Search NASA⌕ Search

SEARCH · Search NASA

Results for “jwst lessons learned”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Thermal Control of Boundaries for JWST Infrared Tests in Cryogenic Vacuum Configuration

In 2017, the combined Optical Telescope Element and Integrated Science Instrument Module (OTIS) of the James Webb Space Telescope (JWST) underwent functional testing and optical metrology verification under cryogenic vacuum conditions in Chamber A at the Johnson Space Center (JSC). Testing the infrared Science Instruments and OTIS optics below 50 K required an environment architecture that comprehensively controlled the temperature and energy path of every seam and penetration in the over 1100 sq m of Chamber A helium shroud surfaces as well as the Ground Support Equipment (GSE) inside it. This paper outlines the design and implementation of thermal closeouts, thermal anchoring systems for electrical cables, and thermal control systems around room-temperature optical metrology equipment inside the helium shroud. It also details lessons learned from the repeated implementation and testing of these environmental control systems throughout the JWST Pathfinder test campaign.

Huguet, Jesse A.↗

James Webb Space Telescope: Supporting Multiple Ground System Transitions in One Year

Ideas, requirements, and concepts developed during the very early phases of the mission design often conflict with the reality of a situation once the prime contractors are awarded. This happened for the James Webb Space Telescope (JWST) as well. The high level requirement of a common real-time ground system for both the Integration and Test (I&T), as well as the Operation phase of the mission is meant to reduce the cost and time needed later in the mission development for re-certification of databases, command and control systems, scripts, display pages, etc. In the case of JWST, the early Phase A flight software development needed a real-time ground system and database prior to the spacecraft prime contractor being selected. To compound the situation, the very low level requirements for the real-time ground system were not well defined. These two situations caused the initial real-time ground system to be switched out for a system that was previously used by the Bight software development team. To meet the high-!evel requirement, a third ground system was selected based on the prime spacecraft contractor needs and JWST Project decisions. The JWST ground system team has responded to each of these changes successfully. The lessons learned from each transition have not only made each transition smoother, but have also resolved issues earlier in the mission development than what would normally occur.

Detter, Ryan↗

Looking at Hubble Through the Eyes of JWST

The phase retrieval algorithm developed for the James Webb Space Telescope (JWST) is used to process archival image data that was originally used to characterize the Hubble primary mirror edge defect. The Hubble mirror conic constant is inferred from these results and comparisons are made with earlier conic values reported by teams comprising the HARP (Hubble Aberration Recovery Project) study. A number of important lessons learned from the Hubble phase retrieval problem are described and a discussion is given on how these have been incorporated into the JWST Observatory design.

Dean, Bruce H.↗

Design and Lessons Learned on the Development of a Cryogenic Pupil Select Mechanism (PSM)

Calibration and testing of the instruments on the Integrated Science Instrument Module (ISIM) of the James Webb Space Telescope (JWST) is being performed by the use of a cryogenic, full-field, optical simulator that was constructed for this purpose. The Pupil Select Mechanism (PSM) assembly is one of several mechanisms and optical elements that compose the Optical Telescope Element SIMulator, or OSIM. The PSM allows for several optical elements to be inserted into the optical plane of OSIM, introducing a variety of aberrations, distortions, obscurations, and other calibration states into the pupil plane. The following discussion focuses on the details of the design evolution, analysis, build, and test of this mechanism along with the challenges associated with creating a sub arc-minute positioning mechanism operating in an extreme cryogenic environment. In addition, difficult challenges in the control system design will be discussed including the incorporation of closed-loop feedback control into a system that was designed to operate in an open-loop fashion.

PSM Design↗

James Webb Space Telescope (JWST) Integrated Science Instruments Module (ISIM) Cryo-Vacuum (CV) Test Campaign Summary

JWST Integrated Science Instruments Module (ISIM) completed its system-level space simulation testing program at the NASA Goddard Space Flight Center (GSFC). In March 2016, ISIM was successfully delivered to the next level of integration with the Optical Telescope Element (OTE), to form OTIS (OTE + ISIM), after concluding a series of three cryo-vacuum (CV) tests. During these tests, the complexity of the mission has generated challenging requirements that demand highly reliable system performance and capabilities from the Space Environment Simulator (SES) vacuum chamber. The first test served as a risk reduction test; the second test provided the initial verification of the fully-integrated flight instruments; and the third test verified the system in its final flight configuration following mechanical environmental tests (vibration and acoustics). From one test to the next, shortcomings of the facility were uncovered and associated improvements in operational capabilities and reliability of the facility were required to enable the project to verify system-level requirements. This paper: (1) provides an overview of the integrated mechanical and thermal facility systems required to achieve the objectives of JWST ISIM testing, (2) compares the overall facility performance and instrumentation results from the three ISIM CV tests, and (3) summarizes lessons learned from the ISIM testing campaign.

