Search NASA⌕ Search

SEARCH · Search NASA

Results for “installation tests”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Installing a Test Tap on a Metal Battery Case

A mechanical fitting and relatively simple and safe method of installing it on the metal case of a battery have been devised to provide access to the interior of the battery to perform inspection and/or to measure such internal conditions as temperature and pressure. A metal boss or stud having an exterior thread is attached to the case by capacitor-discharge stud welding (CDSW), which takes only 3 to 6 milliseconds and in which the metallurgical bond (weld) and the heat-affected zone are limited to a depth of a few thousandths of an inch (a few hundredths of a millimeter). These characteristics of CDSW prevent distortion of the case and localized internal heating that could damage the chemical components inside of the battery. An access hole is then drilled through the stud and case, into the interior of the battery. A mechanical fitting having a matching thread is installed on the stud and the interior end of the fitting is sealed with a pressure-sealing washer/gasket. The exterior end of the fitting is configured for attachment of whatever instrumentation is required for the selected inspection or measurement.

Mayes, Daniel R.↗

Status Report: Design and Fabricate Installation-Ready Test Capsule for the In-Situ Measurement of Elastic Properties Using an Optical Fiber-Based Measurement Technique

Microstructure evolution due to irradiation in a nuclear reactor can have a dramatic effect on material properties. A better understanding of this evolution is necessary for developing improved nuclear fuels and materials. The ability to measure such changes in real time is extremely limited due to the harsh conditions, high radiation fields, and limited access of the reactor environment. Through carefully designed experiments, measurement of elastic properties can be tied directly to microstructure. We present the methodology, design, and deployment plan for an instrument that has been developed to monitor grain microstructural changes during irradiation. Our measurement approach involves exciting and measuring the resonant frequency of a thin cantilever beam. Excitation and detection of the flexural vibrations of the beam are accomplished using optical methods that require only an optical fiber connection between the instrumentation and the sample. This technique has been demonstrated in a laboratory setting to monitor the recrystallization of highly textured copper during high temperature annealing. A test capsule incorporating this technique has been developed for in reactor testing. The capsule has been designed to be compatible with a reusable test module that allows simplified insertion in the TREAT reactor at INL. An exact replica of the instrument described in this Status Report, constructed from Quality Level 3 materials, is slated to be inserted into the TREAT reactor in FY19.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

New Test Section Installed in NASA Lewis' 1- by 1-Foot Supersonic Wind Tunnel

NASA Lewis Research Center's 1- by 1-Foot Supersonic Wind Tunnel (1x1) is a critical facility that fulfills the needs of important national programs. This tunnel supports supersonic and hypersonic research test projects for NASA, for other Government agencies, and for industry, such as the High Speed Research (HSR) and Space Transportation Technologies (STT) programs. The 1x1, which is located in Lewis' Building 37, Cell 1NW, was built in 1954 and was upgraded to provide Mach 6.0 capability in 1989. Since 1954, only minor improvements had been made to the test section. To improve the 1x1's capabilities and meet the needs of these programs, Lewis recently redesigned and replaced the test section. The new test section has interchangeable window and wall inserts that allow easier and faster test configuration changes, thereby improving the adaptability and productivity of this highly utilized facility. In addition, both the wall and window areas are much larger. The larger walls provide more flexibility in how models are mounted and instrumented. The new window design vastly increases optical access to the research test hardware, which makes the use of advanced flow-visualization systems more effective.

Bauman, Steven W.↗

Cryogenics and purification systems of the ICARUS T600 detector installation at Fermilab

This paper describes the cryogenic and purification systems of the ICARUS T600 detector in its present implementation at the Fermi National Laboratory, Illinois, U.S.A. The ICARUS T600 detector is made of four large Time Projection Chambers, installed in two separate containers of about 275 m 3 each. The detector uses liquid argon both as target and as active medium. For the correct operation of the detector, the liquid argon must be kept in very stable thermal conditions and the contamination of electronegative impurities must be consistently kept at the level of small fractions of parts per billion. The detector was previously operated in Italy, at the INFN Gran Sasso Underground Laboratory (LNGS), in a three-year run on the CERN to LNGS Long Baseline Neutrino Beam. For its operation on the Booster and NuMI neutrino beams at Fermilab, for the search of sterile neutrinos and measurements of neutrino-argon cross sections, the detector was moved from Gran Sasso to CERN for the upgrades required for operation at shallow depth with high intensity neutrino beams. The liquid argon containers, the thermal insulation and all the cryogenic equipment have been completely re-designed and rebuilt, following the schemes of the previous installation in Gran Sasso. The detector and all the equipment have been transported to Fermilab, where they have been installed, tested and recently put into operation. The work described in this paper has been conducted as a joint responsibility of CERN and Fermilab with the supervision provided by the ICARUS Collaboration. Design, installation, testing, commissioning and operation are the result of a common effort of CERN, Fermilab and INFN groups.

