Search NASA⌕ Search

SEARCH · Search NASA

Results for “injection schedule”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Utah FORGE: Well 16A(78)-32 Drilling Data

This dataset includes survey data, drilling data, daily reports, summaries of daily operations, and rig photos from the drilling of Utah FORGE well 16A(78)-32, which is a highly deviated deep well. It was completed 60 days ahead of schedule. Rig move in began 10/22/2020 and drilling commenced on 10/30/2020, and total depth was reached on 12/18/2020. Drilling was followed by a diagnostic fracture injection test (DFIT), logging, and circulating casing. The rig was released on 1/12/2021. The upper part of the well was drilled vertically through approximately 4,700 feet of sediments before penetrating into high strength, crystalline granite. The well was deviated at a 65 degree angle from vertical after reaching a depth of 6,000 ft. This angle was maintained for the remainder of the well's trajectory. The well ultimately reached a true vertical depth of 8,559 feet, and a total measured depth of 10,987 feet. Preliminary measurements indicate temperatures at the "toe" of the well will exceed 442 degrees F (228 degrees C). Approximately 74 ft of core of the granitic and metamorphic rocks that will form the FORGE reservoir was also recovered.

15 GEOTHERMAL ENERGY↗

Evaluating the demand response potential of ammonia plants

Demand-side management/demand response (DSM/DR) are key strategies for mitigating the inherent variability in electricity generation rates by renewable sources. This article represents—to our knowledge—the first foray into assessing the DR potential of ammonia plants. Ammonia plants are interesting candidates for DR initiatives because of their significant electricity use (for operating compressors driving the synthesis loop) and the ability to store the ammonia product relatively easily and safely. Our approach is based on formulating and solving an optimal DR scheduling problem for an ammonia plant while accounting for the process dynamics. To this end, we introduce a new Hammerstein–Wiener-inspired modeling framework based on injecting linear dynamics in a first-principles static nonlinear model of the process. The results are encouraging; for the cases considered, peak-time power consumption decreases between 3.57% and 7.40%, coupled with 1.39% to 3.70% reductions in operating cost.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Probabilistic Zonal Reserve Requirements for Improved Energy Deliverability with Wind Power

In power systems with high penetration of renewable energy resources, uncertainty and variability of these stochastic resources introduce additional challenges for the operation of power systems. To improve the power system's reliability in the face of uncertainty, reserves are required as additional generation capacity to rebalance the power system following random disturbances. However, reserve deliverability is not guaranteed, because it may encounter potential transmission line congestion. Zonal reserve requirements can address this issue, but operators lack efficient ways to allocate reserves to zones while accounting for wind power forecast uncertainty. Herein we propose a methodology for probabilistic zonal reserve requirements to address wind power forecast uncertainties. This method estimates the probability distribution of line flows based on the system generation margin and injection shift factor. This estimate is then used to construct pre-defined and post-zonal reserve requirements. Case studies demonstrate that the proposed method efficiently schedules energy and reserves to balance energy and manage deliverability with wind power forecast uncertainty.We also discuss operational implications of the proposed method.

17 WIND ENERGY↗

A Hierarchical Control Architecture: Utilization of Behind-the-Meter Appliances with Increased Visibility and Controllability

Optimal operations of distribution systems to enhance reliability and resiliency can be achieved if information with higher fidelity can be accessed from grid premise devices. This paper discusses a hierarchical control architecture that can introduce higher visibility and controllability by utilizing the estimated injection and absorption of different behind-the-meter controllable loads, and DERs, including EVs, within a premise. The acquired information is used to make control decisions for scheduling the premise appliances to reduce energy consumptions. The premise controller can also optimize the consumptions on a day-to-day basis in addition to taking input signals from the utility operators to support grid-service events (e.g., peak shaving). The entire control architecture is designed in a modular and scalable fashion that provides benefits to the utility from the reuse of existing infrastructure while creating opportunities for various grid services to be enabled by the operation of premise controllers.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Theoretical analysis of a refrigerant injection-enhanced air source heat pump with thermal energy storage for extended cold-climate and defrosting operations

