Mitigating Smart Meter Asynchrony Error Via Multi-Objective Low Rank Matrix Recovery
Not provided.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Not provided.
A 2.29 m (7.5 ft.) span high-lift research model equipped with full-span leading-edge slat and part-span double-slotted trailing-edge flap was tested in the Langley 4- by 7-Meter Tunnel to determine the low speed performance characteristics of a representative high aspect ratio suprcritical wing. These tests were performed in support of the Energy Efficient Transport (EET) program which is one element of the Aircraft Energy Efficiency (ACEE) project. Static longitudinal forces and moments and chordwise pressure distributions at three spanwise stations were measured for cruise, climb, two take-off flap, and two landing flap wing configurations. The tabulated and plotted pressure distribution data is presented without analysis or discussion.
Due to natural variability and uncertainty, the ever-increasing penetration of solar generation in Hawaii presents challenges to power grid operators to maintain reliable system operation. Demand response (DR) has the potential to be a cost-effective tool for Hawaii to reach its aggressive renewable energy goals while maintaining the reliability of power grids. The Hawaii Public Utilities Commission has approved the Hawaiian Electric Company's revised portfolio of DR programs. The companies have released a grid services purchase agreement and subscribed an initial tranche of load into their DR programs. This paper presents innovative analytical methods and comprehensive economic assessment for distributed photovoltaics (PV) paired with battery energy storage systems (BESSs) for two new DR programs, including fast frequency response and capacity grid service. Optimal dispatch and sizing methods are proposed for the paired system considering different tariff schedules and PV compensation programs across five islands. It was found that while the best resource configuration and potential economic benefits vary with tariff structure, a BESS paired with PV can be optimally dispatched to generate multiple value streams simultaneously. Compensation from DR programs is an important value stream to help increase the cost-effectiveness of the integrated system.
Not Available
Not provided.
The Dark Energy Spectroscopic Instrument (DESI) is a Stage IV ground-based dark energy experiment that will measure the expansion history of the Universe using the Baryon Acoustic Oscillation technique. The spectra of 35 million galaxies and quasars over 14000 square degrees will be measured during the life of the experiment. We describe the installation of the major elements of the instrument at the Mayall 4m telescope, completed in late 2019. The previous prime focus corrector, spider vanes, and upper rings were removed from the Mayall’s Serrurier truss and replaced with the newlyconstructed DESI ring, vanes, cage, hexapod, and optical corrector. The new corrector was optically aligned with the primary mirror using a laser tracker system. The DESI focal plane system was integrated to the corrector, with each of its ten 500-fiber-positioner petal segments installed using custom installation hardware and the laser tracker. Ten DESI spectrographs with 30 cryostats were installed in a newly assembled clean room in the Large Coude Room. The ten cables carrying 5000 optical fibers from the positioners in the focal plane were routed down the telescope through cable wraps at the declination and hour angle axes, and their integral slitheads were integrated with the ten spectrographs. The fiber view camera assembly was installed to the Mayall’s primary mirror cell. Servers for the instrument control system replaced existing computer equipment. The fully integrated instrument has been commissioned and is ready to start its operations phase.
Thermal control design for diffraction limited large diameter Cassegranian telescope systems in orbital conditions, using computer and scale model testing
Overall and blade-element aerodynamic performance of a 0.271-scale model of QF-1 are presented, examined, and then compared and evaluated with that from similar low noise fan stage designs. The tests cover a wide range of speeds and weight flows along with variations in stator setting angle and stator axial spacing from the rotor. At design speed with stator at design setting angle and a fixed distance between stage measuring stations, there were no significant effects of increasing the axial spacing between rotor stator from 1.0 to 3.5 rotor chords on stage overall pressure ratio, efficiency or stall margin.
The Deep Space Network 64-m antennas are being upgraded to improve their performance by increasing the diameter to 70 m, installing precision panels, and using a shaped surface. Performance improvement is expected to be 1.9 dB at X-band and 1.4 dB at S-band. The design and capabilities of the antenna are discussed.
