Hybrid Metalized Polymer Core Hardware Design & Initial Results for Prototype Mass Optimized Pulsed Power Hardware
Explore the source record for details and available documents.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
This paper presents a design of a 10 kV silicon carbide (SiC) MOSFET based modular multilevel converter (MMC). The MMC functions as the interconnection between a 24 kV dc bus and a 13. SkV distribution grid. This paper focuses on the hardware design of the MMC and its submodules. The gate driver, auxiliary power supply and bus bur in submodules are major components that need to meet high dv/dt immunity and high insulation voltage requirements. The gate driver achieves over 200 kV/us common mode transient immunity (CMTI). Its associated auxiliary power supply is based on an on-board transformer with over 30 kV insulation capability and 1.4 pF barrier capacitance. The busbar achieves less than 11 kV/cm electric field in the air to avoid partial discharges. Validation tests of the MMC submodule were performed by double pulse tests at 5 kV and buck converter tests at3 kV, 52A (peak). Reliable operations were achieved in validation tests.
An analytical model for hydrogen reduction of regolith was used to investigate the effects of several key variables on the energy and mass performance of reactors for a lunar in-situ resource utilization oxygen production plant. Reactor geometry, reaction time, number of reactors, heat recuperation, heat loss, and operating pressure were all studied to guide hardware designers who are developing future prototype reactors. The effects of heat recuperation where the incoming regolith is pre-heated by the hot spent regolith before transfer was also investigated for the first time. In general, longer reaction times per batch provide a lower overall energy, but also result in larger and heavier reactors. Three reactors with long heat-up times results in similar energy requirements as a two-reactor system with all other parameters the same. Three reactors with heat recuperation results in energy reductions of 20 to 40 percent compared to a three-reactor system with no heat recuperation. Increasing operating pressure can provide similar energy reductions as heat recuperation for the same reaction times.
All users of the NAVSTAR Global Positioning System (GPS) located within a rather large geographical area are currently required to perform a number of identical, common operations in order to accomplish a navigation "fix" (additional "location dependent" operations are also required). Under the REFSAT concept, the common operations are performed at a central location and results broadcast via a geostationary reference satellite (REFSAT). This concept allows a considerable reduction in the cost and complexity of individual civil user terminals. The hardware design of a REFSAT/GPS receiver terminal and the REFSAT transmitter simulator is described. Since six of the Phase 1 NAVSTAR GPS satellites are now operational a demonstration test plan utilizing the one-to-two hour per day viewing window is also described. Equipment check-out preliminary test results are presented.
This paper reports on the generic prediction capability of full electromagnetic plasma initiation modelling with DYON, which was carried out for the first time in fusion research by the joint modelling of the International Tokamak Physics Activity—Integrating Operation Scenario group. The following devices were included in the experiment database: VEST (spherical torus, copper coils, Stainless steel wall, R/a = 0.3 m/0.2 m, V v = 3.7 m 3 ), MAST-U (spherical torus, copper coils, C wall, R/a = 0.7 m/0.5 m, V v = 55 m 3 ), EAST (conventional tokamak, superconducting coils, metallic wall, R/a = 1.85 m/0.5 m, V v = 38 m 3 ), DIII-D (conventional tokamak, copper coils, C wall, R/a = 1.67 m/0.65 m, V v = 35 m 3 ), and KSTAR (conventional tokamak, superconducting coils, C wall, R/a = 1.8 m/0.5 m, V v = 55 m 3 ). Despite the different hardware features of the devices, the required operating spaces of the loop voltage induction and prefill gas pressure for inductive plasma initiation in each device were successfully reproduced by the predictive simulations with DYON using only the individual hardware design and the control room input data for each discharge. This successful validation across multiple machines demonstrates that the full electromagnetic DYON modelling can capture the essential physics of inductive plasma initiation. The simulation settings commonly employed for all modelling and the modifications necessary to account for the discrepancies between individual devices are reported. Predictions for ITER based on the multi-machine validation indicate that a wide range of prefill gas pressures exists for the Townsend breakdown and the plasma burn-through (0.01–1.5 mPa).
