Search NASA⌕ Search

SEARCH · Search NASA

Results for “licensing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Picking an Open Source License at LLNL: Guidance and Recommendations from the Computing Directorate

Science and innovation are at the core of LLNL’s mission, and open source software is a vehicle by which LLNL innovations reach the scientific community, the nation, and the world. It also serves as a vehicle for building collaborations, publicizing our capabilities, and attracting new employees. Over half of the software produced by LLNL is open source, and open source licenses are the legal tools that allow our software to be used widely. Choosing an appropriate license can be difficult, but it can be even more difficult to change licenses after your software has amassed a significant number of contributors, so it is important understand the potentially subtle implications of your license choice. This document provides a set of recommendations for the busy and uninitiated. They are not set in stone (there are always exceptions). Our goal is to provide default choices that align best with LLNL’s mission, along with a high-level rationale.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Hydropower Licensing Timeline and Cost Dataset

This dataset provides timeline dates, lengths, project characteristics, license characteristics, and costs of hydropower licensing and relicensing for 107 randomly selected hydropower projects that have been issued licenses since 1 October 2005. Projects included in this dataset were licensed but not necessarily constructed. These data were analyzed and presented in Chapters 3 (timeline data) and 5 (cost data) of the Levine et al. (2021) report

13 HYDRO ENERGY↗

Licensing and Operation of BEA Research Reactor Package for Fuel, Source and Target Payloads - 19198

The Battelle Energy Alliance (BEA) Research Reactor Package (BRR Package) is currently in use for a variety of payload types and operational scenarios. The BRR Package is licensed by the Nuclear Regulatory Commission (NRC), under Certificate of Compliance (CoC) number USA/9341/B(U)F-96. The original packaging design, testing, and safety analysis activities were conducted by Orano Federal Services (Orano FS, formerly AREVA Federal Services) for the Idaho National Laboratory (INL), operated by the Battelle Energy Alliance (BEA) for the U.S. Department of Energy (DOE). One package was built and delivered to the INL in 2009, and has seen routine use since that time, primarily by DOE University Research Reactor programs. This paper will provide a history and description of the original design and licensing of the package and subsequent amended applications for the addition of new payloads. Each additional payload type provided unique design, operational, and licensing challenges - these challenges will be discussed, and the results and lessons learned presented will be beneficial for application in other radioactive material packaging projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors: Risk-Informed and Performance-Based Evaluation of Defense-in-Depth Adequacy

This document supports the work contained in Nuclear Energy Institute (NEI) 18-04 “Risk-Informed Performance-Based Technology Inclusive Guidance for Advanced Reactor Licensing Basis Development” Revision 0. NEI 18-04 presents a modern, technology-inclusive, risk-informed, and performance-based (TI-RIPB) process for selection of Licensing Basis Events (LBEs); safety classification of structures, systems, and components (SSCs) and associated risk-informed special treatments; and determination of defense-in-depth (DID) adequacy for non-LWRs. The NEI guidance document provides one acceptable means for addressing the aforementioned topics as part of demonstrating a specific design provides reasonable assurance of adequate radiological protection. This report provides the framework and associated methodology guidelines and discussion for establishing, then evaluating, confirming, and documenting the adequacy of defense-in-depth (DID) for advanced non-light-water reactor technologies. It was developed as part of the Licensing Modernization Project led by Southern Company and cost-shared by the United States Department of Energy and has benefited from considerable NRC formal reviews and public workshops. The methodology converts the DID philosophy into a structured process that is implementable, embraces existing United States and international definitions and philosophies of DID that set the foundation for the process. It builds on the DID framework developed in the Department of Energy Next Generation Nuclear Plant Project and earlier works on this subject. The approach to establishing DID adequacy involves the incorporation of DID attributes into the plant capabilities and programmatic elements of DID. The integrated evaluation of DID adequacy includes both quantitative elements to incorporate risk-informed and performance-based (RIPB) considerations and qualitative elements that address uncertainties and limitations in the quantitative models and supporting data. Demonstration of DID adequacy ensures that there are multiple layers of defense for risk-significant challenges to the design and that the plant capabilities and programs that support each layer are provided in a manner that minimizes dependencies among these layers. The focus of this report is assurance of DID adequacy with respect to protection of the public from radiological exposures resulting from accidental releases of radioactive material. While other hazards are not specifically addressed, this methodology is expected to be beneficial for determining DID adequacy for them as well. Risk-informed evaluation of DID considers the integrated performance of all plant SSCs and associated programs to manage daily operational activities, transients, and accidents, including the evaluation of strategies for accident prevention and mitigation. The RIPB LBE scenario methodology used in this evaluation defines the challenges to the plant safety features included in the plant design basis and beyond, and the scope of all deterministic and probabilistic safety evaluations. By examining event sequences across the whole spectrum of LBEs, a systematic assessment of DID can be accomplished.

