At least 37 records · Page 2

State Requirements for Electric Distribution System Planning

Utilities have conducted distribution planning since they first began building and operating electricity systems. But filing these plans for regulatory and stakeholder review is a relatively recent phenomenon. This report summarizes legislative and regulatory requirements for regulated electric utilities to file some type of distribution system plan in 20 U.S. jurisdictions. Some plans focus on expedited cost recovery for certain types of distribution system improvements; other plans focus on investments for grid modernization or distributed energy resources. Increasingly, states are adopting requirements for Integrated Distribution Plans. Such plans provide holistic grid investment strategies that address state and local policies and increasing complexity at the grid edge. The report covers the following topics for distribution system plans, highlighting advanced practices: -State goals and objectives -Procedural requirements -Forecasting loads and distributed energy resources -Hosting capacity analysis -Baseline information requirements -Grid modernization strategy -Grid needs assessment -Non-wires solutions -Reliability and resilience analyses -Stakeholder engagement -Equity -Pilots -Coordination with other planning processes The report includes links to legislation; regulatory requirements, proceedings, and orders; and filed utility plans. The U.S. Department of Energy’s Office of Electricity provided funding support.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Power System Wildfire Risks and Potential Solutions: A Literature Review & Proposed Metric

Several fire risk evaluation, fire tracking, and fire response resources are available. The risk metrics and fire response programs are sometimes modified to include a power system context. The risk metrics often evaluate the risk of fires causing power system faults or outages, especially on transmission systems. The response programs are modified to ensure the safety of power system equipment and first responders as well as to coordinate power system outages to both ensure safety during an active fire and prevent fire ignition during high risk periods. Although some aspects of wildfire responses have been adapted to include power system concerns, adaptations to power system operations and maintenance to include wildfire risks and responses are still nascent. In particular, a risk metric that evaluates the potential for power system components to ignite wildfires is needed to help guide power system upgrade efforts and power system fire safety measures. This document serves as a brief literature review of wildfire risk metrics and response programs and how they relate to power systems. It also includes a proposed risk metric and structure for describing the risk of a power system component igniting a fire.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Research Priorities and Opportunities in U.S. Wholesale Electricity Markets: Market Design under Deep Decarbonization

This report provides a comprehensive review of challenges, research needs, and potential solutions for competitive wholesale electricity market design in deeply decarbonized power systems. We provide context regarding how competitive wholesale electricity markets can evolve in a longer-term perspective to ensure that they still operate efficiently throughout the transition to a deeply decarbonized future. We organize the discussion across seven topics: operational reliability, emerging technology integration, adequacy and resilience, price formation, interactions across transmission and distribution systems, transmission planning, achieving clean energy objectives, and challenges associated with cost-effectively achieving clean energy objectives. In each section we first identify key associated challenges before proposing a set of corresponding solutions and research needs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Least-cost Optimal Distribution Grid Expansion (LODGE) v1

LODGE finds the least-cost portfolio of traditional distribution system upgrades to integrate new loads and behind-the-meter DERs in combination with advanced non-wire alternative (NWA) planning solutions, such as utility-owned storage and distributed PV. Working with a set of least-cost solutions per feeder/substation allows us to benchmark and compare techno-economic performance of different traditional and NWA planning solutions. An important aspect of the LODGE model is that it includes power flow operation constraints. This means that the least-cost planning solutions delivered by LODGE are technically feasible. Available projects in LODGE portfolio include: 1) feeder reconductoring; 2) transformers upgrades; 3) non-wire alternatives, such as strategic siting and sizing of storage and distributed PV; 4) voltage regulators.

