Search NASASearch

SEARCH · Search NASA

Results for “launch lock”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Optimizing the fine lock performance of the Hubble Space Telescope fine guidance sensors

This paper summarizes the on-orbit performance to date of the three Hubble Space Telescope Fine Guidance Sensors (FGS's) in Fine Lock mode, with respect to acquisition success rate, ability to maintain lock, and star brightness range. The process of optimizing Fine Lock performance, including the reasoning underlying the adjustment of uplink parameters, and the effects of optimization are described. The Fine Lock optimization process has combined theoretical and experimental approaches. Computer models of the FGS have improved understanding of the effects of uplink parameters and fine error averaging on the ability of the FGS to acquire stars and maintain lock. Empirical data have determined the variation of the interferometric error characteristics (so-called 's-curves') between FGS's and over each FGS field of view, identified binary stars, and quantified the systematic error in Coarse Track (the mode preceding Fine Lock). On the basis of these empirical data, the values of the uplink parameters can be selected more precisely. Since launch, optimization efforts have improved FGS Fine Lock performance, particularly acquisition, which now enjoys a nearly 100 percent success rate. More recent work has been directed towards improving FGS tolerance of two conditions that exceed its original design requirements. First, large amplitude spacecraft jitter is induced by solar panel vibrations following day/night transitions. This jitter is generally much greater than the FGS's were designed to track, and while the tracking ability of the FGS's has been shown to exceed design requirements, losses of Fine Lock after day/night transitions are frequent. Computer simulations have demonstrated a potential improvement in Fine Lock tracking of vehicle jitter near terminator crossings. Second, telescope spherical aberration degrades the interferometric error signal in Fine Lock, but use of the FGS two-thirds aperture stop restores the transfer function with a corresponding loss of throughput. This loss requires the minimum brightness of acquired stars to be about one magnitude brighter than originally planned.

Eaton, David J.

Design of a Microgravity Hybrid Inflatable Airlock

Spacewalks, or extra-vehicular activities (EVAs), are a critical component of human space exploration for science activities and habitat construction and maintenance. For NASA's proposed lunar Gateway system, an airlock module is required for vehicle maintenance, repair, and exploration. Traditional airlock structures are fully metallic, with two chambers, known as an equipment lock and a crew lock. The larger volume, called the equipment lock, serves as the storage, logistics and electronics area, while the smaller volume, called the crew lock, serves as the volume to transition from the vacuum of space to the pressurized cabin. A traditional metallic structure design offers mass efficiency for these elements, but cannot offer volume efficiency. The potential to use an inflatable fabric pressure shell supplemented by a metallic support structure allows for efficiency in both mass and volume. Inflatable structures are being used for human habitable space modules, starting with the Bigelow Expandable Activities Module on the International Space Station. They are high-strength fabric-based structures that are compactly stowed for launch and then, once in space, they are expanded and rigidized with internal pressure. They provide significant launch volume savings over metallic structures. For Gateway, a hybrid airlock design is proposed with both metallic and inflatable structural elements, taking advantage of each material's capabilities. A metallic equipment lock serves as both a docking node and provides pressurized volume for pre-EVA activities including pre-breathe and suit donning/doffing. A rigid equipment lock offers stowage space during launch for integrated hardware and suits. Adding an integrated inflatable crew lock provides the volume required for EVAs with minimal use of launch volume. Using dual inflatable crew locks provides redundancy and the capability to move large pieces of equipment into and out of the vehicle for repair and maintenance. The inflatable crew lock is deflated and packaged in the launch shroud and expanded after installation on the Gateway. This packing capability allows additional volume to be added to the equipment lock and fully utilize the capability of the launch vehicle. This report outlines the work completed to design, analyze, and test the systems of a microgravity airlock with inflatable crew locks. In detail, it includes launch vehicles, structural sizing of the metallic equipment lock, the fabric layers of the inflatable crew lock, the internal structure of the crew lock, the space suit interface elements, the crew restraint system, the hatches and pass-throughs, the material and thermal elements, and the crew operations for the usage of the system. This paper is meant to offer a reference design for a hybrid microgravity airlock design for deep space human exploration.

