Search NASA⌕ Search

SEARCH · Search NASA

Results for “geothermal operations optimization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Advanced Horizontal Well Recirculation Systems for Geothermal Energy Recovery in Sedimentary and Crystalline Formations

There is increased recognition that geothermal energy resources are more widespread than previously thought, with potential for providing a significant amount of sustainable clean energy worldwide. Recent advances in drilling, completion, and production technology from the oil and gas industry can now be applied to unlock vast new geothermal resources, with some estimates for potential electricity generation from geothermal energy now on the order of 2 million megawatts. The primary objectives of this DOE research effort are to develop and document optimum design configurations and operating practices to produce geothermal power from hot permeable sedimentary and crystalline formations using advanced horizontal well recirculation systems. During Phase I of this research project Terralog Technologies USA and The University of California, Irvine (UCI), have completed preliminary investigations and documentation of advanced design concepts for paired horizontal well recirculation systems, optimally configured for geothermal energy recovery in permeable sedimentary and crystalline formations of varying structure and material properties. We have also identified significant geologic resources appropriate for application of such technology. The main challenge for such recirculation systems is to optimize both the design configuration and the operating practices for cost-effective geothermal energy recovery. These will be strongly influenced by sedimentary formation properties, including thickness and dip, temperature, thermal conductivity, heat capacity, permeability, and porosity; and by working fluid properties.

15 GEOTHERMAL ENERGY↗

Optimizing Geothermal Drilling: Oil and Gas Technology Transfer

There is a significant amount of financial risk associated with geothermal drilling. This study of drilling operations seeks opportunities to improve upon current practices and technologies. The scope of this study included analyzing 21 geothermal wells and 21 oil and gas wells. The goal was to determine a 'Perfect Well' using historical data to compare the best oil and gas well to the best geothermal well. Unfortunately, limitations encountered in the study included missing data (bit records, mud information, etc.) and poor data collection practices An online software database was used to format drilling data to IADC coded daily drilling reports and generate figures for analysis. Six major issues have been found in geothermal drilling operations. These problems include lost circulation, rig/ equipment selection, cementing, penetration rate, drilling program, and time management. As a result of these issues, geothermal drilling averaged 56.4 days longer than drilling comparable oil and gas wells in the wells in this study. Roughly $13.9 million was spent on non-productive time in the 21 geothermal wells, compared with only $1.3 million in the oil and gas wells, assuming a cost of $50,000 per day. Comparable events such as drilling the same sized hole, tripping in/out, cementing, and running the same size casing took substantially less time in the oil and gas wells. Geothermal wells were drilled using older and/or less advanced technology to depths less than 10,000 feet, while oil and gas wells reached 12,500 feet faster with purpose built rigs. A new approach is now underway that will optimize drilling programs throughout the drilling industry using Mechanical Specific Energy (MSE) as a tool to realize efficient drilling processes. Potential improvements for current geothermal operations are: the use of electronic records, real time services, and official glossary terms to describe rig operations, and advanced drilling rigs/technology.

15 GEOTHERMAL ENERGY↗

Effect of Ambient Design Temperature on Air-Cooled Binary Plant Output

Air-cooled binary plants are designed to provide a specified level of power production at a particular air temperature. Nominally this air temperature is the annual mean or average air temperature for the plant location. This study investigates the effect that changing the design air temperature has on power generation for an air-cooled binary plant producing power from a resource with a declining production fluid temperature and fluctuating ambient temperatures. This analysis was performed for plants operating both with and without a geothermal fluid outlet temperature limit. Aspen Plus process simulation software was used to develop optimal air-cooled binary plant designs for specific ambient temperatures as well as to rate the performance of the plant designs at off-design operating conditions. Results include calculation of annual and plant lifetime power generation as well as evaluation of plant operating characteristics, such as improved power generation capabilities during summer months when electric power prices are at peak levels.

