Search NASA⌕ Search

SEARCH · Search NASA

Results for “launch systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

NASA’s Space Launch System: High C3 Launch Capability for Science Missions

As NASA’s initial Space Launch System (SLS) Block 1 vehicle enters integration and stacking operations at Kennedy Space Center (KSC) this year in preparation for a 2021 launch, work is in progress on future more powerful variants of the vehicle. Available in the mid 2020s and 2030s, Block 1B and Block 2 will feature increased performance and unparalleled volume for payloads, providing an enabling launch option for science mission planners. The baseline SLS architecture consists of two five-segment solid rocket boosters and four RS-25 LH2/LOX engines. The evolved Block 1B and Block 2 vehicles use a four-engine LH2/LOX upper stage and can be outfitted with an 8.4 m-diameter pay-load fairing. Additional upper stages can be packaged in the 8.4 m fairing to enable high C3 (in the range of 300 km2/sec2) missions to Mercury, the Jovian system, the ice giants, the Kuiper Belt and beyond.

Stephen D Creech↗

Considerations for the next manned transportation system - Is a personnel launch system the answer?

The process that NASA is using to determine the high-level requirements for the next manned transportation system (MTS) is discussed. The primary attributes that the MTS must possess are outlined. Three options that could provide assured access to LEO for people are examined: (1) Shuttle evolution, (2) an advanced manned launch system, and (3) a Personnel Launch System.

Erwin, Harry O.↗

Analysis of Transonic Unsteady Aerodynamic Environments using Unsteady Pressure Sensitive Paint for the Space Launch System Block 1 Cargo Launch Vehicle

Predicting launch vehicle unsteady aerodynamic loads due to buffet remains a significant challenge. Current practices for modeling buffet environments involve the development of buffet forcing functions using unsteady pressure measurements acquired during wind-tunnel tests. These practices often result in significant uncertainty in buffet environments for coupled loads analyses due to the complex spatio-temporal nature of the unsteady pressure field and challenge of its estimation using discrete sensors. Unsteady pressure sensitive paint, on the other hand, can provide unsteady pressure data at a comparatively high-spatial-density and may overcome the challenge of unsteady pressure field estimation with discrete sensors and lead to improvements in the development of buffet forcing functions. In this paper, comparisons of the fluctuating pressure field are made for the Space Launch System Block 1 cargo launch vehicle measured using unsteady pressure sensitive paint and pressure transducers.

buffet↗

Analysis of Transonic Unsteady Aerodynamic Environments using Unsteady Pressure Sensitive Paint for the Space Launch System Block 1 Cargo Launch Vehicle

Predicting launch vehicle unsteady aerodynamic loads due to buffet remains a significant challenge. Current practices for modeling buffet environments involve the development of buffet forcing functions using discrete unsteady pressure measurements acquired during wind-tunnel tests. These practices often result in significant uncertainty in buffet environments for coupled loads analyses due to the complex spatio-temporal nature of the unsteady pressure field and the challenge of its estimation using discrete sensors. Unsteady pressure sensitive paint, on the other hand, can provide unsteady pressure data at a comparatively high spatial density and may overcome the challenge of unsteady pressure field estimation with discrete sensors and lead to improvements in the development of buffet forcing functions. In this paper, comparisons of the fluctuating pressure field are made for the Space Launch System Block 1 cargo launch vehicle measured using unsteady pressure sensitive paint and pressure transducers.

buffet↗

Analysis of Transonic Unsteady Aerodynamic Environments using Unsteady Pressure Sensitive Paint for the Space Launch System Block 1 Cargo Launch Vehicle

Predicting launch vehicle unsteady aerodynamic loads due to buffet remains a significant challenge. Current practices for modeling buffet environments involve the development of buffet forcing functions using discrete unsteady pressure measurements acquired during wind-tunnel tests. These practices often result in significant uncertainty in buffet environments for coupled loads analyses due to the complex spatio-temporal nature of the unsteady pressure field and the challenge of its estimation using discrete sensors. Unsteady pressure sensitive paint, on the other hand, can provide unsteady pressure data at a comparatively high spatial density and may overcome the challenge of unsteady pressure field estimation with discrete sensors and lead to improvements in the development of buffet forcing functions. In this paper, comparisons of the fluctuating pressure field are made for the Space Launch System Block 1 cargo launch vehicle measured using unsteady pressure sensitive paint and pressure transducers.

buffet↗

Development of the Multi Purpose Transportation System for the Space Launch System (SLS) Core Stage (CS) Flight Article