Yew, Calinda↗

James Webb Space Telescope (JWST) Integrated Science Instruments Module (ISIM) Cryo-Vacuum (CV) Test Campaign Summary

JWST Integrated Science Instruments Module (ISIM) has completed its system-level testing program at the NASA Goddard Space Flight Center (GSFC). In March 2016, ISIM was successfully delivered for integration with the Optical Telescope Element (OTE) after the successful verification of the system through a series of three cryo-vacuum (CV) tests. The first test served as a risk reduction test; the second test provided the initial verification of the fully-integrated flight instruments; and the third test verified the system in its final flight configuration. The complexity of the mission has generated challenging requirements that demand highly reliable system performance and capabilities from the Space Environment Simulator (SES) vacuum chamber. As JWST progressed through its CV testing campaign, deficiencies in the test configuration and support equipment were uncovered from one test to the next. Subsequent upgrades and modifications were implemented to improve the facility support capabilities required to achieve test requirements. This paper: (1) provides an overview of the integrated mechanical and thermal facility systems required to achieve the objectives of JWST ISIM testing, (2) compares the overall facility performance and instrumentation results from the three ISIM CV tests, and (3) summarizes lessons learned from the ISIM testing campaign.

Yew, Calinda↗

Successful Completion of the JWST OGSE2 Cryogenic Test at JSC Chamber-A While Managing Numerous Challenges

The James Webb Space Telescope (JWST) Optical Telescope Element (OTE) assembly is the largest optically stable infrared-optimized telescope currently being manufactured and assembled, and scheduled for launch in 2018. The JWST OTE, including the primary mirrors, secondary mirror, and the Aft Optics Subsystems (AOS) are designed to be passively cooled and operate at near 45 degrees Kelvin. Due to the size of its large sunshield in relation to existing test facilities, JWST cannot be optically or thermally tested as a complete observatory-level system at flight temperatures. As a result, the telescope portion along with its instrument complement will be tested as a single unit very late in the program, and on the program schedule critical path. To mitigate schedule risks, a set of 'pathfinder' cryogenic tests will be performed to reduce program risks by demonstrating the optical testing capabilities of the facility, characterizing telescope thermal performance, and allowing project personnel to learn valuable testing lessons off-line. This paper describes the 'pathfinder' cryogenic test program, focusing on the recently completed second test in the series called the Optical Ground Support Equipment 2 (OGSE2) test. The JWST OGSE2 was successfully completed within the allocated project schedule while faced with numerous conflicting thermal requirements during cool-down to the final cryogenic operational temperatures, and during warm-up after the cryo-stable optical tests. The challenges include developing a pre-test cool-down and warm-up profiles without a reliable method to predict the thermal behaviors in a rarified helium environment, and managing the test article hardware safety driven by the project Limits and Constraints (L&C's). Furthermore, OGSE2 test included the time critical Aft Optics Subsystem (AOS), a part of the flight Optical Telescope Element that would need to be placed back in the overall telescope assembly integrations. The OGSE2 test requirements included the strict adherence of the project contamination controls due to the presence of the contamination sensitive flight optical elements. The test operations required close coordination of numerous personnel while they being exposed and trained for the 'final' combined OTE and instrument cryo-test in 2017. This paper will also encompass the OGSE2 thermal data look-back review.

JWST OGSE2 Cryogenic Test↗

James Webb Space Telescope - L2 Communications for Science Data Processing

JWST is the first NASA mission at the second Lagrange point (L2) to identify the need for data rates higher than 10 megabits per second (Mbps). JWST will produce approximately 235 Gigabits of science data every day that will be downlinked to the Deep Space Network (DSN). To get the data rates desired required moving away from X-band frequencies to Ka-band frequencies. To accomplish this transition, the DSN is upgrading its infrastructure. This new range of frequencies are becoming the new standard for high data rate science missions at L2. With the new frequency range, the issues of alternatives antenna deployment, off nominal scenarios, NASA implementation of the Ka-band 26 GHz, and navigation requirements will be discussed in this paper. JWST is also using Consultative Committee for Space Data Systems (CCSDS) standard process for reliable file transfer using CCSDS File Delivery Protocol (CFDP). For JWST the use of the CFDP protocol provides level zero processing at the DSN site. This paper will address NASA implementations of Ground Stations in support of Ka-band 26 GHz and lesson learned from implementing a file base (CFDP) protocol operational system.