15 GEOTHERMAL ENERGY↗

Stillwater Hybrid Geo-Solar Power Plant Optimization Analyses

The Stillwater Power Plant is the first hybrid plant in the world able to bring together a medium-enthalpy geothermal unit with solar thermal and solar photovoltaic systems. Solar field and power plant models have been developed to predict the performance of the Stillwater geothermal / solar-thermal hybrid power plant. The models have been validated using operational data from the Stillwater plant. A preliminary effort to optimize performance of the Stillwater hybrid plant using optical characterization of the solar field has been completed. The Stillwater solar field optical characterization involved measurement of mirror reflectance, mirror slope error, and receiver position error. The measurements indicate that the solar field may generate 9% less energy than the design value if an appropriate tracking offset is not employed. A perfect tracking offset algorithm may be able to boost the solar field performance by about 15%. The validated Stillwater hybrid plant models were used to evaluate hybrid plant operating strategies including turbine IGV position optimization, ACC fan speed and turbine IGV position optimization, turbine inlet entropy control using optimization of multiple process variables, and mixed working fluid substitution. The hybrid plant models predict that each of these operating strategies could increase net power generation relative to the baseline Stillwater hybrid plant operations.

15 GEOTHERMAL ENERGY↗

Stillwater Hybrid Geo-Solar Power Plant Optimization Analyses

Solar field and power plant models have been developed to predict the performance of the Stillwater geothermal / solar-thermal hybrid power plant. The models have been validated using operational data from the Stillwater plant. The validated models will be used to optimize performance of the Stillwater hybrid plant and explore next-generation hybrid plant design concepts. A preliminary effort to improve performance of the Stillwater hybrid plant using optical characterization of the solar field has been completed. The Stillwater solar field optical characterization involved measurement of mirror reflectance, mirror slope error, and receiver position error. Subsequent analyses of the optical characterization results indicate that the solar field is currently operating at approximately 90% of the manufacturer’s performance specifications. Control system and hardware modifications expected to improve solar array performance by XX% have been identified.

14 SOLAR ENERGY↗

Efficient Optimization of Energy Recovery From Geothermal Reservoirs With Recurrent Neural Network Predictive Models

Improving the long-term energy production performance of geothermal reservoirs can be accomplished by optimizing field development and management plans. Reliable prediction models, however, are needed to evaluate and optimize the performance of the underlying reservoirs under various operation and development strategies. In traditional frameworks, physics-based simulation models are used to predict the energy production performance of geothermal reservoirs. However, detailed simulation models are not trivial to construct, require a reliable description of the reservoir conditions and properties, and entail high computational complexity. Data-driven predictive models can offer an efficient alternative for use in optimization workflows. This paper presents an optimization framework for net power generation in geothermal reservoirs using a variant of the recurrent neural network (RNN) as a data-driven predictive model. The RNN architecture is developed and trained to replace the simulation model for computationally efficient prediction of the objective function and its gradients with respect to the well control variables. The net power generation performance of the field is optimized by automatically adjusting the mass flow rate of production and injection wells over 12 years, using a gradient-based local search algorithm. Two field-scale examples are presented to investigate the performance of the developed data-driven prediction and optimization framework. Furthermore, the prediction and optimization results from the RNN model are evaluated through comparison with the results obtained by using a numerical simulation model of a real geothermal reservoir.

15 GEOTHERMAL ENERGY↗

Comminty Geothermal: Planning and Design of a Heating and Cooling System in Framingham, Massachusetts