NASA’s Multi Purpose Transportation System (MPTS) is designed to transport the Space Launch System vehicle segments by waterway and roadway. It is tasked with transporting the vehicle from where it is manufactured to its intermediate test location and final launch destination. Its design incorporates mechanisms that release degrees of freedom to prevent excessive loading during transit and ensure a successful delivery of the vehicle to its intended destination. In addition to the CS (Core Stage) flight article, the system will also move three structural test articles and a simulated CS Pathfinder (weight, center of gravity, outer mold line dimensions, and overall length) over road terrain on four NASA centers and on the Pegasus barge. The MPTS independently supports the article at both ends while communicating as a combined unit through automated monitoring of its released degree of freedom and corrective responses. This allows the system to constrain its payload in a statically determinate manner while traversing across highly variable terrain. Multi-body simulation of the transportation route is useful to predict free-body motion within the specified travel ranges. The MPTS has completed its design and analysis developmental cycles. This unpublished paper will describe the design challenges encountered in developing this system of large scale structure which incorporates complex mechanisms. The unique techniques and methodologies developed for analytical assessment of the hardware will be also be discussed. Key results from analytical evaluations as well as ongoing performance testing will be presented.

Sandridge, Sarah↗

Development of the Multi-Purpose Transportation System for the Space Launch System (SLS) Core Stage (CS) Flight Article

NASA's Multi-Purpose Transportation System (MPTS) is designed to transport the Space Launch System (SLS) vehicle segments by waterway and roadway. It is tasked with transporting the vehicle from where it is manufactured to its intermediate test location and final launch destination. Its design incorporates mechanisms that release degrees of freedom to prevent excessive loading during transit and ensure a successful delivery of the vehicle to its intended destination. In addition to the Core Stage (CS) flight article, the system will also move three Structural Test Articles (STAs), the Dynamic Demonstration Unit (DDU), and a simulated CS Pathfinder (weight, center of gravity, outer mold line dimensions, and overall length) over road terrain at four NASA centers and on the Pegasus barge. The MPTS independently supports the article at both ends while operating as a combined unit through automated monitoring of its released degree of freedom and corrective responses. This allows the system to constrain its payload in a statically determinate manner while traversing highly variable terrain. Multi-body simulation of the transportation route is useful to predict free-body motion within its range of mobility. The MPTS has completed its design and analysis developmental cycles. This paper describes the design challenges encountered in developing this system of large-scale structure, which incorporates complex mechanisms. The unique techniques and methodologies developed for analytical assessment of the hardware are also discussed.

Sandridge, Sarah↗

NASA's Space Launch System Progress Toward the Launch Pad

NASA’s Space Launch System (SLS) took a substantial step toward the launch site in2020 with the move of the Artemis I core stage from the manufacturing site to the test stand as the program plans for a 2021 launch. (Fig. 1) SLS is NASA’s evolvable super-heavy-lift launch vehicle to support deep space exploration. It is based on evolutionary improvement to existing proven propulsion systems. Its twin solid rocket boosters employ a five-segment motor based on the four-segment space shuttle motor. Its four RS-25 main engines will operate at thrust levels higher than those in the space shuttle program. The core stage is anew design that will support propellant tanks for the engines and serve as the attach point for the boosters. Modern streamlined manufacturing processes and materials have been incorporated into the initial configuration with planned onramps for improved performance and/or affordability in subsequent versions. The primary role of SLS is to anchor the transportation for NASA’s Artemis Program to return humans to the Moon and build on the exploration that began during the Apollo Program. This paper will discuss progress to date for the SLS Program and look ahead to important milestones in 2020 and beyond.

