Search NASA⌕ Search

SEARCH · Search NASA

Results for “ground operational support system”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Blue Rock CropSpanPV - Low Cost Racking for Agricultural Solar Photovoltaics

In this work, a total of four solar panel layouts, applied to Agrivoltaics, are investigated. This study presents two hypotheses: 1. Prefabrication - Lower total cost can be achieved by constructing a pre-assembled, pre-wired solar array in a factory, with automation, then rapidly deploying it in the field. 2. Tension Structures - Using tension structures in a way to suspend an overhead solar array also reduces costs when compared to conventional support methods. Designs are presented for frames to hold the panels. Configurations are advanced to connect the frames into arrays. Supports and foundations to hold the arrays in the desired layout are calculated, selected and presented. Cost models are prepared for the four layouts, which include definition of the business enterprise, the manufacturing operation, and the required facility for production at scale. Cost models include, detail material and task/labor take-offs for both manufacturing and installation. Comparisons with conventional system adapted to Agrivoltaics reveal that the two hypotheses do not hold true. A prefabricated array requires additional material that is not needed in the base system and the cost of this additional material is not outweighed by the cost savings of reduced field installation. The cost of wire rope for a tension structure does result in an economy of material, however, the cost of end connections and tensioning devices adds significantly to the cost of the overall tension structure. Foundation loads with tension structures, especially the large wind uplift seen with a fixed tilt solar array, impose significant constraints and high costs. The following conclusions are recommended for further consideration: 1. Best Case Agrivoltaic Configuration - The best value/lowest cost configuration for agrivoltaics is the installation of solar panels mounted on a single axis tracker in either a 2-in-portrait or 2-in landscape arrangement. This is useful for grazing lands and for staple crops which require high light levels. These applications represent the vast majority of the potential agrivoltaic market. Important elements in this configuration are the specific geometric layout coordinated with the various field operations and a control system linked between the farm equipment and single axis tracker. The control system is to monitor location and orientation, then actively tilt the solar panels or brake the field equipment to provide clearance and avoid collisions. 2. Long Span Applications - The use of tension structures for an overhead fixed tilt array is beneficial where long spans are a necessity, especially where the base support in the project location has consolidated rock near the surface or some other solid structure. One application is spanning wide irrigation canals. Another may be as an installation at the top deck of parking structures. 3. Direct Ground Mount Configuration – Having skids at the base of a pre-fabricated array that extend when the array is deployed, could be a successful design. This could be a useful strategy for dense, flat, ground-mount configurations like that employed by a couple of successful commercial operations (5G Maverick and Erthos). Arrays would be orientated north and south, deployed very low on prepared grade. Arrays would be aligned closely next to each other and anchored with small ground screws or simply with ballast. This same product arrangement could be very useful for rapid deployment and set-up of solar arrays for temporary deployments, disaster response and the military operations

14 SOLAR ENERGY↗

Surface Meteorology at Teller Mile 47 Watershed, Seward Peninsula, Alaska, Ongoing from 2018

Meteorological data are currently being collected at one location at the Teller Mile 47 (TL_MM47) Research Basin Site, Seward Peninsula (N64 58' 36.918", W166 12' 32.67", 67 meters above sea level). The site was installed and initial measurements started in September 2018 and it has operated continuously since then. The meteorological station is co-located with a continuous snow depth sensor and two soil pits for subsurface temperature and moisture measurements. These data are being collected to better understand the energy dynamics above the active layer and permafrost. They complement in-situ snow and soil measurements also at this location. The data could also be used as supporting measurements for other research and modeling activities. There are 35 comma separated value format (*.csv) files provided, where each file contains the full data for an individual parameter (e.g. air temperature at 1.5 meters above the ground surface (teller_m47_air_temperature_150cm_ags_Avg.csv) or soil temperature 20 centimeters below ground surface (teller_m47_dry_soil_pit_temperature_20cmbgs_Avg.csv)) plus the time in Universal Coordinated Time (UTC) and Alaska Standard Time (UTC time minus nine hours). The site was installed and initial measurements started in September 2018. It has been operated continuously since. Primary data gaps are due to battery failure or sensor failure. These data are being collected to better understand the surface energy dynamics above the active layer and permafrost. The Next-Generation Ecosystem Experiments: Arctic (NGEE Arctic), was a 10-year research effort (2012-2022) to reduce uncertainty in Earth System Models by developing a predictive understanding of carbon-rich Arctic ecosystems and feedbacks to climate. NGEE Arctic was supported by the Department of Energy?s Office of Biological and Environmental Research. The NGEE Arctic project had two field research sites: 1) located within the Arctic polygonal tundra coastal region on the Barrow Environmental Observatory (BEO) and the North Slope near Utqiagvik (Barrow), Alaska and 2) multiple areas on the discontinuous permafrost region of the Seward Peninsula north of Nome, Alaska. Through observations, experiments, and synthesis with existing datasets, NGEE Arctic provided an enhanced knowledge base for multi-scale modeling and contributed to improved process representation at global pan-Arctic scales within the Department of Energy?s Earth system Model (the Energy Exascale Earth System Model, or E3SM), and specifically within the E3SM Land Model component (ELM).

