Search NASA⌕ Search

SEARCH · Search NASA

Results for “gap analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

UAM Fleet Manager Gap Analysis

NASA's Urban Air Mobility (UAM) Sub-Project is engaged in research to support the introduction of air taxis into the National Airspace System. Such operations will require arrange of communication, navigation, and surveillance systems. Air vehicles for UAM are under development and will initially have human pilots. Separation from other aircraft, obstacles, and weather may be a pilot responsibility or provided by an operator's ground-based systems. Eventually, air taxis may be flown from the ground or fly autonomously. There will be a need for dispatch services for UAM. This report presents a gap analysis, data and capability requirements, and workstation design concepts for the UAM dispatcher or Fleet Manager (FM) position. This presentation reviews the gap analysis report and outlines user interface design.

Mogford, Richard↗

Space Human Factors Engineering Gap Analysis Project Final Report

Humans perform critical functions throughout each phase of every space mission, beginning with the mission concept and continuing to post-mission analysis (Life Sciences Division, 1996). Space missions present humans with many challenges - the microgravity environment, relative isolation, and inherent dangers of the mission all present unique issues. As mission duration and distance from Earth increases, in-flight crew autonomy will increase along with increased complexity. As efforts for exploring the moon and Mars advance, there is a need for space human factors research and technology development to play a significant role in both on-orbit human-system interaction, as well as the development of mission requirements and needs before and after the mission. As part of the Space Human Factors Engineering (SHFE) Project within the Human Research Program (HRP), a six-month Gap Analysis Project (GAP) was funded to identify any human factors research gaps or knowledge needs. The overall aim of the project was to review the current state of human factors topic areas and requirements to determine what data, processes, or tools are needed to aid in the planning and development of future exploration missions, and also to prioritize proposals for future research and technology development.

Hudy, Cynthia↗

DER Cybersecurity Standards: Assessment and Gap Analysis

The purpose of this report is to share the comprehensive gap analysis of existing cybersecurity standards applicable to Distributed Energy Resources (DERs) within the electric power sector. This analysis aims to identify critical deficiencies in current standards, assess their alignment with industry needs, and provide actionable recommendations for enhancing cybersecurity measures. The scope encompasses various DER technologies, including solar, wind, energy storage, and hydrogen fuel cells, and emphasizes the significance of establishing robust cybersecurity frameworks and standards to safeguard these increasingly integrated systems. The report provides valuable insights for stakeholders in the DER ecosystem, including manufacturers, utilities, and regulators. It underscores the importance of continued development and refinement of cybersecurity standards to keep up with the technical advances in DERs and associated cybersecurity challenges. The analysis evaluated IEC, IEEE, ISA, ISO, and UL standards relevant to DER cybersecurity. Standards were assessed on their coverage of key requirements including data availability, integrity, confidentiality, access control, authentication, encryption, and system hardening. For each standard, the analysis assessed its alignment with current industry practices, regulatory compliance, effectiveness in addressing known risks, coverage of emerging risks, and how it promotes interoperability. The evaluation also considered potential integration challenges and barriers to adoption.

97 MATHEMATICS AND COMPUTING↗

NGNP Project Regulatory Gap Analysis for Modular HTGRs

The Next Generation Nuclear Plant (NGNP) Project Regulatory Gap Analysis (RGA) for High Temperature Gas-Cooled Reactors (HTGR) was conducted to evaluate existing regulatory requirements and guidance against the design characteristics specific to a generic modular HTGR. This final report presents results and identifies regulatory gaps concerning current Nuclear Regulatory Commission (NRC) licensing requirements that apply to the modular HTGR design concept. This report contains appendices that highlight important HTGR licensing issues that were found during the RGA study. The information contained in this report will be used to further efforts in reconciling HTGR-related gaps in the NRC licensing structure, which has to date largely focused on light water reactor technology.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Overview of the Findings of the Extreme Environment Power Systems Standards Evaluation and Gap Analysis

This lightning talk gives an overview of the findings of the NASA funded Extreme Environment Power Systems Standards Evaluation and Gap Analysis. This document highlighted the gaps between terrestrial distribution system component standards and future lunar distribution system component standards. This shows that existing standards cannot be applied with small modifications for the lunar environment.

electrical power↗

A Geometric Analysis to Protect Manned Assets from Newly Launched Objects - COLA Gap Analysis

