Search NASA⌕ Search

SEARCH · Search NASA

Results for “infrastructure assessment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Sovereign Credit Rating Processes Adapted to Critical Infrastructure Cyber Risk Assessment

United States critical infrastructure entities are increasingly targeted by motivated and capable threat actors and must be prepared to assess and treat a diverse range of cyber risks. Consequently, this necessitates some form of analytical process to evaluate risks and inform cyber security investment decisions. A potential solution for structuring cyber risk evaluation exists within the field of sovereign credit ratings – where agencies employ mature approaches that integrate quantitative and qualitative data to produce a singular value of assessment. Adapting such approaches, we present a novel criterion and methodology for measuring and communicating the likelihood element of cyber risk. The methodology is composed of three sequential phases: a quantitative baseline organized by distinct capability frames, a bounded qualitative adjustment per frame, and a greater-bounded qualitative adjustment spanning the entire process. The process culminates in publication of a cyber capability rating that communicates a critical infrastructure entity’s ability and willingness to mitigate discontinuous function due to cyberattack.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

MASTODON: An Open-Source Software for Seismic Analysis and Risk Assessment of Critical Infrastructure

Seismic analysis and risk assessment of safety-critical infrastructure like hospitals, nuclear power plants, dams, and facilities handling radioactive materials involve computationally intensive numerical models and coupled multiphysics scenarios. They are also performed in a strict regulatory environment that requires high software quality assurance standards, and in the case of safety-related nuclear facilities, a conformance to the American Society of Mechanical Engineers Nuclear Quality Assurance (NQA-1) standard. This paper introduces the open-source finite-element software, MASTODON (Multi-hazard Analysis of Stochastic Time-Domain Phenomena), which implements state-of-the-art seismic analysis and risk assessment tools in a quality-controlled environment. MASTODON is built on MOOSE (Multi-physics Object-Oriented Simulation Environment), which is a highly parallelizable, NQA-1 conforming, coupled multiphysics, finite-element framework developed at Idaho National Laboratory. MASTODON is capable of fault rupture and source-to-site wave propagation using the domain reduction method, nonlinear site response, and soil-structure interaction analysis, implicit and explicit time integration, automated stochastic simulations, and seismic probabilistic risk assessment. When coupled with other MOOSE applications, MASTODON can also solve strongly and weakly coupled multiphysics problems. This paper presents a summary of the capabilities of MASTODON and some demonstrative examples.

42 ENGINEERING↗

Impact of hydropower availability on resource adequacy of the United States western interconnection

Hydropower is a key energy source in the western interconnection of the United States, comprising about 25% of the annual installed nameplate capacity in 2020. However, its generation is increasingly impacted by changing hydrological conditions, operational constraints, environmental factors, water availability, and aging dam infrastructure. Assessing hydropower availability and resource adequacy is valuable for shaping energy policies and infrastructure requirements. In this study we evaluate the sensitivity of resource adequacy in the Western Interconnection to the unavailability of hydropower plants, under a wide-ranging set of 16,384 hydropower loss scenarios derived from a combination of 14 major hydrologic regions. Although a complete loss of hydropower capacity in any region is unlikely, studying such scenarios helps in identifying hydrologic regions most critical for maintaining resource adequacy. So, we identify key hydrologic regions with disproportionately large adequacy impacts relative to their installed hydropower capacity and study compounding effects between regions using classification and regression trees. Even after controlling for total installed capacity, we find that hydropower resources in the Pacific Northwest contribute the most to interconnection-wide adequacy outcomes, with resources in Northern California and the Desert Southwest providing more moderate incremental contributions.