These reports, plans, and drawings review the achievements of Home Energy Efficiency Team (HEET) and its partners to plan and design a network of interconnected ground-source heat pump systems, or geothermal network, in an area encompassing multiple environmental justice (EJ) neighborhoods in the City of Framingham, MA. The materials provided in this dataset include, a) stakeholder and design best practices, b) study on optimal method to interconnect geothermal loops, c) guidelines for monitoring and metering, d) operations and maintenance plans, e) permitting guidelines and f) 10-day driller tutorial curriculum. These materials can guide the efficient and ethical design of future geothermal networks nationwide. The capacity of the system is estimated at 217 tons and is designed to provide 100% of heating and cooling needs for the buildings connected to the loop. In this project, 80 boreholes are used as the main thermal resources, the distribution system (or loop) consists of 0.61 miles of an 8-inch single-pipe at ambient temperature, with the capacity to connect 44 buildings, including 13 apartment buildings from the Framingham Housing Authority, one transitional home, one school building and 29 single family homes. While Framingham already has a geothermal network loop that is currently in the commissioning stage, our proposed project is unique because it is the first utility-led expansion loop (2nd loop) project that will connect to an adjacent existing geothermal loop (1st loop) in a pre-existing neighborhood. Both the 1st and 2nd loops are being installed, owned and operated by Eversource Energy, the utility Deployment Partner.

15 GEOTHERMAL ENERGY↗

Developing a Drilling Optimization System for Improved Overall Rate of Penetration in Geothermal Wells

Geothermal energy is renewable, reliable and environmentally friendly source of energy. The major cost in the development of geothermal wells is the actual drilling of the wells. The main objective of this paper is to introduce a new real-time drilling optimization system designed for granite formation to reduce the overall drilling cost. In this study, a drilling optimization system is verified using drilling data from Utah-Forge well 58-32. The drilling optimization system used the Utah-Forge well 58-32 data to achieve real-time unconfined compressive strength (UCS). Based on the UCS value from the previous feet, the system simulates the ROP for the next drilling feet. The drilling optimization system utilizes the Differential Evolution Algorithm (DEA), which is a metaheuristic method to search the space of solution, to find the best operating parameters (i.e. WOB and RPM) for the next drilling foot. The optimization algorithm takes a maximum cutter temperature into account as a constraint and avoids the accelerated wear. The developed drilling optimization system improves ROP responses and reduces the drilling cost of geothermal wells. The simulated ROP results from the system show a good agreement with the ROP from Utah-Forge well 58-32 drilling data. The drilling time before and after optimization for both intervals were presented.

15 GEOTHERMAL ENERGY↗

Optimizing Cornell’s future geothermal district heating performance through systems engineering and simulation

Cornell University’s intention to lower its carbon footprint has motivated this engineering evaluation of using low-temperature geothermal energy to supply heat to the campus district energy system. Optimal selection and operation of heat pumps can significantly improve system performance. To support this analysis, we model the quantitative relationships between heat pump configurations and source flow, supply and distribution temperatures, facility heating design options, output heat generation, and carbon abatement outcomes. A systems approach is used for analysis, troubleshooting, and improvement of the model. The result of this effort is a dynamic tool that appropriately responds to hourly thermal demand and communicates energy response for techno-economic analysis. Simulations indicate that a single well-pair in the local Basement Contact Zone reservoir can satisfy almost 68% of annual thermal demand at nearly 20 MWth average capacity while remaining financially competitive compared to conventional heating with levelized cost of heating (LCOH) as low as $4.55/MMBTU ($15.53/MWh th ). A direct-use scheme with heat pump augmentation provided more carbon abatement and 50 to 150% more annual heat supply than one without augmentation. Exploration of three and four well-pair scenarios prove the capability to achieve 50 MW th baseload heating capacity with competitive LCOH and significant carbon reductions.