Heleno, Miguel↗

Distributed Energy Resource Visual Emulator: Phase 1

To help federal energy managers assess, monitor, and manage cybersecurity while achieving decarbonization, the National Renewable Energy Laboratory's Distributed Energy Resource Cybersecurity Framework (DER-CF) offers a comprehensive, web-based assessment tool focusing on cyber governance or policies, technical management, and physical security. The DER-CF currently presents users with a series of pertinent cybersecurity questions, which are used to generate a site-specific report and recommendations. This paper outlines a technical approach to integrate the DER-CF with another key asset—NREL's Advanced Research on Integrated Energy Systems (ARIES) Cyber Range—to visualize cybersecurity resilience and compliance and to enhance the usability and accessibility of the DER-CF. The result is a new tool called the Distributed Energy Resource Visual Emulator (DER-VE). Its development will include regular conversations with stakeholders to assess the effectiveness of these efforts, refine the visualization capability, and ensure its value to our partners. Phase 0 of the integration project was concluded in 2021. Phase 1, completed in 2022, has two components: The first is developing a working visualization of system compliance using the DER-CF, and the second is planning the design of a server application that takes input data from the DER-CF and creates a personal emulated environment of the user's system or a selected reference architect. Major components that were addressed in this phase are the DER-CF output, compliance visualization, data model, and compliance server design.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Geospatial mapping of distribution grid with machine learning and publicly-accessible multi-modal data

Abstract Detailed and location-aware distribution grid information is a prerequisite for various power system applications such as renewable energy integration, wildfire risk assessment, and infrastructure planning. However, a generalizable and scalable approach to obtain such information is still lacking. In this work, we develop a machine-learning-based framework to map both overhead and underground distribution grids using widely-available multi-modal data including street view images, road networks, and building maps. Benchmarked against the utility-owned distribution grid map in California, our framework achieves > 80% precision and recall on average in the geospatial mapping of grids. The framework developed with the California data can be transferred to Sub-Saharan Africa and maintain the same level of precision without fine-tuning, demonstrating its generalizability. Furthermore, our framework achieves a R 2 of 0.63 in measuring the fraction of underground power lines at the aggregate level for estimating grid exposure to wildfires. We offer the framework as an open tool for mapping and analyzing distribution grids solely based on publicly-accessible data to support the construction and maintenance of reliable and clean energy systems around the world.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Measuring labor productivity dynamics in U.S. industrial and electric power sectors: a case study (2014–2023)

This study proposes a subsystem methodology for measuring labor productivity in the U.S. industrial and electric power sectors by leveraging public data available between 2014 and 2023. Building on Pasinetti’s framework and subsequent developments, the approach employs Vertically Integrated Sectors (VIS) to account for both direct and indirect productivity effects. The novelty of this work is twofold. First, it enables the estimation of productivity trends over time, providing a robust foundation for empirical analysis. Second, it applies the methodology to a case study of the electric generation sector, highlighting its practical relevance. Using data from the Bureau of Economic Analysis, the Bureau of Labor Statistics, and the Impact Analysis for Planning (IMPLAN) tool, the study reveals significant discrepancies between conventional productivity measures and those derived from the VIS approach. Furthermore, the proposed method aligns with the principles of Integrated Energy Systems by capturing the interrelations among generation, distribution, storage, and consumption. This alignment underscores its utility and applications for energy-related policy and planning. Overall, the findings contribute to more precise labor productivity assessments, supporting informed decision-making and future research. Additionally, the method highlights the importance of considering the whole supply chain, providing interrelated metrics for labor productivity which includes both, direct and indirect effects on the final labor productivity metric. By incorporating intersectoral dependencies, this method offers a more comprehensive and accurate measure of labor productivity compared to traditional metrics.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Adaptive Protection and Validated Models to Enable Deployment of High Penetrations of Solar PV (PV-MOD)