54 ENVIRONMENTAL SCIENCES↗

Pueblo of Picuris Phase I Community Solar Project (Final Report)

The Pueblo of Picuris Community Solar Project (Project) is a 1-megawatt (MW) alternating current (AC) ground mounted, fixed tilt solar photovoltaic system that became operational on December 18th, 2017. The Project, which was partially funded by the DOE (Grant No. DEIE0000033), generates revenue for the Tribe through a Power Purchase Agreement (PPA) with the electric utility, Kit Carson Electric Cooperative. The PPA revenue provides Tribal members with residential and commercial electric utility bill offsets and also supports critical Tribal programs. This Final Report provides a technical overview of the Project, documents the Project’s development process and outcomes, identifies successes and challenges, and offers recommendations for similarly funded tribal projects.

1 megawatt solar↗

Analysis of the Feasibility of UAS-Based EMI Sensing for Underground Utilities Detection and Mapping

This paper investigates the feasibility of using a linear current sensing (LCS) technique integrated on an unmanned aerial system (UAS) for detecting and mapping underground infrastructure rapidly and cost-effectively. The LCS technique is based on data from a wide band of electromagnetic induction frequencies (50 kHz to 2 MHz) using a vector magnetic field gradiometer. This technique takes advantage of a slowly decaying secondary magnetic field in order to achieve greater standoff detection distance ($\frac{1}{R^2}$ vs. $\frac{1}{R^6}$ for compact metallic targets during EMI sensing, where R is the distance from a target to the sensor). These secondary magnetic fields are produced by the excite current on long conductors, allowing detection at a distance of 10 meters or more. The system operates between tens of kHz to a few MHz and uses either an active EMI source or existing EM fields to excite this linear current on a long metallic subsurface target. Once excited, these linear currents produce a secondary magnetic field that is detected with an above ground triaxial magnetic field gradiometer. By moving and tracking its geolocation, the system outputs rich datasets sufficient to support high-fidelity forward and inverse EMI models for estimating the depth and orientation of deep underground long linear metallic infrastructure. The system’s hardware and its integration to a UAS system are outlined, along with the formulation of LCS theory, and numerical and experimental data are presented. The results illustrate that the LCS technique offers large standoff detection, is adaptable to UAS, and could be used effectively for detecting deep underground infrastructure such as wires and pipes.

54 ENVIRONMENTAL SCIENCES↗

Solar panel field array support system and apparatus and method for construction use

A combined PV panel assembly jig and forklift transport pallet is used to assemble PV panels for transport to a field array from a protected manufacturing environment. The panels are assembled to have adhesively applied rails for transport by a robotic drone on a ground-support rack and are pre-wired. The PV panel assembly jig holds, protects, and aligns the PV panels in an upside down position, opposite to their operational position, for ease of wiring in order to decrease the manual labor required in the field. Once the pallet is transported to the load station at the end of a row of solar panel racks in the field array, a robotic loader lifts the upside down PV panels from the combined PV panel assembly jig and forklift transport pallet in an arcing overhead motion that lifts, tilts, and deposits the PV panels in an upright position at the loading station of a railed rack support as ground-mounted in a solar panel field array.