15 GEOTHERMAL ENERGY↗

District Energy Corporation SW 40th Street Thermal Energy Plant

The overall deliverable from the project is the design, construction and commissioning of a detention facility heating and cooling system that minimizes ownership costs and maximizes efficiency (and therefore minimizes environmental impact). The primary deliverables were the proof of concept for the application of geothermal systems for an institutional facility and the ongoing, quarterly system operating data downloads to the Department of Energy . The primary advantage of geothermal based heat pump systems is the higher efficiency of the system compared to a conventional chiller, boiler, cooling tower based system. The higher efficiency results in a smaller environmental foot print and lower energy costs for the detention facility owner, Lancaster County. The higher efficiency for building cooling is primarily due to a more constant compressor condensing temperature with the geothermal well field acting as a thermal “sink” (in place of the conventional system’s cooling tower). In the heating mode, Ground Couple Heat Pump (GCHP) systems benefits from the advantage of a heat pump Coefficient of Performance (COP) of approximately 3.6, significantly better than a conventional gas boiler. The geothermal well field acting as a thermal “source” allows the heat pumps to operate efficiently in the heating mode regardless of ambient temperatures. The well field is partially located in a wetland with a high water table so, over time, the project will be able to identify the thermal loading characteristics of a well field located in a high water table location. The project demonstrated how a large geothermal well field can be installed in a wetland area in an economical and environmentally sound manner. Finally, the SW 40th Street Thermal Energy Plant project demonstrates the benefits of providing domestic hot water energy, as well as space heating, to help balance well filed thermal loading in a cooling dominated application. During the period of August 2012 thru March 2014, with the detention facility occupied for the final seven months, the well field supply water temperatures to the heat pumps dropped to a minimum of 39°F and reached a maximum temperature of 68 °F while providing 15,819 MMBtu of cooling energy and 27,467 MMBtu of heating energy. During this period the peak recorded system cooling load was 610 tons and the peak heating load was 8.4 MMBtu. The DEC is currently evaluating the most beneficial electric rate for plant operations. Total project cost of $16.9 million was approximately $3.2 million less than the estimate provided in the grant application. The reduction in project costs were primarily due to favorable construction material prices as well as strong competition in the local construction contractor market. The DEC plant reached the substantial completion milestone in December 2011 and began providing thermal service to the detention facility in January 2012 when the building’s HVAC system was ready to accept heating service. The plant reached commercial operating status on August 1, 2012. However, due to construction delays, the detention facility was not occupied until September of 2013. The detention facility construction delays also impacted the installation and commissioning of the project’s dedicated domestic hot water heat pump. Final coordination with the detention facility’s building management system vendor to establish network links for the exchange of date is currently being completed. This will allow the development of control sequences for the optimal operation of the domestic hot water system.

15 GEOTHERMAL ENERGY↗

Renewable electricity capacity planning with uncertainty at multiple scales

Abstract We formulate and compare optimization models of investment in renewable generation using a suite of social planning models that compute optimal generation capacity investments for a hydro-dominated electricity system where inflow uncertainty results in a risk of energy shortage. The models optimize the expected cost of capacity expansion and operation allowing for investments in hydro, geothermal, solar, wind, and thermal plant, as well as battery storage for smoothing load profiles. A novel feature is the integration of uncertain seasonal hydroelectric energy supply and short-term variability in renewable supply in a two-stage stochastic programming framework. The models are applied to data from the New Zealand electricity system and used to estimate the costs of moving to a 100% renewable electricity system by 2035. We also explore the outcomes obtained when applying different forms of CO 2 constraint that limit respectively non-renewable capacity, non-renewable generation, and CO 2 emissions on average, almost surely, or in a chance-constrained setting, and show how our models can be used to investigate the merits of a proposed pumped-hydro scheme in New Zealand’s South Island.