42 ENGINEERING↗

Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors: Safety Classification and Performance Criteria for Structures, Systems, and Components

This report, “Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors: Safety Classification and Performance Criteria for Structures, Systems and Components,” represents a key element in the development of a framework for the efficient licensing of advanced non-Light Water Reactors (non-LWRs). It is the result of a Licensing Modernization Project (LMP) led by Southern Company and cost-shared by the United States Department of Energy (DOE).

42 ENGINEERING↗

Advanced Reactor Licensing

This is the licensing presentation for the Waste Management Symposia 2023. It covers licensing activities, LMP, and manufacturing licenses.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A Decision Support System to Compile Environmental Mitigations from Hydropower Licensing Documents

The process of deciphering, extracting, and compiling information from texts dense with domain-specific terminology and technical jargon is a challenging endeavor. It demands considerable expertise and deep knowledge in the respective field, resulting in a labor-intensive process when executed by humans. Furthermore, the task of identifying multiple class labels in extensive texts presents a challenge due to intra- and inter-reader variability, making the process time-consuming and costly.We’re introducing a user-friendly graphical interface, fortified with a BERT model-powered decision support system. This advanced system aims to augment efficiency, curtail data collection time, and sustain high precision in data acquisition. It is instrumental in deciphering and synthesizing intricate texts teeming with a spectrum of expressions, even within similar mitigation categories. Such tasks traditionally demand substantial human effort and specialized knowledge in the domain.Our system is specifically engineered for the task of extracting environmental mitigation information to promote sustainable hydropower development from licenses issued by the Federal Energy Regulatory Commission (FERC). These license documents are comprehensive, each containing over 15,000 words and requiring the identification of 135 different class labels. We anticipate that our system will boost reading speed, improve the consistency of classification outputs among readers, and contribute to the development of a robust scientific database of environmental mitigations associated with the 2,000+ non-federal hydropower facilities licensed by FERC in the United States.

Yoon, Hong-Jun [ORNL] (ORCID:0000000254505878)↗

Technical and Licensing Considerations for Micro-Reactors

The U.S. Nuclear Regulatory Commission (NRC) has interacted with vendors pursuing the commercialization of micro-reactors (i.e., reactors capable of producing about 1 MW(th) to 20 MW(th) of energy from nuclear fission). It is envisioned that micro-reactors could be assembled and fueled in a factory and shipped to a site. Many of the sites are expected to be remote locations requiring off-grid power or in some cases military bases. The objective of this effort is to explore the technical issues and the approach required to reach a finding of "reasonable assurance of public health and safety" for this new and different class of reactors. The analysis performed here leverages available micro-reactor design and testing data available from national laboratory experience as well as commercial design information to explore technical issues. Some factors considered include source term, accidents that would need to be analyzed, and the extent of the probabilistic risk assessment (PRA). The technical evaluation was performed within the framework of the Licensing Modernization Project (LMP) to identify licensing basis events, classification of structures, systems and components, and defense-in-depth needed to provide regulatory certainty. With this framework and technical evaluation in mind, the scope and content of a micro-reactor licensing application is discussed.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Regulatory Treatment of Low Frequency External Events under a Risk-Informed Performance-Based Licensing Pathway

