Search NASA⌕ Search

SEARCH · Search NASA

Results for “licensing and permitting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Language Barriers in Organismal Biology: What Can Journals Do Better?

Synopsis In the field of organismal biology, as in much of academia, there is a strong incentive to publish in internationally recognized, highly regarded, English-language journals to promote career advancement. This expectation has created a linguistic hegemony in scientific publishing, whereby scholars for whom English is an additional language face additional barriers to achieving the same scientific recognition as scholars who speak English as a first language. Here, we surveyed the author guidelines of 230 journals in organismal biology with impact factors of 1.5 or greater for linguistically inclusive and equitable practices and policies. We looked for efforts that reflect first steps toward reducing barriers to publication for authors globally, including the presence of statements that encouraged submissions from authors of diverse nationalities and backgrounds, policies regarding manuscript rejection based on perceived inadequacies of the English language, the existence of bias-conscious reviewer practices, whether translation and editing resources or services are available, allowance for non-English abstracts, summaries, or translations, and whether journals offer license options that would permit authors (or other scholars) to translate their work and publish it elsewhere. We also directly contacted a subset of journals to verify whether the information on their author guidelines page accurately reflects their policies and the accommodations they would make. We reveal that journals and publishers have made little progress toward beginning to recognize or reduce language barriers. Counter to our predictions, journals associated with scientific societies did not appear to have more inclusive policies compared to non-society journals. Many policies lacked transparency and clarity, which can generate uncertainty, result in avoidable manuscript rejections, and necessitate additional time and effort from both prospective authors and journal editors. We highlight examples of equitable policies and summarize actions that journals can take to begin to alleviate barriers to scientific publishing.

Nolde-Lopez, B.↗

Evaluation of AI-enabled Digital Documented Safety Analysis

The National Reactor Innovation Center (NRIC) is leading a transformative initiative to accelerate advanced reactor deployment by fundamentally reimagining how nuclear safety basis documentation is developed, reviewed, and maintained. Traditional Documented Safety Analysis (DSA) processes for DOE-authorized facilities rely on static, document-centric workflows that consume significant time and resources, exemplified by recent major licensing efforts requiring hundreds of thousands of staff hours and millions of pages of documentation review. These conventional approaches create barriers to the rapid, cost-effective deployment of advanced reactors that America's future energy needs demand. NRIC's DOE Authorization Digital Transformation Project addresses these challenges through an innovative framework that integrates artificial intelligence (AI), digital engineering, and systems-based data management into a cohesive digital ecosystem. This white paper presents NRIC's methodology for evaluating AI-enabled document generation capabilities within this broader digital infrastructure, using the Demonstration of Microreactor Experiments (DOME) facility as a pilot case study. The evaluation will assess an AI tool's ability to generate a Preliminary Documented Safety Analysis (PDSA) through progressive integration stages—from standalone document processing to full digital thread connectivity—while maintaining rigorous verification, validation, and regulatory acceptance standards. By establishing dynamic, traceable connections between design data and safety documentation, NRIC's approach has the potential to reduce both document development time and regulatory review cycles by as much as 50%, while simultaneously improving accuracy, consistency, and traceability. This initiative represents a critical step toward establishing reusable digital infrastructure that reactor developers can leverage to accelerate their path from concept to commercial operation, directly supporting NRIC's mission to demonstrate and deploy advanced nuclear energy technologies.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

US domestic and international regulatory issues

The U.S. domestic and international regulatory and policy milestones since 1982, when NASA filed its petition with the Federal Communications Commission (FCC) to establish the U.S. domestic Mobile Satellite Service (MSS), are described. In 1985, the FCC proposed to establish MSS services and allocate spectrum for such service. In 1986, the FCC allocated L-band spectrum for MSS. In 1987, at the Mobile World Administrative Radio Conference (MOB WARC-87), despite U.S., Canadian, and Mexican efforts, the WARC did not adopt a multi-service, generic MSS allocation. In 1989, the FCC licensed the first MSS system. After two decisions by the U.S. Court of Appeals, the FCC's licensing actions remain intact. The FCC also has permitted Comsat to provide international aeronautical and land MSS via the Inmarsat system. Inmarsat, however, may not serve the domestic U.S. market. In 1991, the FCC accepted applications for MSS systems, most of which were non-geostationary proposals, for operation in the Radiodetermination Satellite Service (RDSS) bands, and the VHF and UHF bands. In 1992, the FCC proposed rules for non-geostationary MSS systems and applied a negotiated rulemaking procedure to each. Also in 1992, the U.S. position for flexibility in existing MSS bands and for additional worldwide MSS allocations was adopted in large part at the 1992 World Administrative Radio Conference (WARC-92).