The availability and validation of various PV models in commercial tools differ, with some models not yet thoroughly validated for advanced inverter functionalities and reliable performance under weak system conditions. Many existing models do not fully incorporate new inverter control functions, which can affect system stability. The increasing deployment of solar PV and other inverter-based resources (IBRs), including distributed energy resources (DERs), is influencing the reliable operation of protection schemes in distribution systems and microgrids. Emerging adaptive protection schemes (APS) offer new opportunities for protecting these systems during varying configurations and DER operating conditions, though their demonstration and validation remain limited. Adaptive protection schemes face similar challenges, as they are typically designed for specific configurations. There is a growing need for tools and methodologies to streamline the deployment of adaptive protection for safe and reliable DER integration. The project main objective was to develop and validate high-fidelity generic models of solar PV facilities for stability, protection, EMT, and QSTS analyses. This objective was achieved, and these models can now be integrated into commercial software tools, enabling utilities, vendors, and developers to study high-penetration PV systems more confidently. The project also demonstrated advanced applications of these models, including the design and deployment of adaptive protection schemes in high-penetration field applications and microgrids, supporting grid safety and reliability. Several milestones were reached by the end of the project. A sophisticated inverter test plan was developed, and inverters representative of the North American marketplace were selected. EPRI and NREL tested various inverters, conforming to IEEE standards. Improvements were made to existing generic models of IBR units, IBR plants, and aggregated feeders for various analyses. The first generic electromagnetic transient (EMT) model for a solar PV plant was developed, conforming to IEEE Std 2800™-2022 and validated against laboratory measurements of a 2.2 MVA large-scale battery energy storage system (BESS) inverter. That model was then used to produce reference responses illustrating examples of validated and verified IBR plant models that pass or fail tests for technical minimum capability and performance as specified in the IEEE standard. The developed, tested, and validated generic models can be used for transmission planning, stability assessments, expansion planning, and evaluating potential future IBR interconnection requirements. They can also support interconnection screens and conformity assessments of IBR plants, including solar PV. The project significantly contributed to the ongoing standardization and model-based representation and verification of IBR responses. The project further addressed challenges of common distribution protection schemes with increasing deployment of DER by developing, validating, and demonstrating adaptive protection schemes (APS) that can improve the reliable and safe integration of DER into distribution systems. New APS were designed using improved DER models for three common distribution systems: a radial feeder, a meshed network, and a microgrid. Modeling and hardware-in-the-loop (HIL) testing of the APS were conducted, successfully showing their effectiveness and selectivity. Proof-of-concept field demonstration was achieved for two APS, i.e., one on a radial feeder and another one in a microgrid. Field demonstration could not be achieved for the APS on a meshed network, primarily due apprehension of one utility partner and also due to limited access to the protective algorithms in the network protectors. Guidelines developed from the lessons learned in the project lay out the general process followed in the design, installation, and commissioning of APS for various distribution systems. Distribution utility partners’ apprehension about field demonstration of the new APS were addressed—with varying success—by taking a stepped risk-management approach of modeling of a wide range of sensitivities first, performing in-depth proof-of-concept testing in the laboratory including HIL next, and finally deliberately implementing and commissioning the actual protection equipment and algorithms into parts of—or in parallel operation to—the three real distribution systems. Future work should include pilot projects that further show the acceptable performance of the developed APS before these schemes be rolled out more widely. Inclusion of both utility and original equipment manufacturers (OEMs) in future projects could increase chances of successful field demonstration. Despite challenges in achieving the field demonstration goal of the project for all three APS, the research significantly contributed to the innovation of adaptive protection solutions for scalable and reliable DER integration into distribution systems. This project significantly enhances the understanding of the impact of using appropriate inverter models on distribution and transmission (T&D) systems. By addressing the limitations of existing generic models, the project introduces high-fidelity models for stability, protection, electromagnetic transient (EMT), and quasi-static time series (QSTS) analyses. These models, integrated into commercial software tools, enable utilities, vendors, and developers to confidently study high-penetration PV systems. The project also demonstrates advanced applications, including adaptive protection schemes (APS) for distribution systems and microgrids, ensuring grid safety and reliability. The technical effectiveness and economic feasibility of the methods are evident through the development and validation of sophisticated inverter test plans and the selection of representative inverters. Testing by EPRI and NREL on retail, commercial, and utility-scale inverters, conforming to IEEE standards, underscores the robustness of the models. Improvements to existing generic models for various analyses further enhance their validity and applicability. The project also identifies gaps in common distribution protection schemes and designed new APS using improved DER models, demonstrating their effectiveness through modeling and hardware-in-the-loop (HIL) testing. The project’s benefits to the public are manifold. By advancing the standardization and model-based representation of IBR response, it supports transmission planning, stability assessments, and future IBR interconnection requirements. The generic models can facilitate better communication between transmission planners and developers, supporting expected IBR plant capability and performance. Additionally, the development of APS for radial feeders, meshed networks, and microgrids supports the integration of distributed energy resources (DERs) into distribution systems, enhancing grid reliability and safety. The project’s emphasis on thorough testing and simplicity in design ensures practical and scalable solutions for DER integration.

