaged in grid operations. Although the field is still under active development, many of the potential use cases presented in literature or industry are built upon edge computing, two-way communications, and other innovative computational constructs to attain their goals. However, at their core, many use cases assume a great level of data access to aid with the decision-making process, an assumption that may need to be revised to ensure fair and equitable operational processes are maintained. This may be particularly true as edge resources are predicted to participate in retail-side, many-to-many, or peer-to-peer markets and thus may lead to financial impacts if data access considerations are ignored. The need to revise data access mechanisms can be further justified by the introduction of new participants into the operational process, who do not have the same level of trust, nor the incentives to focus on energy delivery as their primary objective. At the same time, more consumers are becoming aware of their own data, and the potential impacts of its abuse. To help solution developers better understand these risks, this report has been developed to offer an initial introduction to the topic of privacy. This is achieved by 1) Highlighting the need for privacy-aware solutions; 2) Encouraging system designers to be inquisitive about the status quo; 3) Documenting the existing threat space; 4) Presenting and evaluating tools that may be helpful towards enabling better privacy postures; and 5) Making recommendations to encourage the adoption of better practices. From a technical perspective, the report focuses on evaluating two potential techniques by applying them to the Transactive Energy Space. Based on the obtained results, it can be established that differential privacy (DP) methods may have limited applicability when highly correlated, time-series data records need to be protected. However, DP may be a powerful tool when it is used to aggregate and analyze mid-size and large-size data sets in a more traditional statistical environment. The second tool under evaluation is threshold cryptography, which can guarantee complete secrecy (and thus privacy) but requires the establishment of key management procedures and dedicated communication channels for key coordination. Therefore, due to its increased computational overhead, the use of threshold cryptography must be weighted using a cost/benefit analysis on a per-application basis.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Launch vouchers for space science research

Recent national space policy proposes the use of space transportation vouchers to increase opportunities for space-based science research and to support the U.S. space transportation industry. Vouchers issued and financially backed by the government would be given to researchers for redemption on any mode of space transportation. This paper examines the economic costs and benefits of vouchers; incentive-based strategies for effective program design; and areas where the voucher scheme is weak. It is concluded that, under plausible assumptions, vouchers may well be a cost-effective way to achieve near-term space transportation for space research payloads.

Macauley, Molly K.↗

Dataset for Blueprinting Electrified Transit System Implementation

This dataset contains the figures and tabulated results generated from a system-level optimization study of transit fleet electrification planning. The dataset does not include executable modeling code required to reproduce the optimization. The dataset includes results for optimized charging infrastructure deployment by location and power level and service block assignments by fuel type, battery capacity selections, and distributed energy resource sizing. It also contains aggregated financial results, capital expenditures, operating cost summaries, net present cost comparisons across scenarios, and quantified air quality impacts. Results are structured to reflect multiple planning scenarios, including heuristic electrification plans, system-optimized configurations, and sensitivity cases with alternative objective weightings. The modeling was developed using publicly available General Transit Feed Specification data from Omnitrans and standardized modeling assumptions.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Dataset for Blueprinting Electrified Transit System Implementation

This dataset contains the figures and tabulated results generated from a system-level optimization study of transit fleet electrification planning. The dataset does not include executable modeling code required to reproduce the optimization. The dataset includes results for optimized charging infrastructure deployment by location and power level and service block assignments by fuel type, battery capacity selections, and distributed energy resource sizing. It also contains aggregated financial results, capital expenditures, operating cost summaries, net present cost comparisons across scenarios, and quantified air quality impacts. Results are structured to reflect multiple planning scenarios, including heuristic electrification plans, system-optimized configurations, and sensitivity cases with alternative objective weightings. The modeling was developed using publicly available General Transit Feed Specification data from Omnitrans and standardized modeling assumptions.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Operational-based annual energy production uncertainty: are its components actually uncorrelated?