Levin, Lon C.↗

Challenges in the post-licensing stage of U.S. hydropower development: Current status and some potential solutions

The issuance of a Federal Energy Regulatory Commission (FERC) license is an important milestone in the development process of new U.S. hydropower projects. The complexity and uncertain timeline of the licensing process have been often cited as a key deterrent to new hydropower installations in the United States. However, very little attention has been paid to post-licensing timelines and attrition rates. This article explores the challenges faced by developers in bringing their FERC-licensed hydropower projects to the construction stage. Post-licensing activities to be completed before starting construction include obtaining additional permitting from other federal or state agencies, completing the technical design, securing financing, and in most cases, negotiating a power purchase agreement. For the set of projects that obtained a FERC license between 2007 and 2018, we assembled a dataset—combining information from FERC dockets and responses from a questionnaire to developers—to calculate attrition rates and development timelines and to examine the reasons for delays and cancellations.

13 HYDRO ENERGY↗

AquaPV: Regulatory and Environmental Considerations for Floating Photovoltaic Projects Located on Federally Controlled Reservoirs in the United States

To meet the nation's decarbonization goals, the U.S. Department of Energy's Solar Futures study forecasts that installed solar photovoltaic (PV) capacity must increase nearly tenfold, from 80 gigawatts (GW) in 2020 to approximately 760 GW cumulative installed capacity by 2035. Ground-mounted PV is expected to dominate future solar deployment and will require more than 3.5 million acres of land to meet annual demand projections (of nearly 45 GW) by 2030. However, various competing demands for land (e.g., agricultural production, conservation) and high land acquisition costs in specific locations could be challenges to meeting future PV demand solely with ground-mounted PV deployment. Floating photovoltaics (FPV) may be an alternative in locations where ground-mounted PV is not feasible and aid in reaching the nation's PV deployment and decarbonization goals. FPV is a newer siting approach in which a PV array is affixed to a floating apparatus and sited on a water body like a reservoir behind a dam. FPV systems may be stand-alone or co-located at new or existing hydroelectric facilities or pumped storage hydropower (PSH) facility reservoirs. Co-located FPV systems may or may not be operationally paired and work in tandem with the hydroelectric or PSH facility. This report provides novel analysis to understand the opportunities and challenges associated with developing stand-alone and co-located FPV projects on reservoirs in the United States. Specifically, the report explores potential environmental and energy benefits and environmental impacts associated with the siting, construction, and operation of FPV projects. The report also identifies and analyzes U.S. federal- and state-issued permits and authorizations required by federal laws to understand the licensing pathways and regulatory requirements for FPV projects sited on reservoirs licensed by the Federal Energy Regulatory Commission and on powered and non-powered reservoirs owned by the Bureau of Reclamation or U.S. Army Corps of Engineers.

13 HYDRO ENERGY↗

Phased Project Planning Guidelines

NHB 7121.2 is the initial publication of the guidelines for implementation of the Phased Project Planning (PPP) concept prescribed by NPD 7121,1A. These guidelines are applicable to the planning and approval activities which lead to the implementation of major new research and development projects as defined in NPD 7121.1A as well as to major modifications or extensions of approved projects. They should, therefore, be reflected in the Project Approval Documents which serve as the basic documentation for project definition, guidance and control throughout NASA. The purpose of PPP is to provide, through defined phases, an adequate basis for management decisions on the extent to which project activities can be properly undertaken and commitments made. However, these guidelines do not prescribe detailed format and content of plans and other documents and reports used to apply the PPP concept. Similarly, the work content of phases and the information requirements described herein are not checklists. They are included to assist in understanding the intent of the PPP concept and should not be viewed as rigid or inflexible. PPP, as a concept for orderly planning and definition of new major R&D undertakings, must be adapted to the peculiarities of each individual case. However, the flexibility permitted for adaptation should not be considered as a license for major variation which would compromise the objectives that underlie the concept. Cognizant NASA officials are expected to pursue their project planning and definition activities in reasonable conformance with these guidelines and to request only those exceptions or deviations which are clearly necessary and justified. These guidelines will be modified as determined necessary on the basis of experience. Comments or suggestions for changes should be directed to the Office of Organization and Management.