Cryogenic detectors↗

Gas Atomization Equipment Statement of Work and Specification for Engineering design, Fabrication, Testing, and Installation

The Gas Atomization Equipment will be used to fabricate metallic powder suitable for Powder Bed Fusion additive Manufacturing material to support Lawrence Livermore National Laboratory (LLNL) research and development. The project will modernize our capabilities to develop spherical reactive, refractory, and radioactive powders in the 10-75 μm diameter size range at LLNL.

42 ENGINEERING↗

Lightning testing at the subsystem level

Testing at the subsystem or black box level for lightning hardness is required if system hardness is to be assured at the system level. The often applied philosophy of lighting testing only at the system level leads to extensive end of the line design changes which result in excessive costs and time delays. In order to perform testing at the subsystem level two important factors must be defined to make the testing simulation meaningful. The first factor is the definition of the test stimulus appropriate to the subsystem level. Application of system level stimulations to the subsystem level usually leads to significant overdesign of the subsystem which is not necessary and may impair normal subsystem performance. The second factor is the availability of test equipment needed to provide the subsystem level lightning stimulation. Equipment for testing at this level should be portable or at least movable to enable efficient testing in a design laboratory environment. Large fixed test installations for system level tests are not readily available for use by the design engineers at the subsystem level and usually require special operating skills. The two factors, stimulation level and test equipment availability, must be evaluated together in order to produce a practical, workable test standard. The neglect or subordination of either factor will guarantee failure in generating the standard. It is not unusual to hear that test standards or specifications are waived because a specified stimulation level cannot be accomplished by in-house or independent test facilities. Determination of subsystem lightning simulation level requires a knowledge and evaluation of field coupling modes, peak and median levels of voltages and currents, bandwidths, and repetition rates. Practical limitations on test systems may require tradeoffs in lightning stimulation parameters in order to build practical test equipment. Peak power levels that can be generated at specified bandwidths with standard electrical components must be considered in the design and costing of the test system. Stimulation tests equipment and test methods are closely related and must be considered a test system for lightning simulation. A non-perfect specification that can be reliably and repeatedly applied at the subsystem test level is more desirable than a perfect specification that cannot be applied at all.

Luteran, Frank↗

2021 Prototype Installation and Testing Awardee: XFlow Energy Company

XFlow Energy Company (XFlow Energy) aims to reduce the cost of wind energy by designing vertical-axis wind turbines (VAWTs), which have a cheaper blade manufacturing process and a mechanically simpler design than traditional wind turbines, among other cost-saving advantages. However, a lack of modeling or simulation tools that can predict the coupling between aerodynamic and structural forces poses a significant challenge to developers of VAWTs. Known as aeroelastic models, these are not just important design tools - they're critical for certifying VAWTs of 25 kilowatts (kW), which is the size of XFlow Energy's prototype wind turbine. Without certification, XFlow Energy will not be able to deliver an independently validated product to its customers, and those customers will not be eligible for state and federal incentives. An accurate aeroelastic model could provide less-conservative structural optimization tactics than are currently used, resulting in a wind turbine with lower capital costs.

CIP↗

2022 Prototype Installation and Testing Awardee: Windward Engineering

The 60-kilowatt (kW) Zephyr 21/60 wind turbine from Windward Engineering uses a low-cost, full-span independent pitch system that can act as a redundant aerodynamic braking system. This design uses a relatively simple pneumatic rotary vane actuator, allowing each of the turbine's three blades to be pitched independently and any single blade to activate emergency braking for the entire turbine. A previous Competitiveness Improvement Project (CIP) funding award enabled Windward Engineering to design and develop the Zephyr 21/60 wind turbine's aeroelastic model and pitch system. At the end of this current Competitiveness Improvement Project award, a fully validated aeroelastic model will make it possible to certify Windward Engineering's Zephyr 21/60 design and quantify the technology's levelized cost of energy in preparation for certification and entry into the distributed wind market. The Zephyr 21/60 will feature an attractive levelized cost of energy, improved reliability, and a full-span pitch system for safe and redundant protection against rotor overspeed (which occurs when the rotor turns beyond its design limit).

CIP↗

Effects of steady-state pressure distortion on the stall margin of a J85-21 turbojet engine

The effects of the inlet pressure distortions, induced by five screen patterns, on the performance of a J85-21 turbojet engine was conducted at the NASA Lewis Research Center. Testing was in support of the HiMAT RPRV program at Dryden Flight Research Center. Distortion patterns were chosen based on anticipated application of test results of the HiMAT installation. Tests were conducted at a simulated Mach number and altitude condition of 0.9 and 10 973 meters. Results are presented in terms of distortion levels and standard compressor performance parameters.

