Search NASA⌕ Search

SEARCH · Search NASA

Results for “landing site criteria”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

The first Viking mission to Mars

The paper outlines the major goals and present achievements of the Viking 1 mission to Mars. The construction and instrumentation of the orbiter and lander are described. The criteria used to select the optimum landing site are discussed together with orbit adjustments and the landing process. Special attention is given to constraints on surface coverage and observation conditions.

Soffen, G. A.↗

A multi-criteria land suitability assessment of field allocation decisions for switchgrass

With the goal of evaluating biomass resource availability in certain regions in the United States, the Department of Energy, Department of Agriculture, Environmental Protection Agency, national laboratories, and Forest Service research laboratories, together with academic and industry collaborators, performed a resource analysis study, 2016 Billion-Ton Report: Advancing Domestic Resources for a Thriving Bioeconomy, Volume 1: Economic Availability of Feedstocks, using POLYSYS model to estimate biomass potential. The study provided county- and state-level biomass potential projections, with biomass feedstock production estimates and suitability assessment of lands acreage likely to transition to energy crops. For this analysis, we estimate biomass supply by year 2028, more specifically, lands acreage transition to switchgrass in the Midwest of the United States, across 50 counties in 3 states (Nebraska, Kansas, and Colorado). We propose a multi-criteria site suitability framework, to determine the potential acreage and production for switchgrass, at the field level. Site selection criteria span agronomic and ecosystem services such as previous land cover, crop rotation, soil water holding capacity, crop productivity, field efficiency, topography, soil organic matter, soil leaching propensity, distance to surface water bodies, and soil erosivity. Efficient agricultural field selection for dedicated energy crops field allocation is critical to evaluate biomass resource availability, and it is our position that estimation at the field level would provide a more accurate and useful estimation to support an emerging bioeconomy. Using field suitability scores and county-level assessments, we model land allocation decision for energy crop in the future, estimating the spatial distribution of dynamics of energy crop adoption with priority to fields scoring the highest. Additionally, compared with POLYSYS results from the report mentioned above, our method shows good performance overall, with about 2% and 1.2% of difference in switchgrass acreage allocation and crop production, respectively.

54 ENVIRONMENTAL SCIENCES↗

Guideline for Characterizing and Evaluating a Candidate Project Site for Solar Thermal Applications

This document presents a structured procedure for characterizing and evaluating candidate project sites for concentrating solar power (CSP) and solar heat for industrial processes (SHIP) applications. The objective is to provide project developers, researchers, and other stakeholders with a consistent, technology-agnostic framework for early-stage site assessment, enabling informed decision-making prior to significant investment in project development. Site selection is a critical factor in project success or failure for both CSP and SHIP projects. Key factors such as solar resource availability, land characteristics, environmental and regulatory constraints, infrastructure availability, and community context are determined by the choice of project site and can materially impact project performance, cost, schedule, and overall viability. This procedure is designed to systematically evaluate these factors, identify potential fatal flaws, and prioritize the most favorable candidate sites for further development. The process begins with rapid screening-level evaluation, using publicly available data to assess solar resource, land availability and suitability, zoning and land-use compatibility, and exclusion zones such as protected lands or sensitive habitats. Sites that meet the minimum screening criteria advance to a more detailed characterization. Subsequent sections of this report provide guidance for a next-level assessment of the most important technical and environmental parameters, including: 1) Solar resource quality, variability, and uncertainty using multiyear datasets and, where appropriate, on-site measurement campaigns; 2) Meteorological conditions such as wind, temperature, extreme weather events, and soiling impacts; 3) Land characteristics including slope, shading, and geotechnical conditions; and 4) Environmental and regulatory considerations, including permitting processes, endangered species, cultural resources, and visual impacts. The procedure also addresses infrastructure and integration considerations, including: 1) Grid interconnection requirements for CSP power generation projects; 2) Electrical and operational integration for SHIP facilities; 3) Water availability, quality, and permitting constraints, which are particularly critical for CSP in arid regions; and 4) Site access, construction logistics, and availability of workforce and supporting services. Recognizing the importance of social and economic context, the procedure includes evaluation of community engagement factors, such as stakeholder sentiment, proximity to sensitive visual receptors, workforce development opportunities, and local economic incentives. The outputs of these assessments are synthesized in a cost and risk evaluation, translating site characteristics into expected impacts on capital cost, operating cost, schedule, and technical risk. This is complemented by screening-level performance modeling, including 8760 simulations and long-term projections, to quantify expected energy or thermal output, assess variability thereof, and support comparison between candidate sites. Finally, the procedure provides high-level guidance on a structured go/no-go decision framework, categorizing sites based on identified risks and constraints, and outlining a clear path forward to feasibility studies and front-end engineering design for viable projects. By standardizing the site characterization process across both CSP and SHIP applications, this guideline aims to: 1) Improve consistency and transparency in early-stage project evaluation; 2) Reduce development risk and avoid investment in nonviable project sites; 3) Support collaboration between developers, researchers, and public agencies; and 4) Accelerate successful deployment of concentrating solar technologies for both power generation and industrial process heat.