Source record↗

AquaPV: Regulatory and Environmental Considerations for Floating Photovoltaic Projects Located on Federally Controlled Reservoirs in the United States

To meet the nation's decarbonization goals, the U.S. Department of Energy's Solar Futures study forecasts that installed solar photovoltaic (PV) capacity must increase nearly tenfold, from 80 gigawatts (GW) in 2020 to approximately 760 GW cumulative installed capacity by 2035. Ground-mounted PV is expected to dominate future solar deployment and will require more than 3.5 million acres of land to meet annual demand projections (of nearly 45 GW) by 2030. However, various competing demands for land (e.g., agricultural production, conservation) and high land acquisition costs in specific locations could be challenges to meeting future PV demand solely with ground-mounted PV deployment. Floating photovoltaics (FPV) may be an alternative in locations where ground-mounted PV is not feasible and aid in reaching the nation's PV deployment and decarbonization goals. FPV is a newer siting approach in which a PV array is affixed to a floating apparatus and sited on a water body like a reservoir behind a dam. FPV systems may be stand-alone or co-located at new or existing hydroelectric facilities or pumped storage hydropower (PSH) facility reservoirs. Co-located FPV systems may or may not be operationally paired and work in tandem with the hydroelectric or PSH facility. This report provides novel analysis to understand the opportunities and challenges associated with developing stand-alone and co-located FPV projects on reservoirs in the United States. Specifically, the report explores potential environmental and energy benefits and environmental impacts associated with the siting, construction, and operation of FPV projects. The report also identifies and analyzes U.S. federal- and state-issued permits and authorizations required by federal laws to understand the licensing pathways and regulatory requirements for FPV projects sited on reservoirs licensed by the Federal Energy Regulatory Commission and on powered and non-powered reservoirs owned by the Bureau of Reclamation or U.S. Army Corps of Engineers.

ENERGY PLANNING, POLICY, AND ECONOMY,SOLAR ENERGY↗

AquaPV: Regulatory and Environmental Considerations for Floating Photovoltaic Projects Located on Federally Controlled Reservoirs in the United States

To meet the nation's decarbonization goals, the U.S. Department of Energy's Solar Futures study forecasts that installed solar photovoltaic (PV) capacity must increase nearly tenfold, from 80 gigawatts (GW) in 2020 to approximately 760 GW cumulative installed capacity by 2035. Ground-mounted PV is expected to dominate future solar deployment and will require more than 3.5 million acres of land to meet annual demand projections (of nearly 45 GW) by 2030. However, various competing demands for land (e.g., agricultural production, conservation) and high land acquisition costs in specific locations could be challenges to meeting future PV demand solely with ground-mounted PV deployment. Floating photovoltaics (FPV) may be an alternative in locations where ground-mounted PV is not feasible and aid in reaching the nation's PV deployment and decarbonization goals. FPV is a newer siting approach in which a PV array is affixed to a floating apparatus and sited on a water body like a reservoir behind a dam. FPV systems may be stand-alone or co-located at new or existing hydroelectric facilities or pumped storage hydropower (PSH) facility reservoirs. Co-located FPV systems may or may not be operationally paired and work in tandem with the hydroelectric or PSH facility. This report provides novel analysis to understand the opportunities and challenges associated with developing stand-alone and co-located FPV projects on reservoirs in the United States. Specifically, the report explores potential environmental and energy benefits and environmental impacts associated with the siting, construction, and operation of FPV projects. The report also identifies and analyzes U.S. federal- and state-issued permits and authorizations required by federal laws to understand the licensing pathways and regulatory requirements for FPV projects sited on reservoirs licensed by the Federal Energy Regulatory Commission and on powered and non-powered reservoirs owned by the Bureau of Reclamation or U.S. Army Corps of Engineers.

