Search NASA⌕ Search

SEARCH · Search NASA

Results for “long term planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

National facilities study. Volume 5: Space research and development facilities task group

With the beginnings of the U.S. space program, there was a pressing need to develop facilities that could support the technology research and development, testing, and operations of evolving space systems. Redundancy in facilities that was once and advantage in providing flexibility and schedule accommodation is instead fast becoming a burden on scarce resources. As a result, there is a clear perception in many sectors that the U.S. has many space R&D facilities that are under-utilized and which are no longer cost-effective to maintain. At the same time, it is clear that the U.S. continues to possess many space R&D facilities which are the best -- or among the best -- in the world. In order to remain world class in key areas, careful assessment of current capabilities and planning for new facilities is needed. The National Facility Study (NFS) was initiated in 1992 to develop a comprehensive and integrated long-term plan for future aerospace facilities that meets current and projected government and commercial needs. In order to assess the nation's capability to support space research and development (R&D), a Space R&D Task Group was formed. The Task Group was co-chaired by NASA and DOD. The Task Group formed four major, technologically- and functionally- oriented working groups: Human and Machine Operations; Information and Communications; Propulsion and Power; and Materials, Structures, and Flight Dynamics. In addition to these groups, three supporting working groups were formed: Systems Engineering and Requirements; Strategy and Policy; and Costing Analysis. The Space R&D Task Group examined several hundred facilities against the template of a baseline mission and requirements model (developed in common with the Space Operations Task Group) and a set of excursions from the baseline. The model and excursions are described in Volume 3 of the NFS final report. In addition, as a part of the effort, the group examined key strategic issues associated with space R&D facilities planning for the U.S., and these are discussed in Section 4 of this volume.

Source record↗

Medical Response, Search and Recovery during the Space Shuttle Columbia Accident Investigation

On February 1, 2003, the Space Shuttle Columbia broke apart during atmospheric re-entry on mission STS-107. After an event such as this, with high visibility and international interest, the operational challenge of recovering the crewmembers could not be underestimated. The Space Shuttle Program is organized to respond to a vehicle mishap using the resources of the Mishap Investigation Team (MIT). On the afternoon of Feb. 1, 2003, the MIT deployed to Barksdale Air Force Base (AFB), Louisiana. This location became the investigative center and interim storage location for crewmembers received from the Lufkin, Texas Disaster Field Office (DFO). The Lufkin DFO served as the primary area for all operations, including staging assets and deploying field teams for search, recovery and security of crewmember remains. More than 2,000 people from numerous organizations were involved with the recovery of the crew. All seven crewmembers of STS-107 were recovered and ceremonial last rights were administered. Astronaut and military personnel escorted the crew with honor to the MIT at Barksdale AFB, Louisiana. At Barksdale AFB a temporary morgue was established in an aircraft hangar and operated for approximately two weeks during which time coordination with the DFO field recovery teams, Armed Forces Institute of Pathology (AFIP) medical personnel, and the crew surgeons was on going. Families of crewmembers and NASA management were notified daily of the current findings. Working under the leadership of the MIT Lead, the medical team developed and executed a short-term plan to identify and relocate the crew with a military honor guard and protocol to the medical examiner at the Armed Forces Port Mortuary, Dover AFB, Delaware. After operations at Barksdale AFB were concluded the medical team transitioned back to Houston and a long-term plan was developed and implemented which involved the Air Force Mortuary Affairs at Randolph AFB, Texas. This plan was coordinated with search teams in the field, Barksdale AFB Mortuary Affairs, KSC security, AFIP, and the crew surgeons at JSC.

Stepaniak, Philip C.↗

Project Prometheus

Project Prometheus will enable a new paradigm in the scientific exploration of the Solar System. The proposed JIMO mission will start a new generation of missions characterized by more maneuverability, flexibility, power and lifetime. Project Prometheus organization is established at NASA Headquarters: 1.Organization established to carry out development of JIMO, nuclear power (radioisotope), and nuclear propulsion research. 2.Completed broad technology and national capacity assessments to inform decision making on planning and technology development. 3.Awarded five NRA s for nuclear propulsion research. 4.Radioisotope power systems in development, and Plutonium-238 being purchased from Russia. 5.Formulated science driven near-term and long-term plan for the safe utilization of nuclear propulsion based missions. 6.Completed preliminary studies (Pre-Phase A) of JIMO and other missions. 7.Initiated JIMO Phase A studies by Contractors and NASA.