Litteken, Douglas

Design of a Microgravity Hybrid Inflatable Airlock

Spacewalks, or extra-vehicular activities (EVAs), are a critical component of human space exploration for science activities and habitat construction and maintenance. For NASA's proposed lunar Gateway system, an airlock module is required for vehicle maintenance, repair, and exploration. Traditional airlock structures are fully metallic, with two chambers, known as an equipment lock and a crew lock. The larger volume, called the equipment lock, serves as the storage, logistics and electronics area, while the smaller volume, called the crew lock, serves as the volume to transition from the vacuum of space to the pressurized cabin. A traditional metallic structure design offers mass efficiency for these elements, but cannot offer volume efficiency. The potential to use an inflatable fabric pressure shell supplemented by a metallic support structure allows for efficiency in both mass and volume. Inflatable structures are being used for human habitable space modules, starting with the Bigelow Expandable Activities Module on the International Space Station. They are high-strength fabric-based structures that are compactly stowed for launch and then, once in space, they are expanded and rigidized with internal pressure. They provide significant launch volume savings over metallic structures. For Gateway, a hybrid airlock design is proposed with both metallic and inflatable structural elements, taking advantage of each material's capabilities. A metallic equipment lock serves as both a docking node and provides pressurized volume for pre-EVA activities including pre-breathe and suit donning/doffing. A rigid equipment lock offers stowage space during launch for integrated hardware and suits. Adding an integrated inflatable crew lock provides the volume required for EVAs with minimal use of launch volume. Using dual inflatable crew locks provides redundancy and the capability to move large pieces of equipment into and out of the vehicle for repair and maintenance. The inflatable crew lock is deflated and packaged in the launch shroud and expanded after installation on the Gateway. This packing capability allows additional volume to be added to the equipment lock and fully utilize the capability of the launch vehicle. This report outlines the work completed to design, analyze, and test the systems of a microgravity airlock with inflatable crew locks. In detail, it includes launch vehicles, structural sizing of the metallic equipment lock, the fabric layers of the inflatable crew lock, the internal structure of the crew lock, the space suit interface elements, the crew restraint system, the hatches and pass-throughs, the material and thermal elements, and the crew operations for the usage of the system. This paper is meant to offer a reference design for a hybrid microgravity airlock design for deep space human exploration.

Litteken, Douglas

Government conceptual estimating for contracting and management

The use of the Aerospace Price Book, a cost index, and conceptual cost estimating for cost-effective design and construction of space facilities is discussed. The price book consists of over 200 commonly used conceptual elements and 100 systems summaries of projects such as launch pads, processing facilities, and air locks. The cost index is composed of three divisions: (1) bid summaries of major Shuttle projects, (2) budget cost data sheets, and (3) cost management summaries; each of these divisions is described. Conceptual estimates of facilities and ground support equipment are required to provide the most probable project cost for budget, funding, and project approval purposes. Similar buildings, systems, and elements already designed are located in the cost index in order to make the best rough order of magnitude conceptual estimates for development of Space Shuttle facilities. An example displaying the applicability of the conceptual cost estimating procedure for the development of the KSC facilities is presented.

Brown, J. A.