John H Honeycutt↗

NASA's Space Launch System: Moving Toward the Launch Pad

The National Aeronautics and Space Administration's (NASA's) Space Launch System (SLS) Program, managed at the Marshall Space Flight Center (MSFC), is making progress toward delivering a new capability for human space flight and scientific missions beyond Earth orbit. Designed with the goals of safety, affordability, and sustainability in mind, the SLS rocket will launch the Orion Multi-Purpose Crew Vehicle (MPCV), equipment, supplies, and major science missions for exploration and discovery. Supporting Orion's first autonomous flight to lunar orbit and back in 2017 and its first crewed flight in 2021, the SLS will evolve into the most powerful launch vehicle ever flown via an upgrade approach that will provide building blocks for future space exploration. NASA is working to deliver this new capability in an austere economic climate, a fact that has inspired the SLS team to find innovative solutions to the challenges of designing, developing, fielding, and operating the largest rocket in history. This paper will summarize the planned capabilities of the vehicle, the progress the SLS Program has made in the 2 years since the Agency formally announced its architecture in September 2011, the path it is following to reach the launch pad in 2017 and then to evolve the 70 metric ton (t) initial lift capability to 130-t lift capability after 2021. The paper will explain how, to meet the challenge of a flat funding curve, an architecture was chosen that combines the use and enhancement of legacy systems and technology with strategic new developments that will evolve the launch vehicle's capabilities. This approach reduces the time and cost of delivering the initial 70 t Block 1 vehicle, and reduces the number of parallel development investments required to deliver the evolved 130 t Block 2 vehicle. The paper will outline the milestones the program has already reached, from developmental milestones such as the manufacture of the first flight hardware, to life-cycle milestones such as the vehicle's Preliminary Design Review (PDR). The paper will also discuss the remaining challenges both in delivering the 70-t vehicle and in evolving its capabilities to the 130-t vehicle, and how NASA plans to accomplish these goals. As this paper will explain, SLS is making measurable progress toward becoming a global infrastructure asset for robotic and human scouts of all nations by harnessing business and technological innovations to deliver sustainable solutions for space exploration.

Creech, Stephen D.↗

NASA's Space Launch System: Moving Toward the Launch Pad

The National Aeronautics and Space Administration's (NASA's) Space Launch System (SLS) Program, managed at the Marshall Space Flight Center, is making progress toward delivering a new capability for human space flight and scientific missions beyond Earth orbit. Developed with the goals of safety, affordability, and sustainability in mind, the SLS rocket will launch the Orion Multi-Purpose Crew Vehicle (MPCV), equipment, supplies, and major science missions for exploration and discovery. Supporting Orion's first autonomous flight to lunar orbit and back in 2017 and its first crewed flight in 2021, the SLS will evolve into the most powerful launch vehicle ever flown, via an upgrade approach that will provide building blocks for future space exploration and development. NASA is working to develop this new capability in an austere economic climate, a fact which has inspired the SLS team to find innovative solutions to the challenges of designing, developing, fielding, and operating the largest rocket in history. This paper will summarize the planned capabilities of the vehicle, the progress the SLS program has made in the 2 years since the Agency formally announced its architecture in September 2011, and the path the program is following to reach the launch pad in 2017 and then to evolve the 70 metric ton (t) initial lift capability to 130-t lift capability. The paper will explain how, to meet the challenge of a flat funding curve, an architecture was chosen which combines the use and enhancement of legacy systems and technology with strategic new development projects that will evolve the capabilities of the launch vehicle. This approach reduces the time and cost of delivering the initial 70 t Block 1 vehicle, and reduces the number of parallel development investments required to deliver the evolved version of the vehicle. The paper will outline the milestones the program has already reached, from developmental milestones such as the manufacture of the first flight hardware and the record-breaking testing of the J-2X engine, to life-cycle milestones such as the vehicle's Preliminary Design Review. The paper will also discuss the remaining challenges in both delivering the 70 t vehicle and in evolving its capabilities to the 130 t vehicle, and how the program plans to accomplish these goals. As this paper will explain, SLS is making measurable progress toward becoming a global infrastructure asset for robotic and human scouts of all nations by harnessing business and technological innovations to deliver sustainable solutions for space exploration

Creech, Stephen D.↗

State Machine Modeling of the Space Launch System Solid Rocket Boosters

The Space Launch System is a Shuttle-derived heavy-lift vehicle currently in development to serve as NASA's premiere launch vehicle for space exploration. The Space Launch System is a multistage rocket with two Solid Rocket Boosters and multiple payloads, including the Multi-Purpose Crew Vehicle. Planned Space Launch System destinations include near-Earth asteroids, the Moon, Mars, and Lagrange points. The Space Launch System is a complex system with many subsystems, requiring considerable systems engineering and integration. To this end, state machine analysis offers a method to support engineering and operational e orts, identify and avert undesirable or potentially hazardous system states, and evaluate system requirements. Finite State Machines model a system as a finite number of states, with transitions between states controlled by state-based and event-based logic. State machines are a useful tool for understanding complex system behaviors and evaluating "what-if" scenarios. This work contributes to a state machine model of the Space Launch System developed at NASA Ames Research Center. The Space Launch System Solid Rocket Booster avionics and ignition subsystems are modeled using MATLAB/Stateflow software. This model is integrated into a larger model of Space Launch System avionics used for verification and validation of Space Launch System operating procedures and design requirements. This includes testing both nominal and o -nominal system states and command sequences.