14 SOLAR ENERGY↗

Procedures for gathering ground truth information for a supervised approach to a computer-implemented land cover classification of LANDSAT-acquired multispectral scanner data

Procedures for gathering ground truth information for a supervised approach to a computer-implemented land cover classification of LANDSAT acquired multispectral scanner data are provided in a step by step manner. Criteria for determining size, number, uniformity, and predominant land cover of training sample sites are established. Suggestions are made for the organization and orientation of field team personnel, the procedures used in the field, and the format of the forms to be used. Estimates are made of the probable expenditures in time and costs. Examples of ground truth forms and definitions and criteria of major land cover categories are provided in appendixes.

Joyce, A. T.↗

Global Environmental Micro Sensors Test Operations in the Natural Environment

ENSCO, Inc. is developing an innovative atmospheric observing system known as Global Environmental Micro Sensors (GEMS). The GEMS concept features an integrated system of miniaturized in situ, airborne probes measuring temperature, relative humidity, pressure, and vector wind velocity. In order for the probes to remain airborne for long periods of time, their design is based on a helium-filled super-pressure balloon. The GEMS probes are neutrally buoyant and carried passively by the wind at predetermined levels. Each probe contains onboard satellite communication, power generation, processing, and geolocation capabilities. ENSCO has partnered with the National Aeronautics and Space Administration's Kennedy Space Center (KSC) for a project called GEMS Test Operations in the Natural Environment (GEMSTONE) that will culminate with limited prototype flights of the system in spring 2007. By leveraging current advances in micro and nanotechnology, the probe mass, size, cost, and complexity can be reduced substantially so that large numbers of probes could be deployed routinely to support ground, launch, and landing operations at KSC and other locations. A full-scale system will improve the data density for the local initialization of high-resolution numerical weather prediction systems by at least an order of magnitude and provide a significantly expanded in situ data base to evaluate launch commit criteria and flight rules. When applied to launch or landing sites, this capability will reduce both weather hazards and weather-related scrubs, thus enhancing both safety and cost-avoidance for vehicles processed by the Shuttle, Launch Services Program, and Constellation Directorates. The GEMSTONE project will conclude with a field experiment in which 10 to 15 probes are released over KSC in east central Florida. The probes will be neutrally buoyant at different altitudes from 500 to 3000 meters and will report their position, speed, heading, temperature, humidity, and pressure via satellite. The GEMS data will be validated against reference observations provided by current weather instrumentation located at KSC. This paper will report on the results of the GEMSTONE project and discuss the challenges encountered in developing an airborne sensor system.

