Search NASA⌕ Search

SEARCH · Search NASA

Results for “greenfield”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Design, Integration and Synthesis Platform to Advance Tightly Coupled Hybrid Energy Systems (DISPATCHES) v0.1.0

The DISPATCHES software will enable the design and optimization of Integrated Energy Systems (IES). The platform will support hybridizing existing generation facilities (such as nuclear and coal plants) as well as greenfield hybrid designs that incorporate advanced technologies (such as Advanced Modular Reactors and Coal FIRST), and it will enable the consideration of multiple technology options with different time constants. The design of the IES will be optimized for operation within the bulk power system via energy market signals (day ahead, real-time, and ancillary services) obtained from a production cost model. The goal of DISPATCHES is to identify flexible, dynamic designs that are responsive to grid market signals resulting in highly efficient, cost effective tightly coupled hybrid energy systems that can act as a "black box" to the grid to provide increased flexibility and resiliency.

Gunter, Daniel↗

Oilwell Conversion (Well API 121913310501) to Geothermal Heat Storage Well for Flexible Electricity Storage

Geothermal growth is limited by a lack of geographically dispersed high-temperature thermal resources and high initial upfront investment in characterization and well construction. This project intended to address the challenges of energy supply intermittency and enhance grid resilience, reliability, and energy security by storing energy provided from currently available renewable resources in the subsurface to harvest it a later time during at-peak energy demand. This project intended to improve geothermal adoption, reduce initial project risk, and improve price competitiveness through utilizing existing oil and gas infrastructure such as non-productive wells, non-economic fields, dry holes, and orphaned wells. The project also intended to address the lack of geographically dispersed thermal resources and enhance grid resilience, reliability, and energy security by introducing an economical method for storing energy from currently available renewable resources in the subsurface for usage during at-peak energy demand. During this research, the project furthered the understanding of the feasibility of utilizing abandoned oil and gas wells as geothermal heat storage wells. The project team investigated the heat storage and hydrogeological characteristics of subsurface reservoirs in the Illinois Basin to evaluate their response to heat injection for determining the evolution of temperature profiles and heat losses over time using existing and available data sets. The project team then performed modeling and simulation to evaluate the heat losses of returning fluids during heat extraction. The outputs were used to select an optimal candidate reservoir and location in Southern Illinois. The team designed and performed a small-scale field test in an existing oil well to refine the model and to demonstrate the permitting and regulatory pathways necessary for the conversion of oil and gas assets to geothermal use. The field test also serves as a proof of concept and can guide the procedures for future research and implementation. Additionally, the project team, conducted initial market research and customer discovery to develop a go to market strategy for an Advanced Geothermal Energy Storage (AGES) system. The project team in this research also identified the parameters to be refined in future research, to improve the current go to market strategy economic model. To this end several subject matter experts were also identified to assist in future research with geothermal infrastructure setup, energy storage policy and law, energy storage market demand, potential siting based on demand etc. Future research will involve further sophistication of the site commercial modeling, implementing a larger-scale test, and further refinement of the thermodynamic modeling/simulation process. The output will be lifecycle costs and economics suitable for comparison to alternative approaches from a validated full-scale demonstration for venture capital investment into this technology. The project successfully demonstrated the ability to leverage existing oilfield infrastructure, permits, and land access and leasing agreements, to enable geothermal storage projects to come online faster and cheaper than a greenfield development could. This technology could allow for greater energy independence and security through long-term energy storage solutions. The longer duration allows for greater storage for renewables currently limited by hours-long storage durations of lithium-ion. The AGES system would support the growth of renewable energy farms, and provide greater opportunities for a cleaner energy infrastructure.