The System Identification (SysID) Rack is a real-time hardware-in-the-loop data acquisition (DAQ) and control instrument rack that was designed and built to support inlet testing in the NASA Glenn Research Center 10- by 10-Foot Supersonic Wind Tunnel. This instrument rack is used to support experiments on the Combined-Cycle Engine Large-Scale Inlet for Mode Transition Experiment (CCE‒ LIMX). The CCE‒LIMX is a testbed for an integrated dual flow-path inlet configuration with the two flow paths in an over-and-under arrangement such that the high-speed flow path is located below the lowspeed flow path. The CCE‒LIMX includes multiple actuators that are designed to redirect airflow from one flow path to the other; this action is referred to as "inlet mode transition." Multiple phases of experiments have been planned to support research that investigates inlet mode transition: inlet characterization (Phase-1) and system identification (Phase-2). The SysID Rack hardware design met the following requirements to support Phase-1 and Phase-2 experiments: safely and effectively move multiple actuators individually or synchronously; sample and save effector control and position sensor feedback signals; automate control of actuator positioning based on a mode transition schedule; sample and save pressure sensor signals; and perform DAQ and control processes operating at 2.5 KHz. This document describes the hardware components used to build the SysID Rack including their function, specifications, and system interface. Furthermore, provided in this document are a SysID Rack effectors signal list (signal flow); system identification experiment setup; illustrations indicating a typical SysID Rack experiment; and a SysID Rack performance overview for Phase-1 and Phase-2 experiments. The SysID Rack described in this document was a useful tool to meet the project objectives.
Explore the source record for details and available documents.
In this hardware project the students designed the prototype of a novel mini-rover for the exploration of a planetary surface. In an actual application, a large number of such miniature roving devices would be released from a landing craft. Each rover would be equipped with a Cd 109 radio-isotope source (a gamma ray emitter) irradiating the planetary surface below the rover, and an x-ray fluorescence detector for a quantitative assay of high atomic weight elements in the planet's surface. (Similar, miniaturized, hand-held devices have recently been developed for use in gold mines). The device developed by the students was limited to demonstrating the mechanical and electrical drive. The geometric external shape is a sphere; hence there is no danger of the rover being turned on its back and stopped. Propulsion is by means of an interior mass, eccentric to the sphere and driven by an electric motor. In an inter-disciplinary effort in mechanical and electrical engineering, the students designed the mechanical parts, built the transistorized circuit board, and tested the device.
W, Q and PF engineers and machinists designed and fabricated, on the new Mazak i300, the first Single Piece Blast Hardware (unclassified design shown) reducing fabrication and inspection time by over 50%. The first DU Single Piece is completed and will be used for Hydro Test 3680. Past hydro tests used a twopiece assembly due to a lack of equipment capable of machining the complex saddle shape in a single piece. The i300 provides turning and milling 5-axis machining on one machine. The milling head on the i300 can machine past 90 relative to the spindle axis. This makes it possible to machine the complex saddle surface on a single piece. Going to a single piece eliminates tolerance problems, such as tilting and eccentricity, that typically occurred when assembling the two pieces together
NASA Glenn Research Center (GRC) has been supporting development of the Advanced Stirling Radioisotope Generator (ASRG) since 2006. A key element of the ASRG project is providing life, reliability, and performance testing of the Advanced Stirling Convertor (ASC). For this purpose, the Thermal Energy Conversion branch at GRC has been conducting extended operation of a multitude of free-piston Stirling convertors. The goal of this effort is to generate long-term performance data (tens of thousands of hours) simultaneously on multiple units to build a life and reliability database. The test hardware for operation of these convertors was designed to permit in-air investigative testing, such as performance mapping over a range of environmental conditions. With this, there was no requirement to accurately emulate the flight hardware. For the upcoming ASC-E3 units, the decision has been made to assemble the convertors into a flight-like configuration. This means the convertors will be arranged in the dual-opposed configuration in a housing that represents the fit, form, and thermal function of the ASRG. The goal of this effort is to enable system level tests that could not be performed with the traditional test hardware at GRC. This offers the opportunity to perform these system-level tests much earlier in the ASRG flight development, as they would normally not be performed until fabrication of the qualification unit. This paper discusses the requirements, process, and results of this flight-like hardware design activity.
NASA Glenn Research Center (GRC) has been supporting development of the Advanced Stirling Radioisotope Generator (ASRG) since 2006. A key element of the ASRG project is providing life, reliability, and performance testing of the Advanced Stirling Convertor (ASC). For this purpose, the Thermal Energy Conversion branch at GRC has been conducting extended operation of a multitude of free-piston Stirling convertors. The goal of this effort is to generate long-term performance data (tens of thousands of hours) simultaneously on multiple units to build a life and reliability database. The test hardware for operation of these convertors was designed to permit in-air investigative testing, such as performance mapping over a range of environmental conditions. With this, there was no requirement to accurately emulate the flight hardware. For the upcoming ASC-E3 units, the decision has been made to assemble the convertors into a flight-like configuration. This means the convertors will be arranged in the dual-opposed configuration in a housing that represents the fit, form, and thermal function of the ASRG. The goal of this effort is to enable system level tests that could not be performed with the traditional test hardware at GRC. This offers the opportunity to perform these system-level tests much earlier in the ASRG flight development, as they would normally not be performed until fabrication of the qualification unit. This paper discusses the requirements, process, and results of this flight-like hardware design activity.
