Search NASA⌕ Search

SEARCH · Search NASA

Results for “integrated systems planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Grid Planning for Building Electrification: A Report by the Energy Systems Integration Group’s Grid Planning for Building Electrification Task Force

The increased electrification of buildings across the United States is being driven by technical advancements, cost reductions for some building technologies, consumer preferences, and policy goals for decarbonization. However, the effects of this load growth on the electric distribution system are often only a minor consideration in policymaking and long-term planning studies. The long lead time and useful life of power system equipment means that the decisions taken today are expected to support our society well into the 2060s and beyond. Distribution planning stakeholders can take steps today to establish a grid foundation that captures the new challenges presented by building electrification. This report focuses on building electrification for the residential and commercial sectors, focusing most heavily on space heating, as this end use stands to most strongly impact demand.1 Across all end uses, building electrification could require somewhere between 10% and 70% more electricity generation capacity than exists today depending on technology adoption and energy efficiency.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Effectively Considering the Distribution System in Integrated Resource Plans

While electricity planning practices vary by state and utility based on utility type and market structure, integrated resource planning (IRP) remains a prominent vehicle — even in states with centrally-organized wholesale electricity markets. IRP focuses on meeting forecasted long-term electricity needs. Typically, utilities have not considered impacts of design and operation of the low-voltage distribution network in IRP. With advanced capabilities of grid-edge technologies to generate and store electricity and provide load flexibility, and large utility investments in distribution systems, it's increasingly important to consider at least some distribution planning elements in IRP. This report considers the value proposition for doing so, such as reducing utility costs through resource co-optimization and strategic siting of grid-edge resources, and idenfities the most important touchpoints between planning for bulk power and distribution systems and provide a range of tactics for integrating these two processes.

Relf, Grace [Lawrence Berkeley National Laboratory↗

Integrated Distribution Planning

The contemporary distribution planning landscape is comprised of an increasing number of factors that require integration into the engineering of the modern electric grid. Expectations for electric utilities to accommodate heightened awareness of stakeholders' interest in things like decarbonization, resilience and equity are growing. As these interests are formed into objectives, many jurisdictions will experience increasing levels of load modifying technologies like DER, building and industrial electrification and electric vehicles which prove not only to challenge the capabilities of the grid; but the processes by which planning for it is traditionally done. Other related factors that strain the conventional distribution planning mold are the swelling amount and sources of data associated with these technologies and the need it creates for improved capabilities in the processes and tools that manage it. As the complexity of the distribution system expands, so will the distribution system's effects on the transmission and generation systems that it is a part of. Forecasting distribution system load and DER are examples of areas where this complexity will manifest, and harmonizing distribution forecasting with transmission and generation forecasting requires higher amounts of intentionality as these typically separate processes become a solitary one. Of course, core activities do not cease as a utility begins to integrate these other factors, and in this webinar we explore specifics of how distribution planning can be expected to evolve as progress towards Integrated Distribution System Planning is made.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Systems Engineering Management Plan NASA Traffic Aware Planner Integration Into P-180 Airborne Test-Bed

NASA's Traffic Aware Planner (TAP) is a cockpit decision support tool that provides aircrew with vertical and lateral flight-path optimizations with the intent of achieving significant fuel and time savings, while automatically avoiding traffic, weather, and restricted airspace conflicts. A key step towards the maturation and deployment of TAP concerned its operational evaluation in a representative flight environment. This Systems Engineering Management Plan (SEMP) addresses the test-vehicle design, systems integration, and flight-test planning for the first TAP operational flight evaluations, which were successfully completed in November 2013. The trial outcomes are documented in the Traffic Aware Planner (TAP) flight evaluation paper presented at the 14th AIAA Aviation Technology, Integration, and Operations Conference, Atlanta, GA. (AIAA-2014-2166, Maris, J. M., Haynes, M. A., Wing, D. J., Burke, K. A., Henderson, J., & Woods, S. E., 2014).