15 GEOTHERMAL ENERGY↗

Evaluation of Steam Cycle Upgrades to Improve the Competitiveness of U.S. Coal Power Plants (Final Scientific / Technical Report)

Increasing the competitiveness of the existing pulverized-coal utility fleet in the United States may be achieved by decreasing heat rate, via increases in steam cycle efficiency through upgraded steam temperatures and use of latest technology available in steam turbine and blading design. The average net plant efficiency of the US coal-fired fleet is approximately 33% (HHV). Plant efficiency increases to approximately 41.4% (HHV) at 1,350°F (732°C) steam temperature. However, achieving these Advanced Ultra-Super Critical (AUSC) steam conditions requires the use of advanced high-temperature materials. While there has been a significant amount of DOE-funded materials R&D, most of the related design work has focused on new (greenfield) units, rather than on opportunities to retrofit this advanced technology to the existing utility fleet. If technology, based upon the advanced materials required for AUSC steam conditions, may be applied to the existing fleet, using an economically viable retrofit, a higher capacity factor can be expected as a result of the increased plant competitiveness. The Electric Power Research Institute (EPRI) was awarded a project by the US Department of Energy to examine the technical and economic feasibility of a series of steam cycle upgrades to the two most prevalent types of U.S. coal power plants: 2,400 psig (16.6 MPa) subcritical and 3,500 psig (24.1 MPa) supercritical pulverized coal units. The nine upgrade options that were originally being considered included increasing the main and reheat steam temperatures from 1,000°F (538°C) to 1,100°, 1,200°, and 1,350°F (593°C, 649°C, and 732°C) while holding the steam pressures constant at their original design values, and cases where just the main steam or reheat steam temperatures were increased. The objective was to minimize the modifications required to the existing power plant while still providing a significant improvement in heat rate. The upgrade options assumed that the boiler enclosure envelope remained unchanged from each base case, and that all applicable OEM design guidelines for normal commercial units were imposed. For the highest temperature supercritical case, an option of using a low-pressure molten salt loop to transfer heat from the furnace to the steam was examined. The first major task of the work scope was designed to examine the technical feasibility of various upgrade options, while the subsequent work determined economic viability of the technically feasible upgrade options. Prior to evaluating the effect of these increased temperatures, a “base case” model of a subcritical and supercritical PC boiler was created, which was used for comparative purposes. Upgrade options were evaluated at full-load, part-load and dynamic transient conditions. Once the technical feasibility of each upgrade option was evaluated, the economic value of the heat rate improvement of each feasible option was determined by detailed modeling of unit dispatch in several regional power markets. The dispatch model was used to estimate the amount of revenue from power sales the upgraded unit would receive in comparison to a non-upgraded version of the same power plant. As a parallel task to the dispatch analysis, the capital cost of implementing the upgrades was estimated. The capital cost estimates were then compared to the increased revenue estimated by the dispatch modeling to determine the economic attractiveness of each upgrade option. Several upgrade options were determined to be technically feasible. The net present value (NPV) of the costs for steam cycle upgrades considered in this study ranged from approximately $\$$111 to $\$$130 million. The economic modeling results show that the unit dispatch changes resulting from steam cycle upgrades are relatively small, due largely to heat rate (and operating cost) changes being relatively small. Additionally, the cost of each upgrade exceeds the net revenue increases associated with the upgrade case. Note that the breakeven values are higher for subcritical retrofits, but the capital costs for the subcritical upgrades are also slightly higher. In typical new pulverized coal plants, fuel accounts for approximately 25% of the cost of electricity (COE), while capital costs represent around 50% of the COE. Therefore, in order to improve the heat rate by 4% one can only afford to increase the capital cost by 2%, at the same cost of electricity. The conclusion of this study is that without a cost for emitting CO 2 , it will be difficult to pay for significant efficiency improvements on plants firing low cost coals.

01 COAL, LIGNITE, AND PEAT↗

Integration of a Concentrating Solar Steam Topping Turbine to an Existing Geothermal Binary Power Plant (CRADA CRD-17-700 Final Report)

U.S. Geothermal Inc. is a publicly traded leading renewable energy company focused on the development, production, and sale of electricity from geothermal energy with operating generation facilities at Raft River, Idaho; San Emidio, Nevada; and Neal Hot Springs, Oregon. (U.S. Geothermal was acquired by Ormat Technologies, Inc. since the execution of this project). This project will evaluate the integration of a concentrating solar steam topping cycle with a geothermal bottoming binary cycle. This hybrid plant configuration will enable high efficiency conversion of the solar heat to electrical power, while simultaneously increasing the power output of the bottoming cycle. Such a design has the potential to reduce the cost of electrical power from concentrating solar power (CSP) and geothermal plants, and a viable design could be deployed at existing geothermal plants that have experienced resource productivity decline as well as in greenfield projects. This analysis will examine US Geothermal’s Raft River power plant for implementation of this concept. INL and NREL have previously collaborated in the analysis of geo-solar hybrid power plants. These two labs will again work together to model the solar field, steam-topping, and geothermal bottoming cycles in order to investigate the performance of the proposed cycle. This analysis will provide US Geothermal with technical information including equipment specifications and estimated power generation necessary to advance the concept toward implementation. A successful project outcome has two parts: One would be for US Geothermal to have a process flow diagram (heat and mass balance), and performance parameters for the major pieces of equipment. US Geothermal could then use this information evaluate the techno-economic feasibility of the hybrid power cycle, and serve as the basis for subsequent detailed equipment design, purchase, and installation of the cycle. The second would be for the developed solution to be published by DOE for use by other geothermal developers both to retrofit underperforming plants and to lower the LCOE of new developments.