Adams, Mark L.↗

Technology Impact and Resource Assessment of Existing and Planned U.S. Biofuel Production: Life Cycle Water Consumption, Water Stress, Land Use, and Criteria Air Pollutants

Biofuels have the potential to strengthen the U.S. energy supply, enhance energy security, and promote economic development. As the United States continues to expand biofuel production, quantifying resource requirements and location-specific constraints is crucial for planning, siting, and technology development to support long-term viability. Accordingly, this work assesses the life cycle resource consumption (water consumption, and land use), water stress and criteria air pollutants associated with expanded U.S. biofuel production over the 2020–2035 period, based on producers’ plans. We perform a bottom-up technology impact assessment and resource assessment by integrating facility-level production statistics with Argonne’s Research and Development (R&D) GREET model and county-level water-stress characterization factors from Available Water Remaining for the United States (AWARE-US) model. Results suggest that by 2035, biofuels could meaningfully contribute to U.S. energy demand, driven primarily by first-generation and waste-based feedstocks with plans for substantial capacity expansion, although cellulosic and e-fuel technologies remain limited. However, growth must be managed to minimize impacts on water resources and land use. These impacts vary by fuel type and facility location, specifically, projected expansion increases water consumption and can elevate water-stress impacts in certain regions like Nebraska, Kansas, Colorado, Idaho, California and North Texas. Direct land use also increases overall, particularly for first-generation feedstocks such as corn and soybeans. These findings underscore the need for continued technological improvements and innovative strategies to manage resource demands as the industry scales and to support complementary deployment within the evolving U.S. energy system.

09 BIOMASS FUELS↗

Pristine lunar glasses - Criteria, data, and implications

The examination of glasses from all of the Apollo landing sites has led to the identification of 25 groups of pristine glass. The nickel found in these glasses is shown to be indigenous, not meteoritic contamination, and to be correlated with Mg. Chemical data indicate that these glasses are more suitable for primary magma than most crystalline mare basalts. In addition, these pristine glasses support the view that assimilative processes involving two cumulative systems in the differentiated mantle operated during mare petrogenesis. Two linear arrays found among the chemistries of the glasses attest to the existence of these interactions. Data suggest that these cumulate components in the mantle continue for 1000 km (laterally) and therefore are likely to be products of a magma ocean that existed early in lunar history.

Delano, J. W.↗

Mars Exploration Rover Landing Site Selection

Selection of the landing sites for the Mars Exploration Rovers has involved over 2 years of research and analysis effort that has included the participation of broad sections of the planetary sciences community through a series of open landing site workshops. The effort has included the definition of the engineering constraints based on the landing system, mapping those engineering constraints into acceptable regions and prospective sites, the acquisition of new information from Mars Global Surveyor and Mars Odyssey orbiters, the evaluation of science and safety criteria for the sites, and the downselection and final site selection based on the sites science potential and safety. The final landing sites (Meridiani Planum and Gusev crater) were selected by NASA Headquarters on April 11, 2003, prior to launch in June. This paper presents engineering requirements, and potential landing sites for Mars Exploration Rovers.