14 SOLAR ENERGY↗

Pump-and-Treat Impacts on Aquifer Conditions and the Development of System-Wide Performance Strategies - 20377

The pump-and-treat (P and T) system on the Hanford Site's Central Plateau currently treats multiple contaminants within the 200-ZP-1 operable unit, including nitrate through its biological treatment processes. Although it was initially designed to support the 200-ZP-1 Remedial Action Objectives, the P and T system has evolved in use to address contaminants from other regions of the aquifer as well. The P and T influents are biogeochemically distinct, treating groundwaters with elevated concentrations of cyanide, uranium, technetium-99, and nitrate. Given the varying geochemical signatures from current and potential future sources, operational conditions, and amendments considered for treatment processes, there is a need to identify the impacts that the P and T effluent has on the aquifer, and how the aquifer affects P and T performance. To this end, laboratory efforts have focused on characterizing P and T effluent and its biogeochemical effects on the sediments through a series repacked column experiments. The P and T effluent is rich in particulate matter. A systematic inspection of this particulate matter in the P and T effluent showed significant levels of manganese/iron oxides, calcite crystals, relatively large organic matter molecules, and biomass. Therefore, the column experiments were designed and conducted for four different treatment systems: artificial groundwater, filtered P and T effluent, non-filtered P and T effluent, and chlorinated P and T effluent. Different levels of microbiologically- and geochemically-induced changes in the columns occurred and modified the flow systems. For example, physical filtration occurred in the sediments where the particulate material had accumulated in the top portion of the column. Reactive transport modeling of the laboratory experiments is being carried out so that the reaction network can be extrapolated to the field scale. These simulations will provide predictive evaluations of system performance based on P and T operational changes and aquifer mass loading and capacity estimates. This information can be used to address combined subsurface and operational challenges, such as the need for frequent well redevelopment to maintain injection capacity. This information also provides the technical basis for decisions related to the P and T system operations that support remedy optimization efforts and short- and long-term remedy decisions related to multiple operable units on the Hanford Site Central Plateau. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Emergent orbital magnetization in Kitaev quantum magnets

Unambiguous identification of the Kitaev quantum spin liquid (QSL) in materials remains a huge challenge despite many encouraging signs from various measurements. To facilitate the experimental detection of the Kiteav QSL, here we propose to use remnant charge response in Mott insulators hosting QSL to identify the key signatures of QSL. We predict an emergent orbital magnetization in a Kitaev system in an external magnetic field. The direction of the orbital magnetization can be flipped by rotating the external magnetic field in the honeycomb plane. The orbital magnetization is demonstrated explicitly through a detailed microscopic analysis of the multiorbital Hubbard-Kanamori Hamiltonian and also supported by a phenomenological picture. We first derive the localized electrical loop current operator in terms of the spin degrees of freedom. Thereafter, utilizing the Majorana representation, we estimate the loop currents in the ground state of the chiral Kitaev QSL state, and obtain the consequent current textures, which are responsible for the emergent orbital magnetization. Finally, we discuss the possible experimental techniques to visualize the orbital magnetization which can be considered as the signatures of the underlying excitations.

36 MATERIALS SCIENCE↗

Hydropower Geotechnical Foundations: Current Practice and Innovation Opportunities for Low-Head Applications

Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to challenges frequently encountered with traditional approaches. With this understanding, it is critically important to understand and document the current state of practice for hydropower geotechnical foundations, identify key challenges, and define opportunities for innovative solutions. To this end, this report documents the current state of practice across the three main phases of geotechnical foundation development: (1) geotechnical site assessment, (2) design, and (3) construction for hydropower systems. It also describes the major challenges with conventional approaches and identifies opportunities for innovation to reduce hydropower foundations costs, timelines, and risks. Key takeaways from this report include the following: Approximately 80% of available low-head sites are expected to have foundations on soil beds rather than rock beds, suggesting that rockfill and earthfill dams may be the most cost-effective conventional dam type for new projects.; Geotechnical and geologic investigation activities are time-consuming and expensive but are essential to define the parameters and criteria needed for foundation design.; Certain riverbed soil and bedrock types present significant technical challenges or require expensive foundation construction, which can prove financially prohibitive for low-head project development.; Modular hydropower design and prefabricated modular foundations represent a promising but unproven paradigm for new hydropower development. Design and construction approaches using optimized and highly repeatable, reliable components would benefit project cost, time, and risk but require additional research and development.; Temporary construction features for foundations, including cofferdams, water diversion, and water control systems, can prove costly and have inherent construction risk.; For economically viable development, hydropower geotechnical foundations should be limited to 4 to 15% of the project’s total initial capital costs. Many proposed projects have experienced cost overruns attributable to foundation difficulties or surprises during construction. These overruns may have been due to inadequate investigations, lack of adequate engineering effort to tailor the structures to site geology and topography, and/or contractual terms, among other considerations.; Challenges for hydropower foundations and opportunities for innovative technology solutions are identified in the following areas (consistent with the three main phases of foundation development): Geotechnical site assessment, Foundation design and materials, Construction methods and technology. Ultimately, this report aims to provide information about geotechnical foundations for low-head hydropower and to motivate transformative technologies to support hydropower growth.

13 HYDRO ENERGY↗

Data generated during the 2018 LAPSE-RATE campaign: an introduction and overview

Unmanned aircraft systems (UASs) offer innovative capabilities for providing new perspectives on the atmosphere, and therefore atmospheric scientists are rapidly expanding their use, particularly for studying the planetary boundary layer. In support of this expansion, from 14 to 20 July 2018 the International Society for Atmospheric Research using Remotely piloted Aircraft (ISARRA) hosted a community flight week, dubbed the Lower Atmospheric Profiling Studies at Elevation – a Remotely-piloted Aircraft Team Experiment (LAPSE-RATE; de Boer et al., 2020a). This field campaign spanned a 1-week deployment to Colorado's San Luis Valley, involving over 100 students, scientists, engineers, pilots, and outreach coordinators. These groups conducted intensive field operations using unmanned aircraft and ground-based assets to develop comprehensive datasets spanning a variety of scientific objectives, including a total of nearly 1300 research flights totaling over 250 flight hours. This article introduces this campaign and lays the groundwork for a special issue on the LAPSE-RATE project. The remainder of the special issue provides detailed overviews of the datasets collected and the platforms used to collect them. All of the datasets covered by this special issue have been uploaded to a LAPSE-RATE community set up at the Zenodo data archive (https://zenodo.org/communities/lapse-rate/, last access: 3 December 2020).

47 OTHER INSTRUMENTATION↗

Chapter 8: Life-Cycle Testing and Analysis

Prior to a spacecraft launch, program mission assurance standards dictate that the flight battery power system should comply with mission requirements under the intended operating conditions. Ground life cycle testing (LCT) combined with an analysis on the electrical power system (EPS) battery is an empirical method used to demonstrate compliance to satellite service life requirements. The LCT compliance method adopted by the aerospace industry is based on demonstrating a space battery's life expectancy as a part of battery qualification. Real-time cell and lithium-ion battery (LIB) LCT data are commonly used for model inputs to EPS power and energy balance analyses, in LIB reliability analysis estimates, and to support on-orbit spacecraft mission life extension opportunities. This chapter describes the LCT planning steps, process approach, and analysis techniques commonly used to qualify space LIB power systems.

accelerated aging↗

NGEE Arctic Tram: Radiation and Environmental Measurements over Low- and High-Centered Polygon Vegetation Communities, Barrow, Alaska, 2014-2017

These data were generated from an observational platform (Tram), an automated cart carrying a suite of radiation and remote sensing instruments running on 68 meters of elevated track 1 to 1.5 meters above the surface of the vegetation communities of low- and high-centered polygon ground. The Tram is in the footprint of the NGEE Arctic/AmeriFlux eddy covariance flux tower (US-NGB) at the Barrow Environmental Observatory, Barrow, Alaska, and operated before, during, and after the growing seasons of 2014-2017. Dataset includes one user guide (*.pdf) with final and raw *.csv data files. The Next-Generation Ecosystem Experiments: Arctic (NGEE Arctic), was a research effort to reduce uncertainty in Earth System Models by developing a predictive understanding of carbon-rich Arctic ecosystems and feedbacks to climate. NGEE Arctic was supported by the Department of Energy's Office of Biological and Environmental Research. The NGEE Arctic project had two field research sites: 1) located within the Arctic polygonal tundra coastal region on the Barrow Environmental Observatory (BEO) and the North Slope near Utqiagvik (Barrow), Alaska and 2) multiple areas on the discontinuous permafrost region of the Seward Peninsula north of Nome, Alaska. Through observations, experiments, and synthesis with existing datasets, NGEE Arctic provided an enhanced knowledge base for multi-scale modeling and contributed to improved process representation at global pan-Arctic scales within the Department of Energy's Earth system Model (the Energy Exascale Earth System Model, or E3SM), and specifically within the E3SM Land Model component (ELM).

