Mechanisms Engineering Test Loop (METL) Operations and Testing Report (FY2021)
This report documents the operations and testing that was performed at the Mechanisms Engineering Test Loop (METL) during FY2021. The METL facility had a very successful third year of operations having logged about 944 days of operations with molten sodium either in a flowing or static condition. Operations were paused in April 20, 2021 to accommodate the refurbishing of building 308’s alkali metal passivation booth and scrubber (AMPB&S). METL is being prepared to support a second larger experiment, the Thermal Hydraulic Experimental Test Article (THETA) and expects to resume the Gear Test Assembly (GTA) testing. The technology development team is also developing two additional experiments, a gripper test article and a flow sensor test article that are expected to go into METL in late FY22 or early FY23.