A safety risk was identified for the International Space Station (ISS) by The Aerospace Corporation following the launch of GPS IIR-20 (March 24, 2009), when the spent upper stage of the launch vehicle unexpectedly crossed inside the ISS notification box shortly after launch. This event highlighted a 56-hour vulnerability period following the end of the launch Collision Avoidance (COLA) process where the ISS would be unable to react to a conjunction with a newly launched object. Current launch COLA processes screen each launched object across the launch window to determine if an object's nominal trajectory is predicted to pass within 200 km of the ISS (or any other manned/mannable object), resulting in a launch time closure. These launch COLA screens are performed from launch through separation plus I 00 minutes. Once the objects are in orbit, they are cataloged and evaluated as part of routine on-orbit conjunction assessment processes. However, as the GPS IIR-20 scenario illustrated, there is a vulnerability period in the time line between the end of launch COLA coverage and the beginning of standard on-orbit COLA assessment activities. The gap between existing launch and on-orbit COLA processes is driven by the time it takes to track and catalog a launched object, identify a conjunction, and plan and execute a collision avoidance maneuver. For the ISS, the total time required to accomplish an of these steps is 56 hours. To protect human lives, NASA/JSC has requested that an US launches take additional steps to protect the ISS during this "COLA gap" period. The uncertainty in the state of a spent upper stage can be quite large after all bums are complete and all remaining propellants are expelled to safe the stage. Simply extending the launch COLA process an additional 56 hours is not a viable option as the 3-sigma position uncertainty will far exceed the 200 km miss-distance criterion. Additionally, performing a probability of collision (Pc) analysis over this period is also not practical due to the limiting effects of these large orbit state uncertainties. An estimated upper bound for Pc for a typical spent upper stage if nominally aligned for a direct broadside collision with the ISS is only on the order of 10-6. For a smaller manned object such as a Soyuz capsule, the risk level decreases to an order of 10'8 . In comparison, the Air Force Range policy (AFI 91-217) for launch COLAs would only eliminate launch opportunities when conjunctions with objects exceed a Pc of 10'5 This paper demonstrates a conservative geometry-based methodology that may be used to determine if launch opportunities pose a threat to the ISS during the COLA gap period. The NASA Launch Services Program at Kennedy Space Center has developed this COLA gap analysis method and employed it fQr three NASA missions to identify potential ISS conjunctions and corresponding launch window closures during the 56-hour at-risk period. In the analysis, for each launch opportunity, the nominal trajectory of the spent upper stage and the orbit state of the ISS are propagated over the 56 hour period. Each time the upper stage crosses the orbit plane of the ISS, the relative radial and argument of latitude separations are calculated. A window cutout is identified if these separation differences fall within a mission-specific violation box, which is determined from the evaluation of a Monte Carlo dispersions analysis that quantifies the potential variation in the upper stage radial and argument of latitude differences. This paper details the results of these analyses and their impacts to each mission.

Hametz, Mark E.↗

High Level Gap Analysis for Accident Tolerant and Advanced Fuels for Storage and Transportation

This initial gap analysis considers proposed accident tolerant fuel (ATF) options currently being irradiated in commercial reactors, since these are most likely for future batch implementation. Also, advanced fuel (AF) options that may be likely for use in advanced reactors are considered. The cladding technologies considered were chromium-coated zirconium-based alloys, FeCrAl, and both monolithic and matrix composite Silicide carbide (SiC). The fuel technologies considered were chromium-doped uranium dioxide fuel, uranium alloys, uranium nitride, and uranium silicide. Numerous national labs, industry, and countries are performing significant testing and modeling on these proposed technologies to establish performance, but at this time none of the prototypes being irradiated have achieved end-of-life (EOL) burnup. There are some testing results after one burnup cycle to verify in-reactor performance, but little data beyond that. As the ATF prototypes acquire more burnup, data will be produced that is relevant to storage and transportation. The DOE:NE Spent Fuel and Waste Science and Technology (SWFST) Storage and Transportation (ST) Control Account will evaluate the performance data as it becomes available for application to the identified gaps for ST.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Atlantic Offshore Wind Transmission Literature Review and Gaps Analysis

In support of the national goal to deploy 30 gigawatts of offshore wind by 2030, DOE’s Wind Energy Technologies Office has published an Atlantic Offshore Wind Transmission Literature Review and Gaps Analysis. Transmission constraints— including both land-based transmission interconnections and offshore transmission—are expected to be one of the central challenges to meeting offshore wind deployment goals. Given current trends in offshore wind development, available technology, and state-level procurement goals, most of the first 30 GW of offshore wind are anticipated to be developed along the East Coast. This report summarizes current publicly available transmission analyses along the Atlantic Coast, as well as gaps in existing analyses. Improving understanding of offshore wind transmission options, establishing coordination and aligning processes among states and regions, and quantifying the long-term impacts of offshore wind transmission options will catalyze offshore wind energy’s growth and ensure adequate transmission and a reliable grid.