M Golombek↗

Restoration Hydro: A Watershed Approach to Standard Modular New Hydropower

The objectives of FOA DE- FOA-0001836- “Standard Modular Hydropower” included designing a standardized, modular, and environmentally compatible hydropower schematic for implementation in greenfield sites that generate up to 10 MW of capacity. Utilizing funds competitively awarded under DOE’s Water Power Technologies Office, the Natel Energy team developed a concept for modular new stream reach (NSR) hydropower that incorporates multi species upstream and downstream fish passage, improved river channel connectivity, and recreational modules. The in-stream design of the collective modules minimized site specific design and maximized the opportunities for modularity. Financial data was also presented using actual costs from regional suppliers, with figures provided in 2022 dollars. While the project team did not address potential permitting process improvements, the site selection criteria did consider established barriers to hydropower development such as tribal and preserved lands, interconnection proximity, and endangered species to exclude or deprioritize. The project’s design schematic met the objectives of the FOA, and presented a unique solution that targets alluvial pockets as natural features for sustainable development. Natel’s concept also incorporated the company's fish-safe Restoration Hydro Turbine for safe downstream passage, while featuring a rock arch that integrates fish passage, water, recreation, and grade control modules (including sediment). Alignment with the Department of Energy Office of Energy Efficiency and Renewable Energy (EERE) “Innovative Design Concepts for Standard Modular Hydropower and Pumped-Storage Hydropower” Program: According to the Hydropower Vision (DOE, 2016), approximately 16 GW of hydropower growth is possible with the development of technology solutions that balance efficiency, economics, and environmental sustainability. The desired outcome of the SMH program is transformational innovation specifically in the site identification, conceptual, and detailed design phases of technology development lifecycles (DOE, 2018). In developing the SMH design schematic, the team aimed to address the opportunities outlined in the Vision through an inverted design philosophy; rather than singularly prioritizing efficiency and power production, the team focused on integrating hydropower with restoration of degraded streams to optimal ecosystem function and provision of exceptional recreation value as design criteria. To achieve this, Restoration Hydro incorporates the principles of nature-based engineering (WWAP, 2018) and biomimicry (Biomimicry NL.) to strategically deploy complementary combinations of permanent, semi-permanent, and ephemeral low-head structures - such as natural and engineered log jams - that harness geomorphological and hydrological processes at the landscape-scale. Primary applications of Restoration Hydro include: 1) restoration of degraded watersheds’ natural ecological function and enhancement of hydrological connectivity; and 2) creation of associated co-benefits to hydro production, including increased groundwater recharge, improved sediment transport and management, improved water security and water quality. Restoration Hydro projects build upon proven watershed restoration engineering techniques by integrating hydropower turbines into low-head structures using innovative and evolving civil works concepts that facilitate fish and sediment passage, and in some cases create additional revenue-generating recreational opportunities. Powering low-head structures creates a directly monetizable layer of economic value in the form of flexible, reliable, renewable energy on top of the already high-value water, environmental and recreational benefits of watershed and river restoration. The approach aims to create a virtuous, self-reinforcing cycle whereby Restoration Hydro projects support the scaling of ecosystem restoration activities, creating a water-energy-carbon multiplier effect that, through the principles of adaptive change management: 1) improves the resilience of landscapes and downstream population centers for changing hydrological cycles; 2) creates a reliable energy resource that facilitates the integration of intermittent renewable power sources into grids; and 3) supports climate change mitigation through grid decarbonization and enhanced ecosystem carbon capture and retention.

13 HYDRO ENERGY↗

Characterizing 5,000 Properties to Determine which Require Radiological Remediation - 19152

The Port Hope Area Initiative (PHAI) is a federal environmental clean-up program. Its mandate is the remediation and local, long-term, safe management of approximately 1.7 million cubic metres of historic low-level radioactive waste (hLLRW) in the adjacent communities of Port Hope and Port Granby in Southern Ontario, Canada. The PHAI is being undertaken by Canadian Nuclear Laboratories (CNL), on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. It is currently one of the largest environmental remediation projects in Canada. Conducting work safely, while delivering the PHAI on time and within budget, is CNL's number one priority. The PHAI is being carried out as two projects - the Port Hope Project and the Port Granby Project. The Port Hope Project is the larger of the two and includes the cleanup of approximately 1.7 million cubic metres of hLLRW from various locations within the community. The Port Hope Project includes a unique and important component - the Property Radiological Survey. This survey involves the interior and exterior investigation of approximately 4,800 small-scale sites (SSS) - primarily residential - in the Municipality of Port Hope for the presence or absence of hLLRW. This paper provides an overview of the characterization, delineation and design for remediation of historic LLRW for the SSS, a grouping of sites within the municipality comprised of residential properties, municipal properties including municipal road allowances, private road allowances and temporary storage sites. Comprising over 4,800 parcels of land, a robust remedial process was designed to identify, characterize, delineate and remediate interior and exterior hLLRW contamination found in soils and building materials. The process adheres to the framework of the Port Hope Project Waste Nuclear Substance Licence (License) and its associated governance frameworks and regulatory requirements [1]. The overall goal is for CNL to be able to issue the owner of each parcel of land a Compliance Letter stating that the site meets the PHAI Clean-up Criteria, either after completion of characterization (if no hLLRW is identified) or after completion of remediation and verification. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Notional Artemis Lunar Surface Exploration Package (ArLSEP) based on the Gandalf Staff Platform