15 GEOTHERMAL ENERGY↗

Microgrid Design Toolkit (MDT) User Guide. Software v1.3.

The Microgrid Design Toolkit (MDT) supports decision analysis for new ("greenfield") microgrid designs as well as microgrids with existing infrastructure. The current version of MDT includes two main capabilities. The first capability, the Microgrid Sizing Capability (MSC), is used to determine the size and composition of a new, grid connected microgrid in the early stages of the design process. MSC is focused on developing a microgrid that is economically viable when connected to the grid. The second capability is focused on designing a microgrid for operation in islanded mode. This second capability relies on two models: the Technology Management Optimization (TMO) model and Performance Reliability Model (PRM).

42 ENGINEERING↗

Solar Photovoltaic (PV) Manufacturing Expansions in the United States, 2017-2019: Motives, Challenges, Opportunities, and Policy Context

This report analyzes U.S. PV manufacturing announcements from 2017 through July-2019 and explores the potential impact of tariffs on the competitiveness of U.S. PV module manufacturing. First, the fraction of announcements that resulted in established facilities in the time frame specified is analyzed, as well as firm nationality and the existence of any other U.S. facilities for the firm. The prevalence of different PV product types among the announcements was also analyzed, as well as the type of facilities selected for development (greenfield, existing PV factories, or repurposed buildings). The cost to build these facilities was also analyzed in the context of their capacity, the value of incentives received by state and local governments, and the number of jobs created. Case studies of Auxin Solar, First Solar, Hanwha Q Cells, JinkoSolar, LG, Silfab, Solaria, and SunPower were conducted and highlight five factors influencing firms’ decisions to expand their U.S. PV production capacity. These included: 1) proximity to demand, including supply contracts and demand for domestic content 2) tariffs and other incentives. The Section 201 tariffs on PV module imports were often described helpful but tariffs on cell imports (Section 201) or materials (Section 301, Section 232) were often described as counterproductive since U.S. supply chains do not exist for many necessary goods. The corporate tax decrease and local incentives were often mentioned as helpful. 3) the ability to move quickly in order to maximize the benefit of the Section 201 tariffs. This affected decisions to select localities with faster permitting or moving into existing buildings. 4) competition with scale, where competing with Asian PV imports or avoiding imports of material from China was challenging due to the larger scale of Asian manufacturers. Additionally, smaller firms expressed concerns that larger firms may not need their U.S. facilities to profitable. 5) access to capital, which was a particular challenge for smaller firms. Several U.S. tariffs affect the economics of PV cells, modules, and balance-of-module (BOM) materials, some of which are applicable to a long list of countries and others applicable only to China or Taiwan. We analyze how the tariffs interact to affect the prices of c-Si modules sourced under various assumptions about domestic and imported components and assembly. We estimate module prices under a range of baseline scenarios featuring U.S.-assembled modules with Southeast Asian cells (not from China or Taiwan). When all BOM components are sourced from the United States, baseline module prices are $0.37/W (below the 2.5-GW Section 201 cell cap) to $0.42/W (above the 2.5-GW cell cap). If all BOM components are sourced from China, the module price in this baseline U.S.-assembly scenario can reach up to $0.60/W. Imported module prices are lower than or within the range of the U.S.-assembled baseline prices under some conditions. Importing bifacial modules from Southeast Asia is the lowest-priced alternative, at $0.35/W, because bifacial modules are excluded from the Section 201 tariffs. Importing Southeast Asia modules that contain U.S. cells results in a price of $0.38/W, also owing to a Section 201 exclusion. Importing Southeast Asian modules that have Southeast Asian cells yields a price of $0.44/W, and importing Chinese modules that have U.S. cells yields a price of $0.58/W. These results suggest that U.S. tariff policy in 2019 may encourage U.S. assembly of mono-facial c-Si modules if the 2.5-GW cell import cap is not reached and Chinese BOM imports are negligible. However, some imported module options may offer the lowest prices if the 2.5-GW cell import cap is reached and/or U.S. module manufacturers must rely on significant Chinese BOM content. The analysis shows the 2.5-GW cell cap may be exceeded in 2019 and following years. It is also likely that U.S. module manufacturers will need to use at least some Chinese BOM content, since U.S. module manufacturers have stated that U.S. supply chains do not exist (or do not exist at a sufficient scale) for most BOM components, which makes them at least partially reliant on Chinese BOM and thus subject to Section 301 tariffs.