Ferris, Michael C.↗

Optimizing Geothermal Drilling: Oil and Gas Technology Transfer

There is a significant amount of financial risk associated with geothermal drilling; however, there are opportunities to improve upon current practices and technologies used. The scope of this drilling operational study included 21 geothermal wells and 21 oil and gas wells. The goal was to determine a 'perfect well' using historical data to compare the best oil and gas well to the best geothermal well. Unfortunately, limitations encountered in the study included missing data (bit records, mud information, etc.), poor data collection, and difficult to ascertain handwriting. An online software database was used to format drilling data to IADC coded daily drilling reports and generate analysis figures. Six major issues have been found in geothermal drilling operations. These problems include lost circulation, rig/equipment selection, cementing, penetration rate, drilling program, and time management. As a result of these issues, geothermal drilling averages 56.4 days longer than drilling comparable oil and gas wells in the wells in this study. Roughly $13.9 million would be lost due to non-productive time in the 21 geothermal wells and only $1.3 million in the oil and gas wells, assuming a cost of $50,000 per day. Comparable events such as drilling the same sized hole, tripping in/out, cementing, and running the same size casing took substantially less time in the oil and gas wells. Geothermal wells were drilled using older and/or less advanced technology to depths less than 10,000 feet, while oil and gas wells reached 12,500 feet faster with purpose built rigs. A new approach is now underway that will optimize drilling programs throughout the drilling industry. It is the use of Mechanical Specific Energy (MSE) as a tool to realize efficient drilling processes. However, a work-flow must also be established in order for there to be an efficient drilling program. Potential improvements for current geothermal operations are: the use of electronic records, real time services, and official glossary terms to describe rig operations, and advanced drilling rigs/technology.

15 GEOTHERMAL ENERGY↗

A multiscale recurrent neural network model for predicting energy production from geothermal reservoirs

Optimization of energy production from geothermal reservoirs requires reliable prediction of energy production performance under alternative operation and development scenarios. Traditionally, reservoir simulation models are used for the evaluation and screening of alternative production and development plans. However, simulation models require extensive data collection and modeling efforts and are time-consuming to build, run, and update. Data-driven predictive models, on the other hand, can serve as efficient prediction tools that can be used for decision support and management of daily operations and surveillance activities. Data-driven models become particularly attractive when a reservoir simulation model for a field does not exist and/or is difficult to build. Machine learning (ML)-based data-driven models that have recently become popular in several fields exploit statistical patterns and relations in training data to generate predictions. As such, they tend to perform better in interpolation problems (that is, prediction within the training data range) than when they are used to extrapolate beyond the training data. Production data from geothermal reservoirs tend to exhibit short-term variabilities as well as long-term trends, such as monotonically declining production temperatures. Capturing both short-term features and long-term trends with ML-based models is not trivial. We evaluate the use of recurrent neural networks (RNN) for the prediction of energy production from geothermal reservoirs. RNN is a class of ML architectures that are used to represent and predict sequential/dynamic data. Thus, it can be challenging to apply RNN to problems where long-term trends must be captured and extrapolation beyond the training data range is needed. We introduce the multiscale RNN architecture to extend the application of RNN to detect and predict both short-term variabilities and long-term trends in geothermal data. The developed architecture consists of a long-term component to only capture low-frequency data patterns, and a short-term component to detect features with higher frequency and more nonlinearity. The final prediction is obtained by combining the long-term and short-term predictions. Both synthetic and field data are used to evaluate the presented multiscale RNN model. The prediction performance of the multiscale RNN is compared against those obtained from the regular RNN and the autoregressive (AR) model. The results suggest that the multiscale architecture improves the long-term prediction performance of the regular RNN and enhances its robustness against noise.

15 GEOTHERMAL ENERGY↗

Two 175 ton geothermal chiller heat pumps for leed platinum building technology demonstration project. Operation data, data collection and marketing

The activities funded by this grant helped educate and inform approximately six thousand individuals who participated in guided tours of the geothermal chiller plant at Johnson Controls Corporate Headquarters in Glendale, Wisconsin over the three year term of the project. In addition to those who took the formal tour, thousands more were exposed to hands-on learning at the self-service video kiosks located in the headquarters building and augmented reality tablet app that allowed for self-guided tours. The tours, video, and app focused on the advantages of geothermal heat pump chillers, including energy savings and environmental impact. The overall tour and collateral also demonstrated the practical application of this technology and how it can be designed into a system that includes many other sustainable technologies without sacrificing comfort or health of building occupants Among tour participants were nearly 1,000 individuals, representing 130 organizations identified as potential purchasers of geothermal heat pump chillers. In addition to these commercial clients, tours were well attended by engineering, facilities, and business trade groups. This has also been a popular tour for groups from Universities around the Midwest and K-12 schools from Wisconsin and Northern Illinois A sequence of operations was put into place to control the chillers and they have been tuned and maintained to optimize the benefit from the geothermal water loop. Data on incoming and outgoing water temperature and flow from the geothermal field was logged and sent to DOE monthly during the grant period to demonstrate energy savings.