model-based systems engineering↗

A Deformed Geometry Synthesis Technique for Determining Stacking and Cryogenically Induced Preloads for the Space Launch System

The Space Launch System (SLS) stacking and Core Stage (CS) fueling induce significant preloads that contribute to the liftoff pad separation “twang”. To accurately capture this, an approach is required that can replicate the physics of all SLS physical stacking steps, CS cryogenic shrinkage, associated geometric nonlinearities, and the transient behavior and decay of the preloads with changing boundary conditions as the vehicle separates from the pad. The Deformed Geometry Synthesis (DGS) approach presented here satisfies the above requirements. DGS determines induced preloads by modeling components in their deformed geometry states and then enforcing compatibility by closing the resulting “deadbands”. DGS seamlessly integrates into the multibody modal synthesis framework and does not require the use of artificial external loads to enforce preloads or post-processing steps to remove their influence. Since DGS iterates to solve for the deformed state inclusive of geometric nonlinearities, running linearized parametrics to exercise different potential orientations of ball jointed struts that connect the CS to Boosters for cryo-shrinkage analyses is entirely avoided. Relative to the transient behavior and decay of stacking and cryo-induced preloads with SLS liftoff pad separation, this is an area of considerable interest to the SLS program. To capture this in the most accurate way possible, DGS algorithms are designed to work with Henkel-Mar nonlinear pad separation algorithms which operate on the separating longitudinal and lateral degrees of freedom (DoFs) between the vehicle and the pad. As the separating DoFs release, in whatever manner as dictated by the interface geometries, interface loads and interface flexibilities as well as the external loading on the vehicle, the subject preloads generate a complex twang/decay time-trace as dictated by the physics of the problem. This paper presents DGS numerical verification against the closed-form solution for Timoshenko’s 3 ball-jointed strut preload problem. This problem is then extended by the authors to the geometric nonlinear case where DGS is compared to the Newton-Raphson solution of the nonlinear equations. Next, DGS is utilized to solve the SLS stacking and cryogenic shrinkage coupled loads analyses. Finally, Henkel-Mar pad separation simulations are executed that isolate the impact of the induced preloads’ twang and decay characteristics.

Space Launch System↗

NASA's Space Launch System: Momentum Builds Toward First Launch

NASA's Space Launch System (SLS) is gaining momentum toward the first launch of a new exploration-class heavy lift launch vehicle for international exploration and science initiatives. The SLS comprises an architecture that begins with a vehicle capable of launching 70 metric tons (t) into low Earth orbit. It will launch the Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back in December 2017. Its first crewed flight follows in 2021. SLS can evolve to a130-t lift capability and serve as a baseline for numerous robotic and human missions ranging from a Mars sample return to delivering the first astronauts to explore another planet. The SLS Program formally transitioned from the formulation phase to implementation with the successful completion of the rigorous Key Decision Point C review in 2014. As a result, the Agency authorized the Program to move forward to Critical Design Review, scheduled for 2015. In the NASA project life cycle process, SLS has completed 50 percent of its major milestones toward first flight. Every SLS element manufactured development hardware for testing over the past year. Accomplishments during 2013/2014 included manufacture of core stage test articles, preparations for qualification testing the solid rocket boosters and the RS-25 main engines, and shipment of the first flight hardware in preparation for the Exploration Flight Test-1 (EFT-1) in 2014. SLS was conceived with the goals of safety, affordability, and sustainability, while also providing unprecedented capability for human exploration and scientific discovery beyond Earth orbit. In an environment of economic challenges, the SLS team continues to meet ambitious budget and schedule targets through the studied use of hardware, infrastructure, and workforce investments the United States made in the last half century, while selectively using new technologies for design, manufacturing, and testing, as well as streamlined management approaches that have increased decision velocity and reduced associated costs. This paper will summarize recent SLS Program accomplishments, as well as the challenges and opportunities ahead for the most powerful and capable launch vehicle in history.

May, Todd A.↗

A Change of Inertia-Supporting the Thrust Vector Control of the Space Launch System

The Space Launch System (SLS) is America's next launch vehicle. To utilize the vehicle more economically, heritage hardware from the Space Transportation System (STS) will be used when possible. The Solid Rocket Booster (SRB) actuators could possibly be used in the core stage of the SLS. The dynamic characteristics of the SRB actuator will need to be tested on an Inertia Load Stand (ILS) that has been converted to Space Shuttle Main Engine (SSME). The inertia on the pendulum of the ILS will need to be changed to match the SSME inertia. In this testing environment an SRB actuator can be tested with the equivalent resistence of an SSME.

Dziubanek, Adam J.↗