14 SOLAR ENERGY↗

Technoeconomic and Life Cycle Analysis for Bio-Energy with Carbon Capture and Storage (BECCS) Baseline

Bio-Energy with Carbon Capture and Storage (BECCS) is an attractive option from an environmental standpoint, as biomass regrowth removes CO 2 from the atmosphere, which offsets the emissions produced by burning the biomass. When combined with carbon capture, this produces a system that is capable of zero or even negative greenhouse gas (GHG) emissions. This study examines the performance, environmental impact, and economics of co-firing biomass in pulverized coal (PC) power plants. The analysis is based on various plant configurations (with and without carbon dioxide [CO 2 ] capture) using hybrid poplar biomass at three levels of co-fire (20, 35, and 49 weight percent) with Illinois No. 6 coal. This study is an analysis of the overall performance and economics of the plant, which was used to determine the levelized cost of electricity (LCOE) and to perform a full environmental life cycle analysis (LCA) of greenfield PC plants co-firing biomass.

09 BIOMASS FUELS↗

Review of Analogous Basins

Sedimentary basins comprise extensive porous sandstone and carbonate reservoirs capable of hosting economically significant greenfield and brownfield residual oil zones (ROZs). Several basins in the United States, including the intracratonic Illinois Basin (ILB), have stacked, predominantly siliciclastic ROZs that are potential targets for tertiary recovery of petroleum and for storing large volumes of anthropogenic carbon in the subsurface. The rocks in these basins share facies and depositional settings with many reservoirs that have already been major producers in primary production and, in some cases, as carbon dioxide enhanced oil recovery (CO 2 -EOR)targets. The lessons learned from field data collection and testing of these intervals in a basin like the ILB have broad applications to analogous basins with potential ROZs.

02 PETROLEUM↗

Non-Powered Dam Retrofit Exemplary Design for Hydropower Applications

Non-powered dams (NPDs) represent complex systems, situated at the intersection of natural stream environments and the built environment. The presence and operations of NPDs affect stream constituents (e.g., fish, recreational craft, sediment, water) and serve one or more engineered purposes (e.g., recreation, flood control, water supply, irrigation, tailings and debris control, navigation). By definition, NPDs do not provide hydropower generation. However, every NPD contains some untapped hydropower resource potential, represented by the pre-existing hydraulic head created by the dam and presence of flowing water. Adding power generation to an NPD requires retrofitting the NPD, which could involve the addition of any new component or function beyond that currently installed. Because this research is funded by the US Department of Energy Water Power Technologies Office, adding hydropower to NPDs is among the primary objectives for research investment. However, NPD retrofitting extends beyond the purview of hydropower additions. This report provides background information regarding NPD development in the United States, including an overview of the US NPD population, development potential, and recent development. It also summarizes challenges and opportunities facing NPD retrofit development, highlights the importance of maintaining or improving stream and dam functionality, notes key NPD characteristics, describes NPD retrofit methods, and identifies innovation areas for spurring future NPD retrofit development. Section 4 describes retrofit exemplary design principles and concepts that could apply to a wide range of NPD projects. These principles and concepts inform an NPD Retrofit Exemplary Design Specification (REDS), as included in Appendix A. The NPD REDS is heavily influenced by prior work under the standard modular hydropower technology acceleration research initiative, especially the work documented in the Exemplary Design Envelope Specification for Standard Modular Hydropower Technology (Witt et al., 2017). Whereas this prior work focuses on a particular technology class that applies most intentionally for new stream-reach development (i.e., greenfield sites), the NPD REDS contained herein applies more broadly to the NPD resource class and is technology-agnostic (i.e., the specific technologies intended to be described are not explicitly prescribed). This report serves as a part of early-phase research on NPD retrofit development, aimed toward spurring additional, follow-on efforts to specifically address development challenges, capitalize on development opportunities, and inspire innovation. As documented in the landmark “Hydropower Vision” report (DOE 2016), “transformative technical innovations able to meet the co-objectives of environmental sustainability and low-carbon energy will be critical to enabling additional hydropower growth.” This report serves as an important step in steering transformation of US non-powered dam infrastructure.

