Search NASA⌕ Search

SEARCH · Search NASA

Results for “hydropower flexibility”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Applying Particle Swarm Optimization and Extended Kalman Filtering to Model Kaplan Generation Dynamics for Hydropower Systems

Variable renewable generation is increasing the need for hydropower plants to provide fast and flexible grid support, which places new demands on plant-level dynamic models used for monitoring, control, and operational decision-making. This need is especially important for hydroelectric systems, where turbine and generator dynamics are strongly coupled, nonlinear, and time-varying, making accurate real-time representation difficult. To address this problem, this paper develops a digital twin (DT) framework for a synchronous generator–Kaplan turbine system using an explicit separation of slow turbine dynamics and fast generator dynamics. The turbine subsystem is represented by a six-coefficient model, whose parameters are identified offline using particle swarm optimization, while the generator subsystem is updated online through an extended Kalman filter for real-time state and parameter estimation. These models are integrated within a closed-loop simulation that includes a proportional–integral–derivative–double-derivative governor and excitation system, allowing the DT to track plant behavior under realistic operating conditions. Unlike prior studies that treat turbine and generator modeling separately or rely mainly on simulated inputs, the proposed framework is validated using real operational data from a hydropower plant. Results show that the DT reproduces terminal voltage, active power, and reactive power with a normalized root mean square error of approximately 5%. This hybrid offline–online formulation constitutes the main contribution of the work, providing an adaptive and practically deployable DT for hydropower systems with direct relevance to control improvement, performance monitoring, and grid-support applications under high renewable penetration.

13 HYDRO ENERGY↗

Facets of hydro power and future trends in a Nordic Context

Hydropower technologies bolster high penetration of variable renewable energies (VREs) in the net zero emissions scenarios. Nevertheless, there are various challenges to meeting the ambitious goal, such as stability, reliability, resiliency, security, lack of reactive power, voltage support and inertia, large-scale storage deployment and coordination, interconnectedness, demand-side response, higher thermal cycles with increased start/stops, and inadequate Levelized Cost of Energy (LCOE) for system-wise VRE integration and profitability. This survey conducts a bottom-up analysis to unveil the opportunities to utilize hydropower facilities and disentangle the nested problem for intertwining design features, control algorithms, operation, optimization approaches, incentives, services, and market mechanisms using a three-pillar framework perspective: grid owners, power producers, and machine designers. The survey identified emerging trends in real-time and capacity markets, flexible power systems, and enhanced grid capabilities, including advanced voltage support and updated grid codes. These developments present significant opportunities for hydropower, such as achieving super-flexibility through hybridization, expanded reactive power capabilities, and advanced operational modes like a synchronous condenser and power adequator functionalities. These opportunities require novel design philosophies — including new winding, stator, and rotor configurations, optimized ventilation, and active cooling systems — to enhance performance under stressed grid and climate conditions. Finally, integrating climate and energy models for multi-basin optimization with finer spatial and temporal granularity enhances the planning accuracy for water management of hydropower while addressing environmental challenges. The review delivers helpful prospective suggestions and tools that would serve researchers, power engineers, and stakeholders in making decisions about hydropower technologies and services in 2050 and beyond.

13 HYDRO ENERGY↗

EverGREEN 2045: An Energy mix to Decarbonize Washington State

The Clean Energy Transformation Act transitions Washington State to 100% clean energy by 2045. As the future resource mix will likely include intermittent renewables, hydropower, and new, carbon-free, flexible technologies including advanced nuclear reactors and enhanced geothermal systems, we assess the cost and feasibility of the future resource mix with proprietary cost data from our industry partners for new technologies. For plausible future resource mix scenarios, we find that revenues are sufficient to cover variable operations and maintenance costs for most technologies, but capacity payments or power purchase agreements will be necessary for new, flexible resources to participate in the future resource mix.