Introduction: The Artemis program is planning to deliver crew and cargo to the lunar surface, but there is no current package for supporting lunar in-struments and experiments similar to the Apollo Lunar Surface Exploration Package (ALSEP). This abstract provides a possible concept for such a package using the Gandalf Staff Platform as a common core. Gandalf Staff: The Gandalf Staff is an early prototype system developed over FY’21/FY’22 using NASA Science Technology Mission Directorate (STMD) Center Information Fund (CIF) grants to de-sign, build and test “proof-of-concept” components. These components include a 24v battery powered monopole that powers a suite of subsystems, including a Graphical User Interface (GUI) for crew, surface voice and data communications, Lunar Search and Rescue (LunaSAR) navigation and communications, LiDAR, field site external lighting, 360-degree camera, and a geothermal instrument for measuring sub-surface temperature gradient. The staff can be carried independently by an Extra-Vehicular Activity (EVA) astronaut, or can be mounted into a tripod for “hands free” support at a surface site being investigated. The staff can be attached to an external solar array and power storage system for long-duration operations. [1,2] ALSEP: An ASLEP flew on each mission Apollo 12 to Apollo 17. For Apollo 11, a simplified packaged called the Early Apollo Scientific Experiments Pack-age (EASEP) was flown. Each package included a “Central Station” that provided the power and communications connected to a variety of instruments and sensors. The power was provided by a Radioisotope Thermoelectric Generator (RTG) fueled by Plutoni-um-238 generating 70 watts of power (initially, decayed over time) [3]. The communications system provide for direct to Earth data transfer from the lunar surface. Each pack-age was stowed externally in the Lunar Module (LM) Scientific Equipment (SEQ) bay with a mass up to 163 kg (Apollo 17). The crew unloaded the ALSEP from the LM and deployed the instruments on the lunar surface. Although designed to operate for only 1 year, many sites operated for up to 8 years successfully [4]. The Active Seismic Experiment (ASE) included 3 geophones for detecting seismic waves created by mortars and thumpers deployed by the crew. Other active experiments measured the lunar atmosphere, the heat flow in the subsurface, the lunar gravity and potential gravity waves, the lunar magnetic field, the solar wind and plasma interactions in cislunar space. Passive experiments included collectors for dust and cosmic rays, and retroreflectors for precise measurements of distance using a laser from Earth. The ALSEP program continues to generate insights into lunar formation and evolution. ArLSEP Concepts: The lunar surface science package for the Artemis program will hopefully exceed the capability of the ALSEP. There are multiple issues for discussion leading to the design of a new ArLSEP, needing requirements definition from the science community, NASA mission architecture, and NASA budget planners. 1. Delivery Mechanism Two possible projects currently provide capability to deliver scientific cargo to the lunar surface: 1) the Commercial Lunar Payload Services (CLPS) [5] and the Human Landing System (HLS) [6, 7]. Each project is controlled by a different organization within NASA and budgeted with different criteria although both support lunar exploration. The HLS system delivers crew (and potentially cargo) to human landing sites. If an ArLSEP is “predeployed” to such a site, the design must include power (either from the vehicle or independently) to keep the electronics functioning until deployed by the crew. If an ArLSEP is delivered on a vehicle after the crew is present on the lunar surface, safety protocols require adequate distance from the humans for impact from descent propelled sur-face regolith ejecta. This distance can not exceed the capability of the crew to walk (if no rover) to the vehicle for ArLSEP deployment. 2. Overall Guidelines The general design of ArLSEP will likely follow the ALSEP with a common system for communications and power; however, significant architecture differences between Apollo and Artemis exist. Power: The RTG will not be available for early Artemis missions nor likely follow-on Lunar Exploration Transportation Services (LETS) missions [8]. Thus, ArLSEP power must be supplied by solar arrays with sufficient battery capability to “keep alive” necessary electronics during any lunar surface eclipse period. Communication: The Artemis program is developing a series of communications satellites for lunar orbit to provide surface transmission of data and voice to Earth. Called “LunaNET”, this network is component useful for ArLSEP since south polar locations may not always have direct “line-of-sight” to Earth [9]. 3. Concept of Operations (ConOps) The general ConOps for ArLSEP is to deliver the package to lunar surface before the crew arrives, and then have the crew deploy the package after some period of time. This requires coordinated design (for power systems) and launch window (for schedule) on both the cargo and crew missions. Once the ArLSEP is deployed, it will operate autonomously for a number of years. It should be designed to be EVA compatible for crew maintenance and upgrade. 4. Notional Design (for discussion purpose only) The landing site near the South Pole is expected to have no eclipse cycle exceeding 5 days, so the “keep alive” power is 144 hours (6 days to include margin). A 12v ArLSEP will use rechargeable LiFePO4 cells, which are common in the Electric Vehicle (EV) industry. With a current of 5 amps and a 125 watt system, the mass is about 90kg. The comm. system and structure adds another 10kg, thus the “Central Station” is approximately 100kg. The solar power is collected on four arrays (each 2m above the surface), and the entire ArLSEP is designed to stow in a 2m x 1m x 1m volume. The experiment and instrument design will vary for each installation and add mass to the total (although they are expected to fit within the 2m3 volume). Seismic wave generation will likely not be provided with mortars, thus an electric “thumper” will be required. Active instruments such as imaging systems and sensing instruments will benefit from the additional power and communication capability provided by ArLSEP. Passive systems such as retroreflectors, witness plates, and cosmic dust collectors can be added to either the landing vehicle and/or the ArLSEP. With repeated HLS missions to the same human site, the ArLSEP can be expanded and easily maintained for long duration science collection on the lunar surface.