This study investigates a conceptual refrigerant injection-enhanced air source heat pump with integrated thermal energy storage (ITES-ASHP) that combines two-phase flash tank injection with phase change material (PCM) thermal energy storage (TES) to extend cold-climate operation and maintain indoor heating during defrost. A steady-state, mode-based thermodynamic cycle model is developed to evaluate heating and defrosting modes with and without refrigerant injection and TES integration over an outdoor temperature range of 8 to −25 °C. The framework is applied to refrigerants R-290, R-454B, R-410 A, and R-32. A parametric study is conducted for an 18-kW system rated for an outdoor temperature of 8 °C, with the compressor frequency scheduled to 150 Hz. The optimal PCM phase-change temperature is identified as 20 °C for R-290, R-454B, and R-410 A, and 15 °C for R-32. At the design condition of −25 °C outdoor temperature, the proposed concept achieves a combined COP of 2.22 for R-290, corresponding to a 60% increase relative to the theoretical single-stage baseline for combined heating and defrosting operation. Safety screening based on compressor discharge temperature (≤ 120 °C) and injection quality (≥ 0.65), together with performance evaluation, indicates that R-290 is the most suitable candidate, followed by R-410 A and R-454B. Under the assumptions and constraints used here, R-32 is found to be less suitable due to excessive discharge temperatures and a higher risk of wet compression.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Modeling and Detection of Future Cyber-Enabled DSM Data Attacks

Demand-Side Management (DSM) is an essential tool to ensure power system reliability and stability. In future smart grids, certain portions of a customer’s load usage could be under the automatic control of a cyber-enabled DSM program, which selectively schedules loads as a function of electricity prices to improve power balance and grid stability. In this scenario, the security of DSM cyberinfrastructure will be critical as advanced metering infrastructure and communication systems are susceptible to cyber-attacks. Such attacks, in the form of false data injections, can manipulate customer load profiles and cause metering chaos and energy losses in the grid. The feedback mechanism between load management on the consumer side and dynamic price schemes employed by independent system operators can further exacerbate attacks. To study how this feedback mechanism may worsen attacks in future cyber-enabled DSM programs, we propose a novel mathematical framework for (i) modeling the nonlinear relationship between load management and real-time pricing, (ii) simulating residential load data and prices, (iii) creating cyber-attacks, and (iv) detecting said attacks. In this framework, we first develop time-series forecasts to model load demand and use them as inputs to an elasticity model for the price-demand relationship in the DSM loop. This work then investigates the behavior of such a feedback loop under intentional cyber-attacks. We simulate and examine load-price data under different DSM-participation levels with three types of random additive attacks: ramp, sudden, and point attacks. We conduct two investigations for the detection of DSM attacks. The first studies a supervised learning approach, with various classification models, and the second studies the performance of parametric and nonparametric change point detectors. Results conclude that higher amounts of DSM participation can exacerbate ramp and sudden attacks leading to better detection of such attacks, especially with supervised learning classifiers. We also find that nonparametric detection outperforms parametric for smaller user pools, and random point attacks are the hardest to detect with any method.

97 MATHEMATICS AND COMPUTING↗

A Hybrid Stochastic-Interval Operation Strategy for Multi-Energy Microgrids

Increasing deployment of distributed energy resources intensifies interactions among electric, gas, heating, and cooling systems. Inherent uncertainties ranging from internal parameters to external inputs also impose significant challenges on system operation. A coordinated scheduling method is, therefore, desired for facilitating efficient operation of multi-energy microgrids under multiple uncertainties. In this paper, a deterministic coordinated scheduling model is developed first with detailed modeling of system dynamics and device parameters to fully characterize complex interactions among multi-energy carriers. Then, a hybrid stochastic-interval method is proposed to account for heterogeneous uncertainties in decisions of operational strategies. Specifically, performance and efficiency uncertainties of distributed energy resources, and injection uncertainty of renewable sources and multienergy demands are characterized by interval-based uncertain operation regions and probability distributions, respectively. A scenario-based two-stage algorithm is developed to solve the problem so that multiple uncertainties are preserved in the entire decision-making process. Moreover, adjustable operational strategies are determined to hedge uncertainty by considering operators’ risk preferences. The validity of the proposed method is verified by comprehensive case studies on a test system.