Calculations of annual energy production (AEP) from a wind power plant – whether based on preconstruction or operational data – are critical for wind plant financial transactions. The uncertainty in the AEP calculation is especially important in quantifying risk and is a key factor in determining financing terms. A popular industry practice is to assume that different uncertainty components within an AEP calculation are uncorrelated and can therefore be combined as the sum of their squares. We assess the practical validity of this assumption for operational-based uncertainty by performing operational AEP estimates for more than 470 wind plants in the United States, mostly in simple terrain. We apply a Monte Carlo approach to quantify uncertainty in five categories: revenue meter data, wind speed data, regression relationship between density-corrected wind speed (from reanalysis data) and measured wind power, length of long-term-correction data set, and future interannual variability. We identify correlations between categories by comparing the results across all 470 wind plants. We observe a positive correlation between interannual variability and the linearized long-term correction; a negative correlation between wind resource interannual variability and linear regression; and a positive correlation between reference wind speed uncertainty and linear regression. Then, we contrast total operational AEP uncertainty values calculated by omitting and considering correlations between the uncertainty components. We quantify that ignoring these correlations leads to an underestimation of total AEP uncertainty of, on average, 0.1% and as large as 0.5% for specific sites. Although these are not large increases, these would still impact wind plant financing rates; further, we expect these values to increase for wind plants in complex terrain. Based on these results, we conclude that correlations between the identified uncertainty components should be considered when computing the total AEP uncertainty.

17 WIND ENERGY↗

Fleet retrofit report

Flight tests are evaluated of an avionics system which aids the pilot in making two-segment approaches for noise abatement. The implications are discussed of equipping United's fleet of Boeing 727-200 aircraft with two-segment avionics for use down to Category 2 weather operating minima. The experience is reported of incorporating two-segment approach avionics systems on two different aircraft. The cost of installing dual two-segment approach systems is estimated to be $37,015 per aircraft, including parts, labor, and spares. This is based on the assumption that incremental out-of-service and training costs could be minimized by incorporating the system at airframe overhaul cycle and including training in regular recurrent training. Accelerating the modification schedule could add up to 50 percent to the modification costs. Recurring costs of maintenance of the installation are estimated to be of about the same magnitude as the potential recurrent financial benefits due to fuel savings.

Source record↗

Functional Volume Assessment of an Early Version of the Mars Transit Habitat

During the summer of 2020, the NASA Mars Architecture Team (MAT) conducted a functional volume assessment of the Transit Habitat (TH). The TH has evolved substantially since that time and the current TH does not share the same internal configuration, but the insights gained from the assessment remain relevant. In virtually all architectures involving chemical, electric, or nuclear propulsion, the majority of the crew mission is spent aboard the TH. The Earth to Mars transit durations may vary from architecture to architecture, but all are on the order of hundreds of days, regardless of whether an opposition or conjunction class trajectory is selected, and regardless of whether the propulsion system is chemical, electric, or nuclear. Thus, the TH must provide capabilities appropriate to a very long duration. So, despite significant changes in the current Mars architecture over the past few years, this evaluation still provides useful recommendations in the form of habitability guidance that can be applied to current and future TH concepts. This assessment had six primary objectives: provide a sanity check to the BOC-derived TH layout; understand if we can fit the hardware and functional tasks in the volume; provide a high-level assessment of how aggressive the layout is; generate a list of challenges or assumptions necessary to make it work; generate a list of future work to refine understanding; and identify proposed requirements. All of this information is critical to drive habitat sizing studies and key architecture decisions. It was clear that a human-in-the-loop (HITL) evaluation of some kind would be necessary, but several challenges were immediately identified. The most information could be gleaned from a Desert Research and Technology Studies (DRATS) type of mission operations test (MOT), but the TH concept was too low fidelity to construct the type of prototype necessary to conduct a MOT, nor were their financial resources to do so. The next best option – and really the one most appropriate for the BOC’s stage of maturity – is a Virtual Reality (VR) walk-through evaluation. However, NASA was in a shutdown state due to the COVID-19 pandemic and the VR labs were inaccessible. As a result, a tabletop evaluation was created, using .jpg imagery from the ECM CAD model along with Excel-based datasheets. High-level crew living and working functions within the habitat were identified for evaluation. Questionnaires using Likert scales assessed acceptability of habitat functions and sim quality – the degree to which the function was represented in CAD. This enabled the evaluation to be conducted by personnel working remotely. Each function was evaluated individually along with several overarching habitability parameters and vehicle subsystems. The results of this evaluation are discussed, including methodological challenges and rating challenges. Acceptability results are discussed for functions that the participants were able to rate and participant comments for functions that could not be related are also described. Final conclusions are described, including challenges or assumptions needed to make the TH design acceptable, future work needed to refine understanding of the TH, and proposed habitat requirements based on test data.