Johnson, Steve↗

Flight software issues in onboard automated planning: lessons learned on EO-1

This paper focuses on the onboard planner and scheduler CASPER, whose core planning engine is based on the ground system ASPEN. Given the challenges of developing flight software, we discuss several of the issues encountered in preparing the planner for flight, including reducing the code image size, determining what data to place within the engineering telemetry packet, and performing long term planning.

planning↗

Viewgraph description of Penn State's Propulsion Engineering Research Center: Activity highlights and future plans

Viewgraphs are presented that describe the progress and status of Penn State's Propulsion Engineering Research Center. The Center was established in Jul. 1988 by a grant from NASA's University Space Engineering Research Centers Program. After two and one-half years of operation, some 16 faculty are participating, and the Center is supporting 39 graduate students plus 18 undergraduates. In reviewing the Center's status, long-term plans and goals are reviewed and then the present status of the Center and the highlights and accomplishments of the past year are summarized. An overview of plans for the upcoming year are presented.

Merkle, Charles L.↗

Aerospace Systems Design in NASA's Collaborative Engineering Environment

Past designs of complex aerospace systems involved an environment consisting of collocated design teams with project managers, technical discipline experts, and other experts (e.g. manufacturing and systems operations). These experts were generally qualified only on the basis of past design experience and typically had access to a limited set of integrated analysis tools. These environments provided less than desirable design fidelity, often lead to the inability of assessing critical programmatic and technical issues (e.g., cost risk, technical impacts), and generally derived a design that was not necessarily optimized across the entire system. The continually changing, modern aerospace industry demands systems design processes that involve the best talent available (no matter where it resides) and access to the best design and analysis tools. A solution to these demands involves a design environment referred to as collaborative engineering. The collaborative engineering environment evolving within the National Aeronautics and Space Administration (NASA) is a capability that enables the Agency's engineering infrastructure to interact and use the best state-of-the-art tools and data across organizational boundaries. Using collaborative engineering, the collocated team is replaced with an interactive team structure where the team members are geographically distributed and the best engineering talent can be applied to the design effort regardless of physical location. In addition, a more efficient, higher quality design product is delivered by bringing together the best engineering talent with more up-to-date design and analysis tools. These tools are focused on interactive, multidisciplinary design and analysis with emphasis on the complete life cycle of the system, and they include nontraditional, integrated tools for life cycle cost estimation and risk assessment. NASA has made substantial progress during the last two years in developing a collaborative engineering environment. NASA is planning to use this collaborative engineering infrastructure to provide better aerospace systems life cycle design and analysis, which includes analytical assessment of the technical and programmatic aspects of a system from "cradle to grave." This paper describes the recent NASA developments in the area of collaborative engineering, the benefits (realized and anticipated) of using the developed capability, and the long-term plans for implementing this capability across the Agency.

Monell, Donald W.↗

Aerospace Systems Design in NASA's Collaborative Engineering Environment

Past designs of complex aerospace systems involved an environment consisting of collocated design teams with project managers, technical discipline experts, and other experts (e.g., manufacturing and systems operation). These experts were generally qualified only on the basis of past design experience and typically had access to a limited set of integrated analysis tools. These environments provided less than desirable design fidelity, often lead to the inability of assessing critical programmatic and technical issues (e.g., cost, risk, technical impacts), and generally derived a design that was not necessarily optimized across the entire system. The continually changing, modern aerospace industry demands systems design processes that involve the best talent available (no matter where it resides) and access to the the best design and analysis tools. A solution to these demands involves a design environment referred to as collaborative engineering. The collaborative engineering environment evolving within the National Aeronautics and Space Administration (NASA) is a capability that enables the Agency's engineering infrastructure to interact and use the best state-of-the-art tools and data across organizational boundaries. Using collaborative engineering, the collocated team is replaced with an interactive team structure where the team members are geographical distributed and the best engineering talent can be applied to the design effort regardless of physical location. In addition, a more efficient, higher quality design product is delivered by bringing together the best engineering talent with more up-to-date design and analysis tools. These tools are focused on interactive, multidisciplinary design and analysis with emphasis on the complete life cycle of the system, and they include nontraditional, integrated tools for life cycle cost estimation and risk assessment. NASA has made substantial progress during the last two years in developing a collaborative engineering environment. NASA is planning to use this collaborative engineering engineering infrastructure to provide better aerospace systems life cycle design and analysis, which includes analytical assessment of the technical and programmatic aspects of a system from "cradle to grave." This paper describes the recent NASA developments in the area of collaborative engineering, the benefits (realized and anticipated) of using the developed capability, and the long-term plans for implementing this capability across Agency.