17 WIND ENERGY↗

Gap Analysis of Storage Conditions between NNSS and LANL for SAVY 4000 Use

As part of the gap analysis for utilizing the SAVY 4000® at NNSS, the hydrogen gas generation rate and the effect of atmospheric pressure changes on the maximum normal operating pressure (MNOP) of the SAVY container must be evaluated because the nuclear material characteristics and atmospheric conditions will not be the same for NNSS and LANL. This paper documents this analysis and demonstrates that the LANL SAVY Safety Analysis Report (SAR) is bounding with respect to the Nevada facilities.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

An Energy Codes Gap Analysis Field Study in the Southwest (Final Technical Report)

The primary goal of the “An Energy Codes Gap Analysis Field Study in the Southwest” project was to improve housing through strengthened building energy code implementation in two states, Colorado and Nevada, leading to greater energy and utility bill savings for households. Colorado is a home rule state. Nevada adopts a statewide code, but cities and counties must also adopt the code, making the state function like a home rule state. To broaden the impact of the project, an additional goal was to share and amplify project experiences, findings, and lessons that can be applied in other states. To achieve these goals, the project’s key objectives were to examine how residential energy codes are implemented in partner states; to use these findings to strengthen codes implementation through enhanced education, training, and outreach; and to enhance energy code technical assistance capabilities in the two partner states. In both partner states, the project led to the creation of a quantitative baseline understanding of compliance with high-impact energy code requirements, such as foundation, wall, and ceiling R-value; window U-factor and SHGC; envelope air tightness; duct tightness; and high-efficiency lighting. It then applied this baseline information to directly inform training in geographic areas with high levels of building and construction activity. The project has placed Colorado and Nevada among 23 states across the country that have conducted a single-family residential field study based on the established U.S. Department of Energy (DOE) methodology since 2014. It has also helped each State Energy Office test models for partnership- and relationship-building among government agencies and key stakeholder groups, including the State Energy Office and relevant code administration and professional licensing agencies, building officials, designers, builders, trades and utilities. At the national level, the project helped educate and inform State and Territory Energy Offices on a replicable methodology to assess energy code construction practices, effective stakeholder engagement strategies, and tailored energy code education and training. These findings are particularly pertinent for home-rule states, such as Colorado and Nevada, which rely on local government awareness and action to advance and implement building energy codes. By raising awareness of code adoption and compliance, this project has helped to equip each partner state with data on code compliance, strategies, education, and partnership models to advance building energy codes. This in turn will have an important impact on new construction practices in Colorado and Nevada, leading to more energy efficient and affordable housing. Currently, more than 62 percent of Colorado’s population lives in one of the 55 jurisdictions that have adopted the 2021 IECC to date, while nearly 95 percent of the state's population lives in one of the 208 jurisdictions that have adopted a code at 2015 IECC levels or higher. In Nevada, the 2018 IECC was adopted by the Governor’s Office of Energy in July 2018. By July 2020, 47 percent of the adopted energy code in the state was 2018 IECC which covers 96.5 percent of Nevada’s population. The training materials funded by this project focus on the 2021 IECC and will continue to be relevant in the two states as additional jurisdictions update their building energy codes.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Status Quo and Gap Analysis of Heliostat Field Deployment Processes for Concentrating Solar Tower Plants

In this study, deployment of the solar field of a concentrating solar power plant is one of many factors that are integral to the success of a project. Knowledge transfer from outside the industry is limited due to the unique nature of heliostats, which redirect sunlight to a receiver with high precision while maintaining a high level of reflectivity. Moreover, learning from project to project can be limited due to the site-specific nature of projects, as the market includes several developers, each with their own unique design. In this paper, we discuss the state of the art in heliostat field deployment. We cover all the key aspects of deployment from project assessment to a fully functioning system, which include site selection, layout development, supply chain, assembly, site preparation and construction, calibration, and operations and maintenance. We then perform a gap analysis on field deployment and recommend priorities for future research.