clean energy, energy policy, energy transition, re↗

Leveraging Hydropower Multi-Sensor Data for Inference and Age-Informed Modeling

Increased demand of operational flexibility such as faster ramp up/down in generation, and more frequent start/stops are putting hydropower plants and their associated components in unprecedented stress. Consequently, these plants are at the high risk of extended and more frequent outage to accommodate unscheduled, and unexpected maintenance. Therefore, hydropower plants are in critical need of data driven and age-informed analysis for their regular and unscheduled operation. Yet not all hydropower plants are exhaustively equipped with sensors and/or measurement streams for their respective components – demanding solutions on how to detect, identify, and locate the cause of any event from the unobservable. Idaho National Laboratory (INL) analyzed the anonymized measurements and event records from the Hydropower Research Institute (HRI) to address this issue, as part of the Water Power Technologies Office (WPTO) funded one year multi-lab project. First, we investigated how time series of multiple sensor measurements can be leveraged to identify an event “root cause” as well as to develop an inference (i.e., estimate the unobservable) problem. INL also investigated how individual hydropower components’ reaction or response times vary across the pre-event, during event, and post-event conditions – enabling the hydropower dynamic models to be age-informed. Finally, the impact of clustering multi-sensor time series on short-term vibration prediction is analyzed. INL will present key findings from these analyses and recommend next steps for stakeholder adoption.

13 HYDRO ENERGY↗

Impact of Hydrological Data on Power System Operational Studies: Preprint

Hydropower is expected to play an important role in maintaining grid reliability and flexibility as the share of of variable renewable energy increases. While the current hydropower operational models have been studied and used widely, they haven't been updated for decades to meet new performance standards. For example, current steady state and dynamic models often neglect hydrological conditions, which may lead to unrealistic expectations when relying on hydropower for energy and ancillary services. To study this impact, a multi-timescale hydrological model was created by leveraging the National Renewable Energy Laboratory-developed Multi-timescale Integrated Dynamics and Scheduling (MIDAS) tool. Using MIDAS, we compare the impact of considering hydrological conditions in a day-ahead unit commitment (DAUC) schedule on the reduced 240-bus Western Interconnect (WI) test system under winter and summer case studies. We show that neglecting current hydrological conditions of hydropower plants in power system models can lead to an overestimation of hydropower capabilities, which could lead to power balancing issues. For example, power system DAUC simulation results of our reduced test system show that in the case where hydrological conditions are not considered in the model, an approximate 31% overestimation of hydropower capabilities occurs in the summer case and approximately 60% occurs in the winter case compared to what is available. Additionally, results show an underestimation of WI day-ahead power system generation costs by approximately $54M - $80M in the weekly summer scenario and $116M - $126M in the weekly winter scenario. This analysis helps to underscore the importance of considering hydrological data in power system operational studies.

ENERGY PLANNING, POLICY, AND ECONOMY,HYDRO ENERGY↗

Pumped Storage Hydropower Resource and Deployment Potential

There is growing interest in deploying new pumped storage hydropower (PSH) to meet grid needs for flexibility, reliability, and resiliency. This presentation describes how NLR resource assessment, cost modeling, and capacity expansion modeling are used to identify technical and economic PSH deployment potential and support industry decision-making on PSH investments. NLR's open data and tools demonstrate the vast technical potential of PSH on the order of 80 TW, and modeling shows economic PSH deployment under an attractive cost-value proposition.