We report the High-Luminosity Large Hadron Collider (HL-LHC) will deliver more than ten times the integrated luminosity of the previous runs combined. Meeting its stricter throughput requirements poses new challenges to the Trigger and Data Acquisition (TDAQ) systems of the LHC experiments. Introduced in the framework of the ATLAS experiment’s HL upgrade, the Global Trigger (GT) is a new subsystem which will perform offline-like algorithms on full-granularity calorimeter data. The implementation of the GT’s functionality is firmware-focused and is composed of three layers: multiplexing (or data aggregating), global event processing, and demultiplexing interface to the central trigger processor. Each layer will be composed of several, similar nodes, hosted on replicas of identical hardware, the Global Common Module (GCM), an ATCA front board which is designed to be adopted throughout the entire GT subsystem. This article proceeds from the TWEPP 2021 conference and presents the GCM hardware design, performed in 2020, and focuses on some key results of its extensive testing performed in 2021.
Abstract In the framework of the ATLAS experiment’s Phase-II Upgrade at the High-Luminosity Large Hadron Collider (HL-LHC), new and improved trigger hardware and algorithms will be implemented onto a single-level, 10 μs-latency architecture. The Global Trigger is a new subsystem which will bring event-filter capabilities by performing offline-like algorithms on full-granularity calorimeter data. The implementation of the functionality is firmware-focused and composed of several processing nodes, which are hosted on identical hardware, made up of an Advanced Telecommunications Computing Architecture (ATCA) front board, called Global Common Module (GCM), and a rear transition module (RTM), called Generic RTM (GRM). The GRM, which was developed to mitigate the risks deriving from the complex design and power management of the GCM, features an advanced Xilinx Versal Prime system-on-chip and can handle communication with the GCM and Front-End Link eXchange (FELIX) subsystem and trigger processors through 124 25.8 Gb/s transceiver links, for readout and control. Additionally, the GRM mounts a Low-Power GigaBit Transceiver (lpGBT) chip which enables emulation of the detector front-ends for integration tests. This paper presents the GRM hardware design and its testing.
Toxicity of plastic hardware containing biological space flight experiment
The final results are presented of the hardware verification task. The basic objectives of the various subtasks are reviewed along with the ground rules under which the overall task was conducted and which impacted the approach taken in deriving techniques for hardware self test. The results of the first subtask and the definition of simulation hardware are presented. The hardware definition is based primarily on a brief review of the simulator configurations anticipated for the shuttle training program. The results of the survey of current self test techniques are presented. The data sources that were considered in the search for current techniques are reviewed, and results of the survey are presented in terms of the specific types of tests that are of interest for training simulator applications. Specifically, these types of tests are readiness tests, fault isolation tests and incipient fault detection techniques. The most applicable techniques were structured into software flows that are then referenced in discussions of techniques for specific subsystems.
In this hardware project, continued from last year, the students developed ideas for a new grappling and docking mechanism that would be able to accommodate a very large initial misalignment (up to one half of the spacecraft radius) and simultaneously a large angular misalignment (up to 20 degrees) between space tug and space vehicle. The students were made familiar with the project by visiting TRW, where they could study the prototype of the NASA Orbiting Maneuvering Vehicle (OMV, since canceled). The students' objective was to design a model, built in the University machine shop, that would demonstrate the potential for much larger misalignments than was possible with the OMV.
Several items were found to be of immense value in the design and development of the Assembly Concept for Construction of Erectable Space Structures (ACCESS) hardware. The early availability of mock-up and engineering test hardware helped to develop the concept and prove the feasibility of the experiment. The extensive neutral buoyancy testing was invaluable in developing the procedures and timelines, proving that the hardware functioned as intended, and effectively trained the astronauts. The early involvement of the crew systems/astronaut personnel was extremely beneficial in shaping the design to meet the EVA compatibility requirements. Also, the early definition of coupled loads and on-orbit dynamic responses can not be overemphasized due to the relative uncertainty in the magnitude of these loads and their impact on the design.
There have been advances in magnesium alloy development that NASA has not taken into consideration for space hardware because of a lack of test data. Magnesium alloys offer excellent weight reduction, specific strength, and deep space radiation mitigation. Traditionally, magnesium has been perceived as having too poor of a flammability resistance and corrosion resistance to be used for flight. Recent developments in magnesium alloying has led to the formation of two alloys, WE43 and Elektron 21, which are self-extinguishing and significantly less flammable because of their composition. Likewise, an anodizing process called Tagnite was formulated to deter any concern with galvanic and saltwater corrosion. The Materials Science Branch at Kennedy Space Center is currently researching these new alloys and treatments to better understand how they behave in the harsh environment of space. Successful completion of the proposed testing should result in a more thorough understanding of modern aerospace materials and processes, and possibly the permission to use magnesium alloys in future NASA designs.