54 ENVIRONMENTAL SCIENCES↗

Creating an Inter-Tribal Technical Assistance Network in the Northwest Arctic

The US Department of Energy-Office of Indian Energy's (DOE-IE) support for NANA's establishment of an Inter-Tribal Assistance Network in the Northwest Arctic was a ground-breaking effort that led to many individual community successes and a regional escalation of clean energy for our tribes. Before this grant award was initiated, high penetration renewable-diesel hybrid systems were primarily aspirational. Now, after five years of intensive technical assistance and multi-institution collaboration and funding, the NANA Region has three high penetration solar-wind-battery-diesel hybrid systems and one solar-battery-diesel hybrid system fully operational with diesel-off operation occurring regularly; another solar-battery-diesel hybrid system fully funded with an RFP for construction targeted for 2023; a current grant application that was awarded to begin the final design process for solar-battery-diesel hybrid systems for four other villages in the region; and initial funding to begin a high penetration wind-battery-diesel system for the remaining village in the region. Clearly, our goal to demonstrate and replicate high penetration renewable hybrid technology has been accomplished and is increasing in scale and pace.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Precursor Analysis Report: Blackmatter Ransomware Attack on New Cooperative 2021

The BlackMatter Ransomware Attack on New Cooperative 2021 Precursor Analysis Report leverages publicly available information about the New Cooperative cyber attack and catalogs anomalous observables for each technique employed in the attack. This analysis is based upon the methodology of the Cybersecurity for the Operational Technology Environment (CyOTE) program. The BlackMatter ransomware was first identified in July 2021 and is reported to have infected more than 50 corporations around the world. , The Iowa-based grain cooperative, New Cooperative, was impacted by the BlackMatter ransomware on or before 18 September 2021. The adversary likely resided on New Cooperative’s networks for 15 days prior to encrypting its network and demanding New Cooperative pay $5.9 million in ransom by 25 September to unlock systems and prevent 1 terabyte (TB) of sensitive data from being publicly released. It is not clear if New Cooperative paid the ransom. The full impact of the ransomware attack is not known; however, according to New Cooperative’s general manager, the attack caused the company’s automated processes to revert back to processes used in the 1970s. , As of 6 October, only 50 percent of New Cooperative’s operations were utilizing automated processes. The company took eight weeks to rebuild the entire network and information technology (IT) systems from the ground up, which puts the date of fully recovery around 13 November. Researchers and analysts identified 20 unique techniques utilized during the attack with a total of 404 observables using MITRE ATT&CK® for Industrial Control Systems. The CyOTE program assesses observables accompanying techniques used prior to the triggering event to identify opportunities to detect malicious activity. If observables accompanying the attack techniques are perceived and investigated prior to the triggering event, earlier comprehension of malicious activity can take place. Seventeen of the identified techniques used during the New Cooperative cyber attack were precursors to the triggering event. Analysis identified 360 observables associated with these precursor techniques, 284 of which were assessed to have an increased likelihood of being perceived in the 15 days preceding the triggering event. The response and comprehension time could have been reduced if the observables had been identified earlier. The information gathered in this report contributes to a library of observables tied to a repository of artifacts, data sources, and technique detection references for practitioners and developers to support the comprehension of indicators of attack. Asset owners and operators can use these products if they experience similar observables or to prepare for comparable scenarios.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

​​Hydrogen Transportation and Distributed Energy Systems Seismic Risk Assessment for Cascadia Subduction Zone Airport Facilities​