Significant efforts are underway to develop and implement a risk-informed performance-based licensing framework for advanced reactors built on the establishment of an affirmative safety case. Such approaches offer the benefits of increased flexibility regarding key design and licensing decisions based on a detailed assessment and understanding of plant risk. These methods include the comprehensive analysis of scenarios that have historically been addressed through conservative and deterministic licensing analysis approaches, such as the evaluation of event sequences at frequencies of occurrence beyond the design basis. While the detailed analysis of low frequency events provides insights that can help justify alternative treatments to past conservatism, the findings are dependent on the quality and confidence associated with the analyses. The assessment of external hazards presents a unique challenge, as their potential frequency of occurrence, especially of large magnitude events, is inherently uncertain given the long return periods in question. The current project seeks to further explore the regulatory treatment of low frequency external events as part of a risk-informed performance-based framework. The goals are to identify the benefits and challenges of such approaches for advanced reactor vendors and to aid in the development of consistent and appropriate methodologies. As part of this effort, the current report summarizes initial project findings, with a focus on the evaluation of the seismic hazard. This includes an exploration of the implementation of a risk-informed performance-based approach through an example analysis. Based on the identified challenges associated with the probabilistic treatment of low frequency event sequences, additional performance-based methods were explored as complementary tools for demonstrating regulatory compliance. The report highlights key challenges and opportunities associated with the methods and outlines recommendations and future activities to assist with their implementation.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Marine Energy Environmental Toolkit for Permitting and Licensing

The permitting and licensing process for marine energy in the U.S. could take up to 7 years for even small demonstrations or pilot studies despite existing resources like Tethys, MarineCadstre, and the FERC E-Library. The goal of the Marine Energy Environmental Toolkit Project was to increase regulators, developers, and marine energy innovators’ understanding of potential environmental effects of marine energy conversion devices deployments and provide information to make efficient and effective determinations during permitting and licensing; develop a one-stop shop for existing environmental, spatial, regulatory, and scientific data that allows users to access disparate sources of data through a series of tags and spatial queries. The Toolkit (marineenergy.app) builds upon prior U.S. Department of Energy (DOE) Water Power Technologies Office (WPTO) investments by pulling from WPTO-funded and outside resources to facilitate the permitting and licensing process, inform technology developers of required permits, and disseminate the latest knowledge of the environmental effects of these devices to regulators, developers, and marine energy innovators and stakeholders.

16 TIDAL AND WAVE POWER↗

Modeling and Simulation Development Pathways to Accelerating KP-FHR Licensing (Final Report)

This project assembles a strong U.S. industry and national laboratory team to complete scope of work. Kairos Power (KP), headquartered in Alameda, CA, is the leader of this effort and has built an internal team of highly competent engineers and managers with extensive combined experience in nuclear power, conventional power, product development, and licensing. INL, ANL, and LANL bring unique capabilities in advanced reactor R&D and licensing. The project funding source is the result of FOA No. 0001817, U. S. Industry Opportunities for Advanced Nuclear Technology Development. There has been on-going work and this Access Cooperative Research and Development Agreement (CRADA) will cover the remaining work scope of FOA 0001817. KP is implementing innovative strategies that can reduce the cost and accelerate the initial demonstration of the Kairos Power Fluoride-salt-cooled, High-temperature Reactor (KP-FHR) to meet the needs of the U.S. electricity market by 2030. Licensing of the KP-FHR could be significantly accelerated using advanced computing methods with sufficient predictive capabilities to be able to extrapolate potential response of the structure in different scenarios. However, currently used computational methods heavily rely on empirical fits and cannot be used for extrapolation. The scope focuses on improving the modeling capability in the NEAMS Grizzly structural mechanics code and the NEAMS BISON fuel performance code and the NEAMS SAM systems analysis code. This work leverages the expertise and know-how gathered in three DOE National Laboratories – INL, ANL, and LANL.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Understanding the Environmental Study Life Cycle in the United States Hydropower Licensing and Federal Authorization Process