ENERGY PLANNING, POLICY, AND ECONOMY,SOLAR ENERGY↗

AEOSS runtime manual for system analysis on Advanced Earth-Orbital Spacecraft Systems

Advanced earth orbital spacecraft system (AEOSS) enables users to project the required power, weight, and cost for a generic earth-orbital spacecraft system. These variables are calculated on the component and subsystem levels, and then the system level. The included six subsystems are electric power, thermal control, structure, auxiliary propulsion, attitude control, and communication, command, and data handling. The costs are computed using statistically determined models that were derived from the flown spacecraft in the past and were categorized into classes according to their functions and structural complexity. Selected design and performance analyses for essential components and subsystems are also provided. AEOSS has the feature permitting a user to enter known values of these parameters, totally and partially, at all levels. All information is of vital importance to project managers of subsystems or a spacecraft system. AEOSS is a specially tailored software coded from the relational database program of the Acius' 4th Dimension with a Macintosh version. Because of the licensing agreements, two versions of the AEOSS documents were prepared. This version, AEOSS Runtime Manual, is permitted to be distributed with a finite number of the restrictive 4D Runtime version. It can perform all contained applications without any programming alterations.

Lee, Hwa-Ping↗

Community Engagement - A Citizen-Centric Approach to Seeking a Social License - 20017

The long regulatory road has finally been completed-after years of effort a Record of Decision has been signed and a Permit to Construct has been granted or a Permit to Operate has been obtained. But what about the other road that should be taken in parallel-community engagement? Working with the public is not a sequential activity, rather it is a consequential one and needs to be integrated with overall project planning. Unless you have effectively, meaningfully, and patiently engaged with the project's communities of impact, you may find your project trying to obtain a social license or a social license to operate (SLO). The SLO has its origins in the mining industry and its roots in the business model of corporate social responsibility and sustainability. These latter practices are well known to the US DOE and its contractor community. Aspects of the SLO are emerging as individuals and communities are becoming more informed and have increased expectations for being able to influence and shape decisions. When local community issues are not sought out, listened to, or addressed early, and questions are left unanswered, they can become agenda items for larger unaffiliated groups, and project loss (through delays and/or cancellation) can occur. Issues can transition from resolvable to intractable, a type of SLO face-off. Social media campaigns, serial negative media coverage, and protest signs at project sites opposing regulatory decisions already made are no longer anomalies. These types of incidents demonstrate the increasingly delicate relationship between approved regulatory/technical decisions and public acceptance of those decisions. A SLO is not a requirement. However, the building-blocks of a SLO - working with members of affected communities to build understanding, potentially to obtain and maintain community acceptance or even gain approval or support - are evidence of leadership by project sponsors. Actions taken, or not taken, by project sponsors truly have the ability to influence an outcome. While projects are not assured of success or failure, engaging the community in an empowered process is an investment of time and resources toward success for the project and thus for the communities of impact. Authors Note: Extensive literature searches were performed in developing this paper. The majority of the published literature on SLO as a 'movement' was found from sources in Canada, the European Union (Germany and France in particular), South Asia, South Korea, and many Latin American countries. The literature addressed resource development (mining), infrastructure, and energy projects. Articles written by US sources often spoke to origins and structural theory, specific project issues such as Not in My Back Yard (NIMBY) and to protests/demonstrations related to those projects, rather than systemic opposition/conflict phenomena. For these reasons many international SLO experiences and sources are cited in the discussion. The authors recognize these non-US experiences with SLO as having a 'forecast' value to US projects, especially those related to nuclear projects of any type, waste treatment and disposal, energy development (especially fossil fuels as well as alternative sources), mining, and infrastructure. The body of future SLO experiences in the US will shape the future responses to it. (authors)

99 GENERAL AND MISCELLANEOUS↗

Identification and Validation of Models of Importance for Simulation of Time-at-Temperature using CTF

The US nuclear industry is currently investigating the feasibility and benefit of pursuing a clad performance–based licensing strategy known as time-at-temperature (TaT)—whereby limited dryout of the fuel is permitted during anticipated operational occurrences (AOOs)—as opposed to the more restrictive critical heat flux (CHF) limitation.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Identification and Validation of Models of Importance for Simulation of Time-at-Temperature using CTF