Monell, Donald W.↗

Real-Time Science Decisioning During High Tempo-High Intensity Mission Operations and the Role of Analogs

Introduction: NASA’s VIPER mission presents a unique operational paradigm within the history of robotic spaceflight. The proximity of the Moon to the Earth and the terrain elements (surface characteristics, light/shadow dynamics, communication links) of the lunar South Polar landing site create unprecedented operational conditions between these two planetary bodies. Apollo era lunar science and exploration included humans in situ to operate instruments and assimilate observational inputs in real-time. Previous lunar orbital missions have worked to operational timescales, e.g., decisional timelines and communication exchanges, that were weeks in length. Mars rover missions have worked to operational timescales, e.g., decisional timelines and communication exchanges between Mars and Earth, that were hours, days, and weeks in length. In the case of the VIPER mission, our operational decisioning for rover driving and instrument commanding will be compressed to minute-scale timeframes. These operational conditions directly impact the manner and speed with which the VIPER Science Team (VST) is required to synthesize and analyze data and produce timely science-driven decisions throughout surface mission operations. The VST shall provide mission enhancing scientific input to guide rover traverse planning and drill site confirmation and selection throughout surface operations. Further, the VST input will be of vital importance to the mission’s ability to maximize science return and to meet broader NASA objectives for future lunar in-situ resource utilization (ISRU)and exploration activities. The VST co-located in the Mission Science Center (MSC) will be responsive to the tactical operational cadence of the Mission Operations Center (MOC) and will provide further strategic and Long-Term Planning (LTP) guidance to the mission. The VIPER Science Operations & Integration(SO&I)team has developed an architecture that is focused on the infusion of science-decisioning into the operational framework and execution cadence of VIPER. NASA analog research has played a significant role in the construction of the VIPER science operations systems. As an example, the SO&I team has led analog missions that have focused on bringing together expertise in the sciences (natural, applied and social) and in operations in service of learning how to build and hold together interdisciplinary work environments and what tools are needed to support high tempo, high intensity integrated decisioning. These experiences have provided an essential foundation of knowledge to the VIPER team. Those analogs that specifically influenced the VIPER science operations construct were identified through a process of comparative analysis to prioritize those that offered relevance in whole or in part, and those that did not. The analog research output that provided extensibility to the VIPER science operations architecture included remote teams of humans and robots in cooperation (synchronous and asynchronous) with simulated earthbound systems, engineering and science teams, and the integrated assembly of tools that supported scientific analysis and data synthesis and provided infrastructure for the remote testing framework. Analogs which included real-time data monitoring, synthesis, visualization and access in a democratized and operationalized manner were of particular interest to the development of the VIPER MSC toolset both in terms of the technology and the processes used to develop the supporting infrastructure. We anticipate that each subsequent mission to the lunar south pole, whether with robots or humans, will be able to optimize science and exploration return by evolving strategies to infuse real-time collaborative science-decisioning. Furthermore, these efforts will result in a foundation for science operations development in support of human-robotic exploration of deep space and Mars. NASA analogs can continue to provide the opportunity to prepare, test and iterate on the operational concepts and tools that will support these ever-expanding space exploration efforts. Our presentation will include an overview of the VIPER Science Operations & Integration development process and specifics on what aspects of analog research have had a significant impact on our work systems.

D S S Lim↗

Managing a Safe and Successful Multi-User Spaceport

Encouraged by the creation of the Office of Commercial Space Transportation within the U.S. Federal Aviation Administration (FAA) in 1984 and the Commercial Space Act of 1998, the National Aeronautics and Space Administration (NASA) now relies on an extensive network of support from commercial companies and organizations. At NASA's Kennedy Space Center (KSC), this collaboration opens competitive opportunities for launch providers, including repurposing underutilized Shuttle Program resources, constructing new facilities, and utilizing center services and laboratories. The resulting multi-user spaceport fosters diverse activity, though it engenders risk from hazards associated with various spaceflight processing activities. The KSC Safety & Mission Assurance (S&MA) Directorate, in coordination with the center's Spaceport Integration and Center Planning & Development organizations, has developed a novel approach to protect NASA's workforce, critical assets, and the public from hazardous, space-related activity associated with KSC's multi-user spaceport. For NASA KSC S&MA, the transformation to a multi-user spaceport required implementing methods to foster safe and successful commercial activity while resolving challenges involving: Retirement of the Space Shuttle program; Co-location of multiple NASA programs; Relationships between the NASA programs; Complex relationships between NASA programs and commercial partner operations in exclusive-use facilities; Complex relationships between NASA programs and commercial partner operations in shared-use facilities. NASA KSC S&MA challenges were met with long-term planning and solutions involving cooperation with the Spaceport Integration and Services Directorate. This directorate is responsible for managing active commercial partnerships with customer advocacy and services management, providing a dedicated and consistent level of support to a wide array of commercial operations. This paper explores these solutions, their relevance to the current commercial space industry, and the challenges that continue to drive improvement with a focus on areas of safety management and risk assessment that have been crucial in KSC's evolution into a multi-user spaceport. These solutions may be useful to government entities and private companies looking to partner with the commercial space industry.