Johns, Alan↗

The Role of NASA Engineering & Safety Center (NESC) in Advancing NASA’s Astrophysics Missions (Past, Present, and Future)

The NASA Engineering & Safety Center (NESC) was established in 2003 (after the Columbia accident) to provide an independent technical resource for the resolution of challenging technical problems (through the use of studies, analysis, tests, etc.) for NASA programs and projects. Since its inception, NESC has completed nearly 1000 technical assessments for NASA’s Human Exploration and Operation Mission Directorate (HEOMD), Science Mission Directorate (SMD), Space Technology Mission Directorate (STMD), and Aeronautics Research Mission Directorate (ARMD). Of the SMD related assessments, several were for the resolution of technical problems, analysis, or studies related to NASA’s astrophysics missions in various phases of the project from design to operation. Some of the recent examples of NESC technical support for NASA astrophysics missions have been for: Hubble Space Telescope (HST), Chandra X-ray Observatory (CXO), Fermi Gamma-ray Space Telescope, Kepler Space Telescope, Transiting Exoplanet Survey Satellite (TESS), James Webb Space Telescope (JWST), and Laser Interferometer Space Antenna (LISA). In this paper, we outline some of the technical challenges faced by these astrophysics missions and describe how NESC contributed to their resolution. The case studies cover a wide range of disciplines involving space telescopes, detectors, lasers, and attitude control systems. These efforts include innovative solutions for extending the life of the missions, technical resolution of challenging problems, strategies for risk mitigation, and failure investigations combined with lessons learned reports to advance discipline knowledge, enhance NASA capabilities, and avoid future problems.

NASA↗

Commissioning the James Webb Space Telescope Observatory

The James Webb Space Telescope (JWST) is going through final integration and testing and is planned to launch in 2021. The last remaining optical challenge for JWST is to fully align the observatory in flight to meet the optical requirements but this effort involves many system considerations to do this safely and efficiently and the entire effort will take several months. This talk will cover what it takes to deploy and optically commission the telescope including the many interactions and constraints of deployment, thermal, optical, attitude control and contamination properties of the observatory. The talk will cover the final optical requirements that the telescope will need to meet and will provide the roadmap of timelines, cooldown profiles, Wavefront Sensing and Control steps, system constraint considerations, and implementation of lessons learned from the ground test campaign that will result in meeting those optical requirements. The talk will also cover the organizational structure and processes in place to assure this process will be successful and efficient.

Commissioning JWST OBS↗

Cryogenic Fiber Optic Assemblies for Spaceflight Environments: Design, Manufacturing, Testing, and Integration

Fiber optic assemblies have been used on spaceflight missions for many years as an enabling technology for routing, transmitting, and detecting optical signals. Due to the overwhelming success of NASA in implementing fiber optic assemblies on spaceflight science-based instruments, system scientists increasingly request fibers that perform in extreme environments while still maintaining very high optical transmission, stability, and reliability. Many new applications require fiber optic assemblies that will operate down to cryogenic temperatures as low as 20 Kelvin. In order for the fiber assemblies to operate with little loss in optical throughput at these extreme temperatures requires a system level approach all the way from how the fiber assembly is manufactured to how it is held, routed, and integrated. The NASA Goddard Code 562 Photonics Group has been designing, manufacturing, testing, and integrating fiber optics for spaceflight and other high reliability applications for nearly 20 years. Design techniques and lessons learned over the years are consistently applied to developing new fiber optic assemblies that meet these demanding environments. System level trades, fiber assembly design methods, manufacturing, testing, and integration will be discussed. Specific recent examples of ground support equipment for the James Webb Space Telescope (JWST); the Ice, Cloud and Land Elevation Satellite-2 (ICESat-2); and others will be included.