The US nuclear industry is currently investigating the feasibility and benefit of pursuing a clad performance–based licensing strategy known as time-at-temperature (TaT)—whereby limited dryout of the fuel is permitted during anticipated operational occurrences (AOOs)—as opposed to the more restrictive critical heat flux (CHF) limitation.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Regulatory Treatment of Low Frequency External Events under a Risk-Informed Performance-Based Licensing Pathway: Safety Criteria Evaluation

There has been recent progress in the development of risk-informed performance-based (RIPB) design and licensing approaches, which leverage the insights gained from detailed risk assessments and utilize performance-based metrics to permit flexibility and innovation. The RIPB approaches have included the probabilistic treatment of external hazards, including low frequency events that are beyond the design basis. A preceding study conducted in FY21 noted that there are certain challenges to the probabilistic treatment of low frequency external events, which are primarily the result of uncertainty in the hazard curve and the associated plant response to rare, severe events. The current work expands on the previous study by examining the regulatory safety criteria contained within draft 10 CFR Part 53 and associated draft RIPB seismic design guidance. The evaluation identified potential challenges in demonstrating satisfaction of the safety criteria for low frequency external events, with specific difficulties associated with demonstrating compliance with cumulative safety criteria metrics, such as the quantitative health objectives (QHOs). Non-LWRs are expected to utilize the direct calculation of offsite consequence, rather than use surrogates, for comparison to the QHOs, which can be particularly challenging as the previously identified uncertainties are compounded by uncertainties in the response of the neighboring population. The current work details this evaluation and key findings. The central recommendation from this effort is that it is necessary to develop an approach for demonstrating compliance with the safety criteria in draft Part 53 that addresses the key challenges while providing flexibility to applicants.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Mobile satellite regulation in the United States

During the last decade, the U.S. FCC has developed the regulatory structure for the provision of mobile services via satellite. In May 1989, the FCC awarded American Mobile Satellite Corporation (AMSC) a license to provide the full range of domestic mobile satellite services in the U.S. At that time, the FCC reaffirmed the U.S. mobile satellite industry structure and spectrum allocations that had been adopted previously. Also in May 1989, the FCC authorized the Communications Satellite Corporation (COMSAT), the U.S. Signatory to Inmarsat, to provide international aeronautical satellite service via the Inmarsat system. Earlier in 1989, the FCC permitted the use of Ku-band satellites to provide messaging and tracking services. In the mid-1980's, the FCC established the Radiodetermination Satellite Service and awarded licenses. Among the mobile satellite matters currently facing the FCC are whether additional spectrum should be allocated for domestic 'generic' mobile satellite services, the regulatory structure for the provision of mobile satellite service on an interim basis before AMSC launches its dedicated satellites, and whether to authorize a low earth orbit satellite system to provide mobile data service.

Levin, Lon C.↗

GH Induction System 1B (BR-105) & MRF System 6 (BR-120) in B226

The purpose of the attached calculations and detail sketches is to document conformance with the requirements of DOE-STD-1020-2016 for the subject project. The calculations have been reviewed for technical accuracy, appropriate methodology, and completeness using the "Document Review Method." The reviewer confirms that the stated purpose has been met. This package does not constitute a construction permit. The enclosed calculations are valid for 2 years from signed date or expiration of listed code cycles, whichever occurs first. Licensed civil or structural engineer is to be contacted for calculations application following expiration of calculations package.

42 ENGINEERING↗

Comparison of atmospheric radionuclide dispersion models for a risk-informed consequence-driven advanced reactor licensing framework