Transit Habitat↗

The Geothermal Probabilistic Cost Model with an Application to a Geothermal Reservoir at Heber, California

A financial accounting model that incorporates physical and institutional uncertainties was developed for geothermal projects. Among the uncertainties it can handle are well depth, flow rate, fluid temperature, and permit and construction times. The outputs of the model are cumulative probability distributions of financial measures such as capital cost, levelized cost, and profit. These outputs are well suited for use in an investment decision incorporating risk. The model has the powerful feature that conditional probability distribution can be used to account for correlations among any of the input variables. The model has been applied to a geothermal reservoir at Heber, California, for a 45-MW binary electric plant. Under the assumptions made, the reservoir appears to be economically viable.

Orren, L. H.↗

Technology progress and clean vehicle policies on fleet turnover and equity: insights from household vehicle fleet micro-simulations with $\text{ATLAS}$

This paper documents the design and application of ATLAS (Automobile and Technology Lifecycle-Based ASsignment), a comprehensive household vehicle transaction and technology adoption micro-simulator in the San Francisco Bay Area. ATLAS evolves the fleet mix of individual households by simulating the vehicle transaction and choice decisions in response to co-evolving demographics, land use, and vehicle technology simulations. While most existing literature has focused on the aggregate clean vehicle uptake, this paper differentiates distributional effects and decomposes the underlying mechanisms across heterogeneous sub-populations of households. Using scenarios and sensitivity simulations that vary vehicle technology and policy assumptions, we find that Zero Emission Vehicles (ZEVs) penetrate into higher income groups at a faster rate than into lower income groups, which is intuitive and aligns with expectations. Interestingly, the relative income disparity in ZEV ownership shrinks over time across all scenarios, with a ZEV mandate coupled with declining battery cost leading to the greatest reduction in disparity of ZEV ownership by 2050. Federal, state, and local financial incentives influence the redistribution of ZEV uptake across income groups and contribute to narrowing income disparity. Vehicle transaction frequency and new versus used market dynamics are found to be important factors contributing to the income disparity.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Quantifying the Financial Impacts of Electric Vehicles on Utility Ratepayers and Shareholders [Slides]

Widespread electric vehicle (EV) adoption is critical for meeting economy-wide decarbonization goals and, as a result, states are considering enabling policies and rate designs to accelerate EV deployment. EVs can provide possible financial upside to electric utilities and ratepayers in several ways. For example, from the utility perspective, EVs could drive increased electricity sales and new earnings opportunities through increased capital investments. From the ratepayer perspective, increased electric loads from EVs could reduce average all-in retail rates. The degree to which there are net benefits or costs to shareholders and/or ratepayers depends on how EVs are integrated and managed through enabling grid investments and charging strategies. Using Berkeley Lab’s Financial Impacts of Distributed Energy Resources (FINDER) model that mimics the electric utility investment planning and ratemaking processes, we estimate the utility earnings and customer rate impacts of EVs using a bookend approach of “managed” (i.e., best case) and “mismanaged” (i.e., worst case) charging strategies for a generic summer-peaking, investor-owned, and vertically integrated utility. The analysis also examines the sensitivity of results to different assumptions of EV deployment characteristics, EV impacts on retail electricity sales, incremental distribution system costs, EV charging location, and utility EV enablement costs (i.e., utility costs to invest in EV charging, controls, and communication to deliver and administer EV programs). The results are intended to inform EV policies and deployment strategies that maximize utility system benefits and minimize ratepayer costs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Highly Reusable Space Transportation System Concept Evaluation (The Argus Launch Vehicle)