13 HYDRO ENERGY↗

MRCI Task 4: Evaluating Regional Infrastructure Technical Summary Report

The infrastructure required to enable carbon capture and sequestration (CCS) goes beyond the equipment and materials needed to capture, transport, and store carbon dioxide (CO2) but includes people and policy that make CCS feasible. The Infrastructure Assessment task of the Midwest Regional Carbon Initiative (MRCI) seeks to determine the infrastructure requirements for the MRCI study area through four activities: • Infrastructure Readiness: Strategizing the buildout of capture, transport, and storage infrastructure in the Midwest, Northeast, and Mid-Atlantic Offshore. • Site Readiness: Determining the CCS readiness of each state in the MRCI region in the categories of subsurface readiness; infrastructure readiness; regulations, permitting, and incentives; and social dynamics. • Jobs, Economics, and Social Characteristics: Quantifying the economic potential, job opportunities, and training opportunities for CCS as well as the social characteristics of the region with a focus on energy and environmental justice (EJ) issues. • Policy and Regulations: Providing an updated accounting of the CCS-relevant policy and regulations in the MRCI region.

CCUS,Carbon storage,Midwest,Midwest Regional Carbo↗

Public water supply infrastructure extensification and diversification in surface waters is insufficient to meet future demands in Texas

The data were developed to evaluate the capacity of existing and potential new surface water supply infrastructure to meet projected public water demands across districts in Texas under multiple future socioeconomic and climate scenarios. The database integrates hydrologic, water quality, infrastructure, energy, cost, demographic, and demand-projection information for candidate surface water supply locations. Candidate sites include stream reaches, waterbodies, reservoir surplus locations, and potential new reservoir sites. Water availability is characterized using historical and projected flow conditions, while site suitability is evaluated using five indicators: Water Availability Index (WAI), Water Quality Index (WQI), Energy Requirement Index (ERI), Water Treatment Cost (WTC), and Water Infrastructure Cost (WIC). The datasets include statewide candidate-site information, district-level demand projections under Shared Socioeconomic Pathways (SSPs), runoff-based allocation constraints, climate-stress metrics, and optimization outputs evaluating alternative infrastructure planning strategies. Optimization results compare Business-as-Usual (BAU) and All Surface Water (AllSW) demand-management approaches under both scaled and fixed cost-cap strategies. Associated validation datasets provide district-level feasibility assessments, infrastructure selection outcomes, cost-cap utilization, demand satisfaction metrics, and constraint diagnostics. Additional datasets quantify projected changes in storage and flow conditions as well as water availability stress for both existing and newly selected intake locations under the SSP5 scenario for mid-century and late-century climate conditions. Together, these datasets support assessment of the extent to which surface-water infrastructure expansion and diversification strategies can satisfy future public water demands while accounting for hydrologic, economic, and planning constraints across Texas. Dataset(s) Description Dataset_preoptimization.xlsx Comprehensive pre-optimization dataset containing candidate water-supply sites and associated hydrologic, water-quality, infrastructure, climate, demographic, runoff, and demand-projection variables used as inputs to the optimization analyses. Includes variable descriptions and the full statewide candidate-site database. District_level_site_selection.zip - Compressed archive containing all SSP-specific district-level optimization result files MESIO_ssp1_results.xlsx District-level site selection results for SSP1 (MESIO). Includes variable descriptions, BAU and AllSW site-selection results under scaled and fixed cost strategies, and district-level validation diagnostics. MESID_ssp2_results.xlsx District-level site selection results for SSP2 (MESID). Includes variable descriptions, BAU and AllSW site-selection results under scaled and fixed cost strategies, and district-level validation diagnostics. LCMRD_ssp3_results.xlsx District-level site selection results for SSP3 (LCMRD). Includes variable descriptions, BAU and AllSW site-selection results under scaled and fixed cost strategies, and district-level validation diagnostics. IRDev-Low_ssp4l_results.xlsx District-level site selection results for SSP4-Low (IRDev-Low). Includes variable descriptions, BAU and AllSW site-selection results under scaled and fixed cost strategies, and district-level validation diagnostics. IRDev-High_ssp4h_results.xlsx District-level site selection results for SSP4-High (IRDev-High). Includes variable descriptions, BAU and AllSW site-selection results under scaled and fixed cost strategies, and district-level validation diagnostics. RSIM_ssp5_results.xlsx District-level site selection results for SSP5 (RSIM). Includes variable descriptions, BAU and AllSW site-selection results under scaled and fixed cost strategies, and district-level validation diagnostics. tx_hydrological_stress.xlsx Hydrological stress dataset for existing and newly selected intake locations. Includes projected mid-century and late-century changes, gain/loss classifications, planning strategy information, and accompanying variable descriptions. Also includes water-stress metrics derived from historical and projected low-flow conditions.