hybrid stochastic-interval approach↗

Overview on Analyses of Dose Rates During RID Parts Removal/Exchange

One of the most irradiated Spallation Neutron Source (SNS) accelerator components is ring injection dump (RID), which is located downstream of the accumulator ring injection section. The unstripped and only partially stripped H- beam is discarded in the injection into the accumulator ring and is redirected to the RID, which is about 5% of the full beam current. According to the accelerator operation plan, the beam stop and the window assemblies of the existing RID will be removed and replaced, when they have reached their end-of-life. This procedure, which includes multiple steps, is scheduled to take place during facility maintenance period in January 2023.In order to support job planning and meet ALARA requirements during removal and exchange of the components, dose rates for each stage of exchange operation are calculated.

Popova, Irina I.↗

Influence of Fuel Properties on Gasoline Direct Injection Particulate Matter Emissions Over First 200 s of World-Harmonized Light-Duty Test Procedure Using an Engine Dynamometer and Novel “Virtual Drivetrain” Software

Abstract The influence of fuel properties on particulate matter (PM) emissions from a catalytic gasoline particulate filter (GPF) equipped gasoline direct injection (GDI) engine was investigated using novel “virtual drivetrain” software and an engine mated to an engine dynamometer. The virtual drivetrain software was developed in labview to operate the engine on an engine dynamometer as if it were in a vehicle undergoing a driving cycle. The software uses a physics-based approach to determine vehicle acceleration and speed based on engine load and a programed “shift” schedule to control engine speed. The software uses a control algorithm to modulate engine load and braking to match a calculated vehicle speed with the prescribed speed trace of the driving cycle of choice. The first 200 s of the World-harmonized Light-duty Test Procedure (WLTP) driving cycle was tested using six different fuel formulations of varying volatility, aromaticity, and ethanol concentration. The first 200 s of the WLTP was chosen as the test condition because it is the most problematic section of the driving cycle for controlling PM emissions due to the cold start and cold drive off. It was found that there was a strong correlation between aromaticity of the fuel and the engine-out PM emissions, with the highest emitting fuel producing more than double the mass emissions of the low PM production fuel. However, the post-GPF PM emissions depended greatly on the soot loading state of the GPF. The fuel with the highest engine-out PM emissions produced comparable post-GPF emissions to the lowest PM producing fuel over the driving cycle when the GPF was loaded over three cycles with the respective fuels. These results demonstrate the importance of GPF loading state when aftertreatment systems are used for PM reduction. It also shows that GPF control may be more important than fuel properties, and that regulatory compliance for PM can be achieved with proper GPF control calibration irrespective of fuel type.

Energy & Fuels↗

A hybrid architecture for volt-var control in active distribution grids

Modern active distribution grids are characterized by the increasing penetration of distributed energy resources (DERs). The proper coordination and scheduling of a large numbers of these small-scale and spatially distributed DERs is necessary, and warrants the use of novel distributed approaches. In this paper, we propose a hybrid volt-var control architecture for the distribution grid, which leverages existing centralized and local approaches to planning, decision making, and control, and augments it with distributed optimization and distributed control for DER management. First, we propose a convex model to describe the power physics of distribution grids of meshed topology and unbalanced structure, based on current injection and McCormick Envelopes. Second, we employ the distributed proximal atomic coordination (PAC) algorithm to coordinate DERs to provide voltage support. We implement volt-var optimization by optimally coordinating DERs including PV smart inverters and demand response. We present results using the IEEE-34 bus network, using real data from a distribution feeder in Hawaii, to model load and PV generation. Different levels of DER penetration and objective functions are simulated. Finally, our results show the need for the coordination of DERs to improve voltage profiles, even in networks with existing voltage control devices. Further, we show the need for flexible reactive power capabilities to achieve desired grid performance.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Numerically Testing Conceptual Models of the Utah FORGE Reservoir Using July 2023 Circulation Test Data