14 SOLAR ENERGY↗

Advanced nuclear reactor integration opportunities for the pulp and paper industry in the U.S. context: Technical perspectives, gap analysis, and preliminary technoeconomic assessment

Pulp and paper (P&P) manufacturing requires a large amount of low-pressure (LP) steam to digest, wash wood fibers and dry pulp into paper. Most of the LP steam is extracted from backpressure turbines that produce power from high-pressure (HP) steam. This HP steam is generated from burning wood waste material; bark is burned in hog boilers, and lignin is boiled in a black liquor recovery boiler. In a typical integrated P&P mill, 50–100% of the steam is produced from these sources, while additional steam is produced in natural gas (NG), fuel oil, or coal boilers. The other energy-intensive process in the plant is the chemical-recovery section (e.g., lime kiln), which requires high-temperature processing from NG combustion to retrieve and recirculate spent chemicals. This paper assesses the energy and heat demand and material balances of a typical generic kraft pulp mill, along with the nuclear heat, steam, and power integration opportunities to replace conventional combustion systems. The paper also addresses steam and electricity generation through a comprehensive technical and engineering gap analysis of five different nuclear-integration opportunities and their process economics, thus enabling the lignin and bark to be further processed into biobased chemicals or fuels, as well as the potential to reduce overall emissions from kraft pulping. Preliminary findings have shown that the P&P industry could achieve technological benefits by integrating their current manufacturing process with small modular nuclear reactors (SMNRs) on a national level. This research aims to set the path forward for a cleaner and more resilient P&P industry.

Advanced nuclear reactor↗

ADMS State of the Industry and Gap Analysis

An Advanced distribution management system (ADMS) is a platform for optimized distribution system operational management. This platform comprises of distribution management system (DMS) applications, supervisory control and data acquisition (SCADA), outage management system (OMS), and distributed energy resource management system (DERMS). One of the primary objectives of this work is to study and analyze several ADMS component and auxiliary systems. All the important component and auxiliary systems, SCADA, GISs, DMSs, AMRs/AMIs, OMSs, and DERMS, are discussed in this report. Their current generation technologies are analyzed, and their integration (or evolution) with an ADMS technology is discussed. An ADMS technology state of the art and gap analysis is also presented. There are two technical gaps observed. The integration challenge between the component operational systems is the single largest challenge for ADMS design and deployment. Another significant challenge noted is concerning essential ADMS applications, for instance, fault location, isolation, and service restoration (FLISR), volt-var optimization (VVO), etc. There are a relatively small number of ADMS application developers as ADMS software platform is not open source. There is another critical gap and while not being technical in nature (when compared the two above) is still important to consider. The data models currently residing in utility GIS systems are either incomplete or inaccurate or both. This data is essential for planning and operations because it is typically one of the primary sources from which power system model are created. To achieve the full potential of ADMS, the ability to execute acute Power Flow solution is an important pre-requisite. These critical gaps are hindering wider Utility adoption of an ADMS technology. The development of an open architecture platform can eliminate many of these barriers and also aid seamless integration of distribution Utility legacy systems with an ADMS.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hydrogen Safety Sensor Performance and Use Gap Analysis: Preprint

Hydrogen sensors are recognized as an important technology for facilitating the safe implementation of hydrogen as an alternative fuel, and there are numerous reports of a sensor alarm successfully preventing a potentially serious event. However, gaps in sensor metrological specifications, as well as in their performance for some applications, exist.The U.S. Department of Energy (DOE) Fuel Cell Technology Office published a short list of critical gaps in the 2007 and 2012 multiyear project plans; more detailed gap analyses were independently performed by the JRC and NREL. There have been, however, some significant advances in sensor technologies since these assessments, including the commercial availability of hydrogen sensors with fast response times (t90 less than 1 s, which had been an elusive DOE target since 2007), improved robustness to chemical poisons, improved selectivity, and improved lifetime and stability. These improvements, however, have not been universal and typically pertain to select platforms or models. Moreover, as hydrogen markets grow and new applications are being explored, more demands will be imposed on sensor performance. The hydrogen sensor laboratories at NREL and JRC are currently updating the hydrogen safety sensor gap analysis through direct interaction with international stakeholders in the hydrogen community, especially end-users. NREL and the JRC are currently organizing a series of workshops (in Europe and the U.S.) with sensor developers, end-users, and other stakeholders in 2017 to identify technology gaps and to develop a path forward to address them. One workshop is scheduled for May 10 in Brussels, Belgium at the Headquarters of the Fuel Cell and Hydrogen Joint Undertaking. A second workshop is planned at the National Renewable Energy Laboratory in Golden, CO, USA. This presentation will review improvements in sensor technologies in the past 5 to 10 years, identify gaps in sensor performance and use requirements, and identify potential research strategies to address the gaps. The presentation will also summarize the outcomes of the Hydrogen Sensors Workshops.