15 GEOTHERMAL ENERGY↗

Toward Drilling the Perfect Geothermal Well: An International Research Coordination Network for Geothermal Drilling Optimization Supported by Deep Machine Learning and Cloud Based Data Aggregation

The EDGE project, supported by the U.S. Department of Energy Geothermal Technologies Office under award DE-EE0008793, established a data-driven framework for improving the efficiency, cost-effectiveness, and reliability of geothermal well drilling. The project focused on developing scalable data infrastructure, advanced machine learning and probabilistic models, and integrated analytics tools to support continuous drilling optimization. A central objective was to reduce geothermal drilling costs by up to seventy percent while minimizing the risk of well failure through predictive diagnostics and adaptive planning. Over the project period, a comprehensive data repository was designed and deployed, incorporating records from over one hundred geothermal wells across varied geological settings. This repository supported both structured and unstructured data and adhered to FAIR data principles, enabling provenance tracking, quality control, and standardized metadata. The project introduced automated ingestion pipelines and a cloud-hosted platform that facilitated access to raw, processed, and derived datasets. This infrastructure served as the foundation for model development and analysis. Machine learning workflows were developed to predict key drilling metrics including rate of penetration, non-productive time, and total drilling costs. Self-organizing maps and dimensionality reduction methods were used to uncover operational patterns and outliers, while supervised learning algorithms such as random forests and deep neural networks were applied to forecast performance outcomes. The models were validated on heterogeneous datasets from both U.S. and Icelandic fields, demonstrating variable but significant predictive accuracy. The results indicated that finer temporal resolution, inclusion of lithological data, and consistency in operational annotations could substantially improve model performance. The project also implemented process mining techniques to reconstruct state-transition models from drilling event logs. These models enabled the identification of deviations from optimal workflows and provided insights into recurring failure modes. Analysis of non-productive time highlighted the impact of equipment failures, geological challenges, and human factors, offering opportunities for targeted mitigation strategies. The EDGE Dashboard was developed as a web-based expert system integrating data visualization, model outputs, and user-driven queries. It provided an accessible interface for operators to explore historical data, evaluate predicted outcomes, and compare drilling scenarios. Initial feedback from project partners suggested that the dashboard could serve as a foundation for more advanced advisory and optimization tools. Overall, the EDGE project demonstrated the feasibility and value of applying modern data science techniques to geothermal drilling. It delivered a set of interoperable tools and models that can support more efficient, lower-risk well development. The findings point toward a viable path for transitioning from advisory analytics to semi-autonomous drilling systems, contingent on continued collaboration, expanded datasets, and field validation. The project results have immediate relevance for drilling operations, data management practices, and future geothermal R&D efforts aimed at achieving reliable, cost-competitive geothermal energy at scale.

15 GEOTHERMAL ENERGY↗

Subsurface Characterization and Machine Learning Predictions at Brady Hot Springs Results