Fiber Optic↗

Evolution of Software-Only-Simulation at NASA IV and V

Software-Only-Simulations have been an emerging but quickly developing field of study throughout NASA. The NASA Independent Verification Validation (IVV) Independent Test Capability (ITC) team has been rapidly building a collection of simulators for a wide range of NASA missions. ITC specializes in full end-to-end simulations that enable developers, VV personnel, and operators to test-as-you-fly. In four years, the team has delivered a wide variety of spacecraft simulations that have ranged from low complexity science missions such as the Global Precipitation Management (GPM) satellite and the Deep Space Climate Observatory (DSCOVR), to the extremely complex missions such as the James Webb Space Telescope (JWST) and Space Launch System (SLS).This paper describes the evolution of ITCs technologies and processes that have been utilized to design, implement, and deploy end-to-end simulation environments for various NASA missions. A comparison of mission simulators are discussed with focus on technology and lessons learned in complexity, hardware modeling, and continuous integration. The paper also describes the methods for executing the missions unmodified flight software binaries (not cross-compiled) for verification and validation activities.

Embedded↗

James Webb Space Telescope Optical Telescope Element / Integrated Science Instrument Module (OTIS) Cryogenic Vacuum Test Part I: Thermal Architecture

The James Webb Space Telescope (JWST), set to launch in early 2019, is currently undergoing a series of system-level environmental tests to verify its workmanship and end-to-end functionality. As part of this series, the Optical Telescope Element and Integrated Science Instrument Module (OTIS) Cryo-Vacuum (CV) test, the most complex cryogenic test executed to date by NASA, was completed in 2017 at the Johnson Space Center's Chamber A facility. The OTIS CV test was intended as a comprehensive test of the integrated instrument and telescope systems to fully understand its optical, structural, and thermal performance within its intended flight environment. Due to its complexity, extensive pre-test planning was required to ensure payload safety and compliance with all limits and constraints. A comprehensive thermal analysis campaign was undertaken to predict the behavior of the test payload during its transition to cryogenic temperatures and back to ambient, and exhaustive preparations for off-nominal scenarios were studied due to the increased possibility of unanticipated events during the 100-day test length. This current four-part online course for the NASA Engineering and Safety Center (NESC) Academy gives a thorough overview of the mutiple years of preparation executed by hundreds of individuals to ensure the success of the JWST OTIS CV Test. Part I will introduce the major components of James Webb and specifically the OTIS CV Test thermal architecture. Part II will encompass the extensive thermal analysis performed to prepare for the test. Part III will talk about the preparations for off-nominal events: what analysis was done, and how steps were taken pre-test to anticipate unexpected circumstances and mitigate their impacts to hardware and test timeline. Part IV is a recap of the lessons learned from the thermal perspective for both the payload and ground support equipment (GSE) test conductors. It is hoped that the insight gained from the OTIS CV test campaign will benefit planning and execution for upcoming large cryogenic missions.

OTIS↗

James Webb Space Telescope Optical Telescope Element / Integrated Science Instrument Module (OTIS) Cryogenic Vacuum Test Part II: Thermal Analysis

The James Webb Space Telescope (JWST), set to launch in early 2019, is currently undergoing a series of system-level environmental tests to verify its workmanship and end-to-end functionality. As part of this series, the Optical Telescope Element and Integrated Science Instrument Module (OTIS) Cryo-Vacuum (CV) test, the most complex cryogenic test executed to date by NASA, was completed in 2017 at the Johnson Space Center's Chamber A facility. The OTIS CV test was intended as a comprehensive test of the integrated instrument and telescope systems to fully understand its optical, structural, and thermal performance within its intended flight environment. Due to its complexity, extensive pre-test planning was required to ensure payload safety and compliance with all limits and constraints. A comprehensive thermal analysis campaign was undertaken to predict the behavior of the test payload during its transition to cryogenic temperatures and back to ambient, and exhaustive preparations for off-nominal scenarios were studied due to the increased possibility of unanticipated events during the 100-day test length. This current four-part online course for the NASA Engineering and Safety Center (NESC) Academy gives a thorough overview of the multiple years of preparation executed by hundreds of individuals to ensure the success of the JWST OTIS CV Test. Part I will introduce the major components of James Webb and specifically the OTIS CV Test thermal architecture. Part II will encompass the extensive thermal analysis performed to prepare for the test. Part III will talk about the preparations for off-nominal events: what analysis was done, and how steps were taken pre-test to anticipate unexpected circumstances and mitigate their impacts to hardware and test timeline. Part IV is a recap of the lessons learned from the thermal perspective for both the payload and ground support equipment (GSE) test conductors. It is hoped that the insight gained from the OTIS CV test campaign will benefit planning and execution for upcoming large cryogenic missions.