14 SOLAR ENERGY↗

Energy Technology Proving Ground Program Plan

New methods of energy production and distribution are required to meet clean energy goals and demands across all U.S. energy sectors. Idaho National Laboratory’s (INL) Integrated Energy Systems (IES) initiative is enabling clean energy research, development, and demonstration (RD&D) activities. To date, IES demonstration programs have been limited by distributed infrastructure and a lack of large-scale facilities to accommodate industry-scale research of Technical Readiness Level (TRL) 6-8 technologies. The IES initiative plans to eliminate these constraints by establishing a new research complex at INL known as the Energy Technology Proving Ground (Proving Ground) to be led by the Energy and Environment Science and Technology Directorate. The Energy and Environment Science and Technology (EES&T) directorate, one of five Idaho National Laboratory (INL) RD&D organizations, focuses on clean energy technologies that anchor the industry-enabling research of the Proving Ground. The Proving Ground will combine diverse clean energy systems into lean integrated test bed of independent multiscale capabilities available to the government and commercial industries to perform research; and will enable INL’s goal of becoming a Net-Zero entity by 2031. This program encompasses existing and new research space at both the in-town Research and Education Campus (REC) and the Arco desert site (the Site). The Proving Ground will support the maturation of IES technologies from TRL 1 through 8 by providing the infrastructure and capabilities needed to sustain a continuum of RD&D from basic science to industry-scale. To establish The Proving Ground and meet INL’s net-zero goals by 2031, nine research program areas have been identified within the IES initiative that require expanded and new capital infrastructure. This program plan provides guidance for establishing the Proving Ground at the Site for plug-and-play pilot testing and proofing of integrated energy system functionality including fission and renewable energy sources for industry driven application platforms.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Energy Technology Proving Ground FY-2026 Program Plan (Rev.1)

New methods of energy production and distribution are required to meet clean energy goals and demands across all U.S. energy sectors. Idaho National Laboratory’s (INL) Integrated Energy Systems (IES) initiative is enabling clean energy research, development, and demonstration (RD&D) activities. To date, IES demonstration programs have been limited by distributed infrastructure and a lack of large-scale facilities to accommodate industry-scale research of Technical Readiness Level (TRL) 6-8 technologies. The IES initiative plans to eliminate these constraints by establishing a new research complex at INL known as the Energy Technology Proving Ground (Proving Ground) to be led by the Energy and Environment Science and Technology Directorate. The Energy and Environment Science and Technology (EES&T) directorate, one of five Idaho National Laboratory (INL) RD&D organizations, focuses on clean energy technologies that anchor the industry-enabling research of the Proving Ground. The Proving Ground will combine diverse clean energy systems into lean integrated test bed of independent multiscale capabilities available to the government and commercial industries to perform research; and will enable INL’s goal of becoming a Net-Zero entity by 2031. This program encompasses existing and new research space at both the in-town Research and Education Campus (REC) and the Arco desert site (the Site). The Proving Ground will support the maturation of IES technologies from TRL 1 through 8 by providing the infrastructure and capabilities needed to sustain a continuum of RD&D from basic science to industry-scale. To establish The Proving Ground and meet INL’s net-zero goals by 2031, nine research program areas have been identified within the IES initiative that require expanded and new capital infrastructure. This program plan provides guidance for establishing the Proving Ground at the Site for plug-and-play pilot testing and proofing of integrated energy system functionality including fission and renewable energy sources for industry driven application platforms.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Interconnection of Distributed Energy Resources in the Indian Context: IEEE 1547-2018 Adaptation for Locally-Appropriate Grid Code Development