13 HYDRO ENERGY↗

Investigating Benefits and Challenges of Converting Retiring Coal Plants into Nuclear Plants

A coal-to-nuclear (C2N) transition means siting a nuclear reactor at the site of a recently retired coal power plant. Three overarching questions from the C2N transition guide this research: where in the United States are retired coal facilities located and what factors make a site feasible for transition; what factors of technology, cost, and project timeline drive investor economics over such a decision; and how will C2N impact local communities? The study team evaluated the siting characteristics of recently retired plants and those operating coal-fired power plant sites run by a utility or an independent power producer utilizing publicly available data to screen U.S. coal power plant sites to nuclear-feasible locations. After screening all retired coal sites to a set of 157 potential candidates and screening operating sites to a set of 237 candidates, the study team estimates that 80% of retired and operating coal power plant sites that were evaluated have the basic characteristics needed to be considered amenable to host an advanced nuclear reactor. For the recently retired plant sites evaluated, this represents a capacity potential of 64.8 GWe to be backfit at 125 sites. For the operating plant sites evaluated, this represents a capacity potential of 198.5 GWe to be backfit at 190 sites. This report evaluates a case study for the detailed impacts and potential outcomes from a C2N transition. Based on the nuclear technology choices and sizes evaluated to replace a large coal plant of 1,200 MWe generation capacity at the case study site, nuclear overnight costs of capital could decrease by 15% to 35% when compared to a greenfield construction project, through the reuse of infrastructure from the coal facility. Nuclear replacement designs can have a lower capacity size because nuclear power plants run at higher capacity factors than coal power plants. In the case study replacing coal capacity with 924 GWe of nuclear capacity, the study team found regional economic activity could increase by as much as $\$275 million$ and add 650 new, permanent jobs to the region of analysis. The evaluated site choice in the report is hypothetical for analysis purposes only and based on available data and documented assumptions. Consequently, the findings only inform at a general level. A community, investor, or other interested stakeholder can use these results to set up a detailed, in-depth analysis for a specific application of interest, such as evaluating a C2N transition of a specific coal power plant and a specific nuclear technology design. The report was subjected to independent peer reviews by experts in systems engineering and regional economic modeling to evaluate analysis and assumptions.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Advanced Water-Related Technology Performance Development

This U.S. Department of Energy/National Energy Technology Laboratory techno-economic analysis evaluates those parameters having the greatest performance and cost impact on wet flue gas desulfurization (FGD) effluent wastewater treatment systems, and air cooled condensers for dry cooling systems. Two supercritical pulverized coal power plants are considered: 1) an existing plant (modified for surface water discharge and air emissions consistent with limits for existing plants) retrofitted with wet FGD effluent wastewater treatment and 2) a greenfield plant constructed with an air-cooled condenser (ACC). Sensitivity analyses are completed on various process parameters associated with the wet FGD effluent wastewater treatment system and ACC to determine the impact on the net plant efficiency and levelized cost of electricity (LCOE). Research and development targets are recommended for the parameters shown to have the greatest potential impact on cost or performance.

20 FOSSIL-FUELED POWER PLANTS↗

Cost and Performance of Retrofitting NGCC Units for Carbon Capture – Revision 3

This study presents updated cost and performance information on retrofitting natural gas combined cycle (NGCC) power plants with post-combustion carbon capture based on an advanced solvent process, based on NETL's Fossil Energy Baseline, Revision 4A. Cases considered include those using a state-of-the-art F-frame turbine, and H-frame turbines. Cases include both greenfield and retrofit analysis at 90% and 95% carbon capture.