13 HYDRO ENERGY↗

Methods for Assessing Opportunities for Ring Dam Pumped Storage Hydropower

There is growing interest in new pumped storage hydropower (PSH) deployment to provide a range of grid flexibility, reliability, and resiliency services under an evolving and uncertain future power sector. The National Laboratory of the Rockies develops open PSH resource assessment and cost modeling tools to help evaluate PSH deployment opportunities, and this report describes expansions to those tools to consider an additional PSH system configuration - ring-dam reservoirs built on flat topographical features that are constructed from roller-compacted concrete material. This reservoir type is common among current PSH proposals and requires new methods to identify sites with this reservoir geometry throughout the United States and characterize the associated dam cost. Cost characterization for ring dam reservoirs required collecting historical dam cost data for earthen, rockfill, and roller-compacted concrete dams and regressing equations that relate costs between alternative materials. The ring dam site identification algorithm follows a 5-step procedure to identify circular geometry reservoirs. Once ring dam reservoirs are identified, they are then paired with potential dry-gully reservoirs, and the full set of potential paired reservoirs is cost-optimized to produce a least-cost set of potential PSH sites with no overlapping reservoirs. The resulting analysis found 1,663 ring-dam to dry-gully systems in the contiguous United States that are lower cost than any overlapping dry-gully to dry-gully systems, 29 in Alaska, and none in Hawaii or Puerto Rico. These systems constitute 1.5 TW of capacity in the contiguous United States and nearly 29 GW in Alaska, demonstrating that under suitable topography and head, ring-dam systems can provide cost-effective PSH opportunities. The greatest density of these opportunities are found in the intermountain west where there are mesas and flat land at bases of mountain ranges, but continued work could incorporate additional site characteristics or consider more complex reservoir shapes to find additional PSH deployment opportunities.

13 HYDRO ENERGY↗

Hydropower Black Start: A Guidebook for Retrofitting Grid Dependent Hydropower

Not all United States (US) hydropower plants were designed to provide black start, but they are increasingly needed to uphold resilience in the evolving electric grid. This guidance is designed to help understand the minimal retrofits required for grid dependent hydropower (GDH) plants behind the point of interconnection (POI). For distribution connected hydropower plants or those with dedicated cranking paths, such upgrades can be sufficient for the plant to provide black start. For others, more coordination with the transmission system operator will be needed. This guidebook answers a number of questions relevant to retrofitting hydropower plants with black start capabilities. For example, the guidebook answers: • How flexible do the wicket gate controls need to be? • Who needs to do hydro governor model validation, why, and how? • How robust and flexible do the excitation and AVR controls need to be? • What protection settings need to be adjusted? • What relay(s) will need to be bypassed or overridden and at what risk? • What is the electrical energy demand of the station load or auxiliary power systems? • What should the strategy to energize transformer(s) along cranking path to address inrush currents be? • How should the critical load restoration be sequenced? In addition to outlining the specifications that hydropower plants need to meet for each component to be able to perform black start, this guidebook provides a set of case studies for specific upgrades needed at actual plants. Between the case studies of plants that have already performed black start retrofits and the examples of how this guidebook can be applied to scope future retrofits, five key themes have been identified for retrofit needs. 1. Protection needs “black start” mode: hydropower plants that are not designed with black start capabilities will have protections that prevent them from interconnecting to a “dead bus.” These protections will need to be overridden in every retrofit case and a separate black start mode should be established so that operators can safely switch between black start and grid connected modes, minimizing the risk to the plant. 2. Wicket gates need modern controls: digital governors accelerate the parameter tuning process and gate position sensors improve controllability, so plants with mechanical governors should be upgraded. Furthermore, a black start and islanding mode should be established for controls to maximize plant performance. 3. Robust excitation support: the DC system or excitation generator needs to be reliable enough to form and sustain the rotor electromagnetic field. These systems are typically undersized in plants that were not designed for black start, so they will need to be upgraded. 4. Turbine-governor model validation and operator training: validation of a standard hydro governor model is needed to characterize the dynamic response (i.e., inertial and primary frequency response) of the GDH. This is required for control development and old hydropower plants often have outdated or incorrect models. Operator training is also typically required to ensure the hardware retrofits are utilized correctly during the black start process. 5. Transformer and cranking path energization: any upgradation and control adjustment in front of the POI will depend upon the existing interconnection. Coordination with the transmission or distribution operator may be required.