The derivation of the proper truck preload is discussed and is shown to be dependent upon the azimuth drive preload direction, the wind direction and magnitude, and the out of roundness of the track. The resulting wheel and track contact stresses were evaluated and found to be satisfactory for either the 64-m or 70-m antenna. The wheel bearing loads were found to be quite satisfactory for the larger 70-m antenna. Methods for evaluating the effects of track out of roundness and for aligning the wheel and truck assemblies are presented. It is believed that these methods are practical and that the increased loadings on the parts should not affect the expected long life of the azimuth bearing.
RESOLVE is the payload on a Class D mission, Resource Prospector, which will prospect for water and other volatile resources at a lunar pole. The RESOLVE payload's primary scientific purpose includes determining the presence of water on the moon in the lunar regolith. In order to detect the water, a gas chromatograph (GC) will be used in conjunction with a mass spectrometer (MS). The goal of the experiment was to compare two GC column lengths and recommend which would be best for RESOLVE's purposes. Throughout the experiment, an Inficon Fusion GC and an Inficon Micro GC 3000 were used. The Fusion had a 20m long column with 0.25mm internal diameter (Id). The Micro GC 3000 had an 8m long column with a 0.32mm Id. By varying the column temperature and column pressure while holding all other parameters constant, the ideal conditions for testing with each column length in their individual instrument configurations were determined. The criteria used for determining the optimal method parameters included (in no particular order) (1) quickest run time, (2) peak sharpness, and (3) peak separation. After testing numerous combinations of temperature and pressure, the parameters for each column length that resulted in the most optimal data given my three criteria were selected. The ideal temperature and pressure for the 20m column were 95 C and 50psig. At this temperature and pressure, the peaks were separated and the retention times were shorter compared to other combinations. The Inficon Micro GC 3000 operated better at lower temperature mainly due to the shorter 8m column. The optimal column temperature and pressure were 70 C and 30psig. The Inficon Micro GC 3000 8m column had worse separation than the Inficon Fusion 20m column, but was able to separate water within a shorter run time. Therefore, the most significant tradeoff between the two column lengths was peak separation of the sample versus run time. After performing several tests, it was concluded that better detection via good peak separation with a longer run time is a better asset than moderate peak separation with a shorter run time. Even given that RESOLVE is highly interested in water and that mission timeline is of significant importance given the short seven-to-ten-day mission timeline, worse detection with an 8m column may lead to overlooking other substances existing on the moon that could advance planetary science. Thus, I recommend the 20m column. However, if mission timeline and water separation are deemed the highest priority, the 8m column should be selected due to its ability to separate water within a shorter run time than the 20m column.
Data supporting the article “The Missing Correlation Between the Potential Rate Impacts of Rooftop Solar and the Timing of State Net Metering Policy Revisions” (https://www.nlr.gov/docs/fy25osti/93543.pdf). Residential solar photovoltaic (PV) output in most states is credited at the retail electricity rate, a policy commonly known as net metering. Twelve states have replaced net metering with alternative rate structures that reduce PV adopter bill savings. Proponents of these revisions argue that net metering increases the electricity rates of customers without PV. Here, we analyze the degree to which the timelines of net metering revisions have correlated with potential electricity rate impacts. We estimate that potential rate impacts at the end of 2023 were less than 1% of typical customer bills in 37 of 44 states that have offered net metering. There are no statistically significant differences in average or median estimated rate impacts between states that have and have not revised net metering. Nine of the states that had revised net metering did so when estimated impacts were less than 1% of typical customer bills. Many states have retained net metering into higher PV deployment levels with increased risk of potential rate impacts. Only two states-California and Hawaii-retained net metering beyond estimated rate impacts of 5%, and both have revised net metering. These findings do not suggest a clear, consistent link between net metering revision timelines and potential rate impacts. The timing and nature of net metering revisions are ultimately policy decisions based on state-level priorities and considerations.