Maris, John↗

Integrating Resilience Planning in Distribution System Planning

Electric utilities, regulators, and stakeholders face increasing risks of severe storms, freezes, floods, and heat waves damaging grid infrastructure and causing power outages—and increasing risks of utility equipment igniting wildfires. At the same time, customer electricity rates have risen substantially in recent years, due in part to replacing aging infrastructure and improving resilience to natural hazards and physical threats. To address these challenges, utilities are beginning to move beyond traditional, siloed planning processes to balance resilience with other fundamental grid objectives such as affordability, reliability, safety, and serving new loads. This study presents a framework for states and utilities that want to advance integration of resilience and distribution planning processes to improve planning efficiency, better prioritize cost-effective grid expenditures, and balance planning objectives. The framework includes 7 key integration points between these planning processes: -Strategy process -Data -Threat assessments -Solution identification and prioritization -Optimization opportunities -Consideration of other grid needs -Metrics Lawrence Berkeley National Laboratory reviewed utility distribution system plans and interviewed subject matter experts to identify emerging practices for each of the 7 integration points. This report presents these practices, which can be used as a guide toward more holistic planning and cohesive investment strategies. It also includes 3 case studies to provide practical examples of how utilities apply such integrated planning processes: two pole hardening programs and one microgrid planning effort. The report concludes by identifying opportunities for future research.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Space Transportation System Cargo projects: inertial stage/spacecraft integration plan. Volume 1: Management plan

The Kennedy Space Center (KSC) Management System for the Inertial Upper Stage (IUS) - spacecraft processing from KSC arrival through launch is described. The roles and responsibilities of the agencies and test team organizations involved in IUS-S/C processing at KSC for non-Department of Defense missions are described. Working relationships are defined with respect to documentation preparation, coordination and approval, schedule development and maintenance, test conduct and control, configuration management, quality control and safety. The policy regarding the use of spacecraft contractor test procedures, IUS contractor detailed operating procedures and KSC operations and maintenance instructions is defined. Review and approval requirements for each documentation system are described.

Source record↗

Advanced satellite workstation: An integrated workstation environment for operational support of satellite system planning and analysis

A prototype integrated environment, the Advanced Satellite Workstation (ASW), is described that has been developed and delivered for evaluation and operator feedback in an operational satellite control center. The current ASW hardware consists of a Sun Workstation and Macintosh II Workstation connected via an ethernet Network Hardware and Software, Laser Disk System, Optical Storage System, and Telemetry Data File Interface. The central mission of ASW is to provide an intelligent decision support and training environment for operator/analysts of complex systems such as satellites. There have been many workstation implementations recently which incorporate graphical telemetry displays and expert systems. ASW is a considerably broader look at intelligent, integrated environments for decision support, based upon the premise that the central features of such an environment are intelligent data access and integrated toolsets. A variety of tools have been constructed in support of this prototype environment including: an automated pass planner for scheduling vehicle support activities, architectural modeler for hierarchical simulation and analysis of satellite vehicle subsystems, multimedia-based information systems that provide an intuitive and easily accessible interface to Orbit Operations Handbook and other relevant support documentation, and a data analysis architecture that integrates user modifiable telemetry display systems, expert systems for background data analysis, and interfaces to the multimedia system via inter-process communication.

Sutton, Stewart A.↗

Program Review: Thermal Systems Pillar

Program Review: Thermal Systems Pillar Slides go over the 3 year plan for the integrated energy systems program DETAIL. The plan goes into connections between the DETAIL components and plans for future integration.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Using neural networks and Dyna algorithm for integrated planning, reacting and learning in systems

The traditional AI answer to the decision making problem for a robot is planning. However, planning is usually CPU-time consuming, depending on the availability and accuracy of a world model. The Dyna system generally described in earlier work, uses trial and error to learn a world model which is simultaneously used to plan reactions resulting in optimal action sequences. It is an attempt to integrate planning, reactive, and learning systems. The architecture of Dyna is presented. The different blocks are described. There are three main components of the system. The first is the world model used by the robot for internal world representation. The input of the world model is the current state and the action taken in the current state. The output is the corresponding reward and resulting state. The second module in the system is the policy. The policy observes the current state and outputs the action to be executed by the robot. At the beginning of program execution, the policy is stochastic and through learning progressively becomes deterministic. The policy decides upon an action according to the output of an evaluation function, which is the third module of the system. The evaluation function takes the following as input: the current state of the system, the action taken in that state, the resulting state, and a reward generated by the world which is proportional to the current distance from the goal state. Originally, the work proposed was as follows: (1) to implement a simple 2-D world where a 'robot' is navigating around obstacles, to learn the path to a goal, by using lookup tables; (2) to substitute the world model and Q estimate function Q by neural networks; and (3) to apply the algorithm to a more complex world where the use of a neural network would be fully justified. In this paper, the system design and achieved results will be described. First we implement the world model with a neural network and leave Q implemented as a look up table. Next, we use a lookup table for the world model and implement the Q function with a neural net. Time limitations prevented the combination of these two approaches. The final section discusses the results and gives clues for future work.