Current nuclear facility emergency planning zones (EPZs) are based on outdated distance-based criteria, predating comprehensive dose and risk-informed frameworks. Recent advancements in simulation tools have permitted the development of site-specific, dose, and risk-based consequence-driven assessment frameworks. This study investigated the computation of advanced reactor (AR) EPZs using two atmospheric dispersion models: a straight-line Gaussian plume model (GPM) and a semi-Lagrangian Particle in Cell (PIC). Two case studies were conducted: (1) benchmarking the NRC SOARCA study for the Peach Bottom Nuclear Generating Station and (2) analyzing an advanced INL Heat Pipe Design A microreactor's end-of-cycle inventory. The dose criteria for both cases were 10 mSv at mean weather conditions and 50 mSv at 95th percentile weather conditions at 96 h post-release. Results demonstrated that GPM and PIC estimated similar mean peak dose levels for large boiling water reactors in the farfield case, placing EPZ limits beyond current regulations. For ARs with source terms remaining in the nearfield, PIC modeling without specific nearfield considerations could result in excessively high doses and inaccurate EPZ designations. PIC dispersion demonstrated an order of magnitude higher estimate of nearfield inhalation dose contribution when compared to GPM results. Furthermore, both models significantly reduced EPZ sizing within the nearfield. Thus, reductions in the AR source term may eliminate the need for a separate EPZ.

63 RADIATION, THERMAL, AND OTHER ENVIRON. POLLUTAN↗

MECHANISTIC MULTIPHYSICS MODELING OF CLADDING RUPTURE IN NUCLEAR FUEL RODS DURING LOSS-OF-COOLANT ACCIDENT CONDITIONS

The Loss of Coolant Accident (LOCA) is a design basis accident that is included as part of the safety analysis of nuclear power plants. As the nuclear industry desires to increase the cycle length and discharge burnup of existing nuclear power plants they must demonstrate safe operation during a LOCA on high burnup fuel. During a LOCA transient on high burnup fuel rods, the rods may undergo a process known as fuel fragmentation, relocation, and dispersal (FFRD). To permit dispersal, the cladding encapsulating the fuel must rupture with an opening size large enough to allow the fragmented fuel particles to release. Current licensing tools used by industry and the United States Nuclear Regulatory Commission are limited in geometric fidelity and materials that can be analyzed. These simulation tools generally employ a quasi-two-dimensional (1.5D or Layered1D) or 2D-RZ axisymmetric geometric representations exclusively. While a valid approach under some instances, there are times when important physics have an asymmetric behavior in the fuel rod. Examples include fuel fragmentation, thermal-hydraulic boundary conditions, and cladding rupture, all of which are important for LOCA analysis. As industry pursues burnup extensions it must be demonstrated that fuel dispersal can be mitigated or eliminated. To do this, an understanding of the rupture opening after cladding failure is required. This work presents the development of a model for predicting the size and location of the rupture opening in failed fuel rods during LOCA conditions using advanced modeling and simulation tools. In order to supply the rupture model with appropriate boundary conditions, improvements to fuel fragmentation, axial relocation and oxidation modeling were required. First, the eXtended Finite Element Method (XFEM) is used to mechanistically predict the number of fuel fragments that form due to material strength randomization, criteria for strength randomization, mesh density, power ramping rates and irradiation effects. These predictions with associated uncertainty were compared to empirical correlations developed for UO2 verifying that they can be used with increased confidence in subsequent axial relocation analyses. Secondly, a new first-of-its-kind Layered2D computational framework was developed that provides the ability to apply azimuthally varying boundary conditions while providing discrete layers to track fuel movement during the LOCA. An existing fuel axial relocation model developed for Layered1D was extended to work within the Layered2D framework. A large sensitivity study was performed on the initial version of the model to identify modeling parameters of particular importance, with the emissivity used for radiation after blowdown being the primary source of uncertainty. Then, a simplistic approach to incorporate mechanical degradation of the cladding due to oxidation was also developed to investigate the impact of reduced cladding thickness on predictions of the time to failure of cladding tubes. It was found that the cladding will typically rupture prior to a reduction in thickness that is sufficient to impact the rupture behavior. A model was then developed for predicting cladding rupture that transfers the cladding surface temperatures, rod internal and external pressures, fast neutron fluence, and fast neutron flux from a more detailed Layered1D, Layered2D, or 2D-RZ analysis to a 3D cladding only analysis. Comparisons of the rupture model to a few experiments indicate reasonable predictions. The rupture model was then applied to two accident tolerant fuel concepts (FeCrAl and Cr-coated Zircaloy) where it predicted that both ATF concepts would have smaller rupture openings and delayed rupture times than the standard Zircaloy-4 cladding material under identical loading conditions.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