This paper summarizes the results of a conceptual design study that was performed in support of NASA's recent Highly Reusable Space Transportation study. The Argus concept uses a Maglifter magnetic-levitation sled launch assist system to accelerate it to a takeoff ground speed of 800 fps on its way to delivering a payload of 20,000 lb. to low earth orbit. Main propulsion is provided by two supercharged ejector rocket engines. The vehicle is autonomous and is fully reusable. A conceptual design exercise determined the vehicle gross weight to be approximately 597,250 lb. and the dry weight to be 75,500 lb. Aggressive weight and operations cost assumptions were used throughout the design process consistent with a second-generation reusable system that might be deployed in 10-15 years. Drawings, geometry, and weight of the concept are included. Preliminary development, production, and operations costs along with a business scenario assuming a price-elastic payload market are also included. A fleet of three Argus launch vehicles flying a total of 149 flights per year is shown to have a financial internal rate of return of 28%. At $169/lb., the recurring cost of Argus is shown to meet the study goal of $100/lb.-$200/lb., but optimum market price results in only a factor of two to five reduction compared to today's launch systems.

Olds, John R.↗

Potential bill impacts of dynamic electricity pricing on California utility customers

The rapid growth of renewable generation is creating challenges for the California grid in the form of the “duck curve,” with increasingly steep ramping required for conventional generation resources in the morning and evening, and growing curtailment of solar resources in midday periods. Time-varying electricity tariffs have received considerable attention as a tool to address these challenges, with a renewed recent focus on the potential for dynamic tariffs that vary to reflect conditions on the grid in near-real time. Consideration of dynamic tariffs may raise concerns about the financial impact on utility customers, especially for those who have limited flexibility to modify their electricity consumption in response. Specific areas of concern include electricity bills, bill volatility, and equity implications related to cost shifting among customer groups. In this paper we leverage smart meter data for more than 400,000 California utility customers, spanning residential, commercial, industrial, and agricultural customers, to assess potential customer bill impacts arising from a multi-component dynamic tariff . Specifically, we compute impacts on customer bills and bill volatility under the assumption of fully inelastic demand, i.e., where customers do not change their consumption patterns in response to the tariff. We also assess various approaches designing subscription load shapes that customers can pre-purchase as a hedge that may provide a measure of protection against large negative impacts, while still incentivizing the modification of loads on the margin. We compare and contrast the relative impacts on different customer classes and discuss benefits and pitfalls of different dynamic tariff structures and subscription load shapes.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Regression of exchangeable relational arrays

Relational arrays represent measures of association between pairs of actors, often in varied contexts or over time. Trade flows between countries, financial transactions between individuals, contact frequencies between school children in classrooms and dynamic protein-protein interactions are all examples of relational arrays. Elements of a relational array are often modelled as a linear function of observable covariates. Uncertainty estimates for regression coefficient estimators, and ideally the coefficient estimators themselves, must account for dependence between elements of the array, e.g., relations involving the same actor. Existing estimators of standard errors that recognize such relational dependence rely on estimating extremely complex, heterogeneous structure across actors. This paper develops a new class of parsimonious coefficient and standard error estimators for regressions of relational arrays. Here we leverage an exchangeability assumption to derive standard error estimators that pool information across actors, and are substantially more accurate than existing estimators in a variety of settings. This exchangeability assumption is pervasive in network and array models in the statistics literature, but not previously considered when adjusting for dependence in a regression setting with relational data. We demonstrate improvements in inference theoretically, via a simulation study, and by analysis of a dataset involving international trade.

97 MATHEMATICS AND COMPUTING↗