Portland International Airport in Oregon is exploring operating a fleet of 28 fuel cell electric buses to support airport operations and possibly provide backup power during outages. In this report, we evaluate the risk of hydrogen deployment at an airport considering the potential for seismic activity. We present a seismic risk assessment for pressurized piping for a generic hydrogen refueling station at the airport. Only pressurized piping was considered in the risk analysis because of its vulnerability and availability of fragility information unlike the other components. Seismic capacity of other components should be included as more information becomes available. To characterize the seismic hazard, we considered the initiating event frequency of a Cascadia Subduction Zone earthquake event based on data from the literature. Seismic stressors that translate to the site from an earthquake event are expressed as peak ground acceleration. Site disturbance is characterized as a function of soil conditions, represented by different shear wave velocity values, which affect how seismic waves propagate and impact structures. Pipe fragility curves as a function of seismic capacity were used to correlate ground acceleration and failure probability. These fragility characteristics were combined with site-specific soil conditions to calculate the probability of pipe rupture during a seismic event. It should be noted that multiple simultaneous failures due to an earthquake event as a common cause are not considered. Some epistemic uncertainties such as self-exciting shocks, aftershocks, and the time variant nature of the ground motion are not considered either.

08 HYDROGEN↗

SpecFIDLER User Manual: Software Version 2.4.0

The Spectroscopic Field Instrument for Detection of Low Energy Radiation (SpecFIDLER) allows response teams to detect and quantify plutonium contamination on the ground. Notional scenarios include dispersion from a weapon accident, or the launch failure of a space probe containing a radioisotope thermoelectric generator. Unlike other instruments, the thin-window sodium iodide detector is sensitive to the low-energy gamma rays emitted by plutonium isotopes. The system supports both mobile survey as well as stationary sampling. This manual provides information about installing, maintaining, and troubleshooting the SpecFIDLER. The scope of this document includes the physical hardware, software for data acquisition, and algorithms for data analysis. Recent changes to the software and algorithms aim to streamline the operation of the system.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

SpecFIDLER User Manual (Software V.2.5.0)

The Spectroscopic Field Instrument for Detection of Low Energy Radiation (SpecFIDLER) allows response teams to detect and quantify plutonium contamination on the ground. Notional scenarios include dispersion from a weapon accident, or the launch failure of a space probe containing a radioisotope thermoelectric generator. Unlike other instruments, the thin-window sodium iodide detector is sensitive to the low-energy gamma rays emitted by plutonium isotopes. The system supports both mobile survey as well as stationary sampling. This manual provides information about installing, maintaining, and troubleshooting the SpecFIDLER. The scope of this document includes the physical hardware, software for data acquisition, and algorithms for data analysis. Recent changes to the software and algorithms aim to streamline the operation of the system.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

SpecFIDLER User Manual (Software V.2.6.0)

The Spectroscopic Field Instrument for Detection of Low Energy Radiation (SpecFIDLER) allows response teams to detect and quantify plutonium contamination on the ground. Notional scenarios include dispersion from a weapon accident, or the launch failure of a space probe containing a radioisotope thermoelectric generator. Unlike other instruments, the thin-window sodium iodide detector is sensitive to the low-energy gamma rays emitted by plutonium isotopes. The system supports both mobile survey as well as stationary sampling. This manual provides information about installing, maintaining, and troubleshooting the SpecFIDLER. The scope of this document includes the physical hardware, software for data acquisition, and algorithms for data analysis. Recent changes to the software and algorithms aim to streamline the operation of the system.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

SpecFIDLER User Manual (Software V.2.3.0)

The Spectroscopic Field Instrument for Detection of Low Energy Radiation (SpecFIDLER) allows response teams to detect and quantify plutonium contamination on the ground. Notional scenarios include dispersion from a weapon accident, or the launch failure of a space probe containing a radioisotope thermoelectric generator. Unlike other instruments, the thin-window sodium iodide detector is sensitive to the low-energy gamma rays emitted by plutonium isotopes. The system supports both mobile survey as well as stationary sampling. This manual provides information about installing, maintaining, and troubleshooting the SpecFIDLER. The scope of this document includes the physical hardware, software for data acquisition, and algorithms for data analysis. Recent changes to the software and algorithms aim to streamline the operation of the system.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