Bobula, G. A.↗

Automated fault detection and diagnosis of airflow and refrigerant charge faults in residential HVAC systems using IoT-enabled measurements

While automated fault detection and diagnosis (AFDD) in residential heating, ventilation, and air-conditioning (HVAC) using smart thermostat data is gaining increasing attention in recent times, it still requires in-depth investigation for market adoption, especially with real-life data. Furthermore, this paper proposes an Internet of Things (IoT) - based approach that adds a smart sensor to the smart thermostat data to carry out AFDD. The approach uses a model which predicts enthalpy change across the evaporator and compares the prediction to the measured enthalpy change. Deviations which exceed analytically determined thresholds then signal faults in the HVAC system. The faults detected are either installation related or degradation related. Experimental tests were carried out in four homes located in Norman, Oklahoma. From the tests, installation issues like indoor/outdoor mismatch were detected in two homes, while a 30% low charge and low indoor airflow rate were detected in one home. The results show that the proposed AFDD algorithm was able to successfully detect two prevalent faults, namely low indoor airflow and low refrigerant charge. Unlike most of the smart thermostat-based approaches, the proposed IoT-based approach can detect and diagnose both faults but only require one additional sensor which is provided by smart thermostat manufacturers.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Restore-L Satellite Servicing Internship Final Report

This paper reviews the Restore-L mission purpose and the necessary research and simulations to meet mission specification for the Propellant Transfer Subsystem (PTS). It is essential the PTS undergoes functionality testing, environmental testing, and calculations to understand the capabilities of the system. For the testing of components from PTS, a proper test setup is required. It is vital for test hardware, such as hoses and valves, to stay in place while the test is being performed. For the test hardware to operate correctly, positioning, orientation, and alignment are critical as well. In addition to the testing, calculations for pressure drop were explored. To meet requirements for test setups, designs for test hardware mounts were sketched, 3D modeled, and manufactured. Using fluid mechanics for calculations, a pressure drop equation was applied with known variables from mission specification. With the test hardware mounts designed and manufactured, the test setup was assembled with mounts installed. Test hardware mounts met all design requirements. Calculation for pressure drop were concluded and an answer was achieved. Meeting design requirement, mission specification, and calculating correct results allow the Restore-L mission to make further progress and help understand the effectiveness of the Propellant Transfer Subsystem.

