Search NASA⌕ Search

SEARCH · Search NASA

Results for “master planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

DOE Environmental Management and Newport News Nuclear BWXT Briefing - LANL’s Campus Master Plan [Slides]

Triad proposed a robust integrated planning effort during the bidding process and began this effort soon after the LANL contract transition. Within months of Triad commencing this planning process, NA-LA delivered a Contracting Officer (CO) letter requiring: (1) Area Development Plan for the Pajarito Corridor delivered by end of FY19 (completed), and (2) The Campus Master Plan (CMP) to be delivered by end of FY21 (completed).

42 ENGINEERING↗

PNNL 2017 Richland Campus Master Plan

Based in Richland, Washington, Pacific Northwest National Laboratory (PNNL) is one of 10 United States (U.S.) Department of Energy (DOE) Office of Science (SC) national laboratories. PNNL is DOE’s premier chemistry, earth sciences and data analytics Laboratory, delivering vital mission impacts in energy resiliency and national security. PNNL has 19 core capabilities, each a powerful combination of world-class staff, state-of-the-art equipment, and mission ready facilities. These capabilities represent a collective set of skills and a body of world-leading scientific and engineering work that provides exceptional value and mission delivery to DOE, the National Nuclear Security Administration (NNSA), the U.S. Department of Homeland Security (DHS), and the missions of other federal agencies and industry through strategic partnership projects. Operated by Battelle Memorial Institute (Battelle), PNNL has more than: 2.3 million gross square feet and 4,400 staff members. PNNL is implementing a rolling 10-year campus strategy (initiated in FY 2013) designed to deliver the foundation for the multidisciplinary science and engineering expertise, equipment, instrumentation, facilities, and infrastructure required to continue providing exceptional value and mission delivery. PNNL’s annual ten-year plan is published with SC’s Ten-Year Plans for the Science National Laboratories. The most recent publication is available at: https://science.energy.gov/lp/laboratory-planning-process/. This edition of the PNNL Richland Campus Master Plan (CMP) is an update to the 2012 CMP.

99 GENERAL AND MISCELLANEOUS↗

Peña Station NEXT Energy District Master Plan (Cooperative Research and Development Final Report, CRADA Number CRD-17-681)

The objective of the project is to work in close collaboration with Panasonic, Xcel Energy (Public Service), and their partners L.C. Fulenwider, and Denver International Airport to examine different design and technology options in creating an energy master plan for the 400 acre Pena Station NEXT district in Denver, Colorado. To accomplish this, NREL will conduct a solar power/battery storage/grid integration study using the OpenDSS platform linked to UrbanOPT software.

25 ENERGY STORAGE↗

PNNL Campus Master Plan: Richland, Washington

The Plan is used as a guide for PNNL in making facility and infrastructure decisions essential to supporting the PNNL vision: to establish a modern, collaborative, flexible, and sustainable campus while optimizing the efficiency of operations in support of courageous discovery and innovation.

99 GENERAL AND MISCELLANEOUS↗

Twenty-Five-Year High Performance Computing Facility Master Plan and Recommendation

The current Terascale Simulation Facility (TSF) Complex facilities at Lawrence Livermore National Laboratory (LLNL) include buildings B-115, B-117, B-439, B-451, and B-453 (the TSF). B115 and B117 are 60 years old, have permanent limitations with respect to the ability to upgrade their electrical and mechanical infrastructure, and have significant structural deficiencies that must be addressed and are prohibitively costly given the age and limitations of the buildings. They are slated for Deactivation and Decommissioning (D&D).

97 MATHEMATICS AND COMPUTING↗

Site 300 City Water Master Plan

Lawrence Livermore National Laboratory (LLNL), a scientific research facility, operates an experimental test site known as Site 300. The site is located in a remote area of southeastern Alameda County, California, and consists of about 100 facilities spread across 7,000-acres. The Site 300 water system includes groundwater wells and a system of storage tanks, booster pumps, and underground piping to distribute water to buildings and significant areas throughout the site. Site 300, which is classified as a non-transient non-community (NTNC) water system, serves approximately 110 employees through 109 service connections. The distribution system includes approximately 76,500-feet of water mains varying from 4- to 10-inches in diameter, mostly asbestos cement (AC) pipe, and eleven water storage tanks. The water system is divided into four pressure zones fed by three booster pump stations to tanks in each zone.

42 ENGINEERING↗

1997 Sanitary Sewer Master Plan

The sanitary sewer system at Lawrence Livermore National Laboratory (LLNL) is designed to collect and transport wastewater from LLNL and Sandia National Laboratories (SNL). The system was installed in stages, beginning in 1942, and underwent a massive rehabilitation between 1993 and 1995. The existing system is a shallow small pipe collection system of 96,300 linear feet that consists of mainlines, building laterals, manholes, waste retention facilities, a diversion facility and a monitoring station. On average, each day nearly 300,000 gallons of wastewater from LLNL and SNL enters the City of Livermore collection system from an outfall at LLNL's northwest corner.