Residential solar photovoltaic (PV) output in most states is credited at the retail electricity rate, a policy commonly known as net metering. Twelve states have replaced net metering with alternative rate structures that reduce PV adopter bill savings. Proponents of these revisions argue that net metering increases the electricity rates of customers without PV. Here, we analyze the degree to which the timelines of net metering revisions have correlated with potential electricity rate impacts. We estimate that potential rate impacts at the end of 2023 were less than 1% of typical customer bills in 37 of 44 states that have offered net metering. There are no statistically significant differences in average or median estimated rate impacts between states that have and have not revised net metering. Nine of the states that had revised net metering did so when estimated impacts were less than 1% of typical customer bills. Many states have retained net metering into higher PV deployment levels with increased risk of potential rate impacts. Only two states—California and Hawaii—retained net metering beyond estimated rate impacts of 5%, and both have revised net metering. These findings do not suggest a clear, consistent link between net metering revision timelines and potential rate impacts. The timing and nature of net metering revisions are ultimately policy decisions based on state-level priorities and considerations.
NASA Ames Research Center is developing decision support tool technology for air traffic controllers to improve the efficiency and capacity of National Airspace System. The goal is to provide technology, tools and procedures that result in the highest possible level of user preferred trajectories whenever possible with safe and efficient traffic management when necessary. The work is being conducted under the NASA Advanced Air Transportation Technology Program in cooperation with the FAA through the Inter-Agency Integrated Product Team. The objective is to develop technology and procedures that lead towards a seamless integration of conflict resolution with metering and scheduling for arrival aircraft and en route aircraft that are under metering restrictions. A requirement is that the integration incorporate user preferred trajectories. The ultimate goal is the implementation and validation of the Descent Advisor (DA) concept which provides clearance advisories to a sector controller that simultaneously meet metering constraints, are conflict free, incorporate a user preferred (e.g., minimum fuel) descent profile, and generally require no further corrective clearance as the aircraft transitions from en route cruise into the TRACON. The DA concept may also be applied to en route aircraft under metering constraints, e.g., miles-in-trail. To achieve the DA concept a stepwise development and field evaluation is anticipated. This paper addresses the initial steps towards implementation of the DA. The Traffic Management Advisor (TMA) computes arrival time sequence and required delay information for display to the sector controller during periods when arrivals must be metered due to landing rate restrictions at the airport. The Initial Conflict Probe (ICP) compares trajectory predictions for all aircraft and alerts the controller when any two aircraft are predicted to violate separation standards (5 mi. and 2000 ft. in en route airspace). ICP also includes a trial planning function allowing the controller to develop and check a separate "what if" trajectory for conflict resolution. TMA and ICP currently operate independent of one another and have separate controller displays. The TMA meter list is on the radar controller's plan view display. The ICP is still under development, but the current concept calls for a list of predicted conflicts at the data controller position. The research described herein address two steps towards the implementation of DA. The first is to develop a concept for integrated display of conflict and metering information on a controller's display. The objective is to provide the controller with situational awareness of one problem while he develops a solution to the other. The next step is to expand the concept for display of automated clearance advisories for one problem (e.g., metering) which take into account the other problems (e.g., conflicts). Information to be communicated between TMA and ICP to facilitate' manual or automated advisories is being identified as the concept matures. In order to study the ICP/TMA integration concept the CTAS conflict probe capability has been adapted to Ft. Worth Center. The system is being validated in the laboratory with all-track data and for non -interference with TMA, TMA is already running as a daily use prototype at Ft. Worth Center. A laboratory prototype system has been developed under the CTAS baseline which combines conflict and metering information on a common user interface. Elements of the user interface are shown in Figure 1. In this simple illustration the user sees the simultaneous effect of a trial plan on meter fix delay and conflict status. Delay information is shown in the aircraft flight data block, the meter list, and the TMA timeline. Experience during Descent Advisor development and observations at Ft. Worth Center high and low attitude arrival sectors during metering suggests that manual trial planning will be unworkable during rush periods due to high controller workload.