13 HYDRO ENERGY↗

Impacts of Alternative Operations and Renewable Energy Deployment on Columbia River Hydropower

The Columbia River Treaty Tribes in the Pacific Northwest - the Nez Perce, Umatilla, Warm Springs, and Yakama - hold treaty-reserved fishing rights for the Columbia River, one of the world's most productive salmon rivers and a critical resource for these tribes. However, the tribes have expressed that current operating regimes of hydropower dams throughout the Columbia River Basin (CRB) do not fully account for tribal fishing rights and have negatively impacted fish populations. Four tribes acting together through the Columbia River Inter-Tribal Fish Commission (CRITFC)'s 2022 Energy Vision stated that current power system models often do not fully account for the many constraints faced by hydropower facilities in the CRB. As the deployment of variable renewable energy (VRE) like solar and wind continues to increase, power system flexibility will become increasingly important. As a result, there is a growing need to better understand the true capabilities of the hydropower generation fleet while accurately accounting for ecological constraints (Northwest Power and Conservation Council 2022). Understanding hydropower's role in a future grid with a higher share of VRE can inform water resources planning to address ecological needs. The goal of this study is to examine the impacts of alternative hydropower operation rules and weather variability on hydropower generation and grid operations in VRE and transmission infrastructure deployment scenarios. The study evaluates how hydropower scheduling practices can reduce ecological impacts to the region's salmon populations. More specifically, the study examines the impact of today's dam water release rules (called "adjusted base water rules" in this study) and new, ecologically informed water release rules (called "ecosystem water rules" in this study) on two VRE scenarios (current renewable energy levels and higher renewable energy levels) using six weather years for each scenario (2008-2013). CRITFC developed the ecosystem water rules, which capture a portion of the changes they recommend for CRB hydropower operations. These analyses use a water resource planning model (OASIS) and a production cost model (PLEXOS) to simulate CRB reservoir cascade and Western Interconnection power grid operation.

13 HYDRO ENERGY↗

Post-2026 Environmental Impact Statement Rate Analysis for the Colorado River Storage Project

The Glen Canyon Dam (GCD) is a principal power-generating asset within the Colorado River Storage Project (CRSP), accounting for approximately 70–80% of CRSP power production over the past two decades. In June 2023, the U.S. Bureau of Reclamation (Reclamation) issued a Notice of Intent to prepare an Environmental Impact Statement (EIS) outlining operational guidelines and strategies for Colorado River Basin reservoirs after 2026 (Reclamation, 2023). Power generation is among CRSP’s statutory purposes under the Colorado River Storage Project Act of 1956 (U.S. Congress, 1956). Assessing how alternative policy frameworks affect CRSP power production and the resulting electricity rates for U.S. customers is therefore essential to inform decision-making. This report evaluates projected electricity rates and the market value of electricity from the Western Area Power Administration (WAPA) CRSP GCD under multiple post-2026 policy scenarios to support Reclamation’s EIS development. Results from advanced econometric and machine learning models indicate that the Enhanced Coordination alternative (EnhanCoor), Maximum Operational Flexibility alternative (CCA), and Supply Driven - 55 alternative (SD55) alternatives yield more favorable hydropower generation and capacity outcomes, which are objectives outlined in Reclamation’s documentations (Reclamation, 2007; Reclamation, 2016). Specifically, these scenarios are associated with higher electricity production, lower projected rate trajectories, and greater economic value to the U.S. power system from CRSP generation. The remaining five scenarios generally produce lower generation, higher rate trajectories, and reduced long-term market values.