Range↗

Characterizing the Effects of Chronic 2G Centrifugation on the Rat Skeletal System

During weightlessness, the skeletal system of astronauts is negatively affected by decreased calcium absorption and bone mass loss. Therefore, it is necessary to counteract these changes for long-term skeletal health during space flights. Our long-term plan is to assess artificial gravity (AG) as a possible solution to mitigate these changes. In this study, we aim to determine the skeletal acclimation to chronic centrifugation. We hypothesize that a 2G hypergravity environment causes an anabolic response in growing male rats. Specifically, we predict chronic 2G to increase tissue mineral density, bone volume fraction of the cancellous tissue and to increase overall bone strength. Systemically, we predict that bone formation markers (i.e., osteocalcin) are elevated and resorption markers (i.e., tartrate resistant acid phosphatase) are decreased or unchanged from controls. The experiment has three groups, each with an n8: chronic 2g, cage control (housed on the centrifuge, but not spun), and a vivarium control (normal rat caging). Pre-pubescent, male Long-Evans rats were used to assess our hypothesis. This group was subject to 90 days of 2G via centrifugation performed at the Chronic Acceleration Research Unit (CARU) at University of California Davis. After 90 days, animals were euthanized and tissues collected. Blood was drawn via cardiac puncture and the right leg collected for structural (via microcomputed tomography) and strength quantification. Understanding how counteract these skeletal changes will have major impacts for both the space-faring astronauts and the people living on Earth.

rat↗

GGOS Bureau of Networks and Observations: Network Infrastructure and Related Activities

The GGOS Bureau of Networks and Observations works with the IAG Services (IVS, ILRS, IGS, IDS, IGFS, and PSMSL) to advocate for the expansion and upgrade of space geodesy networks for the maintenance and improvement of the reference frame and other applications, as well as for the integration with other techniques, including absolute gravity and sea level measurements from tide gauges. New sites are being established following the GGOS concept of “core” and co-location sites, and new technologies are being implemented to enhance performance in data yield as well as accuracy. The Bureau continues to meet with organizations to discuss possibilities, including partnerships, for new and expanded participation. The GGOS Network continues to grow as new stations join every year. The Bureau holds meetings frequently, providing the opportunity for representatives from the services to meet and share progress and plans, and to discuss issues of common interest. It also monitors the status and projects the evolution of the network based on information from the current and expected future participants. Of particular interest at the moment is the integration of gravity and tide gauge networks and the forthcoming establishment of the new absolute gravity reference frame. The IAG Committees and Joint Working Groups play an essential role in the Bureau activity. The Standing Committee on Performance Simulations and Architectural Trade-offs (PLATO) uses simulation and analysis techniques to project future network capability and to examine trade-off options. The Committee on Data and Information is working on a strategy for a GGOS metadata system for data products and a more comprehensive long-term plan for an all-inclusive system. The Committee on Satellite Missions is working to enhance communication with the space missions, to advocate for missions that support GGOS goals and to enhance ground systems support. The IERS Working Group on Site Survey and Co-location (also participating in the Bureau) is working to enhance standardization in procedures, outreach and to encourage new survey groups to participate and improve procedures to determine systems’ reference points, a crucial aid in the detection of technique-specific systematic errors. We will give a brief update on the status and projection of the network infrastructure of the next several years, and the progress and plans of the Committees/Working Group in their critical role in enhancing data product quality and accessibility to the users.