Balanced flow meters are recent additions to an established class of simple, rugged flow meters that contain no moving parts in contact with flow and are based on measurement of pressure drops across objects placed in flow paths. These flow meters are highly accurate, minimally intrusive, easily manufacturable, and reliable. A balanced flow meter can be easily mounted in a flow path by bolting it between conventional pipe flanges. A balanced flow meter can be used to measure the flow of any of a variety of liquids or gases, provided that it has been properly calibrated. Relative to the standard orifice-plate flow meter, the balanced flow meter introduces less turbulence and two times less permanent pressure loss and is therefore capable of offering 10 times greater accuracy and repeatability with less dissipation of energy. A secondary benefit of the reduction of turbulence is the reduction of vibration and up to 15 times less acoustic noise generation. Both the balanced flow meter and the standard orifice-plate flow meter are basically disks that contain holes and are instrumented with pressure transducers on their upstream and downstream faces. The most obvious difference between them is that the standard orifice plate contains a single, central hole while the balanced flow meter contains multiple holes. The term 'balanced' signifies that in designing the meter, the sizes and locations of the holes are determined in an optimization procedure that involves balancing of numerous factors, including volumetric flow, mass flow, dynamic pressure, kinetic energy, all in an effort to minimize such undesired effects as turbulence, pressure loss, dissipation of kinetic energy, and non-repeatability and nonlinearity of response over the anticipated range of flow conditions. Due to proper balancing of these factors, recent testing demonstrated that the balanced flow-meter performance was similar to a Venturi tube in both accuracy and pressure recovery, but featured reduced cost and pipe-length requirements.
This presentation describes the concept of ATD-2 tactical surface scheduling and metering. The concept is composed of several elements, including data exchange and integration; surface modeling; surface scheduling; and surface metering. The presentation explains each of the elements. Surface metering is implemented to balance demand and capacity• When surface metering is on, target times from surface scheduler areconverted to advisories for throttling demand• Through the scheduling process, flights with CTOTs will not get addedmetering delay (avoids potential for ‘double delay’)• Carriers can designate certain flights as exempt from metering holds• Demand throttle in Phase 1 at CLT is through advisories sent to rampcontrollers for pushback instructions to the flight deck– Push now– Hold for an advised period of time (in minutes)• Principles of surface metering can be more generally applied to otherairports in the NAS to throttle demand via spot-release times (TMATs Strong focus on optimal use of airport resources• Flexibility enables stakeholders to vary the amount of delay theywould like transferred to gate• Addresses practical aspects of executing surface metering in aturbulent real world environment• Algorithms designed for both short term demand/capacityimbalances (banks) or sustained metering situations• Leverage automation to enable surface metering capability withoutrequiring additional positions• Represents first step in Tactical/Strategic fusion• Provides longer look-ahead calculations to enable analysis ofstrategic surface metering potential usage
The Goldstone Deep Space Communications Complex (GDSCC) is part of NASA's Deep Space Network (DSN), one of the world's largest and most sensitive scientific telecommunications and radio navigation networks. A detailed description of the GDSCC is presented. At present the Venus Station has an unused 9-meter antenna and a 26-meter (85 ft) antenna known as DSS-13. Construction of a new 34-meter (111.5 ft) antenna at the Venus site is under way to replace the present DSS-13 26-meter antenna. The proposed construction at the Apollo Site of a new, high efficiency, 34-meter, multifrequency beam waveguide-type antenna to replace the aging, 20-year old, DSS-12 34-meter antenna located at the Echo Site is analyzed. This new 34-meter antenna, to be constructed at the Apollo Site and to be known as DSS-18, will be of a design similar to the new DSS-13 34-meter antenna now being constructed at the Venus Site. When the new 34-meter antenna is completed and operational at the Apollo Site (planned for 1993), the old DSS-12 34-meter antenna at the Echo Site will be decommissioned, dismantled, and removed.