Time Resolved Irradiance of an Integrating Sphere Illuminated by a Mode-Locked Optical Parametric Oscillator

Tunable laser based illumination sources have been adopted by a number of recent hyperspectral instruments for pre-launch spectral radiometric calibration. Some of these sources use mode-locked cavity configurations, which produce a pulse train and create an undesirable fluctuation in the radiometric source at the mode locking frequency. Although typically this frequency is several orders of magnitude higher than the instrument response, care must be taken to ensure the resultant calibration is not biased due to detector or electronic saturation effects. The temporal averaging properties of an integrating sphere can be used to reduce high frequency fluctuations to an acceptable level. In this work, the time resolved output of an integrating sphere coupled with a mode-locked source was measured. A 76 cm diameter sphere with 30 cm output aperture was illuminated using a mode-locked pulse train at 76 MHz, with single pulse durations of 12 ps. The time constant of the sphere was found to be 36 ns, and the resultant temporal averaging of pulses produced a maximum time varying irradiance at the output of 20% of the mean. The form of this time variance is a sawtooth pattern, with a sharp rise during the introduction of each pulse into the sphere followed by a slower decay between pulses. A comparison of instrument calibration data generated with this integrating sphere using both a mode locked source and a continuous wave source is also given. .

McAndrew, Brendan

Process for Measuring Over-Center Distances

Over-center mechanisms were used in the orbiter payload bay to lock down the robotic arm during the launch of the space shuttle. These mechanisms were unlocked while in orbit in order to release the arm for use. Adjusting the mechanism such that it would not inadvertently release during launch, but could be released when needed by use of the motor, required accurate adjustments that were difficult to perform. A procedure was developed to allow these mechanisms to be adjusted to within the specifications required for the Space Shuttle Program. This approach is significantly more accurate than any other technique, and is the only technique known that met the launch requirements of the program.

Youngquist, Robert

Basic space payload fastener

A new basic space fastener has been developed and tested by the GSFC. The purposes of this fastener are to permit assembly and servicing in space by astronauts and/or robots and to facilitate qualification of payloads on Earth prior to launch by saving time and money during the systems integration and component testing and qualification processes. The space fastener is a rework of the basic machine screw such that crossthreading is impossible; it is self-locking and will not work its way out during launch (vibration proof); it will not wear out despite repeated use; it occupies a small foot print which is comparable to its machine screw equivalent, and it provides force and exhibits strength comparable to its machine screw equivalent. Construction is ultra-simple and cost effective and the principle is applicable across the full range of screw sizes ranging from a #10 screw to 2.5 cm (1 in) or more. In this paper, the fastener principles of operation will be discussed along with test results and construction details. The new fastener also has considerable potential in the commercial sector. A few promising applications will be presented.

Vranish, J. M.

Magellan Post Launch Mission Operation Report

Magellan was successfully launched by the Space Shuttle Atlantis from the Kennedy Space Center at 2:47 p.m. EDT on May 4, 1989. The Inertial Upper Stage (IUS) booster and attached Magellan Spacecraft were successfully deployed from Atlantis on Rev. 5 as planned, at 06:14 hrs Mission Elapsed Time (MET). The two IUS propulsion burns which began at 07:14 hrs MET and were completed at 07:22 hrs MET, placed the Magellan Spacecraft almost perfectly on its preplanned trajectory to Venus. The IUS was jettisoned at 07:40 hrs MET and Magellan telemetry was immediately acquired by the Deep Space Network (DSN). A spacecraft trajectory correction maneuver was performed on May 21 and the spacecraft is in the planned standard cruise configuration with all systems operating nominally. An initial attempt was made to launch Atlantis on April 28, 1989, but the launch was scrubbed at T-31 sec due to a failure of the liquid hydrogen recirculation pump on Space Shuttle Main Engine #1. The countdown had proceeded smoothly until T-20 min when the Magellan radio receiver "locked-on" the MIL 71 Unified S-Band (USB) transmission as the transmitter power was increased fro 2 kw to 10 kw in support of the orbiter launch. During the planned hold at T-9 min, the USB was confirmed as the source of the receiver "lock" and Magellan's launch readiness was reaffirmed. In addition a five-minute extension of the T-9 hold occurred when a range safety computer went off-line, creating a loss of redundancy in the range safety computer network. Following resumption of the countdown, both the orbiter and Magellan flows proceeded smoothly until the launch was scrubbed at T-31 sec.