Over the past several years, many new data sets have become available regarding the characterization of the Utah FORGE reservoir. These include, but are not limited to, the stimulation of Well 16A, the drilling and completion of Well 16B, and interwell circulation confirmatory testing. As part of the characterization efforts, conceptual models of the reservoir are re-examined as new data become available. As part of the planning for FORGE activities, numerical models are often used to predict the reservoir response to the planned testing. Stochastic methods are often employed to bound uncertainty and allow for evaluation of comprehensive ranges of key reservoir parameters. For the most recent interwell circulation confirmatory testing (July 2023), a priori numerical model predictions did bound the observed behavior (Xinj et al., 2023), but key deviations from expected behavior prompted the FORGE team to reevaluate our conceptual model of the reservoir. In early October 2023, key members of the development, testing, and monitoring teams met for 2 days to review newly collected data and discuss ‘interesting’ or ‘key’ observations. From these discussions, 15 Key Observations were documented, with several significant ones being that the discrete fracture network developed from the 16A stimulation data may not be appropriate and that the early time pressure data obtained during the summer 2023 reservoir testing were best described using radial solutions. In July 2023, two campaigns of interwell confirmatory testing were conducted, the first set of tests occurred on July 4-5 and the second set on July 18-19. The second set of circulation tests conducted at the Utah FORGE site between the injection well 16A(78)-32 and production well 16B(78)-32 on July 18 and 19, 2023 are used to calibrate material properties in a thermal-hydraulic-mechanical (THM) simulation of the discrete fracture network connecting the wells. The spatially and temporally varying reservoir properties are calibrated to match the time dependent pressure and production profiles from the circulation tests. In future work, this calibrated model will be coupled to the native state THM model of the FORGE reservoir to predict surface deformation and strains resulting from pumping schedules.

58 GEOSCIENCES↗

Numerically Testing Conceptual Models of the Utah FORGE Reservoir Using July 2024 Circulation Test Data

Over the past several years, many new data sets have become available regarding the characterization of the Utah FORGE reservoir. These include, but are not limited to, the stimulation of Well 16A, the drilling and completion of Well 16B, and interwell circulation confirmatory testing. As part of the characterization efforts, conceptual models of the reservoir are re-examined as new data become available. As part of the planning for FORGE activities, numerical models are often used to predict the reservoir response to the planned testing. Stochastic methods are often employed to bound uncertainty and allow for evaluation of comprehensive ranges of key reservoir parameters. For the most recent interwell circulation confirmatory testing (July 2023), a priori numerical model predictions did bound the observed behavior (Xinj et al., 2023), but key deviations from expected behavior prompted the FORGE team to reevaluate our conceptual model of the reservoir. In early October 2023, key members of the development, testing, and monitoring teams met for 2 days to review newly collected data and discuss ‘interesting’ or ‘key’ observations. From these discussions, 15 Key Observations were documented, with several significant ones being that the discrete fracture network developed from the 16A stimulation data may not be appropriate and that the early time pressure data obtained during the summer 2023 reservoir testing were best described using radial solutions. In July 2023, two campaigns of interwell confirmatory testing were conducted, the first set of tests occurred on July 4-5 and the second set on July 18-19. The second set of circulation tests conducted at the Utah FORGE site between the injection well 16A(78)-32 and production well 16B(78)-32 on July 18 and 19, 2023 are used to calibrate material properties in a thermal-hydraulic-mechanical (THM) simulation of the discrete fracture network connecting the wells. The spatially and temporally varying reservoir properties are calibrated to match the time dependent pressure and production profiles from the circulation tests. In future work, this calibrated model will be coupled to the native state THM model of the FORGE reservoir to predict surface deformation and strains resulting from pumping schedules.