Okoye, Perpetua I. (ORCID:0000000215545033)↗

RTN-124: Photometric Redshifts for the Vera C. Rubin Observatory Data Preview

We present the photometric redshifts (photo-z) inferred using algorithms implemented in the Redshift Assessment Infrastructure Layers (RAIL) for the NSF-DOE Vera C. Rubin Observatory Data Preview 2 (DP2). We produce a compilation of reference redshift catalog using spectroscopic, grism and many band photometric redshift dataset hosted on the LIneA Photo-z Server. We curate training and testing set for assessing the scientific and technical performance of Rubin photo-z. The algorithm applied to the object catalog are FlexZBoost, BPZ, kNN, GPz, DNF and TPz; with a combination of 6-band and 4-band photo-z depending on availability of u and y photometry. The redshift point estimates and uncertainty estimation in tabular format through the Large Survey DataBase (LSDB).

79 ASTRONOMY AND ASTROPHYSICS↗

Electric Vehicle Infrastructure Projection Tool (EVI-Pro)

This presentation includes results from the second California installment of EVI-Pro. Pursuant to California Assembly Bill 2127, evolving market and technology conditions warrant updating this statewide infrastructure assessment at least every two years. EVI-Pro has been updated to consider California's 2030 goal to have 5 million zero emission vehicles (ZEVs) on the road by 2030. CEC and NREL with the support of UC Davis and other state agencies, have set out to refine EVI-Pro to reflect increasing PEV market share, evolving vehicle and charging technology, and observed charging behavior.

ADVANCED PROPULSION SYSTEMS,ENERGY STORAGE↗

Integrated Model of Models for Global Flood Alerting

A dramatic increase in frequency of minor to major flooding since 2000 has caused significant economic losses across the world. To mitigate and recover from these losses, actions have been taken to build resilient communities and infrastructures, specifically, by providing situational awareness in near real-time about flood impacts to enhance response and recovery efforts. Several hydrologic and hydraulic flood models are available at various spatial and temporal resolutions to forecast flood events at regional to global scale. Given the global coverage of two operational flood models – GloFAS (Global Flood Awareness System) and GFMS (Global Flood Monitoring System), the purpose of this project is to implement a Model of Models (MoM) approach to integrate the outputs from these two models to classify flood severity at watershed level worldwide, and send alerts based on severity similar to the USGS PAGER (used for severity alerting and impact analysis for earthquakes) to flood impacted communities. The alerts containing flood impacts and severity information will be disseminated through the DisasterAWARE platform, operated by the Pacific Disaster Center (PDC), that provides global multi-hazard alerting and Situational Awareness information to the emergency management community and public. The current version of the MoM approach was implemented for a case study flood event that occurred during January and February of 2020 in South and Central Africa. The findings of the case study event reveal that the approach is effective in identifying potential flood impact areas and the spatio-temporal variation of flood severity, flood depth and extent at watershed level, which will be used to assess infrastructure and societal impacts using earth-observation data and for alerting.

Kar, Bandana↗

Electric Vehicle Supply Equipment (EVSE) Site Assessment Report for the U.S. Army Corps of Engineers Chena Site Near Fairbanks, Alaska