Source record

Space probe/satellite ejection apparatus for spacecraft

An ejection apparatus for spinning and propelling objects for ejection from a spacecraft at a desired velocity and rotational speed is discussed. The apparatus includes a launch cradle on which the space object to be ejected rests. The cradle is rotatably supported by a central hub secured to the upper end of the pneumatic cylinder piston shaft. Release mechanisms consisting of a retractable pin and locking lug is utilized to hold the cradle and object to be ejected. The release mechanism has a fixed barrier member which holds the retractable pin in engagement with the locking lug until release by upward movement of the launch cradle beyond the barrier height.

Smyly, H. M.

Space probe/satellite ejection apparatus for spacecraft

An ejection apparatus for spinning and propelling objects for ejection from a spacecraft at a desired velocity and rotational speed is discussed. The apparatus includes a launch cradle on which the space object to be ejected rests. The cradle is rotatably supported by a central hub secured to the upper end of the pneumatic cylinder piston shaft. Release mechanisms consisting of a retractable pin and locking lug is utilized to hold the cradle and object to be ejected. The release mechanism has a fixed barrier member which holds the retractable pin in engagement with the locking lug until release by upward movement of the launch cradle beyond the barrier height.

Smyly, H. M.

Structures and Mechanisms Design Concepts for Adaptive Deployable Entry Placement Technology

System studies have shown that large deployable aerodynamic decelerators such as the Adaptive Deployable Entry and Placement Technology (ADEPT) concept can revolutionize future robotic and human exploration missions involving atmospheric entry, descent and landing by significantly reducing the maximum heating rate, total heat load, and deceleration loads experienced by the spacecraft during entry [1-3]. ADEPT and the Hypersonic Inflatable Aerodynamic Decelerator (HIAD) [4] share the approach of stowing the entry system in the shroud of the launch vehicle and deploying it to a much larger diameter prior to entry. The ADEPT concept provides a low ballistic coefficient for planetary entry by employing an umbrella-like deployable structure consisting of ribs, struts and a fabric cover that form an aerodynamic decelerator capable of undergoing hypersonic flight. The ADEPT "skin" is a 3-D woven carbon cloth that serves as a thermal protection system (TPS) and as a structural surface that transfers aerodynamic forces to the underlying ribs [5]. This paper focuses on design activities associated with integrating ADEPT components (cloth, ribs, struts and mechanisms) into a system that can function across all configurations and environments of a typical mission concept: stowed during launch, in-space deployment, entry, descent, parachute deployment and separation from the landing payload. The baseline structures and mechanisms were selected via trade studies conducted during the summer and fall of 2012. They are now being incorporated into the design of a ground test article (GTA) that will be fabricated in 2013. It will be used to evaluate retention of the stowed configuration in a launch environment, mechanism operation for release, deployment and locking, and static strength of the deployed decelerator. Of particular interest are the carbon cloth interfaces, underlying hot structure, (Advanced Carbon- Carbon ribs) and other structural components (nose cap, struts, and main body) designed to withstand the pressure and extremely high heating experienced during planetary entry.

Yount, Bryan C.