15 GEOTHERMAL ENERGY↗

Progress towards the completion of the proton power upgrade project

The Proton Power Upgrade project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion in early 2025, 2 MW of beam power will be available for neutron production at the existing first target station (FTS) with the remaining beam power available for the future second target station (STS). The project has installed seven superconducting radio-frequency (RF) cryomodules and supporting RF power systems to increase the beam energy by 30% to 1.3 GeV, and the beam current will be increased by 50%. The injection and extraction region of the accumulator ring are being upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. The first four cryomodules and supporting systems were commissioned in 2022-2023 and supported neutron production at 1.05 GeV, 1.7 MW with high reliability. The first-article 2 MW target was operated successfully for approximately 4400 MW-Hours over two run periods. The long outage began in August 2023 for installation of the remaining technical equipment and construction of the Ring-to-Target Beam Transport tunnel stub that will enable connection to the STS without interrupting operation of the FTS. The upgrade is proceeding on-schedule and on-budget, and resumption of neutron production for the user program is planned for July 2024.

43 PARTICLE ACCELERATORS↗

Progress towards the completion of the proton power upgrade project

The Proton Power Upgrade project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion in early 2025, 2 MW of beam power will be available for neutron production at the existing first target station (FTS) with the remaining beam power available for the future second target station (STS). The project has installed seven superconducting radio-frequency (RF) cryomodules and supporting RF power systems to increase the beam energy by 30% to 1.3 GeV, and the beam current will be increased by 50%. The injection and extraction region of the accumulator ring are being upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. The first four cryomodules and supporting systems were commissioned in 2022-2023 and supported neutron production at 1.05 GeV, 1.7 MW with high reliability. The first-article 2 MW target was operated successfully for approximately 4400 MW-Hours over two run periods. The long outage began in August 2023 for installation of the remaining technical equipment and construction of the Ring-to-Target Beam Transport tunnel stub that will enable connection to the STS without interrupting operation of the FTS. The upgrade is proceeding on-schedule and on-budget, and resumption of neutron production for the user program is planned for July 2024.

Champion, Mark↗

Direct Measurement of Small Particle Growth and Aging at the Atmospheric Radiation Measurement Southern Great Plains Observatory Field Campaign Report

Two identical Captive Aerosol Growth and Evolution (CAGE) chambers were operated at the U.S. Department of Energy Atmospheric Radiation Measurement (ARM) user facility’s Southern Great Plains (SGP) observatory in the late summer and fall of 2021. The field study was scheduled to begin in spring, 2020, but was delayed because of the pandemic. CAGE chambers are designed to expose particles to an environment that mirrors that of the surroundings with or without a controlled perturbation designed to assess a sensitivity. The analysis here focuses on roughly the last two months of the overall study period during which measurements were almost continuous and when several perturbation experiments were conducted. Though the utility of a dual-chamber system is the ability to measure the influence of a single change on top of ambient conditions, both chambers were initially operated in the same way, with ambient air pulled through the gas exchange channel in both and ammonium sulfate particles injected into both. The similar time-dependent particle growth observed in the chambers for those periods provides confidence in differences observed during the subsequent perturbation experiments. The growth rate of particles in the reference chamber into which only ammonium sulfate particles were injected and for which only ambient air was pulled through were used to describe time-of-day averages. The average growth rate was highest in the evening and in the morning after sunrise and lowest in the late afternoon. The sensitivity of particle growth to secondary aerosol precursor gases was studied by adding them at a controlled rate to the ambient air flow pulled through one of the two chambers. Addition of 5 ppb of α-pinene resulted in an average particle growth rate of 4.4 nm hr -1 , compared with that of just 0.8 nm hr -1 in the reference chamber. The added α-pinene also triggered one new particle formation (NPF) event in the early evening just before sunset and another in the morning just after sunrise. Similarly, addition of 5 ppb of SO 2 to one chamber led to a pair of NPF events and to increased particle growth rate, though unlike the impact of added α-pinene, growth was enhanced only during the daytime when OH concentration is highest. The influence of aerosol liquid water on secondary aerosol formation and particle growth was investigated by injecting ammonium sulfate seed particles into one chamber and potassium sulfate particles into the other. Particles were injected into the two chambers four times over a 1.5-day period. The chamber relative humidity (RH) history during and following each injection was used to determine whether each particle type was crystalline or aqueous. For the case when both particle types remained crystalline throughout the period, they were tracked and for the case when they remained aqueous, the magnitude and time-dependence of the growth of both were almost exactly the same. For the other two cases the ammonium sulfate particles deliquesced upon injection and remained aqueous, while the potassium sulfate particles remained crystalline. For those two cases, the aqueous particles grew substantially faster than did the crystalline particles, providing evidence of the role of aerosol liquid water on secondary aerosol formation and particle growth.