Lima, Pedro↗

Innovative Development of a Cross-Center Timeline Planning Tool

The Payload Operations Integration Center (POIC) at Marshall Space Flight Center (MSFC) is the United States focal point to support operations controllers and payload developers conducting payload science operations for the National Aeronautics and Space Administration (NASA) aboard the International Space Station (ISS). Some of the key functions are planning, coordination and scheduling of science activities. This effort occurs in coordination with other NASA centers, international partners, and payload developers. The ability to efficiently plan and re-plan in response to change is critical to the flight planning teams. Additionally, in Fall 2017, NASA will increase its ability to perform payload science operations aboard the ISS with a fourth crew member. In order to support this, there will be an increasing need to quickly plan and schedule more activities. In the past, it was cumbersome and time-consuming to consolidate copious amounts of planning and change request data from various sources. Planners would summarize information from the Johnson Space Center (JSC) Operations Planning Timeline Integration System (OPTIMIS) and manually integrate it with other data in order to produce a Timeline Planning Summary (TPS). This lengthy process of updating static documents while planning and re-planning was cumbersome, introduced human error, and was inflexible to last minute changes. There was a need for a dynamic, more efficient, less erroneous, and more concise way of building a report that could be readily updated as fast as payload science plans change.

Pedoto, Ramon W.↗

Human Frontal Lobes and AI Planning Systems

Human frontal lobes are essential for maintaining a self-regulating balance between predictive and reactive behavior. This paper describes a system that integrates prediction and reaction based on neuropsychological theories of frontal lobe function. In addition to enhancing our understanding of deliberate action in humans' the model is being used to develop and evaluate the same properties in machines. First, the paper presents some background neuropsychology in order to set a general context. The role of frontal lobes is then presented by summarizing three theories which formed the basis for this work. The components of an artificial frontal lobe are then discussed from both neuropsychological and AI perspectives. The paper concludes by discussing issues and methods for evaluating systems that integrate planning and reaction.

Levinson, Richard↗

Building a functional, integrated GIS/remote sensing resource analysis and planning system

To be an effective tool for resource analysis and planning, a geographic information system (GIS) needs to be integrated with a digital remote sensing capability. To be truly functional, the paired system must be driven by grass roots local needs. A case study couched in a Soil Conservation District in northern Utah is presented. Agency representatives determined that the most fundamental data sets to be entered into the GIS system analysis system in the first round were: land use/land cover; geomorphic/soil unit data; hydrologic unit data; and digital terrain. The least expensive and best ways to obtain these data were determined. Data were acquired and formatted to enter the state's PRIME/ARC-INFO GIS, and are being interrogated for resource management decisions related to such issues as agricultural preservation, urban expansion, soil erosion control, and dam siting.

Ridd, M. K.↗

NASA's International Space Station: A Testbed for Planetary Protection Protocol Development

Wherever humans go, they inevitably carry along the critters that live in and on them. Conventional wisdom has long held that it is unlikely those critters could survive the space environment, but in 2007 some microscopic aquatic animals called Tardigrades survived exposure to space and in 2008 Cyanobacteria lived for 548 days outside the ISS. Unlike the Mars rovers that were cleaned once and sent on their way, crew members will provide a constantly regenerating contaminant source. Are we prepared to certify that we can meet forward contamination protocols as we search for life at new destinations? What about the organisms we might reasonably expect a crewed spacecraft to leak or vent? Do we even know what they are? How long might our tiny hitch-hikers survive in close proximity to a warm spacecraft that periodically leaks/vents water or oxygen and how might they mutate with long-duration exposure? How will these contaminants migrate from their source in conditions encountered in space or on other planetary surfaces? This project aims to answer some of these questions by bringing together key stakeholder communities to develop a human forward contamination test, analysis, and integration plan. A system engineering approach to identify the experiments, analysis, and modeling needed to develop the contamination control protocols required will be used as a roadmap to integrate the many different parts of this problem - from launch to landing, living, and working on another planetary surface.

Bell, M. S.↗