13 HYDRO ENERGY↗

Digital Twin User Guide for Chelan County Public Utility District

This user manual offers a comprehensive guide for developing a Digital twin (DT) of a Kaplan turbine at Chelan County Public Utility District (Chelan PUD) using neural networks. As variable renewable generation expands, hydropower units must operate with optimal efficiency and stability. For Kaplan machines, this flexibility is achieved through coordinated control of guide vane (wicket gates) opening and runner blade pitch, which amplifies the plant’s inherent nonlinear behavior and challenges traditional physics-only modeling. The efficiency of the Kaplan turbine varies with different combinations of the guide vans (wicket gate) opening and the blade angle. Each guide van opening and blade angle has a corresponding highest efficiency point, forming a cam relationship that represents the optimal combination.The discharge of a hydraulic turbine is controlled by the opening angle of the guide vans. Therefore, for each value of head, there is a certain guide van opening and blade angle that corresponds to the highest efficiency. For a given head, different combinations of the guide van opening and blade angle have different efficiencies. Therefore, coordinate cam curves are used to describe the relationship between the wicket gate opening and blade angle with different water head. To address these challenges, the manual details a data-driven modeling and learning workflow centered on structured neural networks. The approach is designed to forecast critical operational variables—discharge flow, net head, penstock (or scroll-case) pressure, and generator electrical outputs—by leveraging real-time inputs such as the generator power control setpoint, exciter field current and field voltage, together with hydromechanical commands (e.g., gate position and, when available, runner blade-pitch angle). The neural models are trained and validated on operational data from a Kaplan unit operated by Chelan PUD, demonstrating that the structured NN architecture can learn the coupled gate–blade–electrical dynamics. The result is a robust DT that improves situational awareness and supports data-informed decision-making for Chelan PUD’s Kaplan turbine operations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Optimize the Autonomous Sensor Fish Device for Understanding Interactions of Aquatic Animals with Marine and Hydrokinetic and Hydro Systems (CRADA 476) Final Report

This project at the Pacific Northwest National Laboratory (PNNL) enhances our understanding of how aquatic life interacts with marine renewable energy (MRE) and hydropower systems through the development and testing of advanced sensor technology. The Marine Sensor Fish (MSF) and its smaller variants, the Sensor Fish Mini (SF Mini) and Flexible Sensor Fish (FSF), measure critical environmental stressors, such as shear forces, pressure changes, and strike impacts, that are essential for assessing the risks posed by energy devices, including tidal turbines, hydropower installations, and other MRE infrastructure. Rigorous field testing has shown that these tools are effective in capturing detailed data on turbulence, pressure variations, strike impacts, and other stressors near these devices, providing valuable insights into the conditions faced by aquatic species. Economically, these tools offer renewable energy developers a practical solution for streamlining environmental assessments and ensuring regulatory compliance, ultimately reducing costs associated with evaluating and mitigating ecological impacts. This research also benefits the public by promoting the growth of renewable energy sources that protect aquatic ecosystems, advancing both sustainable energy production and environmental stewardship.

13 HYDRO ENERGY↗

Energy, economic, and environmental tradeoffs at run-of-river hydropower facilities

Hydropower’s ability to quickly adapt to variability from wind and solar generation by fluctuation flow rates can allow the electricity grid to integrate more renewable capacity. However, these rapid flow fluctuations, required to meet variability needs, can negatively impact aquatic ecosystems. In this study, we quantified energy-economic-environment tradeoffs at five conventional hydropower facilities (i.e. hydropower produced ad a dam on a river channel) across the United States to identify a mix of operational regimes that can provide flexibility to support variable renewable energy integration and environmental protections. Model results show a range of ability to meet demand from 4.7% to 97.8% depending on which case study is considered. Additionally, when modeling the case study facilities on a range of RoR conditions, allowing a % of inflow as discharge, we found the range of 140–200% of inflow allowed as discharge lead to lowest environmental impact while meeting the highest amount of demand. Our sensitivity analysis results demonstrated the Richard-Baker Flashiness Index, used to measure flowrate changes, and Revenue, were negatively correlated with the percent of hydropower generation within the defined Regional Energy Deployment System balancing area (i.e. region in which energy demand and energy supply is balanced based on the Regional Energy Deployment System model) yet positively correlated to the variable renewable energy generation percentage in the defined balancing area. In conclusion, our results suggest hydropower operations can aid in increasing renewable energy generation while limiting environmental impacts when considering a holistic analysis of energy-economic-environment tradeoffs.