ALSEP↗

Observation-based estimates of land availability for wind power: a case study for Czechia

Background: The availability of land for the installation of wind power turbines is restricted by numerous factors. Besides climatic conditions, the deployment of wind energy is limited by technical, social, economic, and environmental factors. Typically, assessments of land availability for wind power use legal and technical criteria to estimate the potential for wind power expansion. In contrast, we use observed characteristics of wind power generation sites existing in Austria and Denmark to estimate its potential expansion in Czechia. We combined data on wind turbine locations with data on land use, wind speeds, human impact on land, and nature conservation areas. Results: Our analysis shows that the density of wind power in Austria is variable, but higher on average (4.79 MW km-2 ) than in Denmark (1.76 MW km-2 ). Austrian wind turbines have been installed in areas where the human impact on land is mostly higher than the Austrian average, while in Denmark, no difference is observed. Regarding the land use composite, the share of agricultural land on sites with wind turbines is on average much higher (86%), while the share of forest is much lower (7%) in both countries. We identified a maximum potential area in Czechia of 543 km2 with Austrian and 421 km2 with Danish characteristics. When conservatively assuming observed historical power densities, this area translates to 2295 MW and 741 MW of installed wind power capacity, respectively. These results are a magnitude of order lower than the potentials found in existing studies. In a sensitivity analysis, we have examined that the availability of potential sites depends mainly on the population density, the human impact on land, prevailing wind speeds, and the height above sea level. Conclusions: We estimated available land area for potential wind turbine installations in Czechia using our newly developed methodology based on observed site characteristics of today’s wind power infrastructure in Austria and Denmark. Available land area indicated possible overestimation of wind power capacities proposed in the recent studies on the renewable energy transition. Hence, more rigorous consideration of land availability is required for assessments of potential wind power expansion.

17 WIND ENERGY↗

A flight-test and simulation evaluation of the longitudinal final approach and landing performance of an automatic system for a light wing loading STOL aircraft

As part of a comprehensive flight-test program of STOL operating systems for the terminal area, an automatic landing system was developed and evaluated for a light wing loading turboprop aircraft. The aircraft utilized an onboard advanced digital avionics system. Flight tests were conducted at a facility that included a STOL runway site with a microwave landing system. Longitudinal flight-test results were presented and compared with available (basically CTOL) criteria. These comparisons were augmented by results from a comprehensive simulation of the controlled aircraft which included representations of navigation errors that were encountered in flight and atmospheric disturbances. Acceptable performance on final approach and at touchdown was achieved by the autoland (automatic landing) system for the moderate winds and turbulence conditions encountered in flight. However, some touchdown performance goals were marginally achieved, and simulation results suggested that difficulties could be encountered in the presence of more extreme atmospheric conditions. Suggestions were made for improving performance under those more extreme conditions.