Development of an Inflatable Airlock for a Deep Space Gateway

Inflatable structures technology utilizes high-strength fabric materials and internal pressure to create a stiffened pressure vessel that can replace traditional metallic primary structure in a habitable spacecraft. The flexibility of fabric structures allows them to be compactly stowed for launch and expanded in space, providing significant launch volume savings. The unique construction and design flexibility of these structures can be customized for a variety of uses in space including landing bags, decelerators, long duration in-space and planetary surface habitats, and even airlocks. An airlock is often a required component of a crewed spacecraft to allow for maintenance and human exploration outside of the vehicle. Airlock designs in use today rely on complex hatches and seals connected by metallic walls. Recent developments towards the design of an inflatable airlock structure show feasibility and a significant launch volume savings over a traditional metallic design. This paper will provide a high-level summary of these projects and the current state-of-the-art in inflatable airlock development with additional references and detail about previous and on-going research, providing guidance for the design of a softgoods airlock system. The use of inflatables in space has been in development since the 1960’s for both habitats and airlocks. The first ever EVA was conducted by the USSR in 1965 using an inflatable airlock known as the Volga. This airlock was attached to the Voskhod 2 spacecraft and turned the vehicle into a dual chamber airlock. The airlock was successfully deployed, used and jettisoned after Alexey Leonov’s historic spacewalk. Additional work on human-rated inflatable structures was not continued until the late 1990’s when NASA-JSC led an effort to demonstrate these structures as feasible long-term pressurized elements with the TransHab project. The technology developed and pioneered during this project led to multiple patents and proven feasibility that inflatables could be used for large habitable structures. Following TransHab, Bigelow Aerospace continued the development of inflatable structures with technical support from NASA. This partnership eventually led to the successful flight certification, launch, attachment and deployment of the Bigelow Expandable Activities Module (BEAM) on the ISS in 2016. Inflatable and expandable airlock structures have undergone various detailed feasibility studies and testing for over 15 years, most notably with the Advanced Inflatable Airlock (AIA), Dual-Chamber Hybrid Inflatable Suitlock (DCIS), Minimalistic Advanced Soft Hatch (MASH), and Lightweight External Inflatable Airlock (LEIA). During this time, full-scale articles have been built and pressure-tested, and mock-ups and demonstrators have been constructed and evaluated. During the 2001-2003 timeframe, the AIA concept was matured through requirements development, conceptual design, subscale and full-scale engineering breadboards subjecting various test articles to deployment and pressure testing up to four times operating pressure. These tests proved the feasibility of successful deployment and structural integrity of an inflatable crewlock. Additional testing was performed in the ensuing years, as funding permitted, to further refine additional structural and deployment concepts and to understand the EVA crewmember interfaces, hatches and EVA support equipment interfaces that would be required for a fully functioning airlock. This work resulted in a refinement of the structural requirements and an accounting of the systems needed in an inflatable airlock. In 2014, the MASH project developed an ultra-lightweight airlock concept with a fabric hatch that utilized a unique pressure vessel shape to minimize structural loads around a linear seal. The concept uses an automated zipper-like seal that allows for crew egress/ingress. Most of the development work on the project thus far has focused on the design, analysis and testing of the primary structure and the zipper-like seal system is in the preliminary stages of development with a successful proof-of-concept test. As part of the 2017 LEIA effort, studies were conducted on EVA crewmember interfaces on the inside of an inflatable airlock. These efforts included the design of an internal secondary structure and placement of handholds and foot restraints to enable hatch opening, closing and translation through the airlock. Structural design, analysis and testing was completed on several secondary structure candidates. Crew interface testing was also completed using an inflatable crewlock mockup and the JSC Active Response Gravity Offload System (ARGOS) to simulate the movement of an EVA crewmember through an inflatable crewlock in microgravity. The results of these tests helped demonstrate the feasibility of utilizing an inflatable structure as an airlock and informed the required volume, hatch size, and configuration and location of translation aids for crewmembers in a microgravity crewlock. The ISS Quest airlock uses a dual-chamber design with isolated compartments known as the equipment-lock and the crewlock. The equipment-lock houses the Servicing, Performance and Checkout Equipment (SPCE) items (suit batteries, consumables, etc.) while the crewlock has limited internal hardware and is the nominally depressurized compartment during US EVAs. While inflatable dual chamber airlocks have been studied, the current state of the art emphasizes an inflatable crewlock-type structure attached to a rigid equipment-lock type or habitat structure. Since a large portion of the hardware in the equipment-lock are rigid components and connectors that are installed on the ground - and an inflatable structure does not achieve full structural capabilities until pressurized in space - a depressurized fabric structure cannot provide the capabilities of a full equipment-lock. The use of an inflatable as a crewlock, however, provides all the required capabilities for EVA operations in a small launch package that offers significant volume savings over a metallic crewlock. The functions of a traditional equipment lock, including the SPCE, could be provided by a spacecraft’s habitat module or node and not necessarily in a separate equipment lock. An inflatable crewlock would be attached to the vehicle and launched in a packed and compressed state, saving volume under the launch shroud and mass for the overall airlock element compared to a rigid crewlock. Work is currently underway to continue development of an inflatable airlock with a variety of focus areas including the consideration of crew-induced loads and interfaces, the design and development of an internal sub-structure to provide translation aids and restraints, the thermal considerations of a fabric shell depressurized during an EVA, the micrometeorite environment in deep space, and the packaging and deployment of an inflatable airlock.