Carey Noll↗

National facilities study. Volume 3: Mission and requirements model report

The National Facility Study (NFS) was initiated in 1992 by Daniel S. Goldin, Administrator of NASA as an initiative to develop a comprehensive and integrated long-term plan for future facilities. The resulting, multi-agency NFS consisted of three Task Groups: Aeronautics, Space Operations, and Space Research and Development (R&D) Task Groups. A fourth group, the Engineering and Cost Analysis Task Group, was subsequently added to provide cross-cutting functions, such as assuring consistency in developing an inventory of space facilities. Space facilities decisions require an assessment of current and future needs. Therefore, the two task groups dealing with space developed a consistent model of future space mission programs, operations and R&D. The model is a middle ground baseline constructed for NFS analytical purposes with excursions to cover potential space program strategies. The model includes three major sectors: DOD, civilian government, and commercial space. The model spans the next 30 years because of the long lead times associated with facilities development and usage. This document, Volume 3 of the final NFS report, is organized along the following lines: Executive Summary -- provides a summary view of the 30-year mission forecast and requirements baseline, an overview of excursions from that baseline that were studied, and organization of the report; Introduction -- provides discussions of the methodology used in this analysis; Baseline Model -- provides the mission and requirements model baseline developed for Space Operations and Space R&D analyses; Excursions from the baseline -- reviews the details of variations or 'excursions' that were developed to test the future program projections captured in the baseline; and a Glossary of Acronyms.

Source record↗

Manned space flight in transition

A study was conducted to analyze the reorientation of NASA programs in the post-Apollo period. The study is an external view of NASA by unbiased observers as an input to and aid in the decision making process concerning near and long term planning. The subjects discussed are: (1) the near-term NASA scenario; (2) organization of field centers; (3) planning activities; and (4) operational activities. A summary of the recommendations arising as a result of the study is presented.

Drucker, E. E.↗

Experiment Pointing Subsystems (EPS) requirements for Spacelab missions

The goal of the experiment pointing subsystems (EPS) is to accommodate a broad spectrum of instrument types by providing a number of stability and control functions that greatly exceed the capability of the shuttle. These functions include target acquisition, target tracking through wide gimbal ranges, stabilization, simultaneous pointing to one or more targets, instrument rastering, and on-orbit calibration. The experiments will vary widely in size, weight, geometry, and instrument types, and many have not been completely defined. This great diversity of requirements reflects the long term plans of the user community and establishes challenging performance requirements for the EPS.

Nein, M. E.↗

Are clear-cut areas estimated from LANDSAT imagery reliable?

The reliability of LANDSAT imagery for estimation of clear-cut areas was evaluated by comparison with data obtained from high-altitude photos and logging historical map and from field inspections. A mature forest was selected as a test site because of its continuous clear-cut operation. The forest is about 50 km northwest of Victoria, British Columbia, Canada, and consists of 9092 ha. Areas clear-cut within the past year were overestimated by 12.9%, those clear-cut 1-year or more by 2.2%, whereas uncut mature timber was underestimated by 3.6%. Three clear-cut areas were missed in the logging map and two in the LANDSAT enhancement. The difference between area estimates was significant when all 26 areas were included but not when 2 overestimated areas were excluded from the analysis. The study indicates that LANDSAT imagery color enhancement is a useful tool in up-dating clear-cut areas for long-term planning in forest management.

Lee, Y. J.↗

Long-term prospects for developments in space: A scenario approach

Long-term plans for future NASA programs are reported, and some of the following topics are discussed in detail: (1) systematic formulation of space scenarios; (2) the basic international context; (3) potential 21st century space developments; (4) space vehicle developments; and (5) future exploration.

Brown, W. M.↗

Stereoscopic observations from meteorological satellites

Stereo cloud top height measurements, accurate to within + or - 500 m, have been performed using operational weather satellites. The stereo has been demonstrated using various combinations of GEO and LEO satellites, and the use of synthetic stereo was considered. Stereo can be done over most of the earth (60 deg S to 60 deg N) during the day; at higher latitudes and at night, stereo can be done using two LEOs if the proper coincidences occur. The usefulness of stereo cloud top height measurements has been demonstrated by many studies of convective storm cloud systems. Recommendations relating to short, medium, and long term planning regarding stereo observations from meteorological satellites are outlined.

Hasler, A. F.↗

Recertification analysis and inspection planning for environmental test facilities

Program development and implementation for recertification of pressure vessels used at NASA facilities are outlined, together with inspection procedures. The recertification is carried out in three phases: analysis, inspection planning, and long term inspection plans and management. A data base was developed for each piece of equipment and the associated performance parameters. Either documentation was obtained or NDT was performed on the vessels to confirm design and Code compliance. A Failure Modes and Effects Analysis technique was used to target recurring inspection items and guidelines were drawn up for inspections of parts and systems and intervals between inspections. The steps taken in establishing the program are considered applicable in both research and industrial situations.

Rebeck, K. J.↗