We analyzed United States Federal Energy Regulatory Commission (FERC) documents prepared for 29 recently licensed hydropower projects and created two novel datasets to improve understanding of the environmental study life cycle, defined here as the process that begins with an environmental study being requested by a hydropower stakeholder or regulator, and ends with the study either being rejected or approved/conducted. Our two datasets consisted of summaries of information taken from (1), study determination letters prepared by FERC for 23 projects that were using the integrated licensing process, and (2), environmental study submittals and issuances tracked and attributed to seven projects using the FERC record. Our objective was to use the two resulting environmental life cycle datasets to understand which types of environmental studies are approved, rejected, and implemented during FERC licensing, and how consistently those types of studies are required across multiple hydropower projects. We matched the requested studies to a set of 61 river function indicators in eight categories and found that studies related to the category of biota and biodiversity were requested most often across all 29 projects. Within that category, studies related to river function indicators of presence, absence, detection of species and habitat/critical habitat were the most important to stakeholders, based on the relative number of studies requested. The study approval, rejection, and request rates were similar within each dataset, although the 23 projects with study determination letters had many rejected studies, whereas the dataset created from the seven projects had very few rejected studies.

13 HYDRO ENERGY↗

Licensing of future mobile satellite systems

The regulatory process for licensing mobile satellite systems is complex and can require many years to complete. This process involves frequency allocations, national licensing, and frequency coordination. The regulatory process that resulted in the establishment of the radiodetermination satellite service (RDSS) between 1983 and 1987 is described. In contrast, each of these steps in the licensing of the mobile satellite service (MSS) is taking a significantly longer period of time to complete.

Lepkowski, Ronald J.↗

From the Chemistry Lab to Licensing

This is a story of technology maturation and transfer, and licensing. It traces the history of the recently patented ion- exchange material (IEM) from the accidental discovery that this polymer, a battery separator of marginal performance, picked up copper from distilled water passing through corroded copper tubing in the laboratory, to a point where five organizations and one individual have applied for licenses to manufacture and market it or to use it in a wide variety of applications. This story discusses in detail the problems of converting an immature technology into a mature and eventually commercialized technology, without dedicated resources. Readers will develop an appreciation for how the obstacles to maturation and licensing of the technology were faced and overcome. The lessons learned will be discussed, with the hope of enhancing the technology transfer process.

Savino, Joseph M.↗

Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors: Risk-Informed and Performance-Based Evaluation of Defense-in-Depth Adequacy

This document supports the work contained in Nuclear Energy Institute (NEI) 18-04 “Risk-Informed Performance-Based Technology Inclusive Guidance for Advanced Reactor Licensing Basis Development” Revision 0.[19] NEI 18-04 presents a modern, technology-inclusive, risk-informed, and performance-based (TI-RIPB) process for selection of Licensing Basis Events (LBEs); safety classification of structures, systems, and components (SSCs) and associated risk-informed special treatments; and determination of defense-in-depth (DID) adequacy for non-LWRs.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors: Safety Classification and Performance Criteria for Structures, Systems, and Components

This report, “Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors: Safety Classification and Performance Criteria for Structures, Systems and Components,” represents a key element in the development of a framework for the efficient licensing of advanced non-Light Water Reactors (non-LWRs).

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

An Examination of the Hydropower Licensing and Federal Authorization Process

Site-permitting and regulation are necessary to ensure hydropower projects (both original and relicensed) comply with statutory requirements and address multiple stakeholder priorities that consider a range of factors, including water quality, species protection, cultural resource impacts, and recreation. However, the time involved in acquiring a license for an individual hydropower project can be highly variable by project, leading to increased project costs, financial risks, and uncertainties. In part, this variability is the result of a regulatory structure that has evolved over time to include multiple approvals and compliance requirements administered by the Federal Energy Regulatory Commission (FERC), U.S. Army Corp of Engineers (USACE), federal land management agencies, federal and state resource agencies, and Indian Tribes. Ultimately, the time, benefits, costs, and risks to developers associated with hydropower regulatory processes and/or the preparation (e.g., studies) required for regulatory agency review are not well documented or synthesized in the public domain, which may increase uncertainty and variability within the process. This report addresses these needs by presenting results of a comprehensive examination of hydropower licensing including quantitative and qualitative analyses of timelines, causal factors, and their combined effect on risk and costs to developers.

13 HYDRO ENERGY↗