PTS↗

Design of Hypervelocity Flow Generator (HFG) and Its Diagnostics

Ground facilities for hypersonic research are a key element for successful development of aerodynamically proven hypervelocity vehicles. Design concepts and diagnostics of a hypervelocity flow generator (HFG) were made as a test platform for hypersonic/hypervelocity spacecraft models at the NASA Langley Research Center. The HFG is a hypersonic flow field generator using optically heated gas which is blown into an 80 cu m vacuum chamber. The vacuum chamber is kept at a stable vacuum pressure with a combination of three large vacuum pumps, while the HFG is in the test mode. The HFG provides a relatively small test section with approximately a 20 cm window. This facility was designed to generate 2.45 km/sec of flow speed, and potentially generate a continuous flow with the nozzle and vacuum system. The window in test section provides a direct view of the shock wave around a model in order to measure temperature, pressure, and density profile within the shock layer. One of the key test goals under this project is to understand why the emission spectra from the standing shockwave plasma predicted by Lora-Loran codes are significantly different from the measured emission spectra from the Flight Investigation Reentry Environment (FIRE II) Flight. The correct estimate of the thermal loading on the leading edge of hypersonic vehicles greatly affects the aerodynamic design, the material selection for the vehicle, and the cooling requirement and can be obtained by the precise modeling of emission spectra from shockwave plasma. However, the estimation of thermal loading is not an easy task due to complex non-equilibrium radiative process within high temperature shock layers that still falls into a category of cold plasma. Direct flight experiments are the most desirable, but not a cost-effective approach. Analysis by computational fluid dynamics (CFD) offers many test flexibilities. However, the CFD codes must be fully tested and validated with experimental data before the codes are effectively used for practical design. Large discrepancies between experiments and codes appear in hypersonic/hypervelocity flow regimes at high altitudes of 60 km ~ 90 km. This HFG facility offers some important parameters for CFD code validation, such as collision cross-sections, relaxation times, reaction rate coefficients and transportation coefficients. The HFG test facility is based on the ejection flow of high temperature gas heated over to 3500 K through a nozzle. The tungsten gas chamber of the HFG is heated up to a desired temperature by a 60 kW optical power beam source. This system consists of an optical power source, a thermal chamber, an expansion nozzle, a test section, and an 80 cu m vacuum tank. 60 kW optical input power is obtained from the 150 kW Vortek arc lamp system (by Vortek Industries, Vancouver, Canada). This optical beam is focused to heat the gas chamber within which a flow media is heated. The maximum achievable temperature of the flow medium reached approximately 3500 K or even higher but is limited by the melting point of the chamber material used. The exhaust velocity through the nozzle was determined by the stagnation temperature and the molecular weight of the working medium at the test section. To provide design parameters, a NASA Chemical Equilibrium with Application (CEA) computer program is used for the simulation of aerothermal data. This CEA program can calculate chemical equilibrium and properties of complex mixtures using shock tube parameters. For nitrogen gas at 2666 K stagnation temperature, the maximum achievable velocity at the test section is approximately 2.45 km/sec which is within the range of the thermal velocity of 8000 K shock layer. Based on the calculation through the CEA program, the design parameters of a HFG were determined and implemented for the test section that includes an expansion nozzle. The installed test section of the experimental facility can sustain a condition of a re-entry vehicle from the Space at an altitude of 60-90 km. After installation of the HFG, the system was fully tested and its operational parameters were measured. An 80 cu m vacuum chamber of HFG was set at 1 torr level to keep a stable downstream condition. The pumping time to reach the minimum vacuum pressure (~ 1 torr) at the test chamber from atmospheric pressure was approximately an hour using Kinney (MBV-14000/MB -1600/KT-300) and Stokes (Model 1772 and 412) pumps. Such a setup condition allowed a continued stable operation of the HFG experiment with flowrates through 1-, 3-, or 5-mm diameters of nozzle throat. The flow characteristics of the HFG for various operating conditions were performed using a focused Schlieren method. At 0.8 torr chamber pressure, a barrel shock was observed at the test section. With a sphere obstacle of 12 mm diameter in the flow, a bow shock (~ 2-mm thickness) was observed by a focused Schlieren visualization method.

Hypervelocity flow↗

Photovoltaic Shading Testbed for Module-Level Power Electronics: 2016 Performance Data Update

The 2012 NREL report 'Photovoltaic Shading Testbed for Module-Level Power Electronics' provides a standard methodology for estimating the performance benefit of distributed power electronics under partial shading conditions. Since the release of the report, experiments have been conducted for a number of products and for different system configurations. Drawing from these experiences, updates to the test and analysis methods are recommended. Proposed changes in data processing have the benefit of reducing the sensitivity to measurement errors and weather variability, as well as bringing the updated performance score in line with measured and simulated values of the shade recovery benefit of distributed PV power electronics. Also, due to the emergence of new technologies including sub-module embedded power electronics, the shading method has been extended to include power electronics that operate at a finer granularity than the module level. An update to the method is proposed to account for these emerging technologies that respond to shading differently than module-level devices. The partial shading test remains a repeatable test procedure that attempts to simulate shading situations as would be experienced by typical residential or commercial rooftop photovoltaic (PV) systems. Performance data for multiple products tested using this method are discussed, based on equipment from Enphase, Solar Edge, Maxim Integrated and SMA. In general, the annual recovery of shading losses from the module-level electronics evaluated is 25-35%, with the major difference between different trials being related to the number of parallel strings in the test installation rather than differences between the equipment tested. Appendix D data has been added in this update.

14 SOLAR ENERGY↗

AC propulsion system for an electric vehicle, phase 2

A second-generation prototype ac propulsion system for a passenger electric vehicle was designed, fabricated, tested, installed in a modified Mercury Lynx vehicle and track tested at the Contractor's site. The system consisted of a Phase 2, 18.7 kw rated ac induction traction motor, a 192-volt, battery powered, pulse-width-modulated, transistorized inverter packaged for under rear seat installation, a 2-axis, 2-speed, automatically-shifted mechanical transaxle and a microprocessor-based powertrain/vehicle controller. A diagnostics computer to assist tuning and fault finding was fabricated. Dc-to-mechanical-system efficiency varied from 78% to 82% as axle speed/torque ranged from 159 rpm/788 nm to 65 rpm/328 nm. Track test efficiency results suggest that the ac system will be equal or superior to dc systems when driving urban cycles. Additional short-term work is being performed under a third contract phase (AC-3) to raise transaxle efficiency to predicted levels, and to improve starting and shifting characteristics. However, the long-term challenge to the system's viability remains inverter cost. A final report on the Phase 2 system, describing Phase 3 modifications, will be issued at the conclusion of AC-3.

Slicker, J. M.↗