42 ENGINEERING↗

Sequim Campus Master Plan

Based in Richland, Washington, Pacific Northwest National Laboratory (PNNL) is one of ten U.S. Department of Energy (DOE) Office of Science (SC) national laboratories. PNNL is DOE’s premier chemistry, earth sciences, and data analytics laboratory, delivering vital mission impacts in energy resiliency and national security. PNNL has 19 core capabilities, each a powerful combination of world-class staff, state-of-the- art equipment, and mission-ready facilities. These capabilities represent a collective set of skills and a body of world-leading scientific and engineering work that provides exceptional value and mission delivery to DOE, the National Nuclear Security Administration (NNSA), the U.S. Department of Homeland Security (DHS), and other federal agencies and industry through strategic partnership projects on a not-to-interfere basis. Currently operated by Battelle Memorial Institute, PNNL occupies more than 2.3 million gross square feet (GSF) of buildings and employs approximately 4,700 staff members. PNNL has implemented a rolling 10-year campus strategy, initiated in fiscal year 2013, designed to deliver the foundation for the multidisciplinary science and engineering expertise, equipment, instrumentation, facilities, and infrastructure required to continue providing exceptional value and mission delivery. This strategy is incorporated into PNNL’s annual Laboratory Plan, which serves as DOE-SC’s equivalent of the Five- Year Site Plan required by DOE Order 430.1C Chg. 1, Real Property Asset Management. The PNNL Sequim Campus is located in Clallam County, just outside of Sequim, Washington. PNNL Sequim builds upon a rich history of research related to marine and coastal resources, environmental chemistry, water resources modeling, ecotoxicology, biotechnology, and national security. Facilities at the PNNL Sequim Campus were designed to take advantage of two unique locational assets: the pristine coastal ocean water in Sequim Bay and the region’s exceptionally clean air. Research facilities on the waterfront are supplied with up to 200 gallons per minute (gpm) of seawater and/or groundwater that enables research on aquatic systems ranging from fully seawater to fresh water, with an onsite water treatment system that removes all biological and hazardous chemical residues prior to discharge. Multiple large seawater tanks outside the waterfront laboratories, along with a boat ramp, pier, and floating dock, enable lab-to-field research. The uplands facility takes advantage of the amazing air quality and is built and operated to enable ultratrace chemical/radiological analytical chemistry. This combination of capabilities is not available at any other marine laboratory in the nation.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Modular space station phase B extension program master plan

The project is defined for design, development, fabrication, test, and pre-mission and mission operations of a shuttle-launched modular space station. The project management approach is described in terms of organization, management requirements, work breakdown structure, schedule, time-phased logic, implementation plans, manpower, and funding. The programmatic and technical problems are identified.

Munsey, E. H.↗

Energy Master Planning for Resilient Public Communities—Best Practices from U.S. Military Installations

Until recently, most planners at military installations addressed energy systems for new facilities on an individual facility basis without consideration of community-wide goals relevant to energy sources, renewables, storage, or future energy generation needs. Building retrofits of public buildings typically do not address energy needs beyond the minimum code requirements making it difficult, if not impossible, to achieve community-level targets on a building-by-building basis. Planning on the basis of cost and general reliability may also fail to deliver community-level resilience. For example, many building code requirements focus on hardening to specific threats, but in a multi-building community, only a few of these buildings may be mission-critical. Over the past two decades, the frequency and duration of regional power outages and water utility disruptions from weather, man-made events, and aging infrastructure have increased. Major disruptions of electric and thermal energy have degraded critical mission capabilities and caused significant economic impacts. In 2016, the U.S. Department of Defense issued guidance that each Service (Army, Navy, Air Force, Marines) complete comprehensive energy plans for the installations that consumed 75% of total building energy. Guidance was updated in 2017 to include metrics for energy resilience, and in some cases, water. This paper describes how community level quantitative and qualitative resilience analysis and metrics have been incorporated into community energy and water planning best practices for military installations in three geographically diverse locations. It is based on research performed under the International Energy Agency’s “Energy in Buildings and Communities Program Annex 73,” focusing on development of guidelines and tools that support the planning of Net Zero Energy Resilient Public Communities as well as research performed under the Department of Defense Environmental Security Technology Certification Program project EW18-D1- 5281, “Technologies Integration to Achieve Resilient, Low- Energy Military Installations.” The first case study reviews progress made on an energy and water planning study conducted at Fort Bliss, Texas. The second and third describes planning conducted at Fort Bragg, North Carolina and the Joint Region Marianas, Guam, respectively, under the updated guidance from 2017 regarding energy and water resilience. Analysis methods, key metrics, and key infrastructure and operational constraints are described, as well as technical, economic and business concepts used during the planning process.

Urban, Angela B.↗

Pax permanent Martian base: Space architecture for the first human habitation on Mars, volume 5

America at the Threshold: Report of the Synthesis Group on America's Space Exploration Initiative (the 'Synthesis Report,' sometimes called the Stafford Report after its astronaut chair, published in 1991) recommended that NASA explore what it called four 'architectures,' i.e., four different scenarios for habitation on Mars. The Advanced Design Program in Space Architecture at the University of Wisconsin-Milwaukee supported this report and two of its scenarios--'Architecture 1' and 'Architecture 4'--during the spring of 1992. This report investigates the implications of different mission scenarios, the Martian environment, supporting technologies, and especially human factors and environment-behavior considerations for the design of the first permanent Martian base. The report is comprised of sections on mission analysis, implications of the Martian atmosphere and geologic environment, development of habitability design requirements based on environment-behavior and human factors research, and a full design proposed (concept design and design development) for the first permanent Martian base and habitat. The design is presented in terms of a base site plan, master plan based on a Mars direct scenario phased through IOC, and design development details of a complete Martian habitat for 18 crew members including all laboratory, mission control, and crew support spaces.

Huebner-Moths, Janis↗