Brown, S. C.↗

Plume-Surface Interaction Modeling for a Human-Scale Mars Lander

Landing vehicles impart thermal and strain energy onto the landing site from the retrorocket exhaust. Depending on the design of the vehicle, the energy may be great enough to cause spallation at the landing site. This damage may be minor and repairable in the case of landing on a terrestrial landing pad. For missions to other planetary bodies, the spallation may cause the landing site to become uneven and unstable, as well as damage. Simulating this phenomenon in a laboratory or computationally would require a significant amount of time and other resources. These resources typically are not available during the design phase of a mission. This paper presents a computationally-efficient model for the temperature and stress distributions that arise during landing. These quantities can be used along with existing failure criteria, such as the Hoek-Brown criterion for geological materials, to quickly determine whether spallation will occur. The stress and temperature distributions at the landing site are inherently 3D; however, there is a plane of symmetry and in that plane the distributions are 2D. Both quantities are modeled using series solutions to their governing partial differential equations (PDEs). The stress is modeled using the Airy stress potential function and its governing PDE is the biharmonic equation. The temperature is governed by Fourier's law. The models assume that stress due to gravity can be neglected, the points in the plane do not accelerate, and that the material properties are constant.

Hart, Kenneth↗

Assessment of oil and gas fields in California as potential CO 2 storage sites

California's total annual greenhouse gas (GHG) emissions (425.3 MtCO 2 e) in 2018 were about 6.4% of the US total (6,677 MtCO 2 e) and around 1% of global emissions. About 39% of 2018 GHG emissions in California were from the industrial and electrical sectors. Many of these emissions were from large stationary point sources and were suitable for carbon capture retrofit with subsequent storage of the captured carbon dioxide (CO 2 ) in geological formations. Previous studies of California found suitable geology and CO 2 storage resource. This study refines and furthers prior work using a three-stage screening process of oil fields, gas fields, and underground natural gas storage (UGS) sites by combining criteria from previous studies while excluding sites that pose technical risk or are located in regions with surface restrictions including sensitive habitats and dense populations. In the first stage, 129 CO 2 storage sites in California were identified using qualification criteria based upon formation properties including geological conditions and pore pressure. The second stage identified sensitive sites by applying conservative screens including seismic activity, faulting, population density, restricted lands, and sensitive habitats. During the third stage, 61 CO 2 potential storage sites were identified by subtraction of stage 2 areas from stage 1. The potential storage volume in the third stage ranged from 1.0 to 2.0 GtCO 2 . Finally, we applied a scoring system with seven parameters to rank the 61 potential sites based on subsurface technical criteria. The scored sites are classified as high priority, medium priority, and sites for future study. Prospective CO 2 storage sites with high and moderate priority were selected and linked to CO 2 sources. There are 14 prospective sites (above 20 MtCO 2 storage resource per site) with a total storage resource of 1024 MtCO 2 distributed in Northern and Southern California. Of these sites, there are 9 potential CO 2 -EOR sites and 1 depleted oil field with a total estimated CO 2 storage volume of ~800 MtCO 2 in the Southern San Joaquin and Ventura Basin. These 10 prospective sites with a storage resource greater than 20 MtCO 2 could potentially deliver more than 20 years of storage with an average injection rate of 40 MtCO 2 /year. The remaining 4 highly prospective sites are in Northern California. Additionally, study results suggest that saline formations should be re-evaluated in concert with storage in oil, gas, and natural gas storage reservoirs.

58 GEOSCIENCES↗

The variability of the surface wind field in the equatorial Pacific Ocean: Criteria for satellite measurements

The natural variability of the equatorial Pacific surface wind field is described from long period surface wind measurements made at three sites along the equator (95 deg W, 109 deg 30 W, 152 deg 30 W). The data were obtained from surface buoys moored in the deep ocean far from islands or land, and provide criteria to adequately sample the tropical Pacific winds from satellites.

Halpern, D.↗