30 DIRECT ENERGY CONVERSION↗

Regulatory Gap Analysis of Select NUREG-0800 Chapters for Applicability to Molten Salt Reactors

The past licensing approach for advanced reactors was based on adapting the current LWR-based NRC process that exists today to the advanced reactor concept. This is the approach used by advanced technologies such as the Pebble Bed Reactor licensing application, the Clinch River Breeder Reactor licensing application, and more recently the NuScale licensing application. Current Standard Review Plan (SRP) guidance for large LWRs is available in NUREG-0800, Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: Light Water Reactor (LWR) Edition. However, the SRP is cumbersome to apply to liquid-fueled molten salt reactor (MSR) technologies. Therefore, a thoughtful licensing approach for MSRs is necessary.This report documents for DOE-NE an additional regulatory gap analysis of select chapters from the LWR SRP to further inform a generic nonpower MSR test program. Although the review process outlined in NUREG-0800 is LWR-specific, the plant functions and processes to be reviewed will be similar for the MSR. Therefore, a well-planned nonpower MSR test program can provide the performance data needed to better facilitate the eventual commercial-sized MSR review. The LWR SRP chapters dealing with the reactor, reactor coolant, engineered safety features, auxiliary systems, and waste management systems were reviewed.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Review and Gap Analysis of Heliostat Components and Controls

This investigation provides a comprehensive literature review pertaining to heliostat components and controls as part of the U.S. Department of Energy (DOE), Heliostat Consortium (Heliocon) program. Here, this work presents a detailed assessment of subcomponents, controls and wireless communications elements that comprise various designs of helisotats within concentrating solar power (CSP) installations. Additionally, this work also provides the results of an industry survey, intended to compliment the literature discussion, to provide a gap analysis of the primary technology and cost areas that need to be addressed to help improved to spur concentrating solar power (CSP) bankability. Although the results of the study determined several key areas for development, three strategic areas identified were: (1) the use of advanced composite materials to replace a need for expensive steel within the structure and mirror substrate, (2) employment of closed-loop controls for automated calibration, reduction of commissioning time and O&M hours, reduction of drive requirements, as well as overall cost reduction, and (3) the need for more Heliostat-centric codes and standards to facilitate engineering confidence in the development of new features, cost reductions, or other design iterations to be seamlessly introduced without optical performance problems.

14 SOLAR ENERGY↗

Cybersecurity Vulnerability Mitigation Framework through Empirical Paradigm: Enhanced Prioritized Gap Analysis

Existing cybersecurity vulnerability assessment tools were designed based on the policies and standards defined by organizations such as the U.S. Department of Energy and the National Institute of Standards and Technology (NIST). Frameworks such as the cybersecurity capability maturity model (C2M2) and the NIST Cybersecurity Framework (CSF) are often used by the critical infrastructure owners and operators to determine the cybersecurity maturity of their facility. Although these frameworks are exceptional at performing qualitative cybersecurity analysis and identifying vulnerabilities, they do not provide a means to perform prioritized mitigation of those vulnerabilities in order to achieve a desired cybersecurity maturity. To address that challenge, we developed a framework and software application called the cybersecurity vulnerability mitigation framework through empirical paradigm (CyFEr). This paper presents the detailed architecture of CyFEr’s enhanced prioritized gap analysis (EPGA) methodology and its application to CSF. The efficacy of the presented framework is demonstrated by comparing against existing similar models and testing against the cyber injects from a real-world cyber-attack that targeted industrial control systems (ICS) in critical infrastructures.

Gourisetti, Sri Nikhil G.↗