03 NATURAL GAS↗

Community Centered Solar Development (CCSD) Case Study Interviews [Slides]

Large-scale solar (LSS, defined here as ground-mounted photovoltaic projects ≥1 MWDC) has grown rapidly in the U.S., accounting for nearly half of new electric generating capacity added to the U.S. grid in 2022. All sources of electricity bring positive and negative impacts to hosting communities and the rapid growth of LSS has increased the urgency to understand those impacts. Yet, information about the potential positive and negative impacts of LSS on host communities, and the factors or drivers leading to support or opposition to a project, is lacking. This information gap limits how project developers, municipalities, and local siting authorities can address community concerns and appropriately align proposed projects to best suit and benefit local communities. As part of Berkeley Lab’s Community-Centered Solar Development (CCSD) project, this research set out to explore deep insights and perceptions from LSS stakeholders that only qualitative data can provide to identify key factors driving project success or threatened failure. Case studies, such as those utilized in this research, are uniquely adept at capturing the subjective experience of individuals and at identifying variables, structures, and interactions between stakeholders. Our case studies included 54 semi-structured interviews across 7 different LSS sites, representing a diversity of geographies, project sizes (MW), site types (i.e., greenfield, agrivoltaic, and brownfield / contaminated sites), zoning jurisdiction types, and more (Table 1). In addition to local residents living in close proximity to these LSS sites, we interviewed other key stakeholders involved in the projects such as developers, decision-makers, utility representatives, landowners, and individuals from community-based organizations. The overarching aim of this case study research was two-fold: (1) to inform subsequent tasks in the CCSD research project (including an upcoming national survey of LSS neighbors), and (2) to provide insights into the following set of research questions: -What are the key positive and negative drivers leading to support and opposition to LSS projects? -To what extent do LSS projects exacerbate or mitigate perceived inequities and marginalization within hosting communities and how can those inequities be mitigated going forward? -What strategies can communities employ to align LSS development with local land-use plans and community needs and values? The research findings and next steps are described in this slide deck report.

14 SOLAR ENERGY↗

Hydrogen Production Cost with Alkaline Electrolysis

Rigorous stakeholder-vetted techno-economic analysis was performed to assess the cost of hydrogen (H 2 ) produced using state-of-the-art Liquid Alkaline (LA) electrolysis. Projected high-volume, untaxed levelized cost of hydrogen (LCOH) range from 2020US $\$ 1.84$ to $\$ 2.88$/kg-H 2 depending on technology year, process design, and electrolyzer project scale, assuming an electricity price of $\$ 0.03$/kWh. The total installed capital cost for a LA electrolysis plant was estimated from bottom-up stack and installed cost models that account for purchased equipment, installation costs, site preparation, and general overhead costs. For this study, the LA electrolysis plant is assumed to be a stick-built, greenfield project developed by an EPC firm with electrolysis stacks purchased directly from an electrolysis stack manufacturer. The price of the electrolysis stacks is based on a bottom-up cost assessment with business markup for the electrolysis company fabricator. Methods from the Hydrogen Analysis (H 2 A) production model, a peer-reviewed national laboratory-developed discounted cash flow model, were used to calculate the LCOH production in 2020$/kg-H 2 . The baseline electricity price case ($\$ 0.03$/kWh) corresponds to average wholesale electricity prices currently possible in U.S. markets with plentiful wind. Similar low-cost electricity pricing is possible from solar Power Purchase Agreements (PPA) although these prices are typically limited by renewable energy capacity factors.

08 HYDROGEN↗

Natural Gas Combined Cycle (NGCC) Power Plants with Carbon Capture and Exhaust Gas Recycle (EGR)

The purpose of this study is to determine the cost and performance of natural gas combined cycle (NGCC) power plants using state-of-the-art gas turbines with post combustion carbon capture and recycle streams designed to increase the CO 2 concentration in the inlet to the capture system. Increasing the inlet CO 2 concentration by exhaust gas recycle (EGR) is expected to improve the efficiency of the capture system and reduce its costs. Primary results indicate that adding EGR to NGCC plants with CO 2 capture results in minimal improvement to the cost of electricity. The addition of 50 percent EGR in NGCC plants with CO 2 capture reduces the LCOE by 2 percent over the LCOE of the same design without EGR as reference. Including the EGR ductwork and cooler in a greenfield plant design could still be prudent since there is some cost advantage to EGR and it would allow more flexibility for taking advantage of future improvements in the technology.