The rapid growth of distributed energy resources (DERs) in India and ambitious renewable energy goals set forth by the Indian government have created the need for appropriate distribution interconnection standards to ensure continued system stability, reliability, and resilience. Existing DER interconnection codes in India, at the time of publishing this report, lack many of the critical grid support functionalities for DERs which may protect bulk system stability, such as event ride-through provisions, frequency droop control, or appropriate trip thresholds given the increasing importance of distributed generation. The formal adoption of IEEE 1547-2018 by the Bureau of Indian Standards (BIS) marks a significant step towards achieving appropriate interconnection of DERs, though the implementation of such a standard must be accompanied with careful consideration of the current codes, regulations, and operation of the Indian power system. Studies on the performance of the functionalities within 1547-2018, which properly incorporate local operating conditions, can inform decisions related to the adoption and adaptation of the clauses present in the standard. This report outlines several of these key considerations for stakeholders and provides analyses illustrating the performance of grid support functionalities on typical Indian distribution feeders.

1547↗

ASEAN Technical Exchange Workshop for System Operators, Regulators, and Policymakers

This presentation provides an in-depth exploration of power system planning, cross-border electricity trading, and battery energy storage systems (BESS), offering actionable insights for system operators, regulators, and policymakers. The first section delves into power system planning and analysis, focusing on capacity expansion models and resource adequacy studies, including their role in optimizing system efficiency, managing emissions, and addressing system reliability risks. Key considerations, such as integration of transmission into generation planning and the forecasting versus optimization of customer distributed energy resources (DER) technologies, are explored. The session highlights critical trade-offs in spatial granularity and model runtimes, as well as the feasibility of aligning distribution investments with capacity expansion efforts. The second section examines cross-border electricity trading, with an emphasis on resource adequacy concepts such as reliability targets, loss of load expectation (LOLE), and planning reserve margins (PRM). Case studies on reserve market design and coordination across US regions provide insights into improving reserve deliverability and managing interregional power balance and congestion. This section also addresses market-to-market congestion management, including advanced strategies for high-voltage direct current (HVDC) optimization and ancillary service delivery. Finally, the presentation covers the rapid evolution of Battery Energy Storage Systems (BESS), highlighting their operational growth, regulatory frameworks, and use cases in grid flexibility, energy storage, and reliability. The discussion focuses on the benefits of BESS for system stability, resilience, and integration of renewable energy, offering insights into its role as a vital component in the transition toward a more sustainable and flexible grid. Key performance parameters, such as throughput, round-trip efficiency, and state of charge, are also examined.

25 ENERGY STORAGE↗

Grid Planning for Building Electrification: A Report by the Energy Systems Integration Group’s Grid Planning for Building Electrification Task Force

The increased electrification of buildings across the United States is being driven by technical advancements, cost reductions for some building technologies, consumer preferences, and policy goals for decarbonization. However, the effects of this load growth on the electric distribution system are often only a minor consideration in policymaking and long-term planning studies. The long lead time and useful life of power system equipment means that the decisions taken today are expected to support our society well into the 2060s and beyond. Distribution planning stakeholders can take steps today to establish a grid foundation that captures the new challenges presented by building electrification. This report focuses on building electrification for the residential and commercial sectors, focusing most heavily on space heating, as this end use stands to most strongly impact demand.1 Across all end uses, building electrification could require somewhere between 10% and 70% more electricity generation capacity than exists today depending on technology adoption and energy efficiency.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Thermal Integration of DETAIL Systems