This report presents an analysis of the requirements for charging station installation and electric vehicle operation at the US Army Corps of Engineers - Chena Site, located in a cold weather climate in the Fairbanks North Star Borough, AK. The report includes findings from a site visit, and a detailed electric vehicle (EV) charging site plan with cost estimates. Cost for three 50-ampere pedestal chargers located on the edge of the existing parking lot is estimated at $\$$53,100, and the cost of three 80-ampere chargers is estimated at $\$$89,400. The authors did not assess the cost of a heated garage. The USACE Chena site reaches extreme cold temperatures of -40 Degrees Celsius (-40 Degrees Fahrenheit) and below in a typical winter, often for days on end. Considerations of operating EVs as well as electrical vehicle supply equipment (EVSE) at this site can be applicable to other cold or extremely cold locations. Interviews with EV users in cold climates and a literature review indicated that EVs operate well but have significantly decreased range compared to 21 Degrees Celsius (70 Degrees Fahrenheit) operations. Some strategies such as prewarming the vehicle while it is plugged in and using heated seats and steering wheel instead of cabin heat, can improve cold weather performance. Storing the EV in a garage would mean the battery and cabin are automatically preheated, the battery would not age as rapidly as when the vehicle is stored outside, and problems with charging the vehicle are less likely. Lowest temperate-rated Electric Vehicle Supply Equipment (EVSE), as electric vehicle chargers are known as, are rated to -40 Degrees Celsius (-40 Degrees Fahrenheit), and sometimes malfunction. No EVSE is rated to the temperatures that USACE Chena site experienced for more than a week in winter 2023-4, of -50 Degrees Celsius (-45 Degrees Fahrenheit) and which are typical for the area. If reliability is a must, entities may want to consider a heated garage to minimize potential problems with charging equipment. There is a companion technical report to this titled "Electric Vehicle and Charging Infrastructure Assessment in Cold-Weather Climates: A Case Study of Fairbanks, Alaska" that examines the data on EV and EVSE cold-weather functionality in more detail. (Esparza, Truffer Moudra, and Hodge 2024).

33 ADVANCED PROPULSION SYSTEMS↗

Modeling and Calibration of Supplier Selection Problem in Freight Agent-Based Simulations

Freight transportation modeling often struggles with data limitations, especially in accurately representing complex supplier selection processes and their impact on network flows. This research addresses this critical gap by developing a large-scale, calibrated agent-based model for supplier selection, complemented by a probabilistic heuristic for international shipments. Our approach integrates trade relationships between industry sectors, transportation costs, and a supplier-rating model adapted from existing literature. The model’s core objective is to minimize the discrepancy between modeled and observed commodity flows while ensuring a close match to regional shipping distance distributions. Implemented and tested across four major U.S. metropolitan areas—Atlanta, Chicago, Dallas–Fort Worth, and Los Angeles—the model demonstrates high fidelity in replicating observed freight patterns. Key findings reveal consistent alignment with national shipping distance trends and highlight significant spatial variations in commodity trade assignments and demand across the study regions. This behaviorally informed and transport-sensitive framework is designed to approximate real-world decision making, providing a robust tool for policymakers and planners to evaluate targeted interventions, assess infrastructure investments, and enhance supply chain resilience in the face of disruptions.

Ismael, Abdelrahman (ORCID:0000000303712110)↗

Ground-motions site and event specificity: Insights from assessing a suite of simulated ground motions in the San Francisco Bay Area

This article presents the results of a research that is part of a larger collaborative effort between the Lawrence Berkeley National Laboratory and the Pacific Earthquake Engineering Research Center, funded by the US Department of Energy Office of Cybersecurity, Energy Security and Emergency Response. The main objective of this study is to assess a suite of near and far-field simulated ground motions obtained from 20 realizations of an M7 Hayward Fault earthquake in the San Francisco Bay Area, California USA, and inform the selection of rupture simulation parameters leading to strong motions. To this aim, comparisons are conducted with NGA-W2 and directivity ground-motion models and a selected population of records. An archetypal steel moment-resisting frame is utilized to assess infrastructure response distributions. The analyses carried out for each simulated event and subdomain with consistent properties in terms of shallow shear-wave velocity proved to be instrumental for better interpreting the differences between simulated motions and empirical models. The main reasons identified for variances between simulations and empirical relationships included (1) directivity effects fully captured by the simulations across the full breadth of rupture models; (2) site vicinity to ruptures that incorporate large-slip patches, particularly if these are in the forward-directivity direction; and (3) presence of geologic structures that can “trap” seismic waves and produce ground motions with large amplitude and long signal duration. The analyses carried out in this work provide a path for interpreting ground-motion site and event specificity obtained from a suite of physics-based simulations, differing only in the rupture model characterization, to inform the selection of simulation scenarios for site-specific engineering analyses under strong excitations. Evidence from this work points to the possibility that current hazard models may underestimate ground-motion intensities in areas where the combined effect of directivity and site conditions results in large ground-motion amplitudes.