Geothermal power plants typically show decreasing heat and power production rates over time. Mitigation strategies include optimizing the management of existing wells - increasing or decreasing the fluid flow rates across the wells - and drilling new wells at appropriate locations. The latter is expensive, time-consuming, and subject to many engineering constraints, but the former is a viable mechanism for periodic adjustment of the available fluid allocations. Data and supporting literature from a study describing a new approach combining reservoir modeling and machine learning to produce models that enable strategies for the mitigation of decreased heat and power production rates over time for geothermal power plants. The computational approach used enables translation of sets of potential flow rates for the active wells into reservoir-wide estimates of produced energy and discovery of optimal flow allocations among the studied sets. In our computational experiments, we utilize collections of simulations for a specific reservoir (which capture subsurface characterization and realize history matching) along with machine learning models that predict temperature and pressure timeseries for production wells. We evaluate this approach using an "open-source" reservoir we have constructed that captures many of the characteristics of Brady Hot Springs, a commercially operational geothermal field in Nevada, USA. Selected results from a reservoir model of Brady Hot Springs itself are presented to show successful application to an existing system. In both cases, energy predictions prove to be highly accurate: all observed prediction errors do not exceed 3.68% for temperatures and 4.75% for pressures. In a cumulative energy estimation, we observe prediction errors that are less than 4.04%. A typical reservoir simulation for Brady Hot Springs completes in approximately 4 hours, whereas our machine learning models yield accurate 20-year predictions for temperatures, pressures, and produced energy in 0.9 seconds. This paper aims to demonstrate how the models and techniques from our study can be applied to achieve rapid exploration of controlled parameters and optimization of other geothermal reservoirs. Includes a synthetic, yet realistic, model of a geothermal reservoir, referred to as open-source reservoir (OSR). OSR is a 10-well (4 injection wells and 6 production wells) system that resembles Brady Hot Springs (a commercially operational geothermal field in Nevada, USA) at a high level but has a number of sufficiently modified characteristics (which renders any possible similarity between specific characteristics like temperatures and pressures as purely random). We study OSR through CMG simulations with a wide range of flow allocation scenarios. Includes a dataset with 101 simulated scenarios that cover the period of time between 2020 and 2040 and a link to the published paper about this project, where we focus on the Machine Learning work for predicting OSR's energy production based on the simulation data, as well as a link to the GitHub repository where we have published the code we have developed (please refer to the repository's readme file to see instructions on how to run the code). Additional links are included to associated work led by the USGS to identify geologic factors associated with well productivity in geothermal fields. Below are the high-level steps for applying the same modeling + ML process to other geothermal reservoirs: 1. Develop a geologic model of the geothermal field. The location of faults, upflow zones, aquifers, etc. need to be accounted for as accurately as possible 2. The geologic model needs to be converted to a reservoir model that can be used in a reservoir simulator, such as, for instance, CMG STARS, TETRAD, or FALCON 3. Using native state modeling, the initial temperature and pressure distributions are evaluated, and they become the initial conditions for dynamic reservoir simulations 4....

15 GEOTHERMAL ENERGY↗

Microhole Test Data

Drilling results from the microhole project at the Sandia High Operating Temperature test facility. The project is seeking to help reduce the cost of exploration and monitoring of geothermal wells and formations by drilling smaller holes. The tests were part of a control algorithm development to optimize the weight-on-bit (WOB) used during drilling with a percussive hammer.

15 GEOTHERMAL ENERGY↗

Newberry SHR Demonstration Project – Bipartisan Infrastructure Law Enhanced Geothermal (EGS) Pilot Demonstration (Abstract)

This project will create an Engineered Geothermal System (EGS) comprising two or more wells drilled to a depth of 4.25 km into superhot rock (SHR) with a temperature of 425 °C at Newberry Volcano in Central Oregon. An EGS is a manufactured heat exchanger in which water is injected in a deep injection well, or injector, to extract heat from the hot rock at depth and steam is returned to the surface in a production well, or producer, to generate electricity. In this project, the SHR EGS will be made using new methods and technologies to stimulate and connect hydraulic and natural fractures to enable multiple flow pathways between wells, allowing for optimal heat mining from the reservoir rock. The new technologies are designed to operate at rock temperatures much higher than those encountered in traditional geothermal. Following EGS completion, water will be injected into the injector well and steam extracted from the producer well in a long-term connectivity flow test demonstrating SHR reservoir evolution with time and use. Success will be measured by demonstrating the efficacy of new technologies and by producing economic quantities of steam (>40 MWth).

15 GEOTHERMAL ENERGY↗