Deep Space Exploration

Modification and development of the external tank hydrogen vent umbilical system for the space shuttle vehicle

The design and development of a new T-O lock and secondary release mechanism which is being introduced to the ET Hydrogen Vent Umbilical System for the next launch of the Space Shuttle Vehicle is described. Critical analysis of the system in early 1986 indicated the need for an improvement in the secondary release system. The new T-O lock increases the clearance with the vehicle during secondary disconnect and is described.

Tatem, Bemis C., Jr.

Load measurement system with load cell lock-out mechanism

In the frame work of the project Shuttle Plume Impingement Flight Experiment (SPIFEX), a Load Measurement System was developed and fabricated to measure the impingement force of Shuttle Reaction Control System (RCS) jets. The Load Measurement System is a force sensing system that measures any combination of normal and shear forces up to 40 N (9 lbf) in the normal direction and 22 N (5 lbf) in the shear direction with an accuracy of +/- 0.04 N (+/- 0.01 lbf) Since high resolution is required for the force measurement, the Load Measurement System is built with highly sensitive load cells. To protect these fragile load cells in the non-operational mode from being damaged due to flight loads such as launch and landing loads of the Shuttle vehicle, a motor driven device known as the Load Cell Lock-Out Mechanism was built. This Lock-Out Mechanism isolates the load cells from flight loads and re-engages the load cells for the force measurement experiment once in space. With this highly effective protection system, the SPIFEX load measurement experiment was successfully conducted on STS-44 in September 1994 with all load cells operating properly and reading impingement forces as expected.

Le, Thang

Mission analysis for a potential Mars Sample Return campaign in the 2020's

The Mars 2020 mission, currently under development by NASA, plans to acquire and cache carefully-selected rock and regolith samples from the surface of Mars for potential future return. NASA and ESA are jointly studying options for returning those samples to Earth with missions launching in the 2020s. This paper demonstrates a method for modeling the various campaign elements, synthesizing coordinated campaign timelines, and assuring trajectory feasibility in the presence of many constraints, and finally optimizing towards mission success. Options for complete sample return campaigns in multiple launch and arrival opportunities are explored and compared.

Huesing, Jakob

Deep Space Network Capabilities for Receiving Weak Probe Signals

Planetary probes can encounter mission scenarios where communication is not favorable during critical maneuvers or emergencies. Launch, initial acquisition, landing, trajectory corrections, safing. Communication challenges due to sub-optimum antenna pointing or transmitted power, amplitude/frequency dynamics, etc. Prevent lock-up on signal and extraction of telemetry. Examples: loss of Mars Observer, nutation of Ulysses, Galileo antenna, Mars Pathfinder and Mars Exploration Rovers Entry, Descent, and Landing, and the Cassini Saturn Orbit Insertion. A Deep Space Network capability to handle such cases has been used successfully to receive signals to characterize the scenario. This paper will describe the capability and highlight the cases of the critical communications for the Mars rovers and Saturn Orbit Insertion and preparation radio tracking of the Huygens probe at (non-DSN) radio telescopes.

Asmar, Sami