20 FOSSIL-FUELED POWER PLANTS↗

Sustainable Aviation Fuels from 30,000 feet – Scoping Report

A literature review, first principles analysis, and mapping of the airline-fuel infrastructure were performed to reassess the potential for various means of realizing a sustainable aviation sector. The literature review found a plethora of technical methods to make the airline industry net-zero CO 2 but limited work on the emergent barriers to sustainable aviation implementation such as land use, repurposing of fuel refining assets, and airline cost structures. First principles analyses of the energy, land, and costs of three broad net-zero strategies were performed to determine if sustainable aviation is feasible even in the most optimistic scenarios. Those methods were biomass-derived sustainable aviation fuel (SAF), fuel produced from CO 2 captured from the air and H 2 produced from water electrolysis (air-to-fuel: ATF), and offsetting fossil-derived Jet Fuel with carbon dioxide removal from the atmosphere (direct air capture and storage: DACS). Offsetting CO 2 emissions from using fossil Jet Fuel with DACS was found to consume the least energy, require the smallest quantity of land, and be the cheapest option. Replacing Jet Fuel with SAF was found to be only slightly more expensive than DACS but require substantially more land. ATF was found to be the most expensive and energy intensive option, though it did spare land relative to SAF. We found that calls to utilize waste biomass are well-founded, but wastes alone cannot cover the needs of the global airline industry. This means additional land will need to be allocated for biomass cultivation if SAF becomes the primary pathway to sustainable aviation. While differences were found in the performance of different types of biomass, those differences were small relative to differences with ATF and DACS. An analysis of the pricing structure of the airline industry suggests that some of the cost advantage of DACS may be erased by consumer sentiment which could explain why, to-date, the airline industry is focused primarily on SAF and to a lesser extent ATF. Further work is required to estimate the transportation, capital cost, and financing cost implications of greenfield and brownfield sites for SAF, DACS, and ATF. In the final report, we will analyze the potential to retrofit corn ethanol facilities to operate the ethanol-to-jet fuel process in response to decreasing gasoline demand as the electrification of road transport progresses. We will also construct a prioritization of land use to determine whether each net-zero CO 2 aviation pathway can make claim to the land required by their technology.

09 BIOMASS FUELS↗

Hydrogen Production Cost with Anion Exchange Membrane Electrolysis

Rigorous stakeholder-vetted techno-economic analysis was performed to assess the cost of hydrogen (H 2 ) produced using state-of-the-art Anion Exchange Membrane (AEM) electrolysis. Projected high-volume, untaxed and unsubsidized levelized cost of hydrogen (LCOH)1 range from 2020 $\$$1.78 to $\$$3.68/kg H 2 depending on technology year, process design, and electrolyzer project scale, assuming an electricity price of $\$$0.03/kWh and a capacity factor of 97%. The total installed capital cost for an AEM electrolysis plant was estimated from bottom-up stack and process plant cost models. The stack cost model accounts for manufacturing equipment, equipment maintenance, material, tooling, cycle time, yield, labor, utilities and general overhead. The process plant cost model accounts for purchased equipment, installation costs, site preparation, and general overhead costs. For this study, the AEM electrolysis plant is assumed to be a stick-built, greenfield project developed by an engineering, procurement, and construction (EPC) firm with electrolysis stacks purchased directly from an electrolysis stack manufacturer. The price of the electrolysis stacks is based on a bottom-up cost assessment with business markup for the electrolysis company fabricator. Methods from the Hydrogen Analysis (H2A) production model, a peer-reviewed national laboratory-developed discounted cash flow (DCF) model, were used to calculate the production LCOH in 2020 $\$$/kg H 2 . The baseline electricity price case ($\$$0.03/kWh) corresponds to average wholesale electricity prices currently possible in U.S. markets with plentiful wind. Similar low-cost electricity pricing is possible from solar Power Purchase Agreements (PPA) although these prices are typically limited by renewable energy capacity factors.

08 HYDROGEN↗