A thermal connection between the Microreactor AGile Non-nuclear Experimental Testbed (MAGNET) and the thermal energy distribution system (TEDS) has been a key part of the Dynamic Energy Transport and Integration Laboratory (DETAIL) plan since the development of the Integrated Energy Systems Roadmap in 2020. This connection provides an expanding demonstration capability for integrated system operations. The thermal connection between MAGNET and TEDS required the selection of a heat exchanger and valves to isolate flow. Research staff within the NEET Crosscutting Technology Development program selected equipment after receiving proposals from multiple vendors. A helical coil heat exchanger from Graham Corporation was selected for its small volume relative to its heat transfer surface area to fit in the limited space available. Triple offset butterfly valves with pneumatic actuators from Flowserve were selected to isolate and/or control flow of the hot gas through the heat exchanger. Staff from Idaho National Laboratory’s (INL) Facilities and Site Services Engineering department designed the piping and structural support. A mechanical construction firm was contracted to install the system. This report documents the design and construction of this thermal connection.

25 ENERGY STORAGE↗

A Case Study in NREL DERMS Asset Management Implementation

The National Renewable Energy Laboratory (NREL) and Smarter Grid Solutions (SGS) plan to present a case study on their implementation of SGS' Strata Grid Distributed Energy Resource Management System at NREL's Energy Systems Integration Facility (ESIF). The ESIF is one of the nation's premier energy systems integration laboratory facilities focused on development and deployment of clean energy technologies and resilient delivery systems. NREL looked for a DERMS to install at the ESIF that is capable of replicating real world scenarios to control and monitor distributed devices from small residential scale to the grid substation level. The DERMS system demonstrates the use cases of beneficial operation and coordination of modern grid devices, leverage DERs for improved grid planning and operation, demand-side management and customer engagement through bidirectional communication with utilities and energy market operations. The presentation will cover the delivery strategy of NREL and SGS, how the use cases help NREL's research, and NREL and SGS plan to expand the system and use cases.

ARIES↗

Planning and Operations in Electricity Markets Under System Transformation

United States electricity markets, planning mechanisms, and operational procedures are currently evolving in concert with three key trends. First, a range of new resources—solar, wind, energy storage, hybrid co-located storage, and distributed energy—are coming online and require new solutions to ensure they are efficiently integrated into existing systems. Second, consumers now face more opportunities to participate in markets by providing demand response and engaging in two-way interactions with the grid. Third, there is an increasing need for enhanced coordination between generation and transmission planning as well as across transmission and distribution systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Hydrogen Load Modeling Method for Integrated Hydrogen Energy System Planning: Preprint

The integrated hydrogen energy system incorporates hydrogen energy into the power grid, which has been recognized as a promising option for reaching a 100% renewable electricity supply. It can make a profit because the hydrogen produced can be sold as fuel or used to generate electricity for grid services. In this paper, we develop a planning model for the integrated hydrogen energy system that considers the uncertainty of the load demand, the renewable energy generation, and the market prices. To calculate the hydrogen load, we simulate the refueling operations at a hydrogen fueling station over the course of one day. Moreover, the long-term profitability of the integrated system under both cur-rent and future conditions is compared in the planning results.

active distribution network↗

A Hydrogen Load Modeling Method for Integrated Hydrogen Energy System Planning

The integrated hydrogen energy system incorporates hydrogen energy into the power grid, which has been recognized as a promising option for reaching a 100% renewable electricity supply. It can make a profit because the hydrogen produced can be sold as fuel or used to generate electricity for grid services. In this paper, we develop a planning model for the integrated hydrogen energy system that considers the uncertainty of the load demand, the renewable energy generation, and the market prices. To calculate the hydrogen load, we simulate the refueling operations at a hydrogen fueling station over the course of one day and generate representative load profiles with K-means clustering. Moreover, the long-term profitability of the integrated system under both current and future conditions is validated in 10-year planning results.