Testing↗

Commissioning the James Webb Space Telescope Optical Telescope Element

The James Webb Space Telescope (JWST) launched on December 25th, 2021. The observatory was deployed and commissioned during its first six months. The Optical Telescope Element includes both large deployments of the Deployable Tower Assembly, Secondary Mirror Support Structure and the Primary Mirror Wings and it includes the deployment and alignment of the 18 primary mirror segments and the secondary mirror. The initial phase included cooldown and ice mitigation efforts followed by telescope deployments, mirror deployment and wavefront sensing and control. This paper will discuss the entire OTE commissioning from deployment through alignment including a discussion of results and lessons learned.

Lee D Feinberg↗

Imaging Transitional Disks with TMT: Lessons Learned from the SEEDS Survey

TMT studies of the early phases of giant planet formation will build on studies carried out in this decade using 8-meter class telescopes. One such study is the Strategic Exploration of Exoplanets and Disks with Subaru transitional disk survey. We have found a wealth of indirect signatures of giant planet presence, including spiral arms, pericenter offsets of the outer disk from the star, and changes in disk color at the inner edge of the outer disk in intermediate-mass PMS star disks. T Tauri star transitional disks are less flamboyant, but are also dynamically colder: any spiral arms in these diskswill be more tightly wound. Imaging such features at the distance of the nearest star-forming regions requires higher angular resolution than achieved with HiCIAO+ AO188. Imaging such disks with extreme AO systems requires use of laser guide stars, and are infeasible with the extreme AO systems currently commissioning on 8-meter class telescopes. Similarly, the JWST and AFTAWFIRST coronagraphs being considered have inner working angles 0.2, and will occult the inner 28 atomic units of systems at d140pc, a region where both high-contrast imagery and ALMA data indicate that giant planets are located in transitional disks. However, studies of transitional disks associated with solar-mass stars and their planet complement are feasible with TMT using NFIRAOS.

star-forming regions↗

Optical Testing and Verification Methods for the James Webb Space Telescope Integrated Science Instrument Module Element

NASA's James Webb Space Telescope (JWST) is a 6.6m diameter, segmented, deployable telescope for cryogenic IR space astronomy (~40K). The JWST Observatory includes the Optical Telescope Element (OTE) and the Integrated Science Instrument Module (ISIM) that contains four science instruments (SI) and the fine guider. The SIs are mounted to a composite metering structure. The SI and guider units were integrated to the ISIM structure and optically tested at the NASA Goddard Space Flight Center as a suite using the Optical Telescope Element SIMulator (OSIM). OSIM is a full field, cryogenic JWST telescope simulator. SI performance, including alignment and wave front error, were evaluated using OSIM. We describe test and analysis methods for optical performance verification of the ISIM Element, with an emphasis on the processes used to plan and execute the test. The complexity of ISIM and OSIM drove us to develop a software tool for test planning that allows for configuration control of observations, associated scripts, and management of hardware and software limits and constraints, as well as tools for rapid data evaluation, and flexible re-planning in response to the unexpected. As examples of our test and analysis approach, we discuss how factors such as the ground test thermal environment are compensated in alignment. We describe how these innovative methods for test planning and execution and post-test analysis were instrumental in the verification program for the ISIM element, with enough information to allow the reader to consider these innovations and lessons learned in this successful effort in their future testing for other programs.

spaceborne telescopes↗

NASA Space Flight Program and Project Management Handbook

This handbook is the companion document to NPR 7120.5F, NASA Space Flight Program and Project Management Requirements. It represents the accumulation of knowledge on managing program and projects derived from NASA’s human, robotic, and scientific missions. It incorporates the “corporate knowledge” for existing and future NASA space flight programs and projects, including NASA’s Artemis missions to establish a sustainable human presence on the Moon through collaboration with commercial and international partners, NASA’s James Webb Space Telescope (JWST) mission, and NASA’s robotic missions on Mars. The practices discussed have evolved as a function of NASA’s core values of safety, integrity, teamwork, excellence, and inclusion, and may also prove a resource for other agencies, the private sector, and academia. The knowledge gained from the Agency’s victories and defeats, including the checks and balances and initiatives to better control cost and risk, provides a foundation for continuing an exciting and healthy space program. This handbook provides implementation guidance for NPR 7120.5F and includes the changes and updates to key procedural requirements in NPR 7120.5F since NPR 7120.5E. The goal of the NPR requirements is to ensure programs and projects are developed and successfully executed in the most cost-effective and efficient manner possible. This handbook provides context, rationale, and explanation to facilitate the application of requirements and to pass on some of the hard-won best practices and lessons learned.

Tracy L Osborne↗