Economic impact↗

Impacts of Renewable Energy and Green Hydrogen Policies on Uttar Pradesh's Power Sector Future: Additional Modeling Scenarios to Explore Hydrogen Flexibility [Slides]

This slide deck is part of a broader program focused on supporting Indian states with long-term power system planning. More information about this program can be found at the National Renewable Energy Laboratory's "Supporting India's States With Renewable Energy Integration" web page at https://www.nrel.gov/international/india-renewable-energy-integration.html. The power sector in Uttar Pradesh, India's most populous state, is poised to transform over the next few decades due to a combination of national and state-level policies impacting both the supply and demand of electricity. The Government of Uttar Pradesh has policies and plans to develop in-state solar PV, pumped storage hydropower, and green hydrogen. Power system policymakers and utilities in Uttar Pradesh are faced with the challenges of planning a system that incorporates increasing amounts of renewable energy and storage resources, meets rising electricity demand due to economic development and green hydrogen production, and satisfies operational and reliability requirements. To support these various objectives, the National Renewable Energy Laboratory (NREL), RMI, and the Uttar Pradesh New and Renewable Energy Development Agency (UPNEDA) evaluated the least-cost pathways for the state's power sector through 2050. NREL developed a capacity expansion model that identifies investment and operational decisions for every year (2024-2050) for all of India, with detailed representation for the state of Uttar Pradesh, which can provide a framework for recurring planning studies. The purpose of this slide deck is to supplement the main study (published in May 2024) with additional modeling scenarios to explore hydrogen flexibility.

08 HYDROGEN↗

Reliability and resilience of environmental flows under uncertainty: reconsidering water year types and inconsistent flow requirements in California

Abstract Environmental water allocation in California is a complex legal process involving various government agencies and stakeholders. E-flow requirements can be based on annual runoff typologies called water year types (WYTs), which dictate water volume, timing, and duration. In this study, we examined hydropower licensing documents of the major water and power projects in the Central Sierra Nevada to catalog e-flow requirements by WYT. In this study case, we identify how WYT classification systems and categories vary across and within different basins. Additionally, we assessed the impacts of climate change on hydrology, the frequency of WYTs identified, and the reliability and resilience of e-flows using future projections (2031–2060) of 10 Global Circulation Models (GCMs). We then propose a potential adaptation strategy using a 30 year moving percentiles approach to recalculate WYTs. We identified eight WYT classifications systems were identified, and their WYT distributions statistically significantly changes across all GCMs, even though most GCMs indicate no statistically significant change in hydrology. Disparities in future impacts are observed among and within hydropower projects, with some river reaches showing negative impacts on reliability and resilience. The adaptation strategy can generally boost resilience and improve reliability, but simply updating existing WYT thresholds without flexible regulatory frameworks reconsidering WYTs and e-flows thresholds, may not yield substantial improvements. Challenges in managing e-flows in California within regulatory and hydroclimatic contexts are intricate due to the lack of standardized approaches, leading to inconsistencies and potential conflicts among stakeholders, that will likely be exacerbated by climate change. Thus, we emphasize that targeted, site-specific, and adaptive management strategies are crucial, besides the need for a harmonized and consistent approach to defining and applying WYT categories and methods and/or e-flow assessments.

Environmental Sciences & Ecology↗

Autonomous sensor suite for evaluating fish-turbine interactions and environmental impacts in marine renewable energy and hydropower

Marine renewable energy (MRE) harnesses ocean-based resources such as waves, tides, currents, and thermal or salinity gradients for sustainable power generation. It has the potential to complement existing renewable resources, support remote communities, and contribute to decarbonization efforts. However, understanding the hydrodynamic forces created by MRE devices and their impacts on marine life is critical for responsible deployment. Here, to address these concerns, advanced sensor devices, including the Marine Sensor Fish (MSF), Sensor Fish Mini (SF Mini), and Flexible Sensor Fish (FSF), were developed to measure interactions between aquatic organisms and MRE systems. This paper details the design, manufacturing, calibration, and field deployment of these sensor suites, highlighting their ability to capture key physical stressors such as shear forces, pressure changes, and collision impacts. The MSF successfully evaluated turbine interactions at a tidal turbine in the Salish Sea, capturing data on turbulence, collision impact, and pressure gradients. The SF Mini validated hydrodynamic conditions in scaled hydraulic models, supporting computational fluid dynamics simulations. The FSF, with its flexible silicone body, measured species-specific impacts in turbulent environments. This research demonstrates the potential of Sensor Fish technology to advance sustainable marine energy systems by reducing biological impacts and informing environmentally sustainable designs.