58 GEOSCIENCES↗

Community Planning for Solar: Compiling a Community Solar Action Plan

This document provides an annotated outline for a Community Solar Action Plan. This document is designed to assist community officials, volunteers, and regional planning agency staff in preparing a draft Community Solar Action Plan for a municipality, community, or other jurisdiction. Preparing a Community Solar Action Plan is the fifth step in the Community Planning for Solar process (ag.umass.edu/solarplanning). The plan is intended to be the culmination of the planning process. The contents of the plan will include summaries of information gathered as part of foregoing steps in the process, including completion of a Solar Resource and Infrastructure Assessment, administering of a Community Solar Survey, interpretation of survey results, and review of Solar Financing and Ownership Options and tools. Once the Community Solar Action Plan has been drafted, it should be reviewed by municipal board and commission members and presented at an open community forum. Any important comments or revisions can be incorporated before the final Community Solar Action Plan is approved and implemented. The approved Community Solar Action Plan is a living document that guides community solar planning action over time. As conditions change, new information becomes available, or actions progress over the life of the plan, adjustments may be necessary to maintain the plan's relevance. The Monitoring, Evaluating, and Updating Your Community Solar Action Plan fact sheet (Step 6, Item a) describes some things to consider when updating the Community Solar Action Plan over time.

14 SOLAR ENERGY↗

Site Selection and Cost Estimation of Pilot-Scale CO2 Saline Storage Study in the Gulf of Mexico

Presentation at NETL Carbon Management Project Review Meeting held in Pittsburgh, Pennsylvania, August 15–19, 2022. The presentation provides a high-level overview of initial conceptual analysis evaluating site selection, geologic assessment, infrastructure, and project cost considerations associated with the development of pilot-scale CO2 storage projects in the offshore Gulf of Mexico.

Wijaya, Nur↗

The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure; A Nationwide Assessment

Ambitious federal clean goals, along with historic investment in American manufacturing, have put the United States on track to see 30-42 million light-duty electric vehicles (EVs) on the road by 2030. Now, a groundbreaking study from the National Renewable Energy Laboratory (NREL) has estimated the EV charging infrastructure needed nationwide to support a sweeping transition to electrified transportation. The study, titled "The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure," estimates the number, type, and location of the chargers needed to create a comprehensive network of EV charging infrastructure. Its use of proprietary NREL software tools and sophisticated analysis have resulted in a nationwide infrastructure needs assessment with a never-before-seen level of detail - one that takes into account the different ways Americans travel, from running errands to taking road trips, and can adjust to changing circumstances as EV adoption rates change over time.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Accelerated Assessment of Critical Infrastructure in Aiding Recovery Efforts During Natural and Human-made Disaster

Relief and recovery from disasters (both natural and human-made) require a coordinated approach across several federal and state government agencies. In order to achieve optimal resource allocation and deployment of first responders, accurate and timely assessment of the impact and extent of destruction are the cornerstones to any recovery effort. Ideally, this knowledge should be gathered and shared within the first 0-24 hours (termed as "Acute Phase" by the U.S. CDC guideline) for informed decision-making. But achieving this poses significant challenges for the data collection and data harmonization processes, particularly when voluminous data are being generated from diverse and distributed sources during the disaster responses. To this end, this work developed a scalable and efficient workflow to dynamically collect and harmonize crowd-sourced geographic multi-modal data, and then assess critical infrastructure (CI) damaged during disaster events. We demonstrate the application of our framework with two real-world experiences in addressing post-disaster recovery efforts - for the Bahamas (Natural - due to Hurricane Dorian, 2019) and Beirut (Human-made - due to explosion caused by the ammonium nitrate stored in a warehouse, 2020). We have illustrated that a coordinated effort is needed for planning as well as for execution to achieve informed decision making.

Thakur, Gautam Malviya↗