54 ENVIRONMENTAL SCIENCES↗

Potential Impacts of High-Octane Fuel Introduction in a Naturally Aspirated, Port Fuel-Injected Legacy Vehicle

In recent years there has been an increased interest in raising the octane level of gasoline to enable higher compression ratios (CR) in spark-ignition engines to improve vehicle fuel efficiency. A number of studies have examined opportunities to increase efficiency in future vehicles, but potential impacts on the legacy fleet have not received as much attention. In this study, our effort focused on experimental studies on an engine using high-octane fuels without changing the engine’s CR. Spark timing was advanced until maximum torque was reached or knock was encountered for each engine condition, using each individual fuel to maximize engine efficiency. Knock-limited conditions occurred as the output brake mean effective pressure (BMEP) neared the maximum attainable output at a given engine speed. Increasing research octane numbers generally enabled knock-free operation under a greater number of operating conditions. Vehicle modeling using Autonomie was used to project vehicle energy use, fuel economy, and tailpipe CO 2 emissions for the Urban Dynamometer Driving Schedule (UDDS), the Highway Fuel Economy Test (HWFET), and the US06 cycle. Results show that decreases in energy consumption of up to 2% for a small SUV are possible through the use of a 97 RON fuel compared to a baseline using 91 RON fuel, provided that the formulation of the fuel does not cause unanticipated operational issues such as lower maximum BMEP. Greater improvements using high-octane fuels are possible if the CR is increased, but there is no opportunity to increase the CR in legacy vehicles. Thus, these vehicles realize an improvement from increased octane rating in accordance with their ability to spark advance to take advantage of a fuel with a higher octane rating. For the modeled vehicle, improvements of up to 2% in volumetric fuel economy may be possible through the use of a 97 RON fuel with the largest gains expected on the US06 cycle. Fuel economy impacts are strongly coupled to the heating value of the fuels in addition to changes in engine efficiency. Similarly, decreases in tailpipe CO 2 emissions are also achievable. However, simultaneous improvements in energy consumption, fuel economy, and tailpipe CO 2 emissions are not guaranteed and are dependent upon fuel formulation.

33 ADVANCED PROPULSION SYSTEMS↗

Cybersecurity Anomaly Detection in SCADA-Assisted OT Networks Using Ensemble-Based State Prediction Model

The cybersecurity threats of power system gradually grow due to the increased sophisticated interactions between Information Technology (IT) and Operational Technology (OT) networks. False data injection attack (FDIA) that aims to compromise the Supervisory Control and Data Acquisition (SCADA) measurement and disturb the system operation is one of such cyber threats. Such attacks can potentially lead to significant operational issues at the control centers and substations, and hence, result in severe physical consequences. To avoid catastrophic failure across the power grid resulting from these attacks, it is essential to arm the OT network with real-time vulnerability assessment tools. To this end, this paper outlines various drawbacks of the Purdue architecture model to defend against cyberattacks in the OT network. Furthermore, a novel ensemble-based state prediction model is proposed to detect cybersecurity anomalies in SCADA assisted OT networks. The proposed model uses control center level generation and load forecasts, scheduled, and forced outages, power flow solutions, and the substation level historical data. The hypothesis of the proposed scheme relies on the fact that additional control center and substation data can hardly be accessed and compromised by attackers. One of the vital features of the proposed scheme is an hour-ahead prediction of the operational feasibility of the SCADA measurement range at the control center and substation in real time helps in detecting anomalies in measurements across both substation and the control center.

24 POWER TRANSMISSION AND DISTRIBUTION↗