Ecological impacts↗

HydroForecast Long-term: Improving hydropower’s resilience to climate change through accurate climate-scale

With hydrologic patterns and water availability across the globe shifting due to climate change, advancements in hydrologic prediction systems can help significantly reduce the uncertainties that utilities and water supply entities have in their decision making. Understanding and estimating hydrology at the climate scale is critical for managing water resources under changing climate scenarios. This project focuses on integrating state-of-the-art neural network modeling with downscaled climate projections to deliver the reliable water supply projections decades into the future to meet an urgent need from hydropower operators and water utilities. In this Phase 1 DOE SBIR proposal, we developed and validated a theory-guided neural network model, HydroForecast Long-term, for climate-scale hydrology and implemented the model within existing HydroForecast infrastructure. HydroForecast Long-term combines the most accurate streamflow modeling system with a flexible and scalable data architecture to generate water supply projections out to the year 2100. This report illustrates that we have achieved our four objectives: 1) create a prototype of HydroForecast Long-term, building the neural network prediction model, 2) build an automated data input pipeline that processes large amounts of data from the latest global temperature and precipitation climate models; 3) benchmark the accuracy of the hydrologic model over the recent two decades over a large set of diverse basins, and 4) create a set of output visuals and summary metrics informed by customer feedback that connect the data to critical decision points. This work empowers water users to make data-informed decisions supporting a resilient, renewable-powered grid and water system. The results advance the Department of Energy’s mission by addressing critical gaps in water supply planning under climate change.

13 HYDRO ENERGY↗

Hybridization Assessment of Trybrid Pumped Storage Hydropower System—Part 1: A Case Study of Corral Summit

This report is a part of the deliverables for technical assistance provided to Cat Creek Energy for the Coral Summit Trybrid (Triple Hybrid-Pumped Storage Hydropower, Battery Energy Storage System, and photovoltaic solar energy) energy project. This report explores the operational benefits and challenges of hybridizing an open loop PSH (200MW) located at Mackay, Custer County, Idaho with solar PV (Ground mount 300MW and floating 40MW) and battery (720MWhr). This document reports two activities performed as a part of the hybridization assessment task 1) optimal resource allocation and energy management strategy, and 2) power quality and reliability assessment. From optimal resource allocation and energy management strategy (activity 1), the following key findings can be observed: • Conventional PSH (CPSH) with two reversible pump turbines and separate penstocks can provide required flexibility equivalent to that from two ternary PSH with separate penstock. With single unit CPSH, upper reservoir head cannot be maintained accurately, the variation of water level is rapid and pump mode flexibility is not available. These disadvantages can be overcome by single unit TPSH. However, using two CPSH units with separate penstocks also overcome these disadvantages with the formation of the hydraulic short circuit between two conventional units. • Flooding of the lower reservoir is a severe concern when considering continuous operation for black start. This limits the duration of continuous operation from PSH alone to around 50 hours. Due to the complementary PV and battery action, the duration of continuous operation and smooth power output can be extended. • An optimization problem is framed that maximizes the power output on an hourly basis while minimizing constraint violations and respecting seasonal variations of solar PV and load profiles . Two value streams, arbitrage and baseload generation are served by this profile. It was uncovered that for smooth power output during regular operation, PV curtailment will be required, or the battery capacity needs to be increased above 90MW to accommodate additional PV. From power quality and reliability assessment (activity 2) the following takeaway points can be observed: • The Trybrid, when integrated at the Lost River bus, and limited to 250MW in generation mode and -150MW in the pump mode, causes no violation of voltage or flow.

13 - HYDRO ENERGY↗